B08_Attach_10_PriceSched.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- 140P2023R0011
About this file
This document contains a price schedule template for a federal contract solicitation to replace shoreline barriers at two locations on American Memorial Park in Saipan. The solicitation is issued by the National Park Service's Denver Service Center and includes line items for base work replacing barriers at the West and East Causeways, as well as optional additional work that could be added such as extending the West Causeway shoreline protection and adding a new sidewalk. Offerors are required to submit pricing for both the base line items and all option line items. Pricing terms require unit prices to be provided along with extended totals, and specify that errors in calculation or summation will be resolved based on the provided unit prices or totals.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18 | |||||
| Solicitation Number: 140P2023R0011 | |||||
| PARK - PMIS (Project Management Information System): AMME-236143 | |||||
| Developed Area: American Memorial Park, Saipan | |||||
| Project Title: | Replace Shoreline Barriers at Smiling Cove and Outer Cove | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | West Causeway Shoreline Protection | 1 | Lump Sum | $0.00 | |
| 2 | East Causeway Shoreline Protection | 1 | Lump Sum | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 2 --------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION 1, West Causeway - 500 feet of Additional Shoreline Rock Slope Protection | 500 | Linear Foot | $0.00 | |
| 4 | OPTION 2, New Sidewalk along West Causeway - Approximately 900 Linear Feet | 1 | Lump Sum | $0.00 | |
| 5 | OPTION C, (CLI Title) | - 0 | |||
| 6 | OPTION D, (CLI Title) | - 0 | |||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 & 4 ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 4 -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .