B08_Att_3_Price_Schedule_Replace_Roof_Surfaces_DEWA1.pdf
PDF 150 KB Posted
- Attached to
- REPLACE ROOF SURFACES ON DEWA LOCATIONS
- Solicitation number
- 140P4526R0034
About this file
This is a Contract Price Schedule for a roof replacement project at Delaware Water Gap National Recreation Area under National Park Service (NPS) Solicitation Number 140P4526R0034. The project requires replacement of roof surfaces at two locations: Dingmans School and Jackson House, each identified as Contract Line Item Numbers 1 and 2, respectively. Both line items are priced on a lump-sum (LS) basis with a quantity of one unit each.
Offerors are required to submit pricing that conforms to all solicitation documents, including both base line items and all option line items, with failure to do so potentially rendering proposals unacceptable. For lump-sum line items, offerors must provide the total price only. All totals and extended prices must be rounded to whole dollars. In cases of calculation error, the unit price governs; in cases of summation error, the total of corrected amounts governs. The schedule provides spaces for offerors to enter unit prices and extended prices for each line item, with a total base price line to be calculated from Contract Modification Line Items 1 through 3.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule National Park Service (NPS)
Solicitation Number: 140P4526R0034 PARK - PMIS: Delaware Water Gap National Recreation Area Project Title: Replace Roof Surfaces Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title
Quantity
Unit of Measure
Unit Price
Price
1 Dingmans School 1 LS
2 Jackson House 1 LS
TOTAL BASE PRICE (Contract Modification Line Item Number 1 through 3) ---------------------------------------------------------------------------------
File details come from the government source that posted it. Updated .