B08_Attach_7_QASP_ANTI_FY25_Landscape_Maintenance_with_Options_013125_.pdf

PDF 183 KB Posted

Attached to
ANTI/MONO FY25 LANDSCAPE MAINT W/ OPTION
Solicitation number
140P3025Q0005
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for the ANTI/MONO FY25 Landscape Maintenance contract. The plan details the government's inspection and performance monitoring process for landscape maintenance services, with a 100% acceptable quality level (AQL) across multiple service requirements. Key performance standards include maintaining turf height between 3" and 6", ensuring uniform turf appearance, performing maintenance only during favorable weather conditions, and removing litter and debris before service.

The QASP outlines strict compliance measures with significant financial implications for the contractor. For each performance deficiency, the contractor must correct issues within 2 days of written notification, with 10% of payments withheld until compliance is achieved. Additional requirements include submitting various plans within 14 days post-award (such as safety, quality control, and operations plans), maintaining equipment in safe condition, and adhering to employee conduct standards. Failure to meet these standards can result in work stoppage, payment withholding, or employee dismissal from the job site.

View the file

Other files

File Type Posted
Sol_140P3025Q0005_Amd_0011.pdf PDF
Sol_140P3025Q0005_Amd_0010.pdf PDF
B08_Attch_10-__Limitation_on_Subcontracting_Worksheet_0010.xlsx XLSX spreadsheet
Sol_140P3025Q0005_Amd_0009.pdf PDF
B08_Attch_5_MONO_WD_2015-4269_Rev_29_4_25_2025_0009.pdf PDF
B08_Attch_6_ANTI_WD_2015-4293_Rev_30_4_25_2025_0009.pdf PDF
Sol_140P3025Q0005_Amd_0008.pdf PDF
Sol_140P3025Q0005_Amd_0007.pdf PDF
B08_Attach_9_-_Pricing_Schedule_May_2025_0007.xls XLS spreadsheet
Sol_140P3025Q0005_Amd_0006.pdf PDF
Sol_140P3025Q0005_Amd_0005.pdf PDF
Sol_140P3025Q0005_Amd_0004.pdf PDF
Sol_140P3025Q0005_Amd_0003.pdf PDF
Sol_140P3025Q0005_Amd_0002.pdf PDF
Sol_140P3025Q0005_Amd_0001.pdf PDF
B08_Attch_4_-_FY25-30_Landscape_Maps_-_ANTI_Optional_SAF.pdf PDF
Sol_140P3025Q0005.pdf PDF
B08_Attach_5_MONO_WD_2015-4269_Rev_28_12_23_2024.pdf PDF
B08_Attach_3_-_FY25-30_Landscape_Maps_-_MONO_Options_SAF.pdf PDF
B08_Attach_8_-_ANTI_MONO_Landscape_Maintenance_Daily_Report_Template.docx DOCX document
B08_Attach_2-_FY25-30_Landscape_Maps_Base.pdf PDF
B08_Attach_9_-_Pricing_Schedule.xls XLS spreadsheet
B08_Attach_6_ANTI_WD_2015-4293_Rev_29_12_23_2024.pdf PDF
B08_Attch_1_-_FY25_ANTI_MONO_Landscape_Maintenance_with_Options_PWS_.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan ANTI/MONO FY25 Landscape Maintenance with Options

2/3/2025 R1

The Government shall inspect the contractor’s performance under this contract periodically through the service and when the contractor declares the service complete. The Government must do so to ensure that the contractor has performed in accordance with the performance standards. If the Government should find any performance deficiencies, the Contractor shall correct the deficiencies within 2 days of written notification by the COR, POC, or CO.

Required Services/Tasks

(from PWS)

Performance Standard

Acceptable Quality Level

(AQL)

Method Used/ Frequency

Incentive (Positive and/or Negative)

(Impact on Contractor Payments)

Provide required Landscape Maintenance Services for all Prescribed Areas

Per PWS 3.1 100% Periodic and Final COR Inspection

No Payment will be made until all prescribed areas are compliant.

Maintain Turf between 3” and 6”

Per PWS 3.1.1.1, 3.1.2.2, 3.1.3.2

100% Periodic COR inspection

Contractor will reperform at no cost within 2 days of notification until the condition is compliant with the PWS - 10% of any payment will be withheld until compliant.

Monitor and Maintain Turf in a uniform and constant appearance

Per PWS 3.1.1.3

100% Periodic COR inspection

Contractor will reperform at no cost within 2 days until the condition is compliant with the PWS – 10% of any payment will be withheld until compliant.

Provide landscape maintenance in Cycles

Per PWS 1.0, 6.2, 10.0

100% Periodic and Final COR inspection

Contractor will reperform at no cost within 2 days until the condition is compliant with the PWS – 10% of any payment will be withheld until compliant.

Perform Landscape Maint. Only during Favorable Weather Conditions

Per PWS 3.1.1.5, 10.0

100% Periodic and Final COR inspection

Ground damaged identified during inspection will be repaired at no cost to the satisfaction of the COR within 2 days – 10% payment will be withheld until compliant.

Remove and dispose of excessive turf clippings

Per PWS 3.1.1.7, 10.0

100% Periodic and Final COR inspection

Contractor will reperform at no cost within 2 days of notification until the condition is compliant with the PWS - 10% of any payment will be withheld until compliant

Litter and Debris picked up and removed before starting Landscape Services in a Prescribed Area

Per PWS 3.1.1.6, 3.1.2.7, 3.1.3.6

100% Periodic and Final COR inspection

Contractor will reperform at no cost within 2 days of notification until the condition is compliant with the PWS - 10% of any payment will be withheld until compliant

Provide equipment in operable, effective, and safe condition

Per PWS 4.4 100% Periodic COR Inspection

Equipment will not be permitted to be used until it is deemed adequate and safe to the satisfaction of the

COR.

Safety Control Measures

Per PWS 4.0 100% Periodic COR inspection

Work will be stopped until condition is brought into compliance according to the PWS

Superintendent and Alt. written designation

Per PWS 6.1.1

100% Received & approved 14 days post award

Contractor cannot start services.

Written Safety Plan

Per PWS 6.7, 10.0

100% Received & approved 14 days post award.

Contractor cannot start services.

Spill Prevention Plan

Per PWS 6.7

100% Received & approved 14 days post award.

Contractor cannot start services.

Written Quality Control Plan

Per PWS 6.7, 10.0

100% Received & approved 14 days post award

Contractor cannot start services.

Annual Operations Plan

Per PWS 6.7.2

100% Received & approved 14 days post award.

Contractor cannot start services.

Daily Reports Per PWS 6.6 100% Received & approved after each cycle and prior to any payment application

Payments will not be made until COR receives and approves applicable reports.

Equipment List Per PWS 6.5, 6.7.3, 100% Received & approved 14 days post award.

Contractor cannot start services.

Contractor Employee Conduct

Per PWS 6.8.1

95% No more than 2 reported instances in writing as outlined in 6.9.1 may occur per employee

Offending employee will be dismissed from the premises and shall not return for the remainder of the job.

Quality Assurance Surveillance Plan