B08_Attach_06_Submittal_List.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
CUVA 326071 & NERI 325969 - Oil/Gas Well Plugging
Solicitation number
140P2023R0015
Issued by

About this file

This document contains a submittal list template for a construction project involving the plugging and reclamation of an orphan oil and gas well.

The template includes a table to record required construction submittals. It lists relevant specification sections and paragraphs, and indicates whether each submittal is informational or requires government action. Additional columns allow noting requirements such as certifications, reports, plans, manufacturer data, samples or shop drawings. The template also includes sections for the construction contractor representative and architect/engineer to estimate review hours and costs for action submittals.

The related federal contract opportunity is for oil and gas well plugging projects at Cuyahoga Valley National Park in Ohio and New River Gorge National Park and Preserve in West Virginia. The solicitation was issued by the National Park Service National Office within the Department of the Interior.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21

SUBMITTAL LIST

Park Acronym/Project Management Information System (PMIS) Number:CUVA 326071/NERI 325969
Project Title:Well Plugging and Reclamation of Orphan Well
SUBMITTALREQUIREMENTS
(Indicate with X)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS, CALCULATIONS
OR PLANSMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHER
SOW1.0Bender #1 Confirmation of Plugging

tc={458F1613-9587-4C31-BEFB-06F603539FCF}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

CUVA onlyx
SOW2.7.1Quality Control Daily Reports

tc={597B794A-4CC9-4C46-BBC7-8BBCF52A6C68}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Move to spec 01 40 00x
132161.3Schedule of Valuesx
132161.3Construction Baseline Schedulex
132161.3Critical Path Method Reportsx
132161.3Construction Schedule Updatesx
132161.3Construction Schedule Revisions and Time Impact Analysisx
01 35 23.101.2Spill Event Documentationxx
01 35 231.3Accident Prevention Planx
01 57 231.2SWPPP or UPPPx
01 57 231.2Inspection Schedule Pollution Prevention Measuresx
01 57 231.2Inspection Schedule Stormwater Pollution Prevention Measuresx
01 57 231.2Erosion Control Productsx
01 74 191.4Waste Management Planx
01 74 191.4Recycling and Processing Facility Recordsx
01 74 191.4Landfill and Incinerator Disposal Recordsx
01 74 191.4Summary of a Project Waste Management Plan worksheet for solid waste disposal and diversionx
02 81 011.3Permit profile of Treatment Storage and/or Disposal Facilityx
02 81 011.3Bills of Lading and Manifestsx
02 81 011.3Temporary EPA ID number(s) on behalf of the NPS for hazardous waste materialsx
02 90 001.6Product Datax
02 90 001.6Material Test Reportsx
02 90 001.6Material Certificatesx
02 90 001.6Water Compatibility Testingx
31 10 001.6Existing Conditions Documentationx
31 20 001.6Material Test Reportsx
32 92 001.5Nursery source and availability of seed mixx
32 92 001.5Herbicidex
32 92 001.5Seed mixx
32 92 001.5Straw mulchx
32 92 001.5Tackifierx
32 92 001.5Hydromulch, if usedx
32 92 001.6Seed certificationx