B09_Amend_0004_Attach_Questions_and_Answers-FOVA_993-03Aug21_0004.pdf
PDF 186 KB Posted
- Attached to
- Fort Vancouver National Historic SiteRehabilitat
- Solicitation number
- 140P2021R0116
About this file
This document contains questions and answers related to a solicitation for rehabilitation work at Fort Vancouver National Historic Site in Vancouver, Washington. The solicitation seeks a contractor to rehabilitate historic Main Parade Ground Barracks and the Crossroads Parking Lot. Key details include that hazardous soil remediation is required, with all workers excavating or working with contaminated soil below the demarcation layer needing HAZWOPER training. Maximum recycling of construction waste is also required per the specifications. The proposal due date was extended to August 12, 2021 at 2:00 PM local time in response to a request. The anticipated notice to proceed date is October 1, 2021.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Number Question Answer Amendment # 1 Proposal Technical Factor 1 requires historic structures/buildings renovation and/or preservation projects completed in the last 5 years. We have a number of projects meeting these criteria completed in the last ten years, but very few in the last five years. As these types of projects are not extremely common, will the Government please consider allowing relevant projects completed in the last 10 years?
Relevant projects completed within the last 10 years are acceptable. 3
2 Who provides the paddle fans and controls? I do not find it in the specs Fans are shown on lighting drawings (E2.XX series) and tagged as a luminaire type F1. Electrical contractor required to provide fans and all controls. Fan model information can be located in the luminaire schedule on sheet E0.02. Power to the fans are connected to relay control shown on lighting plans and fans shall be furnished with remote controls that will allow manual on/off control of light as well as manual fan speed control once relays are energized.
3 Would the NPS provide any additional information on CLIN 0009 – Option D Soil Remediation? It is our understanding that a recent soil removal action was performed up to the limits of impervious surfaces adjacent to Buildings 991 and 993. Are there any figures, data tables or other information regarding known contaminants or hazardous waste that is present in soil at
FOVA 241806?
Yes hazardous soils were removed in open locations (no asphalts or sidewalks). The EECA workplan for DU_NE1 is included as Appendix C. The map for the Non‐Critical Response Action work is included in “DU‐NE‐1 NTCRA After Action Report” prepared by ERT, Inc. and provided in recent Amendment.
Per current documents, Contract Line Item 9 (Option D) does assume limited soil remediation. This line item has been has been further clarified in this amendment:
A. Contract Line Item No. 0009: Option D: Soil Remediation at Landscape Areas
a. This item consists of removing and properly disposing of 12” of lead‐ contaminated soil and backfilling with 12” of soil for 200 cubic yards of soil at new landscape areas that were previously covered with asphalt utilizing a demarcation layer of orange open area monofilament geotextile per the Fort Vancouver “DU‐NE‐ 1 NTCRA After Action Report” prepared by ERT, Inc. Soil to be tested as part of the project scope to determine if remediation is required at landscaped areas. .
b. Payment will be made at the contract price per cubic yard.
3 ‐ UPDATED for 4
4 Due to the contamination present as per CLIN 0009, will all workers who are excavating or working in contaminated soil require HAZWOPER training? Are there any specific requirements for environmental exposure or soil management that the contractor need be aware of?
Yes ‐ HAZWOPER training is required for going below the demarcation geotextile fabric.
5 Is there an expectation for contamination to be present in the soil at FOVA 309903? The lead in soil removal action only applies to work in DU_NE1 ‐ around 993, 991, 989 and parking lot west of 993.
3 ‐ UPDATED for 4
6 Is there an expectation or goal for maximizing the amount of material recycled during the restoration process in accordance with the NPS Recycling and Waste Diversion initiatives?
Per spec section 01 74 19 "Construction Waste Management and Disposal" 1.3 B:
Develop waste management plan that results in end‐of‐Project rates for salvage/recycling of 75 percent by weight of total waste generated by the Work.
Please reference the above section for additional requirements.
7 Can substitusions be used in this project? Substitution request are handled after award and must be requested by the awardee.
8 Reference Provision 52.215‐1 (RFP Page 44 of 59): Item c/2 indicates information that the first page of the proposal must show (i.e. solicitation number, name/address/phone/fax of the offeror, etc.). Is this required on the first page for both Volumes I and II?
Yes, please provide on both Volumes 3
Questions and Answers‐FOVA 993 and Crossroads Parking lot
9 Reference Section L, Factor 4 ‐ Schedule (RFP Page 53 of 59): Instructions direct us to assume a Notice to Proceed date of June 2021. This date is in the past. Please advise.
NTP date estimated October 1, 2021 4
10 Volume I, Factor 7 – Past Performance: May we submit previously completed Past Performance Questionnaires (that were submitted for previous proposals)?
Past Performance questioneers should be sent directly to NPS. 3
11 Reference Section L, Other Submittals, Proposed Equals (RFP Page 55 of 59): “Complete and submit the attached “Proposed Equals” form.” We do not find this form included in the solicitation documents. Please advise.
Attached on Amendment 3 3
12 Refence Section L, Volume II instructions (RFP Page 55 of 59): Item 1 states, “Submit (1) electronic copy.” Item 2 states, “Include a Table of Contents with tabs for hard copy formats and folders and files for electronic formats named as follows:” Please confirm that Volume II may include all required items in one electronic file, and that Volume II items are not required to be submitted as separate folders and files.
Volume II may be submitted as one electronic file and Volute II items are not required to be submitted as separate folders or files.
13 FOVA 241806, Drawing Sheet G2.0 (and several other sheets) includes a Construction Note:
“Surrounding the project buildings, NPS recently removed and replaced the top 12” of lead contaminated soil as part of non‐critical soil remediation project. At 12 inches below grade there is a geotextile fabric that demarks the limits of soil removal. For all areas below elevated porches, only 6 inches of contaminated soils were removed due by hand digging, followed by placement of geotextile fabric and gravel backfill. Any required excavation below this fabric extends into potentially contaminated soil. Any such excavation must be completed by contractor employees with HAZWOPER 40 hour certification.”
a.For bidding purposes, please confirm that all export soils below the geotex le fabric as indicated, are to be treated as lead contaminated.
b.Please clarify the lead concentra on of contaminated soils, to be assumed for bidding purposes.
c.During the recent removal/replacement of lead contaminated soil, did the Government remove/replace soils under impervious surfaces? If so, to what depth?
a. Yes, any soils exceeding the EECA defined levels would need to be handled as hazardous materials and disposed of properly. Other soils below this limit could be handled, transported and disposed of as non‐hazardous. Refer to Fort Vancouver “DU‐NE‐1 NTCRA After Action Report” prepared by ERT, Inc.
b. Refer to Fort Vancouver “DU‐NE‐1 NTCRA After Action Report” prepared by ERT, Inc. and provided as an amendment for lead concentration levels.
c. No, refer to Fort Vancouver “DU‐NE‐1 NTCRA After Action Report” prepared by ERT, Inc. for scope completed.
3 ‐ UPDATED for 4
21 Section L, Factor 4 instructions give us an assumed NTP date for the proposal schedule. Please clarify at what stage NTP is issued (i.e. after the Precon, after process and/or materials submittals have been approved, etc.). Please also clarify whether the referenced NTP is a “Construction” NTP.
NTP will be issued on acceptance of Certificate of Insurance, Bond and Division 1 Documents.
26 Is a one week Proposal Submission extension acceptable Yes, Proposal due date is extended to August 12, 2021 at 1400 Mountain Standard 4