B08_Attach_1_FOVA_241806_Technical_Specs.pdf

PDF 15 MB Posted

Attached to
Fort Vancouver National Historic SiteRehabilitat
Solicitation number
140P2021R0116
Issued by

About this file

This document provides details for a federal solicitation to rehabilitate facilities at Fort Vancouver National Historic Site. The solicitation number is 140P2021R0116 and seeks offers to rehabilitate the historic Main Parade Ground Barracks and Crossroads Parking Lot. The work will be performed for the National Park Service National Office within the Department of the Interior. Offerors should provide services to rehabilitate and restore the structures in keeping with historic preservation standards. The response deadline is not specified but the opportunity was posted to support awarding a contract for the work in 2021. Relevant experience rehabilitating historic military or park structures is preferred for the successful offeror.

View the file

Other files

File Type Posted
B09_Amend_0005_Attach_FOVA_Building_993_hazmat_and_demo_work_accomplished_April_2021_0005.pdf PDF
B09_Amend_0005_Attach_FOVA_Building_993_Pre_Renovation_SURVEY_0005.pdf PDF
B09_Amend_0005_Attach_FOVA_Building_993_09_65_00_Resilient_Flooring_0005.pdf PDF
B09_Amend_0005_Attach_FOVA_Building_993_NTCRA_AFter_Action_Report_0005.pdf PDF
Sol_140P2021R0116_Amd_0005.pdf PDF
B09_Amend_0005_Attach_FOVA_Building_993_Questions___Answers_Final_0005.pdf PDF
B09_Amend_0004_Attach_Questions_and_Answers-FOVA_993-03Aug21_0004.pdf PDF
Sol_140P2021R0116_Amd_0004.pdf PDF
B09_Amend_0003_Attach_Questions_and_Answers-FOVA_993-28Jul21_0003.pdf PDF
B09_Amend_0003_Attach__PSP_Vol_I_PropEquals_0003.pdf PDF
Sol_140P2021R0116_Amd_0003.pdf PDF
Sol_140P2021R0116_Amd_0002.pdf PDF
B08_Attach_11F_Solit_PSP_Vol_II_GenRefs_0001.doc DOC document
B08_Attach_11C_Solit_PSP_Vol_I_PastPerf_REQD_0001.docx DOCX document
B08_Attach_11A_Solit_PSP_TOC_0001.pdf PDF
B08_Attach_11G_Solit_PSP_Vol_II_SubKPlanForm_REQD_0001.doc DOC document
B08_Attach_11E_Solit_PSP_Vol_II_241806-309903-ContractPriceSchedule_0001.pdf PDF
B11_FOVA_993_MeetingSignIn_0001.pdf PDF
B08_Attach_11D_Solit_PSP_Vol_II_241806-309903-SF_24_Bid_Bond_0001.pdf PDF
Sol_140P2021R0116_Amd_0001.pdf PDF
B08_Attach_11B_Solit_PSP_Vol_I_Exp_REQD_0001.docx DOCX document
B08_Attach_3_FOVA_309903_Technical_Specs.pdf PDF
B08_Attach_7_Heavy_Civil_Wage_Determination.pdf PDF
B08_Attach_2b_FOVA_241806_FINAL-CD_DWGS-2.pdf PDF
B08_Attach_6_Building_Wage_Determination.pdf PDF
B08_Attach_2a_FOVA_241806_FINAL-CD_DWGS-2.pdf PDF
B08_Attach_8_FOVA_241806_Geotech_Report-FOVA_Utilities2014.pdf PDF
B08_Attach_5_FOVA_241806-309903_Division_-1_Specs.pdf PDF
B08_Attach_9_FOVA_Barracks_Circ_Changes_Site_Vist_Map_June2021.pdf PDF
B08_1442_140P2021R0116.pdf PDF
B08_Attach_4_FOVA_309903_FINAL-CD_DWGS.pdf PDF
Sol_140P2021R0116.pdf PDF
B08_Attach_2c_FOVA_241806_FINAL-CD_DWGS-3.pdf PDF
B08_Attach_10_FOVA_SB_Subcontracting_Plan.doc DOC document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Architecture

Planning

Conservation

100% COMPLETE CONSTRUCTION DOCUMENTS

Rehabilite Historic Main Parade Ground Barracks Buidilng

993 at Fort Vancouver Na� onal Historic Site, WA Na� onal Park Service | July 1, 2019

VOLUME 1B OF 4

FINAL CONSTRUCTION DOCUMENTS

March 2, 2020 k.gillard Text Box June 21, 2021

[THIS PAGE INTENTIONALLY LEFT BLANK]

FOVA 241806 00 01 10-1

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 Table of Contents

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 26 01 Contract Modification Procedures

01 27 00 Definition of Contract Line Items

01 31 00 Project Management & Coordination

01 32 16 Construction Schedule

01 32 33 Photographic Documentation

01 33 23 Submittal Procedures

• Submittal List

01 35 13.22 Archeological Protection

01 35 23 Safety Requirements

01 35 91 Historic Preservation Treatment Procedures

01 40 00 Quality Requirements

01 42 00 Reference Standards

01 50 00 Temporary Facilities and Controls

01 57 19.11 Indoor Air Quality Management

01 57 19.12 Noise & Acoustics Management

01 57 23 Temporary Storm Water Pollution Prevention

01 67 00 Product Requirements

01 73 29 Cutting and Patching

01 73 40 Execution

01 74 19 Construction Waste Management and Disposal

01 77 00 Closeout Procedures

• Closeout and O&M Procedures List

01 78 23 Operation and Maintenance Data

01 79 00 Demonstration and Training

01 81 13 Sustainable Design Requirements

01 91 14 Total Building Commissioning

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Removal of Pavements and Structures

02 41 19 Selective Structure Demolition

02 82 13 Asbestos Abatement

02 82 21 Materials Containing <1% Asbestos

DIVISION 03 – CONCRETE

03 30 00 Cast-In-Place Concrete

DIVISION 04 – MASONRY

04 01 20 Maintenance of Unit Masonry

04 01 41 Stone Cleaning

FOVA 241806 00 01 10-2

DIVISION 05 – METALS

05 12 00 Structural Steel

05 50 00 Metal Fabrications

05 52 00 Metal Handrails

05 52 13 Pipe and Tube Railings

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry

06 20 13 Exterior Finish Carpentry

06 20 23 Interior Finish Carpentry

06 40 23 Interior Architectural Woodwork

06 43 00 Wood Stairs and Railings

06 64 00 Plastic Paneling

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 13 10 Self-Adhering Sheet Waterproofing

07 21 00 Building Insulation

07 25 00 Weather Barriers

07 62 00 Sheet Metal Flashing and Trim

07 63 10 EPDM Coating of Gutter Liner

07 84 00 Firestopping

07 92 00 Joint Sealants

DIVISION 08 – OPENINGS

08 01 52.93 Treatment of Historic Wood Windows

08 14 33 Stile and Rail Wood Doors

08 14 33.98 Treatment of Historic Wood Doors

08 30 50 Access Doors

08 52 00 Wood Windows

08 53 00 Insulating Windows

08 71 00 Door Hardware

08 74 13 Low-Energy Door Operators

08 80 00 Glazing

08 91 00 Louvers

DIVISION 09 – FINISHES

09 23 00 Gypsum Plastering

09 24 00 Portland Cement Plastering

09 29 00 Gypsum Board

09 30 00 Tiling

09 51 00 Acoustical Ceilings

09 55 00 Rehabilitation of Pressed Metal Ceilings

09 64 00 Wood Flooring

09 65 00 Resilient Flooring

09 68 13 Tile Carpeting

FOVA 241806 00 01 10-3

09 91 13 Exterior Painting

09 91 23 Interior Painting

DIVISION 10 – SPECIALTIES

10 11 24 Tackable Wall Systems

10 14 23 Panel Signage

10 21 13 Metal Toilet Compartments

10 28 00 Toilet, Bath, and Laundry Accessories

10 44 13 Fire Extinguisher Cabinets

10 44 16 Fire Extinguishers

DIVISION 11 – (NOT USED)

DIVISION 12 – FURNISHINGS

12 36 61 Solid Surface Countertops

DIVISION 13 – (NOT USED)

DIVISION 14 – CONVEYING EQUIPMENT

14 24 00 Hydraulic Elevators

DIVISION 15-20 (NOT USED)

DIVISION 21 – FIRE SUPPRESSION

21 05 00 Common Work Results for Fire Suppression

21 10 00 Water Based Fire Suppression Systems

DIVISION 22 – PLUMBING

22 05 00 Common Work Results for Plumbing

22 05 19 Meters and Gauges for Plumbing

22 05 23 General Duty Valves and Specialties for Plumbing

22 05 29 Hangers, Supports, and Anchors Plumbing

22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment

22 05 53 Identification for Plumbing Piping and Equipment

22 05 90 Pressure Testing for Plumbing Systems

22 05 93 Testing, Adjusting, and Balancing for Plumbing

22 07 00 Insulation for Plumbing

22 08 00 Commissioning for Plumbing

22 21 13 Pipe and Pipe Fittings Plumbing

22 21 23 Pumps for Plumbing

22 25 00 Plumbing Water Treatment

22 30 00 Plumbing Equipment

22 40 00 Plumbing Fixtures

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

FOVA 241806 00 01 10-4

23 05 00 Common Work Results for Heating, Ventilation, and Air Conditioning

23 05 29 Hangers, Supports, and Anchors for HVAC

23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment

23 05 53 Identification for HVAC Piping and Equipment

23 05 90 Pressure Testing for HVAC Systems

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 00 Insulation for HVAC

23 08 00 Commissioning for HVAC

23 09 93 Sequence of Operations for HVAC Controls

23 21 13 Pipe and Pipe Fittings HVAC

23 31 01 HVAC Ducts and Casing-Low Pressure

23 33 00 Air Duct Accessories

23 34 00 HVAC Fans

23 37 00 Air Outlets and Inlets

23 40 00 HVAC Air Cleaning Devices

23 72 00 Air to Air Energy Recovery Units

23 81 00 Decentralized Unitary HVAC Equipment

23 84 10 Electric Heating Equipment

DIVISION 24 – 25 (NOT USED)

DIVISION 26 – ELECTRICAL

26 05 00 Common Work Results for Electrical

26 05 19 Low Voltage Electrical Power Conductors and Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 29 Hangers and Supports for Electrical Systems

26 05 33 Raceways and Boxes for Electrical Systems

26 05 43 Underground Ducts and Raceways for Electrical Systems

26 05 45 Seismic Restraints for Raceways and Electrical Equipment

26 05 53 Identification for Electrical Systems

26 05 73 Overcurrent Protective Device Coordination Study

26 05 80 Electrical Testing

26 09 23 Lighting Control Devices

26 09 43 Network Lighting Controls

26 09 93 Sequence of Operations for Lighting Control

26 24 13 Switchboards

26 24 16 Panelboards

26 27 26 Wiring Devices

26 28 16 Enclosed Switches and Circuit Breakers

26 33 23 Central Battery Equipment

26 43 13 Surge Protection Devices

26 50 00 Lighting

DIVISION 27 – COMMUNICATIONS

27 05 00 Common Work Results for Communications

27 05 26 Grounding and Bonding for Communication Systems

27 05 28 Pathways for Communication Systems

27 05 43 Underground Ducts and Raceways for Communications

27 08 00 Commissioning of Communications

FOVA 241806 00 01 10-5

27 11 00 Communications Equipment Room Fittings

27 11 19 Communications Termination Blocks and Patch Panels

27 13 00 Communications Backbone Cabling

27 15 00 Communications Horizontal Cabling

27 51 23 Intercommunications and Program Systems

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security

28 05 13 Conductors and Cables for Electronic Safety and Security

28 08 00 Commissioning for Fire Alarm and Security

28 13 00 Access Control

28 16 00 Intrusion Detection

28 23 00 Video Surveillance

28 30 00 Fire Detection and Alarm

DIVISION 29-30 (NOT USED)

DIVISION 31 – EARTHWORK

31 10 00 Site Preparation & Plant Protection

31 11 00 Clearing and Grubbing

31 23 00 Site Excavation and Grading

31 23 33 Utility Trenching and Backfilling

31 37 00 Riprap

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 11 23

32 12 13

32 12 16

32 13 20

32 17 23

32 84 00

32 90 00

Aggregate Base

Bituminous Prime and Tack

Coats Bituminous Concrete

Pavement Site Concrete

Pavement Markings

Irrigation

Planting

DIVISION 33 – UTILITIES

33 05 26 Utility Line Marking

33 13 03 Water Piping and Appurtenances

33 21 15 Disinfection of Water Distribution System

33 31 12 Gravity Sewer Pipe

33 41 13 Storm Drain Pipe & Appurtenances

DIVISION 34-49 (NOT USED)

FOVA 241806 00 01 10-6

D iv is io n

S p e ci fi ca o n s

-3

K.Gillard Text Box

[THIS PAGE INTENTIONALLY LEFT BLANK]

FOVA - 241806 02 41 00-1

031414 REMOVAL OF PAVEMENTS AND STRUCTURES

SECTION 02 41 00 - REMOVAL OF PAVEMENTS AND STRUCTURES

PART 1 - GENERAL

1.1 DESCRIPTION

A. The work of this section consists of demolition and removal of pavements, slabs, structures, and portions of abandoned utilities, and any demolition work not included elsewhere. The work in-cludes backfilling and grading.

B. Provide all demolition required to perform the work covered under this contract including without limitation:

1. Remove existing construction shown to be removed.

2. Remove and replace existing construction and/or finishes as required to provide access to perform other work included in this contract.

3. Include removal of mechanical and electrical work that is to be abandoned and is con-tained in construction to be removed whether or not the mechanical and electrical work is shown. Disconnect and cap off utilities in accordance with applicable codes and safety regulations.

4. Where utilities that are not shown pass through construction that must be removed and those utilities serve other areas notify the Contracting Officer before disrupting service.

If rerouting is required to maintain service, the Government may issue a Change Order to accomplish the required work.

5. Store and protect items intended for reuse including all stockpiling of pavement millings and/or processed pavement at sites designated by the Contracting Officer.

6. Assume Governmentship of debris and unwanted materials, remove from the site and dispose of legally.

7. Include the cost of removing and disposing of hazardous material including without limitation asbestos or asbestos-containing materials, lead-containing paint, and PCBs.

If the presence of a hazardous material is suspected, have material tested. If material is identified as hazardous, retain qualified and licensed specialist to remove and dispose of it legally.

8. Include the cost of temporary diversion of any electrical and utility (propane) lines that are utilized by any structures that are to be temporarily moved during this project. Work will also include the placement of such lines back to their original location.

1.2 RELATED WORK

A. Section 01 35 13.22 – Archeological Protection

1.3 SUBMITTALS

A. As specified in Section 01 33 23: Submittal Procedures.

B. Demolition Plan, including:

FOVA - 241806 02 41 00-2

1. Sequence of demolition operations and related new construction.

2. Proposed methods of structure and pavement demolition including processes and equip-ment to be used for recycling asphalt pavement.

3. Schedule for shutting off utility services, including number, dates, and duration.

C. Submit proposed waste disposal site information.

1. Name, address, phone number, and description of business, etc.

2. Certification (from the County) that the facility is operating in compliance with the ap-plicable State and County laws and ordinances.

D. Demolition shall not proceed until the demolition plan has been approved.

E. Certified laboratory test results that mix proportions and materials for control density fill meet requirements of these specifications.

1.4 QUALITY ASSURANCE

A. Comply with safety requirements for demolition, ANSI A10.6.

1.5 PROJECT CONDITIONS

A. Keep dust to a minimum at removal site and on haul roads, especially near visitors. Use sprinklers or water trucks as necessary. Water truck supply port shall be equipped with an approved back-flow device or air gap.

B. Ensure safety of persons in demolition area. Provide temporary barricades as required and fulfill all appropriate requirements of OSHA.

C. Explosives: Not permitted.

D. Employ all available techniques for construction noise abatement. Use remote, well-mufflered air compressors and newest noise suppressed pneumatic and electric tools.

E. The Contractor is advised that work under this Section may be hazardous. The Contractor is to take all necessary precautions to ensure the safety of workers and property. Removal of and/or working in areas containing even minor amounts of hazardous materials including without limi-tation, asbestos, lead-based paint, PCBs or other hazardous materials requires special precautions, knowledge and procedures. If hazardous material is suspected, notify the Contracting Officer.

F. Site boundaries are as shown. Exact locations to be approved by Contracting Officer.

1.6 CLOSEOUT SUBMITTALS

A. As specified in Section 01 77 00: Closeout Procedures.

B. Submit project record drawings showing all abandoned utilities.

FOVA - 241806 02 41 00-3

PART 2 - PRODUCTS

2.1 BACKFILL MATERIALS

A. Native soils, stone, gravel, or sand, free from debris, frozen materials, and roots and other organic matter. Pieces of concrete and asphalt milled to a maximum size of 3/4-inch in the greatest di-mension, suitably shaped for compaction, and mixed at a maximum 50/50 ratio with native soils, may be used in backfill.

B. Use the existing materials at each site for any backfilling of holes or uneven ground.

C. Use control density fill (CDF) to fill abandoned utilities. CDF shall be concrete with a 28-day compressive strength of 50 psi to 150 psi aggregates no larger than 3/8-inch and at least 70% smaller than 3/8-inch, Type II cement no more than 12% of aggregates smaller than #200 sieve, and no more than 20% entrained air.

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect buildings, structures, utilities, existing improvements, overhanging trees and plant life to remain from damage.

B. Protect trees as specified elsewhere and where shown on Drawings. Do not park vehicles beneath trees that are to remain or drive vehicles within 8 feet of trunk.

C. The Contractor will be required to notify Underground Service Alert (U.S.A.) at 811, a minimum of two work weeks prior to the start of any excavation for asphalt removal work.

D. Identified utilities and their surface features are to be protected. Any damage to those identified utilities will be repaired by the Contractor at no additional cost to the Government.

E. Should the Contractor damage any unmarked utilities, the Contractor may be required to assist with the immediate repair or stabilization of the utility at the direction of the Contracting Officer.

The Contractor will be reimbursed for this work in accordance with the changes clause of the

Contract.

3.2 DEMOLITION

A. Pavement and Slabs: Saw cut material adjacent to new construction. Cuts to be smooth and clear with no jagged edges. Remove completely.

B. Manholes: Remove structures and dispose of legally outside Park.

C. Items to be Salvaged: As shown on the Drawings. Remove carefully.

D. Items to be Reused in New Construction: As shown on the Drawings. Remove carefully.

FOVA - 241806 02 41 00-4

E. Abandoned Utilities: Remove aboveground utilities and terminate as approved by the utility com-pany and the Contracting Officer. Remove necessary portions of underground utilities to within

24 inches of excavation or final grade. Cap off conduits with minimum 24-inch-long concrete plugs.

3.3 RESTORATION

A. Backfilling:

1. Backfill and compact any holes created during demolition.

2. Ensure that areas to be filled are free from standing water, frost, frozen material, and debris.

3. Place backfill materials in horizontal layers not exceeding eight inches in loose depth.

Compact each layer, at optimum moisture content to a density equal to surrounding ground. Distribute concrete and masonry pieces in fill material in a way that ensures adequate compaction and at a depth that will not interfere with new construction and grading.

B. Grading:

1. Restored Areas: Rough grade surface to blend with original contours and provide free drainage flow. Machine grading with an excavator, backhoe and/or loader shall provide a suitable surface that blends with the wooded area the project site is in.

2. New Construction Areas: Grade as shown on Drawings.

3.4 DISPOSAL

A. Dispose of unsuitable and excess material as specified in Section 01 35 13.22 – Archeological

Protection

B. Salvaged Material: All salvaged material remains the property of the Government. Store where directed by Contracting Officer.

C. Trees and tree stumps removed during construction shall be disposed of legally outside the park.

END OF SECTION 024100

FOVA - 241806 02 41 19- 1

SELECTIVE STRUCTURE DEMOLITION

SECTION 02 41 19 - SELECTIVE STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SECTION INCLUDES

A. Demolition and removal of selected portions of a building or structure.

B. Demolition and reuse of selected interior and exterior elements.

C. Repair procedures for selective demolition operations.

1.3 RELATED SECTIONS

A. Section 013233 – Photographic Documentation: For photography prior to selective demolition operations.

B. Section 013513.22 – Archeological Protection: For procedures for discovery of resources during selective demolition activities.

C. Section 013591 –Historic Preservation Treatment Procedures.

D. Section 015000 - Temporary Facilities and Controls: For temporary construction and environmental-protection measures for selective demolition operations.

E. Section 015719.11 Indoor Air Quality Management

F. Section 015719.12 – Noise & Acoustics Management.

G. Section 04120 – Maintenance of Unit Masonry.

1.4 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Government or store for reuse in another location.

C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

FOVA - 241806 02 41 19- 2

D. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.5 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Government’s property, demolished materials shall become Contractor's property and shall be removed from Project site.

B. Historic items, relics, and similar items of interest or value to Government that may be encountered during selective demolition remain Government's property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to

Government. Notify CO when such items are encountered.

1.6 SUBMITTALS

A. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity.

2. Interruption of utility services.

3. Coordination for shutoff, capping, and continuation of utility services.

B. Predemolition Photographs: Show existing conditions of adjoining construction and site improvements, including finish surfaces that might be misconstrued as damage caused by selective demolition operations. Submit before Work begins.

C. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.

1.7 QUALITY ASSURANCE

A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.

B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction. Comply with BAAQMD Regulations for ACM removal.

C. Standards: Comply with ANSI A10.6 and NFPA 241.

1.8 PROJECT CONDITIONS

A. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

B. Government assumes no responsibility for condition of areas to be selectively demolished.

1. Conditions existing at time of inspection for bidding purpose will be maintained by

Government as far as practical.

FOVA - 241806 02 41 19- 3

C. While the majority of hazardous materials on the project site have been abated, they are still present in select locations. Refer to the additional reports listed in specification

011100 “Summary of Work” for potential soil remediation requirements and remaining hazardous materials at Building 993. Removal of these is to be performed in accordance will all applicable regulations.

D. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

E. Storage or sale of removed items or materials on-site will not be permitted.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

2.2 REPAIR MATERIALS

A. Use repair materials identical to existing materials.

1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible.

2. Use materials whose installed performance equals or surpasses that of existing materials.

B. Comply with material and installation requirements specified in individual Specification

Sections.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.

D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.

Promptly submit a written report to Architect and Construction Manager.

FOVA - 241806 02 41 19- 4

E. Engage a professional engineer to survey condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective demolition operations.

F. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

3.2 UTILITY SERVICES

A. Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.

B. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by Government and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to Government and to authorities having jurisdiction.

1. Provide at least 72 hours' notice to Contracting Officer if shutdown of service is required during changeover.

C. Utility Requirements: Locate, identify, disconnect, and seal or cap off indicated utilities serving areas to be selectively demolished.

1. Contracting Officer will arrange to shut off indicated utilities when requested by

Contractor.

2. Arrange to shut off indicated utilities with utility companies.

3. If utility services are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary utilities that bypass area of selective demolition and that maintain continuity of service to other parts of building.

4. Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit after bypassing.

3.3 PREPARATION

A. Dangerous Materials: Drain, purge, or otherwise remove, collect, and dispose of chemicals, gases, explosives, acids, flammables, or other dangerous materials before proceeding with selective demolition operations.

B. Pest Control: Employ a certified, licensed exterminator to treat building and to control rodents and vermin before and during selective demolition operations.

C. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

D. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

E. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, other construction

FOVA - 241806 02 41 19- 5

operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

F. Temporary Shoring: Provide and maintain interior and exterior shoring, bracing, or structural support to preserve stability and prevent movement, settlement, or collapse of construction to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

1. Strengthen or add new supports when required during progress of selective demolition.

3.4 POLLUTION CONTROLS

A. Dust Control: Use water mist, temporary enclosures, and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations.

1. Do not use water when it may damage existing construction or create hazardous or objectionable conditions, such as ice, flooding, fungal growth and pollution.

2. Wet mop floors to eliminate trackable dirt and wipe down walls and doors of demolition enclosure.

B. Cleaning: Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.5 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.

4. Maintain adequate ventilation when using cutting torches.

5. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

6. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

7. Dispose of demolished items and materials promptly.

8. Return elements of construction and surfaces that are to remain to condition existing before selective demolition operations began.

B. Masonry: Demolish in small sections. Cut masonry at junctures with construction to remain, using power-driven saw, and then remove masonry between saw cuts.

FOVA - 241806 02 41 19- 6

1. At Building 404: Salvage brick removed at new window and door openings for reuse in brick infill, repair and replacement work. See Section 040120, Maintenance of Unit

Masonry.

C. Existing Facilities: Comply with Governments's requirements for using and protecting stairs, walkways, and other site features during selective demolition operations.

D. Handling of Removed Items: See Section 013591, Historic Preservation Treatment Procedures.

E. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Government, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.6 PATCHING AND REPAIRS

A. General: Promptly repair damage to adjacent construction caused by selective demolition operations.

B. Repairs: Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.

1. Completely fill holes and depressions in existing masonry walls that are to remain with an approved masonry patching material applied according to manufacturer's written recommendations.

C. Finishes: Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.

D. Floors and Walls: Where walls or partitions that are demolished extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish color, texture, and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.

1. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections of these Specifications.

2. Where patching occurs in a painted surface, apply primer and intermediate paint coats over patch and apply final paint coat over entire unbroken surface containing patch.

Provide additional coats until patch blends with adjacent surfaces.

3. Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation.

E. Ceilings: Patch, repair, or rehang existing ceilings as necessary to provide an even-plane surface of uniform appearance.

3.7 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

B. Burning: Do not burn demolished materials.

FOVA - 241806 02 41 19- 7

C. Disposal: Transport demolished materials off Government’s property and legally dispose of them.

1. Recycle removed material to greatest extent possible.

2. The contractor shall be responsible for segregating and characterizing, to the extent necessary for disposal, all waste streams from the demolition and construction.

Recyclable materials shall be recycled to the extent practical. A report and accounting of all wastes, suitable to calculate waste diversion rates shall be provided to the

Government.

3.8 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

FOVA - 241806 02 41 19- 8

FOVA - 241806 02 82 13 - 1

ASBESTOS ABATEMENT

SECTION 02 82 13 – ASBESTOS ABATEMENT

- GENERAL

SCOPE

This section covers the removal of materials that contain, or are presumed to contain, greater than one percent asbestos.

The contractor shall provide all labor, materials, equipment, services, permits, and insurance required to complete asbestos abatement procedures as indicated in these Specifications and/or the drawings.

The following table lists asbestos-containing materials (ACM) to be abated. Abatement includes soft (non-structural) demolition, asbestos-containing materials, exploratory inspections, protect and save items, and disposal of asbestos and non-asbestos materials as described below.

Table 1. Asbestos-Containing Materials to be Removed – Base Bid

Asbestos-Containing Building

Materials

Approximate

Quantity Locations

Materials Containing <1%

Asbestos

- See Section 02 82 21

Vinyl floor tile and mastic 8,200 SF Areas throughout the first and second floors – some under carpet

Pipe insulation 1,000 LF Exposed throughout the basement level, concealed within wall cavities

Underwriters Laboratories 3-

Hour Fire Doors 3 EA North core area of the basement level

EA: Each; SF: Square Feet; LF: Linear Feet; <1%: Less than one percent

The quantities and location of ACM indicated above are only best estimates limited by the physical constraints imposed by occupancy of the building. Accordingly, minor variations of plus or minus 10 percent of the estimated quantities of ACM within the limits of containment for each abatement stage are considered as having no impact on contract price and schedule of this contract. Locations of ACM different than indicated on drawings, but within the limits of building, are considered as having no impact on contract price and schedule of this contract.

DEFINITIONS

Abatement: Procedures to control fiber release from asbestos-containing building materials, which include encapsulation, enclosure, removal, repair, and related activities.

Aggressive Sampling: Air sampling method that assures that asbestos fibers remain airborne during sampling. All surfaces inside the work area will be agitated by the liberal use of compressed air, leaf blowers, or similar. Fans will then be run throughout the sampling period to keep all suspended fibers airborne.

AHERA: Asbestos Hazard Emergency Response Act, 40 CFR Part 763.

Air Lock: A system for permitting ingress or egress without permitting air movement between a contaminated area and an uncontaminated area, typically consisting of two curtained doorways at least three feet apart.

Air Monitoring: The process of measuring the asbestos fiber content of a specific volume of air in a stated period of time.

FOVA - 241806 02 82 13 - 2

Amended Water: Water containing a surfactant additive.

Asbestos-containing Material (ACM): Any material containing more than one percent (1%) asbestos as defined under NESHAPS CFR 40, Part 61, and OSHA 29 CFR Part 1926.1101, or at least one percent (1%) asbestos as defined under Southwest Clean Air Agency (SWCAA) –

Asbestos Control Standards.

Authorized Visitor: The owner or designated representative, or a representative of any regulatory or other agency having jurisdiction over the project, and having required training, medical, fit test, etc.

Certified Industrial Hygienist (CIH): An industrial hygienist certified in comprehensive practice by the American Board of Industrial Hygiene.

Construction, Manager/General Contractor (CMGC): A construction delivery method in which the construction manager acts as the general contractor with schedule and cost risk. The CMGC provides design phase assistance in evaluating costs, schedule, and implications of systems and materials during design.

Class I Asbestos Work: Activities involving the removal of TSI and surfacing ACM and PACM.

Class II Asbestos Work: Activities involving the removal of ACM, which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and mastics.

Clean Room: An uncontaminated area or room that is part of the worker decontamination enclosure system, with provisions for storing workers' street clothes and clean protective equipment.

Critical Barrier: Solid barrier constructed from minimum of 2- by 4-inch studs, 16-inch o.c.; 0.5-inch plywood or drywall sealed airtight and covered on both sides (where applicable) with two layers of 6-mil plastic.

Curtained Doorway: A device to allow ingress or egress from one room to another while permitting minimal air movement between the rooms, typically constructed by placing three overlapping sheets of plastic over an existing or temporarily-framed doorway, securing each along the top of the doorway in a pleated fashion and securing one vertical side of each sheet on alternating sides of consecutive sheets. Two curtained doorways spaced a minimum of three feet apart to form an air lock.

Disposal: Procedures necessary to transport and deposit the asbestos-contaminated material in an approved waste disposal site in compliance with the Environmental Protection Agency (EPA) and other applicable regulations.

Enclosure: Procedures necessary to completely seal all asbestos-containing material behind airtight, impermeable, permanent barriers, including PVC jackets.

Encapsulant (Sealant): A liquid material that can be applied to asbestos-containing material and that controls the possible release of asbestos fibers from the material either by creating a membrane over the surface (bridging encapsulant), or by penetrating the material and binding its components together (penetrating encapsulant).

Environmental Consultant: Environmental consultant specializing in asbestos abatement—PBS

Engineering and Environmental Inc., 4412 SW Corbett Avenue, Portland, Oregon, 97239, 503.248.1939—or any subcontractor designated by PBS.

Equipment Room: A contaminated area or room, which is part of the worker decontamination enclosure system, with provisions for storage of contaminated clothing and equipment.

FOVA - 241806 02 82 13 - 3

Fitting: With regard to pipe insulation, a fitting is any elbow, offset, reducer, tee, etc.

Fixed Object: Fixtures that are attached to the building or too heavy or bulky to remove from the work area.

Glovebag: A manufactured device consisting of a transparent plastic bag with inward projecting sleeves, an internal tool pouch, provisions for fastening and sealing it at the top and sides, and a receptacle in the bottom to hold asbestos waste. The glovebag is installed to surround the material to be removed and contain all fibers released through the process, with provisions for allowing continuous airflow through the bag while maintaining negative pressure inside.

High-efficiency particulate air (HEPA) Filter: A high efficiency particulate air (absolute) filter capable of trapping and retaining 99.97 percent of asbestos fibers greater than 0.3 microns in length.

HEPA Vacuum Equipment: High efficiency particulate air (absolute) filtered vacuuming equipment with a filter system capable of collecting and retaining asbestos fibers. Filters of 99.97 percent efficiency for retaining fibers of 0.3 microns in length or larger shall be installed for filtering discharge air.

Independent Testing Laboratory: A laboratory financially independent from and hired by the owner, architect, or contractor that is either American Industrial Hygiene Association-accredited

(AIHA) for asbestos with demonstrated proficiency via the AIHA Proficiency Analytical Testing

(PAT) program, or has analysts proficient in the AIHA Asbestos Analysts Registry (AAR) program for air sample analysis.

Industrial Hygienist: An employee of the Independent Testing Laboratory who is experienced and trained in asbestos sampling and analysis as specified.

Insulating Cement: Cementitious material applied to pipe reducers, manifolds, etc.

Isolated Work Area: A totally contained area of the facility where abatement activities are performed.

Movable Object: Furnishings not attached to the building structure that can be removed from the work area.

Owner Representative: Designated by the Owner, and/or designated employee(s) of the Owner

Representative.

PACM: Presumed asbestos-containing materials.

Pressure Differential Fan System: An air-purifying fan system located inside or outside the isolated work area that draws air out of the work area through a HEPA filter, keeping static air pressure in the work area lower than in adjacent areas, and preventing escape of contaminated air from work area to adjacent areas.

Public Area: Any area outside the isolated work area. When work area isolation measures are removed, the work area becomes a public area.

Removal: All operations where ACM and/or PACM are taken out or stripped from structures or substrates, and include demolition activities.

Shower Room: A room between the clean room and the equipment room in the worker decontamination enclosure system that is equipped with soap, shampoo, and hot and cold running water controllable at the faucet, and suitably arranged for complete showering during decontamination. The shower room must be separated from the clean room and equipment room by air locks.

FOVA - 241806 02 82 13 - 4

Special Fitting: With regard to pipe insulation, a special fitting is any valve, union, strainer, thermometer, flange, etc.

Surfactant: A chemical wetting agent added to water to improve penetration, thus reducing the quantity of water required for a given operation or area.

Tack Coat: A coat of penetrating encapsulant applied to all surfaces from which asbestos-containing materials have been removed.

Thermal System Insulation (TSI): ACM applied to pipes, fittings, boilers, breeching, tanks, ducts, or other structural components to prevent heat loss or gain.

Vacuum Loader Removal: Wetting and pneumatic conveying of loose material through a vacuum hose to a sealed collection tank specially equipped to prevent escape of fibers.

Wet Cleaning: The process of eliminating asbestos from building surfaces and objects by using cloths, mops, or other cleaning tools that have been dampened with water.

Worker Decontamination Enclosure System: A showering facility for workers, typically consisting of a clean room, a shower room, and an equipment room. Each of these rooms is separated from the others by air locks. The equipment room is separated from the work area by a curtained doorway. The clean room is separated from the public area by a curtained doorway.

Worksite Entry Logbook: A logbook kept in the clean room that must be signed by everyone entering or leaving the work area. All pages of the logbook must be the same as the sample page bound into these Specifications.

DOCUMENTS INCORPORATED BY REFERENCE

The current issue of each document shall govern. Where conflict among requirements or with these Specifications exists, the most stringent requirements shall apply.

US Environmental Protection Agency National Emissions Standards for Hazardous Air

Pollutants (NESHAPS). (Code of Federal Regulations Title 40, Part 61, Subparts A and B.)

US Environmental Protection Agency Office of Toxic Substances Guidance Document, Guidance for Controlling Friable Asbestos-Containing Materials in Buildings, EPA Report

Number 560/5-85-024 ("Purple Book").

US Department of Labor Occupational Safety and Health Administration (OSHA):

Title 29 Code of Federal Regulations Section 1910.1001--General Industry Standard for

Asbestos.

Title 29 Code of Federal Regulations Section 1910.134--General Industry Standard for

Respiratory Protection.

Title 29 Code of Federal Regulations Section 1910 et al.--Occupational Exposure to

Asbestos; Final Rule.

Title 29 Code of Federal Regulations 1926.1101--Construction Standard for Asbestos.

Title 29 Code of Federal Regulations Section 1910.2--Access to Employee Exposure and

Medical Records.

Title 29 Code of Federal Regulations Section 1910.1200--Hazard Communication.

Environmental Protection Agency 40 CFR Part 763, AHERA, Asbestos-Containing Materials in Schools; Final Rule and Notice.

National Institute for Occupational Safety and Health (NIOSH), 30 CFR, Part II, Respirators.

FOVA - 241806 02 82 13 - 5

American National Standards Institute (ANSI) NY; ANSI Standard Z 88.2-1980 American

National Standards Practice for Respiratory Protection, latest edition.

CERCLA, Comprehensive Environmental Response, Compensation, and Liability Act (42

U.S.C. 9601 et.seq.)

RCRA, Resource Conservation and Recovery Act.

Washington State General Occupational Health Standards, Washington Administrative Code

(WAC) Chapter 296-62-077 Asbestos, Tremolite, Anthophyllite, and Actinolite; Chapter

296-65 Asbestos Removal & Encapsulation; Chapter 296-155 Safety Standards for

Construction Work.

Southwest Clean Air Agency (SWCAA) – Asbestos Control Standards.

Washington Industrial Safety and Health Act (WISHA)

International Building Code (I.B.C.), latest edition, and regulations as applicable.

Electrical work shall be performed in accordance with the National Electrical Code.

All local ordinances, regulations, or rules pertaining to asbestos, including its storage, transportation, and disposal.

SUBMITTALS AND NOTICES

A. Contractors shall provide complete "Pre-Job Submittals" as indicated below for review by the

Environmental Consultant and Owner. No asbestos-related work will be permitted prior to submittals being approved by the Environmental Consultant. Allow 10 days for review.

B. Additional requirements for submittals are also described in other sections of these specifications.

The requirements in this section pertain to asbestos-containing materials removal.

C. Contractors shall submit to the Environmental Consultant the following information prior to beginning work on the project:

1. Work Plan: Include a detailed plan of the procedures proposed for use in complying with the requirements, including the following:

a. A description of all special equipment, techniques, and methods to be used on the

Project, including description of work area layout(s) citing entries/exits, HEPA exhausts, decontamination units, waste load-outs, etc.

b. A detailed project schedule, including proposed clearance monitoring schedule and progression of abatement through the work areas.

c. Specific information relating to handling, transport and disposal of asbestos-containing waste. Identify any disposal site at which any waste material generated during the project will be disposed and furnish evidence of all necessary government approvals to dispose of the waste.

2. Laboratory Qualification Information: Submit information pertaining to the proposed Air

Monitoring Program for this project. Air monitoring shall include employee exposure monitoring. This information shall include the name(s) of the on-site Industrial Hygiene

Technician working under the foreman's supervision, types of equipment, sampling schedule, sampling procedures, calibration record keeping, name and address of proposed Independent

Testing Laboratory, and evidence of analyst's NIOSH 582 course completion and AIHA PAT program participation.

FOVA - 241806 02 82 13 - 6

3. Notifications and Policies: Submit copy of all required notifications and permits obtained by the contractor (Washington State Department of Labor and Industries, and SWCAA) and copies of all types of specified bonds and insurance. Submit upon receipt any approved amendments to notifications or re-notifications for multi-phase activities. See Paragraph 1.11 -

Permits and Notifications for additional requirements.

4. Asbestos Supervisor: Submit the name, Asbestos Supervisor Certification, Certificate of

Worker Acknowledgment and resume of experience of the assigned on-site foreman. At a minimum, the foreman shall have successfully completed a supervisor-training course in compliance with WAC Chapter 296-65-007. References and work on similar projects will also be reviewed. The Owner and the Environmental Consultant reserve the right to reject the foreman from the work at any time during the project. The Contractor shall then submit another on-site foreman for approval as described above.

D. Periodic Job Submittals

1. Personal Air Monitoring: Submit copies of all personal air monitoring data sheets, chain-of-custody and analytical results to the Owner and Environmental Consultant on a daily basis prior to the start of the next work shift following sample collection.

2. Daily Logs: Submit daily logs to the Owner and Environmental Consultant daily prior to the start of the next work shift. Daily logs shall indicate the date, time, identity, company or agency represented, and reason for entry of all persons entering the work area, and the type, amount and location(s) of all ACMs removed.

E. At the request of the Environmental Consultant or other representative of the Owner, immediately provide documentation of training or medical monitoring of employees as required by applicable regulations. Such documentation will be maintained on the project site as required by applicable regulations. Failure to comply with such request will result in immediate suspension of employees from work as defined by the Contract Documents.

F. Post-Job Submittals shall be delivered to the Environmental Consultant within 15-days of completion of work and shall include the following:

1. Certification: Provide written certification from the Abatement Contractor's Project Manager or

Supervisor that Contractor has fully inspected the work area and completed work in strict accordance with the Specifications.

2. Air Monitoring: Submit documentation of all employee personal air monitoring results relative to OSHA and WISHA respiratory protection level compliance. Include copies of all air monitoring data sheets, chain-of-custody documentation and analysis reports for sampling conducted at the site.

3. Project Record Documents: Provide project records including documentation of all contract changes, and copies of worksite entry log books, safety logs, sign-in sheets, and supervisor's daily field reports.

4. Disposal Manifests: Submit legible, fully executed copies of all asbestos waste disposal transportation and disposal manifests including signed receipts from the landfill, and chain-of-custody.

G. Final payment will be issued by the Owner only with written approval, by the Environmental

Consultant, of post-job submittals.

BUILDING PROTECTION

Building Security and Protection

FOVA - 241806 02 82 13 - 7

The contractor shall post adequate warning signs at all potential entrances to work areas as required by EPA and WISHA.

The contractor shall protect all existing fixed equipment, building finishes that are to remain, and existing systems and functions from damage during the abatement process. Extra precautions are to be taken in protecting existing electrical panels, light fixtures, etc. Any damage to existing building, services, and/or equipment shall be remedied by the contractor at their expense.

Contractor shall clean external surfaces of contaminated containers and equipment thoroughly by wet sponging and HEPA vacuum.

Contractor shall maintain access and use of existing fire lanes.

PERSONAL PROTECTION

Training

1. All personnel accomplishing removal of asbestos-containing materials shall have received the minimum training as required by the Washington State Department of Labor and Industries for the work to be performed. At a minimum, the supervisor shall be the bearer of a current

"Certified Asbestos Supervisor Certificate" issued by the Washington State Department of

Labor and Industries.