B08_Attach_10_PriceSched.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Replace Shoreline Barriers at Smiling Cove and Out
Solicitation number
140P2023R0011
Issued by

About this file

This document contains a price schedule template for a federal contract solicitation to replace shoreline barriers at two locations on American Memorial Park in Saipan. The solicitation is issued by the National Park Service's Denver Service Center and includes line items for base work replacing barriers at the West and East Causeways, as well as optional additional work that could be added such as extending the West Causeway shoreline protection and adding a new sidewalk. Offerors are required to submit pricing for both the base line items and all option line items. Pricing terms require unit prices to be provided along with extended totals, and specify that errors in calculation or summation will be resolved based on the provided unit prices or totals.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

Contract Price Schedule
National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18
Solicitation Number: 140P2023R0011
PARK - PMIS (Project Management Information System): AMME-236143
Developed Area: American Memorial Park, Saipan
Project Title:Replace Shoreline Barriers at Smiling Cove and Outer Cove
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1West Causeway Shoreline Protection1Lump Sum$0.00
2East Causeway Shoreline Protection1Lump Sum$0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 2 ---------------------------------------------------------------------------------$0.00
3OPTION 1, West Causeway - 500 feet of Additional Shoreline Rock Slope Protection500Linear Foot$0.00
4OPTION 2, New Sidewalk along West Causeway - Approximately 900 Linear Feet1Lump Sum$0.00
5OPTION C, (CLI Title)- 0
6OPTION D, (CLI Title)- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 & 4 -----------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 4 --------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

File details come from the government source that posted it. Updated .