This document appears to be the Basis of Design for the GRCA 250440 Shuttle Bus Facility, which is the subject of Solicitation Number 140P2024R0028 issued by the Department of the Interior National Park Service National Office.
The Basis of Design provides technical requirements and specifications for the design and construction of a shuttle bus facility to support operations at the Grand Canyon National Park. Key details include the required facility size, layout, utilities, and equipment. It outlines performance criteria for the mechanical, electrical, and other building systems. The document also addresses site development, access, and landscaping requirements. Overall, it establishes the technical and functional parameters that must be met by offerors responding to the shuttle bus facility solicitation.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
nritchie Line o o o o o o o o o o o o o o o o o o o o o o o o o o o
R
IV
E R
BOUNDARY
ONCANYON
RIM
SUBJET TO
CONCURRENCEOF
NAVAJO
TRIBE
BULLHEAD
CITY
KINGMAN
LAKE
HAVASU
CITY PRESCOTT
WINSLOW
JACOB
LAKE
N E V A D A
U T A H
UTAH
ARIZONA
PAGE
ALT
V.C.
GRAND
CANYON
NATIONAL
PARK
HQ.
NORTH
RIM
SOUTH
RIM
JACOB
LAKE
VULCANS
THRONE
TUWEEP
HUALAPAI
HILLTOP
GR
AN
D
WA
SH
C
LIF
FS D
R Y
C
AN
YO
N
CA
NY
ON
SE
PA
RA
TIO
N
MOLLIES
NIPPLE
TUCKUP
POINT
KANAB
POINT
GREAT
THUMB
MESA
POINT
IMPERIAL
CAPE
SOLITUDE
LAKE MEAD
NATIONAL
RECREATION AREA
LAKE
MEAD
NATIONAL
RECREATION
AREA
HAVASUPAI
INDIAN
RESERVATION
NAVAJO
INDIAN
RESERVATION
KAIBAB
NATIONAL
FOREST
CAPE
ROYAL
GRAND
CANYON
VILLAGE
POINT
SUBLIME GRAND
CANYON
LODGE
PHANTOM
RANCH
TU
C K U P C A N Y O N
TO
R O W E A P
V A
LL
E Y
KAIBAB
PLATEAU
CO
LO
RA
DO
RIV
ER
LITTLE
C O L O R A D O
NORTH
RIM
ENTRANCE
STATION
PO
WE
LL
PL
AT
EA
U
H A V
AS
U
C R E E K
C A
TA
R
AC
T
TAPEATS
CREEK
WHITMORE
C
ANYON
U
IN
K A R E T
M T N S
GLEN
CANYON
N.R.A.
FLAGSTAFF
GLEN
CANYON
N.R.A.
LAKE
MEAD
N.R.A
CANYON RIM
D
IAM
O N D
CREE
K
TO
WILLIAMS
AND
CANYON
RIM
KAIBAB
NATIONAL
FOREST
BOUNDARY ON
SOUTHBANK OF COLORADO
RIVER(SUBJECT TO
CONCURRENCEOF HUALAPAI
TRIBE)
SHIVWITS
PLATEAU
K A N A B
C R E E K
BRIGHT
ANGEL
POINT
M A R B
LE
C A N Y O N
HUALAPAI
INDIAN
RESERVATION
C O
LO
R
AD
O
R
IVE
R
DESERT
VIEW
HERMITS
REST
TOROWEAP
POINT
TOPEACH
SPRINGS,SELIGMAN
LEE'S
FERRY
C R E E K
PROJECT LOCATION
PROJECT LOCATION
OR
OR
Design (Title I)
Prepared in Accordance with Preliminary by Preliminary Design (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Preliminary Design (Title I)
Project Manager
Drawing No.
Date
Date
QUALITY DESIGN CERTIFICATIONSheetMark REVISION Date Initial
STATEREGION COUNTY
LOCATION WITHIN PARK
NAME OF PARK
TITLE OF DRAWING DRAWING NO.
DEPARTMENT OF THE INTERIOR
UNITED STATES
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
PMIS
GOLDEN, CO 80401
ANDERSON HALLAS ARCHITECTS, PC
ARCHITECT
PMIS/PKG NO.
SHEET
OF8/
/2
3:
:2
P
M C
:\U se rs \G ill ia nH ev ey \D oc um en ts
\2
G R
C A
B us
S hu ttl e
M ai nt en an ce
B ui ld in g_ A
1R
_g ill ia nh ev ey
.r vt
228794A
228794A
154891
1 X
NORTHERN ARIZONA
BASIC DATA: USGS TOPO MAP; PARK MINI FOLDER 1987; COVER SHEET REVISED & REDRAWN 3/93. UPDATED 11/98. SGS.
INTERMOUNTAIN<COUNTY> ARIZONA
GRAND CANYON NATIONAL PARK
SHUTTLE BUS MAINT. FACILITY
<STRUCTURE WITHIN PARK>
SCHEMATIC DESIGN
GRAND CANYON NATIONAL PARK
BenHeppe Rectangle
GENERAL NOTES
1. DO NOT SCALE DRAWINGS
2. ALL WORK TO BE PERFORMED TO APPLICABLE BUILDING CODES (SEE
LIST OF APPLICABLE CODES).
3. ALL DIMENSIONS ARE TO FACE OF STRUCTURE UNLESS OTHERWISE
NOTED. ALL DIMENSIONS INDICATING REQUIRED CLEARANCES ARE
TO FACE OF FINISH UNLESS OTHERWISE NOTED.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIM
OR HERSELF WITH THE CONTRACT DOCUMENTS, VERIFYING FIELD
CONDITIONS AND DIMENSIONS, AND CONFIRMING THAT THE WORK
MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH
CONSTRUCTION. CONTRACTOR SHALL NOTIFY C.O. IN WRITING OF
ANY DISCREPANCY WITHIN THE CONTRACT DOCUMENTS AND
REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH
CONSTRUCTION.
5. SHOULD THERE BE ANY QUESTIONS CONCERNING THE CONTRACT
DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A
CLARIFICATION FROM THE C.O. PRIOR TO PROCEEDING WITH THE
WORK, OR RELATED WORK IN QUESTION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING
HIMSELF WITH THE PROJECT SCOPE OF WORK, SCHEDULE, AND
DEADLINES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
ADVISING THE C.O. OF ALL ITEMS REQUIRING A LONG LEAD TIME
UPON NOTICE TO PROCEED THAT WILL AFFECT THE SCHEDULE, AND
SHALL SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR
THE ITEMS IN QUESTION TO THE C.O.
7. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN
STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED
SPECIFICATIONS, EXCEPT WHERE THE CONTRACT DOCUMENTS ARE
MORE STRINGENT. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT
SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION
SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. THE
CONTRACTOR SHALL FURNISH TO THE C.O. ALL WARRANTIES AND
GUARANTEES REQUIRED AT THE CONCLUSION OF THE PROJECT.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HOOK UPS / UTILITY
CONNECTIONS, ETC. TO TEMPORARY TRAILERS.
WALL TYPES X
1.1
TYPE #
GRAPHIC
REPRESENTATION
5/8" GWB (MOISTURE
RESISTANT) , PT. @ TILE AREAS
PROVIDE CTBB IN LIEU OF MR-
GWB (RE: FINISH SCHEDULE)
3 5/8" METAL STUDS AT 16" OC
FULL DEPTH ACOUSTIC
BATT INSULATION
5/8" GWB, PT.
1.0
5/8" GWB, PT.
3 5/8" METAL STUDS AT 16" OC
5/8" GWB, PT.
2.0
FULL DEPTH ACOUSTIC
BATT INSULATION
INT.
WET
EXT.
AT TILE AREAS PROVIDE 1/4"
CERAMIC TILE (RE: FINISH
SCHEDULE)
TYPE #
GRAPHIC
REPRESENTATION
2 1/2" CLEAR FOR WALL MOUNTED
TOILET CARRIAGE
STRUCTURAL CMU TO 4'0"
A.F.F. - PROVIDE BLOCK
FILLER PAINT AT INTERIOR
EXPOSED FACE OF CMU
WEATHER BARRIER
4" CMU AT BASE OF WALL TO
4'-0" A.F.F.
LINE OF METAL CLADDING
ABOVE
2" RIGID INSULATION
2.0
5/8" GWB, PT. (PROVIDE IMPACT
RESISTANT GYPSUM BOARD AT
MAINTENANCE BAYS
6" METAL STUDS AT 16" OC
INT.
EXT.
FULL DEPTH BATT INSULATION
5/8" SHEATHING
WEATHER BARRIER
AIR GAP AND CLADDING
CLIPS
METAL CLADDING
2" RIGID INSULATION
<4'-0" A.F.F.
>4'-0" A.F.F.
A4.0
A8.0
ROOM
250 SF
A9.0
A5.0
FIRST FLOOR
100'-0"
5 1 6 75
KEY
NOTE
WAL
L
TYPE
WINDOW
TYPE/NUM
BER
DOOR
NUMB
ER
ELEVATION
MARK
NORTH
ARROW
DETAIL
REFERENCE
BUILDING
SECTION
EXTERIOR
ELEVATIO
N
INTERIOR
ELEVATI
ON
ROOM
TAG
SYMBOLS
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLUMB PLUMBING
PT PAINT
PTD PAINTED
PWD PLYWOOD
QT QUARRY TILE
RAD RADIUS
RB RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REF REFER TO or REFERENCE
REINF REINFORCED
RELOC RELOCATE(D)
REQ REQUIRED
REV REVISE, REVISED or
REVISION
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
(S) SEALANT
S SOUTH
SCHED SCHEDULE
SF SQUARE FEET
SHTG SHEATHING
SIM SIMILAR
SOG SLAB ON GRADE
SPEC SPECIFICATION(S)
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STN STAIN
STRUC STRUCTURE or
STRUCTURAL
(T) TEMPERED
T&G TONGUE AND GROOVE
T.O. TOP OF
TD THRESHOLD
TYP TYPICAL
UON UNLESS OTHERWISE
NOTED
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VIN VINYL
VTR VENT THROUGH ROOF
W WEST
W/ WITH
W/O WITHOUT
WD WOOD
WIN WINDOW
EXT EXTERIOR
FACP FIRE ALARM CONTROL
PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FIN FINISH(ED)
FIXT FIXTURE
FLR FLOOR(ING)
FO FACE OF
FP FIRE PROTECTION
FRP FIBERGLASS REINFORCED
PANEL(ING)
FT FEET
FTG FOOTING
FURR FURRING
GA GAUGE OR GYPSUM
ASSOCIATION
GALV GLAVANIZED
GC GENERAL CONTRACTOR
GD GRADE
GL GLASS or GLAZING
GND GROUND
GWB GYPSUM WALLBOARD
HM HOLLOW METAL
HAZMAT HAZARDOUS MATERIAL
HDR HEADER
HDW HARDWARE
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATION and
AIR CONDITIONING
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIAMETER
INFO INFORMATION
INS INSULATION or INSULATED
INT INTERIOR
JT JOINT
LAV LAVATORY
LIN LINOLEUM
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL
and PLUMBING
MFG MANUFACTURING
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
<N> NEW
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
# POUND(S) or NUMBER
& AND
< ANGLE
@ AT
A/V AUDIO VISUAL
ABA AMERICAN BARRIERS ACT
ABV ABOVE
ACM ASBESTOS CONTAINING
MATERIAL
ACT ACCOUSTICAL CEILING TILE
ADD ADDENDUM
ADJ ADJACENT or ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM
ALT ALTERNATE
APPROX APPROXIMATE(LY)
ARCH ARCHITECTURAL
ASPH ASPHALT
B.O. BOTTOM OF
BLDG BUILDING
BLKG BLOCKING
BR BACKER ROD
BTWN BETWEEN
C.O. CONTRACTING OFFICER
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTBB CEMENTITIOUS TILE
BACKER BOARD
CTR CENTER
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DF DRINKING FOUNTAIN
DIAM DIAMETER
DIM DIMENSION
DN DOWN
DS DOWNSPOUT
<E> EXISTING
E EAST
EA EACH
EG FOR EXAMPLE
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQP EQUIPMENT
ETR EXISTING TO REMAIN
ABBREVIATIONS
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF8/
/2
3:
:2
P
M C
:\U se rs \G ill ia nH ev ey \D oc um en ts
\2
G R
C A
B us
S hu ttl e
M ai nt en an ce
B ui ld in g_ A
1R
_g ill ia nh ev ey
.r vt
G0.1
GH
GRAND CANYON
NATIONAL PARK
154891
228794A
GH/CR
BH
08/13/2020 2 X
GENERAL
INFORMATION &
INDEX
ARCHITECTURAL
3 A1.0 OVERALL FLOOR PLAN
4 A4.1 EXTERIOR ELEVATIONS
5 A4.2 EXTERIOR ELEVATIONS
6 A5.1 BUILDING SECTIONS
7 A6.0 BUS WASH PLAN & ELEVATIONS
SHEET #
SUB.
SHEET SHEET NAME
GENERAL
1 G0.0 COVER SHEET
2 G0.1 GENERAL INFORMATION & INDEX
INDEX
F
A
C EB D
A4.2
A4.1
A4.2
A4.1
53 SF
UNISEX RR
180 SF
MECHANICAL
ROOM
99 SF
LIQUID
STORAGE
103 SF
COMPRESSOR
ROOM
115 SF
ELECTRICAL
ROOM
584 SF
TIRE
SHOP/STORAGE
195 SF
SHOP
MANAGER'S
OFFICE
427 SF
PARTS
STORAGE
175 SF
MECH.
BREAK AREA
90 SF
UNISEX RR
W/ SHOWER
1493 SF
WORK BAY
1493 SF
WORK BAY
1635 SF
WORK BAY
1638 SF
WORK BAY
205 SF
STORAGE/JC
95 SF
CLEANING
STORAGE
110 SF
RR
60 SF
STORAGE
383 SF
CONFERENCE
ROOM
176 SF
SUPERVISOR
OFFICE
159 SF
TRAINING
OFFICE
363 SF
ADMIN
BREAK
ROOM
147 SF
DIRECTOR'S
OFFICE
110 SF
RR
A5.1
A5.1
1.2
1.2
1.2
30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"
1.1
TYP.
1.31.3
1.1
1.1
MECH.
MEZZANINE
ABOVE
F1F1
F2F2
F4
F3
F5
F6
F7
F8
F8
F9
F5
F10
GENERAL NOTES
1. REFER TO SHEET G0.1 FOR WALL TYPES.
2. REFER TO ALL OTHER DISCIPLINE DRAWINGS AND
NARRATIVES FOR RULL SCOPE OF WORK
3. ALL WINDOWS TO BE 2X4 ALUMINUM STOREFRONT
SYSTEM WITH 1" INSULATED/LOW-E GLAZING, U.O.N.
4. ALL INTERIOR PARTITION WALLS TO BE LIGHT GAGE
METAL STUD FRAMING WITH 5/8" GYPSUM BOARD
BOTH SIDES, PT., U.O.N.
5. ALL DOORS TO BE INSULATED HOLLOW METAL IN
HOLLOW METAL FRAME, U.O.N.
6. INSTALL NEW GWB AT ALL INTERIOR WALLS, PAINT,
TYP.
7. ALL GWB IN 'WET' AREAS TO BE MOISTURE RESISTANT
U.O.N. PROVIDE CTBB BEHIND WALL TILE.
8. PROVIDE DROPPED ACT IN ALL RESTROOMS,
CONFERENCE ROOM, TRAINING ROOM, AND OFFICES.
ALL OTHER ROOMS OPEN TO STRUCTURE.
9. PROVIDE MANUAL ROLL-DOWN SHADES AT ALL
WINDOWS IN ADMINISTRATION BLDG.
10. FURNITURE SHOWN FOR REFERENCE ONLY, N.I.C.,
U.O.N.
11. KITCHEN EQUIPMENT PROVIDED BY OTHERS
(REFRIGERATOR, DISHWASHER, OVEN)
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF8/
/2
3:
:1
P
M C
:\U se rs \G ill ia nH ev ey \D oc um en ts
\2
G R
C A
B us
S hu ttl e
M ai nt en an ce
B ui ld in g_ A
1R
_g ill ia nh ev ey
.r vt
A1.0
GH
GRAND CANYON
NATIONAL PARK
154891
228794A
GH/CR
BH
08/13/2020 3 X
OVERALL FLOOR
PLAN
A1.0
OVERALL FLOOR PLAN1
SCALE OF FEET
16808
SCALE A
SCALE A
KEYNOTES - FLOOR PLAN
F1 (2) STERTI-KONI BUS LIFTS, RE: STRUCTURAL
F2 ACCOUSTIC 10' CMU WALL
F3 MEZZANINE ACCESS LADDER
F4 PROVIDE WINDOW AT SHOP MANAGER'S OFFICE
F5 SOLID SURFACE COUNTER WITH UPPER AND LOWER
CABINETS
F6 RANGE & OVEN
F7 SINK
F8 (60) STACKED WOOD LOCKERS, 15"x12"
F9 ALUMINUM TRANSACTION WINDOW AT SUPERVISOR
OFFICE
F10 RESIDENTIAL STACKED WASHER & DRYER
FIRST FLOOR
100' - 0"
FA C EB D
BAY ROOF
120' - 0"
OFFICE ROOF
112' - 0"
A5.1
MEZZANINE
117' - 0"
E4 E10
E5
E13
E13
E12
E1 E1E1E1 E1
E11
FIRST FLOOR
100' - 0"
F ACE BD
BAY ROOF
120' - 0"
OFFICE ROOF
112' - 0"
A5.1
MEZZANINE
117' - 0"
E11
E8
E9
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF8/
/2
3:
:1
P
M C
:\U se rs \G ill ia nH ev ey \D oc um en ts
\2
G R
C A
B us
S hu ttl e
M ai nt en an ce
B ui ld in g_ A
1R
_g ill ia nh ev ey
.r vt
A4.1
GH
GRAND CANYON
NATIONAL PARK
154891
228794A
GH/CR
BH
08/13/2020 4 X
EXTERIOR
ELEVATIONS
A4.1
WEST ELEVATION1
A4.1
EAST ELEVATION2
SCALE OF FEET
16808
SCALE A
SCALE A
SCALE A
KEYNOTES - ELEVATION
E1 ALUMINUM STOREFRONT FRAMING SYSTEM W/ 1"
INSULATED GLAZING (DASH INDICATES OPERABLE
PORTION OF WINDOW)
E4 FIXED STOREFRONT WINDOWS WITH 1"
INSULATED/LOW-E GLAZING AT CLERESTORY
E5 ALUMINUM STOREFRONT DOOR WITH TRANSOM AND
SIDELIGHT
E8 CMU VENEER TO 4'0", RE: WALL TYPES
E9 HORIZONTAL METAL SIDING (22 GA, BASIS OF
DESIGN: BERRIDGE HR-16 PANEL)
E10 PREFINISHED LOUVER, COLOR TO MATCH METAL
SIDING, RE: MECHANICAL
E11 TYPICAL ROOF CONSTRUCTION: STANDING SEAM
METAL ROOF OVER HIGH TEMP. ICE & WATER SHEILD
OVER 1/2" COVER BOARD OVER 6" RIGID INSULATION
E12 PROVIDE DIVERTER AT ROOF OVER ENTRY DOORS
E13 PRE-FINISHED METAL FASCIA AND FLAT METAL
SOFFIT AT EAVES/ROOF OVERHANGS, TYP.
BAY ROOF
120' - 0"
OFFICE ROOF
112' - 0"
A5.1
1 1/2" / 12"
1 1/2" / 12"
MEZZANINE
117' - 0"
E1
E5 E6 E7 E7 E8
E9
FIRST FLOOR
100' - 0"
1 2 3 4
BAY ROOF
120' - 0"
OFFICE ROOF
112' - 0"
A5.1
1 1/2" / 12"
1 1/2" / 12"
MEZZANINE
117' - 0"
E7E7 E6 E6E6
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF8/
/2
3:
:2
P
M C
:\U se rs \G ill ia nH ev ey \D oc um en ts
\2
G R
C A
B us
S hu ttl e
M ai nt en an ce
B ui ld in g_ A
1R
_g ill ia nh ev ey
.r vt
A4.2
GH
GRAND CANYON
NATIONAL PARK
154891
228794A
GH/CR
BH
08/13/2020 5 X
EXTERIOR
ELEVATIONS
SCALE OF FEET
16808
SCALE A
A4.2
SOUTH ELEVATION2
A4.2
NORTH ELEVATION1
SCALE A
SCALE A
KEYNOTES - ELEVATION
E1 ALUMINUM STOREFRONT FRAMING SYSTEM W/ 1" INSULATED GLAZING (DASH
INDICATES OPERABLE PORTION OF WINDOW)
E5 ALUMINUM STOREFRONT DOOR WITH TRANSOM AND SIDELIGHT
E6 HOLLOW METAL INSULATED DOOR WITH TRANSOM LIGHT ABOVE, TYP.
E7 HEAVY DUTY OVERHEAD GARAGE DOOR
E8 CMU VENEER TO 4'0", RE: WALL TYPES
E9 HORIZONTAL METAL SIDING (22 GA, BASIS OF DESIGN: BERRIDGE HR-16
PANEL)
BAY ROOF
120' - 0"
OFFICE ROOF
112' - 0"
A5.1
TYP.
5' - 4"
1635 SF
WORK BAY
1493 SF
WORK BAY
205 SF
STORAGE/JC
60 SF
STORAGE
383 SF
CONFERENCE
ROOM
MEZZANINE
117' - 0"
27' - 6"
LOUVER WHERE
NECESSARY FOR MECH.
EQUIPMENT - APPROX 12'-13'
WIDE FOR ERV AND DOAS
FIRST FLOOR
100' - 0"
FA C EB D
BAY ROOF
120' - 0"
OFFICE ROOF
112' - 0"
A5.1
MEZZANINE
117' - 0"
363 SF
ADMIN
BREAK
ROOM
147 SF
DIRECTOR'S
OFFICE
95 SF
CLEANING
STORAGE
205 SF
STORAGE/JC
195 SF
SHOP
MANAGER'S
OFFICE
584 SF
TIRE
SHOP/STORAGE
53 SF
UNISEX RR
PREFINISHED LOUVER,
COLOR TO MATCH
METAL SIDING, RE:
MECHANICAL
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF8/
/2
3:
:2
P
M C
:\U se rs \G ill ia nH ev ey \D oc um en ts
\2
G R
C A
B us
S hu ttl e
M ai nt en an ce
B ui ld in g_ A
1R
_g ill ia nh ev ey
.r vt
A5.1
GH
GRAND CANYON
NATIONAL PARK
154891
228794A
GH/CR
BH
08/13/2020 6 X
BUILDING SECTIONS
SCALE OF FEET
SCALE AA5.1
Section 11
A5.1
Section 22
SCALE A
SCALE A
5 6
60' - 0"
A6.0
A6.0
7 8 9
BUS WASH
ROOF
115' - 0"
BUS WASH
FIRST FLOOR
100' - 0"
E9
E8
E11
E6
E7
5 6
BUS WASH
ROOF
115' - 0"
BUS WASH
FIRST FLOOR
100' - 0"
E11 E9
E8
GENERAL NOTES
1. REFER TO SHEET G0.1 FOR WALL TYPES.
2. REFER TO ALL OTHER DISCIPLINE DRAWINGS AND
NARRATIVES FOR FULL SCOPE OF WORK
3. ALL INTERIOR PARTITION WALLS TO BE LIGHT GAGE
METAL STUD FRAMING WITH 5/8" GYPSUM BOARD
BOTH SIDES, PT., U.O.N.
4. ALL DOORS TO BE INSULATED HOLLOW METAL IN
HOLLOW METAL FRAME, U.O.N.
5. INSTALL NEW GWB AT ALL INTERIOR WALLS, PAINT,
TYP.
6. ALL GWB IN 'WET' AREAS TO BE MOISTURE RESISTANT
U.O.N. PROVIDE CTBB BEHIND WALL TILE.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
DRAWING NO.
PMIS/PKG NO.
SHEET
OF8/
/2
3:
:2
P
M C
:\U se rs \G ill ia nH ev ey \D oc um en ts
\2
G R
C A
B us
S hu ttl e
M ai nt en an ce
B ui ld in g_ A
1R
_g ill ia nh ev ey
.r vt
A6.0
GH
GRAND CANYON
NATIONAL PARK
154891
228794A
GH/CR
BH
08/13/2020 7 X
BUS WASH PLAN &
ELEVATIONS
A6.0
BUS WASH FLOOR PLAN1
A6.0
BUS WASH - NORTH ELEVATION2
A6.0
BUS WASH - WEST ELEVATION3
SCALE OF FEET
16808
SCALE A
SCALE A
SCALE A SCALE A
KEYNOTES - ELEVATION
E6 HOLLOW METAL INSULATED DOOR WITH TRANSOM LIGHT
ABOVE, TYP.
E7 HEAVY DUTY OVERHEAD GARAGE DOOR
E8 CMU VENEER TO 4'0", RE: WALL TYPES
E9 HORIZONTAL METAL SIDING (22 GA, BASIS OF DESIGN:
BERRIDGE HR-16 PANEL)
E11 TYPICAL ROOF CONSTRUCTION: STANDING SEAM METAL
ROOF OVER HIGH TEMP. ICE & WATER SHEILD OVER 1/2"
COVER BOARD OVER 6" RIGID INSULATION
o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o
20 yearsStudy Life:
Comments Company User Project Name Location
Project Information
Economic Summary
PROPOSED BUILDING
ASHRAE Baseline 90.1-10 Climate Zone 5B
Alternative 1:
Alternative 2:
10 %Cost of Capital:
Economic Comparison of Alternatives
First Cost Difference
Yearly Savings
Cumulative Cash Flow Difference ($)
Simple Payback (yrs.)
Net Present Value
Internal Rate of Return (%)
Life Cycle Payback (yrs.)
Life Cycle Cost
Difference
Alt 1 vs Alt 2 5,784 0 49,288115,788 1,000.0No Payback 49,288.37No Payback
($10,000)
$0
$10,000
$20,000
$30,000
$40,000
$50,000
Yearly Savings vs Alt 1 Yearly Total Operating Cost Yearly Utility Cost Yearly Maintenance Cost
Alt 1 Alt 2
Annual Operating Costs
Yearly Savings vs Alt 1 Yearly Maintenance
Cost ($) Yearly Utility
Cost ($) Yearly Total
Operating Cost ($) Plant kWh/ton-hr
Alt 1 34,822 34,822 00 0.335 Alt 2 40,606 40,606 0-5,784 0.654
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
$4,000
January February March April May June July August September October November December
Alt 1 Alt 2
Monthly Utility Costs
TRACE 700 6.3.3
Dataset Name: 19-214A GRCA BUS MAINT.TRC calculated at 03:01 PM on 08/06/2020
Project Name:
mailto:kevin.hartigan@aps.com o o o o o o o o o o o o o o o o o o o o o o o o o
NPS Constructability Checklist National Park Service (NPS) - Denver Service Center (DSC) | 3-20-18
For instructions, see Instructions tab below.
Date: 8/14/2020 Project Title: GRCA Bus Maintenance Facility
Park: Grand Canyon Completed By: Anderson Hallas Architects, Martin/Martin
PMIS:
(Project Management
Information System)
228794A DBB or DB:
(Design-Bid-Build
OR Design-Build)
DBB
Item Number Project Issues SD Comments Schematic Design
DD or RFP Comments Design Development (DBB)
OR Request for Proposal (DB)
CD or RFP Resolution Construction Documents (DBB)
OR Request for Proposal (RFP)
PROJECT INTRODUCTION
ANY NON-TYPICAL CONTRACT LINE ITEMS OR
MISCELLANEOUS CONTRACT CONCERNS
The project carries no non-typical contract line items associated with the base scope of work.
However, there are 5 additive bid options at the
SD Level.
RECOMMENDED CONTRACT LENGTH; SEASONAL
BREAKS IN CONTRACT; IDENTIFY CONTRACT TIMING
ISSUES THAT NEED TO BE ADDRESSED; IDENTIFY
SPECIFIC PHASING REQUIREMENTS
Recommended construction contract length is 1 year. No specific phasing requirements - project should be complete in one construction phase.
PERMITTING & COMPLIANCE
External Permit or Approval
LIST REQUIRED GOVERNMENT FURNISHED PERMITS
AND APPROVALS: List by Agency-Type: Example: USACE-
CWA404 NWP18. Include contact, and phone number.
AZDEQ Approval to Construct Drinking Water
Facilities
AZDEQ NOI to Discharge Sewage Collection
System (Gravity sewer and lift station)
AZDEQ NOI to Discharge for a Type 3 General
Permit (Vehicle and Equipment Wash Facilities)
External Permit or Approval
LIST REQUIREMENTS FOR GOVERNMENT FURNISHED
PERMITS: Include inspections, meetings, close out requirements, and drawings.
Pre-application meeting, construction drawings, construction specifications, flow calculations, design report, review fees.
External Permit or Approval
LIST REQUIRED CONSTRUCTION CONTRACTOR
FURNISHED PERMITS AND APPROVALS
AZDEQ General Permit for Stormwater Discharge
External Permit or Approval
DESCRIBE WHERE AND HOW PERMIT REQUIREMENTS
ARE INCLUDED IN DESIGN PACKAGE: For each permit, describe requirement, specification (section and paragraph) and/or drawing number.
Contractor will need to prepare a SWPPP
Internal Compliance
IDENTIFY COMPLIANCE REQUIREMENTS:
SHPO, NEPA, EA: List requirement, status, and date or expected date.
OSHA
Project site has already had an EA completed for this specifc use (transportation)
NPS Constructability Checklist, 3-20-18 | page 1 of 5
Item Number Project Issues SD Comments Schematic Design
DD or RFP Comments Design Development (DBB)
OR Request for Proposal (DB)
CD or RFP Resolution Construction Documents (DBB)
OR Request for Proposal (RFP)
Internal Compliance
COMPLETE ALL APPROVALS: Director's, DAB, Congressional Funding issues, estimate within available funds? Adequate time to complete work within project and funding constraints?
AZDEQ approval for water and sanitary systems
General
IDENTIFY REQUIRED SPECIAL INSPECTIONS: List inspecting or approving organization and reason required.
Arizona Department of Water Resources will need to inspect water system prior to being put into service.
Arizona Department of Water Quality will need to inspect sewer system prior to being put into service.
STAGING AND MOBILIZATION
IDENTIFY AREAS FOR STAGING INCLUDING AREAS FOR
PRIME, SUBS, MATERIAL, AND PARKING; IDENTIFY
AREAS FOR CONSTRUCTION CAMP IF APPLICABLE:
List drawing number(s) showing staging area(s).
Potential staging area on north side of site near proposed access drive. Staging areas will be shown on drawings, to be further refined during
CDs.
IDENTIFY TEMPORARY UTILITIES AVAILABLE FOR
CONSTRUCTION: List drawing number or specification section that indentifies available utilities-electrical, phone, non-potable and potable water, sanitary-provider, meter needed, and responsible cost party.
Use of temporary utilities will be outlined in Div 1 spec (Section 01 50 00)
IDENTIFY CONSTRUCTION LOGISTICS: List drawing numbers that show traffic control, access restrictions, work hour restrictions, bridges, features, other.
Fire access must be maintained at all times, maintain traffic flow during times of road crossings/cuts for utilities.
IDENTIFY IMPACTS TO PARK AND VISITOR OPERATIONS:
List drawing number(s) or specification section(s) that identifies impacts (e.g. Visitor Impacts, Neighborhood-Urban
Impacts, Detours, Closures).
Should be limited since this project is to the bus maintenance facility with few park visitors.
IDENTIFY SITE ACCESS ISSUES: List drawing number(s) or specification section(s) that identify issues (e.g. remote and road type constrained sites, weather closure restrictions, road and bridge load limits, road and tunnel height restrictions, crane and helicopter requirements).
Access requirements will need to be coordinated with the adjacent staging area for the pipeline project. Coordination with the design team for that project will be necessary for staging, coordination of deliveries, temporary utilities, etc.
SUBMITTALS
LIST MATERIAL SUBMITTALS ON CRITICAL PATH;
FOR DESIGN-BUILD (DB), LIST MATERIAL SUBMITTALS
REQUIRING GOVERNMENT APPROVAL
List of required submittals, etc. will be identified at the CD level with the completion of the full set of specifications.
LIST LONG LEAD ITEMS; MATERIAL AND EQUIPMENT
AVAILABILITY CONCERNS, SPECIAL DELIVERY
REQUIREMENTS
Nothing identified at this time.
NPS Constructability Checklist, 3-20-18 | page 2 of 5
DD or RFP Comments Design Development (DBB)
OR Request for Proposal (DB)
CD or RFP Resolution Construction Documents (DBB)
OR Request for Proposal (RFP)
LIST OF SOLE SOURCE MATERIALS AND GOVERNMENT
FURNISHED MATERIALS OR EQUIPMENT
Park will harvest seed and plants prior to project for salvage and revegetation efforts.
SITE LAYOUT / RESOURCE PROTECTION
TYPES OF RESOURCE PROTECTION REQUIRED: List where and how requirements are included in design package.
Protect trees not within areas of disturbance.
19 ACCURATE SURVEY DATA ON PLANS: BMs, TBMs, TOPO Control information will be shown on DD/CD plans.
PRELIMINARY SITE INVESTIGATION COMPLETE,
EXISTING CONDITIONS VERIFIED AND INCLUDED IN
PACKAGE
On-site visit completed by design team in
February, 2020.
Field survey completed in March, 2020.
CONSTRUCTION LIMITS CLEARLY SHOWN AND DEFINED
FOR BOTH ACCESS AND CONSTRUCTION: List where and how requirements are included in design package.
Construction limits shown on civil plans.
SPECIAL SIGNAGE REQUIREMENTS: Describe and list where requirements are included in design package.
Traffic Control
LIST WORK SAFETY CONCERNS, LOCATION, AND
NEEDS: Include Height, Weather, Animal, Aerial, Public
Accessibility, Security, Confined Space, Pathologic, Atmospheric, and others.
Confined space for lift station/manhole construction.
DEMOLITION
ALL EXISTING UTILITIES LOCATED AND ACCURATELY
SHOWN: Describe where shown.
Utilities shown based on site survey on Existing
Conditions Plan.
Removal of the existing bus maintenance facility is included in the project (and cost estimate)
TEMPORARY SYSTEMS REQUIRED: Identify for Park or
Public: Access, power, water, sanitary, covered access, exhibit relocation, movement assistance, accessibility.
Contractor will need temporary utilties during construction. Requirements will be further defined in the Division 1 specifications at the DD Level
SALVAGE, RECYCLING, STORAGE, AND DISPOSAL
REQUIREMENTS: Who is removing salvageable equipment and where requirements are included in design package?
Will be identified at the DD level within the
Division 1 specifications.
NPS Constructability Checklist, 3-20-18 | page 3 of 5
DD or RFP Comments Design Development (DBB)
OR Request for Proposal (DB)
CD or RFP Resolution Construction Documents (DBB)
OR Request for Proposal (RFP)
NOISE / DUST / SAFETY CONCERNS FOR PUBLIC OR
ENVIRONMENT: Describe where included in design package.
Limit hours of operation and provide dust mitigation.
Will be further identified at the DD level within the
Division 1 specifications.
CONSTRAINTS ON MEANS AND METHODS: Blasting, Burning, Tidal, Weather, Public Accessibility, Existing structures/features, Holidays and Seasonal, Permitting, other.
No blasting. Burning to be observed by NPS and watch for fire hazards.
HAZARDOUS MATERIAL CONSIDERATIONS DEMO
METHODS AND DISPOSAL STATE AND LOCAL
REQUIREMENTS: Describe hazardous materials being addressed, how, and where in design package.
Will be identified at the DD level within the
Division 1 specifications.
ARCHEOLOGICAL MONITORING REQUIREMENTS:
Describe what is needed and where in design package.
Identify who provides monitor.
No known archeologically sensitive areas within the construction limits; however, prepartation for monitoring during all ground disturbing operations is required.
CONSTRUCTION
MATERIAL, EQUIPMENT, LABOR AVAILABILITY FOR
REMOTE SITES: Describe issues and where included in design package.
Project is within 79 miles of a published commercial center (Flagstaff, AZ).
SITE ACCESS RESTRICTIONS TO CONSTRUCTION
OPERATIONS IF DIFFERENT OR MORE SUBSTANTIAL
THAN ITEMS 12 AND 14
No substantial site access restrictions anticipated
ANTICIPATED WEATHER CONSIDERATIONS,
CONSTRUCTION SEASON, OPTIMUM TIME TO
ADVERTISE, RECOMMENDED CONTRACT LENGTH
The South Rim of the Grand Canyon can experience extremely hot and dry conditions in the summer months and also has the potential for sustained periods of freezing temperatures in the winter months.
PARK / CONCESSION IMPOSED RESTRICTIONS
INCLUDED IN DESIGN PACKAGE AND IMPACTS ON
SCHEDULE & COST
No known park / concession imposed restrictions at this time
DESCRIBE FULL SCOPE OF WORK FOR LOCAL UTILITY
COMPANIES AND CONSTRUCTION CONTRACTOR FOR
EACH UTILITY
Will be shown on drawings and detailed in project specifications.
DESCRIBE DISRUPTION REQUIREMENTS FOR UTILITY
CONNECTIONS, CLOSURES, AND MAXIMUM ALLOWABLE
INTERRUPTIONS: Describe where addressed in design package.
Limit down time of existing facilities as much as possible. Work with Park to determine allowable outage times.
NPS Constructability Checklist, 3-20-18 | page 4 of 5
DD or RFP Comments Design Development (DBB)
OR Request for Proposal (DB)
CD or RFP Resolution Construction Documents (DBB)
OR Request for Proposal (RFP)
SPECIFIC PHASING REQUIREMENTS: Detail what and where where provided in design package.
No separate phases.
DESCRIBE SPECIALIZED MATERIALS/INSTALLATION
METHODS CERTIFICATIONS/TRAINING REQUIREMENTS;
DETAIL GOVERNMENT REQUIRED SPECIALTY SERVICES
OR INSPECTIONS: List requirements.
No specialized materials/installation methods are anticipated at this time.
COORDINATION WITH PARK OR CONCESSIONAIRE ON
BENEFICIAL OCCUPANCY: Grand opening, fixed completion dates, etc.
None at this time.
ADJACENT or CONCURRENT CONTRACTS
COORDINATION / OVERLAPS ON CONCURRENT OR
FUTURE CONTRACTS
The construction staging area for the construction of the transcanyon pipeline project will be located to the west, across Shuttle Bus Road, more details will be coordinated in DD regarding potential scheduling overlaps
41 VALUE ENGINEERING POTENTIAL
Potential in pavement materials for site.
Study reverse osmosis systems, potential to combine.
Further simplify bus wash (gantry system?)
PROJECT CLOSEOUT
42 TRAINING REQUIREMENTS, CERTIFICATIONS SPECIFIED
Will be identified at the DD level within the
Division 1 specifications.
43 OPERATION & MAINTENANCE (O&M) REQUIREMENTS
Will be identified at the DD level within the
Division 1 specifications.
LIST PERMITS NEEDING CLOSURE AND POINTS OF
CONTACT: Describe requirement; include specification and/or drawing location for each.
AZDEQ Approval of Construction for water and sanitary systems.
45 POST CONSTRUCTION REQUIREMENTS
Will be identified at the DD level within the
Division 1 specifications.
LIST LONG TERM MAINTENANCE NEEDS AND LOCATION
IN THE DESIGN PACKAGE.
Cleaning/maintaining pond outlet structures, exercising water valves.
NPS Constructability Checklist, 3-20-18 | page 5 of 5
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
Yes, No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
SITES
Yes Construction Activity Pollution Prevention Erosion and Sediment Control Strategies
X Develop a Storm Water Pollution Prevention Plan (SWPPP)
Stormwater Discharges from Construction Activities X Temporary seeding/planting
X Permanent seeding/planting
Mulching
Earth dike
X Silt fence
Sediment trap
X Sediment basin
Other:
Stormwater Management Protect Hydrology
For development footprints that exceed 5000 square feet, maintain or restore, to the maximum extent
Stormwater Management (pdf) technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, (Guiding Principles for Sustainable Federal Buildings 2016) volume, and duration of flow.
Vegetated roofs
Stormwater Management for Federal Facilities Pervious paving
(EISA Section 438) Reuse stormwater for landscape irrigation.
Reuse stormwater for toilet and urinal flushing.
Reuse stormwater for custodial uses.
Grid pavers
Rain gardens
X Vegetated swales
Constructed wetlands
Vegetated filters
If project involves no site work, answer Yes.
Other:
No Soundscape Preservation Soundscape Preservation
No exterior noise producing equipment.
4.9 Soundscape Management Exterior noise producing equipment is quieter than ambient noise levels.
(2006 NPS Management Policies) Sound screening is installed to reduce noise levels of outside noise producing equipment.
Other:
Yes Dark Sky Preservation Dark Sky Preservation
Minimize site lighting.
4.10 Lightscape Management X All exterior features are full cutoff luminaries.
(2006 NPS Management Policies) Exterior surfaces are low-reflectance.
X Spotlights are low-angle.
If no exterior lighting on site/building, answer yes.
If existing building has existing non-cutoff lighting that will remain, answer No.
Other:
WATER EFFICIENCY
Schematic Design (SD) - NPS Project Sustainability Checklist - page 1 of 12 https://www.epa.gov/npdes/stormwater-discharges-construction-activities https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.epa.gov/nps/stormwater-management-federal-facilities-under-section-438-energy-independence-and-security-act https://www.nps.gov/policy/mp/policies.html#_Toc157232745 https://www.nps.gov/policy/mp/policies.html#_Toc157232746
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
Yes Water Meters Water Metering
X A new water meter will be provided.
Water Meters (pdf) The building has an existing water meter.
(Guiding Principles for Sustainable Federal Buildings 2016) For irrigation systems larger than 25,000 square feet, a separate water meter will be provided.
Other:
NPS Metering of Water and Energy Use - New Construction (pdf)
Yes HVAC Water Efficiency Water Used for Energy Conservation
For such systems, ensure life-cycle cost-effective water conservation technologies are applied.
Section 109 Federal Building Performance Standards (pdf) Systems that use water for energy conservation:
(EPA 2005) X Evaporative cooling
Cooling tower
Domestic water heat rejection loop
Other:
Yes Indoor Water Use Water Metering
Employ strategies that minimize water use and waste:
Indoor Water Use (pdf) X Select plumbing fixtures that are WaterSense labeled and comply with ASHRAE 189.1-2014.
(Guiding Principles for Sustainable Federal Buildings 2016) FEMP designated products.
Cooling tower controls optimized.
Eliminate single pass cooling systems.
Yes Outdoor Water Use Protect and Conserve Water
Employ strategies that minimize water use and waste:
Outdoor Water Use (pdf) X Water efficient landscaping using native, non-invasive, low maintenance plant species.
(Guiding Principles for Sustainable Federal Buildings 2016) X 50% water use reduction using ASHRAE 189.1-2014 methodologies.
Yes Alternative Water Use Protect and Conserve Water
Employ strategies that minimize water use and waste:
Alternative Water (pdf) Capture rainwater.
(Guiding Principles for Sustainable Federal Buildings 2016) Treated wastewater.
X Use of grey water.
X Use of reclaimed water.
Other:
ENERGY / ENVIRONMENT
Yes Fundamental Commissioning Fundamental Commissioning
Systems/tests that may be included:
Commissioning (pdf) X HVAC systems (mechanical and passive) and associated controls
(Guiding Principles for Sustainable Federal Buildings 2016) X Lighting and day lighting controls
X Domestic hot water systems
Meets Performance Objectives Renewable energy systems (wind, solar, etc.)
(Whole Building Design Guide (WBDG) Building envelope
Blower door testing
Other:
Schematic Design (SD) - NPS Project Sustainability Checklist - page 2 of 12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=297464 https://www.govinfo.gov/content/pkg/BILLS-109hr6enr/pdf/BILLS-109hr6enr.pdf#page=21 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=9 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=8 http://wbdg.org/design-objectives/functional-operational/meet-performance-objectives
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
Deliverables for this requirement include:
Owner's project requirements
X Basis of Design Report (BDR)
Commissioning plan
Incorporate commissioning requirements into Construction Documents (CD).
Functional performance testing
Commissioning report
. NPS recommends performing blower door testing on applicable projects to determine overall tightness of building envelope.
. Blower door test should be performed with a pressure differential between indoors and outdoors of
50 Pascals.
. Resulting building tightness should be 3 to 5 air changes per hour (AC/H). (Curatorial storage buildings should be 1 AC/H at 50 Pascals.)
. If building falls outside this range, make improvements to building envelope and retest until within recommended range.
. Infrared thermography could be used in conjunction with blower door testing to identify areas of air leakage and building components that are significant sources of heat loss/heat gain.
No Enhanced Commissioning Enhanced Commissioning
(Required for large or complex buildings or systems.) Systems/tests may be included under Fundamental Commissioning:
HVAC Systems (Mechanical & Passive) and associated controls
Commissioning (pdf) Lighting and day lighting controls
(Guiding Principles for Sustainable Federal Buildings 2016) Domestic hot water systems
Renewable energy systems (wind, solar, etc.)
Building envelope
Blower door testing
Other:
One acceptable standard for commissioning is ASHRAE 0-2005.
Deliverables for commissioning include:
Owner's project requirements
Basis of Design Report (BDR)
Commissioning plan
Conduct commissioning design review prior to mid-Construction Documents.
Incorporate commissioning requirements into Construction Documents.
Review construction submittals.
Functional performance testing
Verify training requirements are complete.
Review building operation within 10 months after substantial completion.
Commissioning report
Commissioning process began during design.
. NPS recommends performing blower door testing on applicable projects to determine overall
Schematic Design (SD) - NPS Project Sustainability Checklist - page 3 of 12 https://sftool.gov/Content/attachments/guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf#page=8
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
tightness of building envelope.
. Blower door test should be performed with a pressure differential between indoors and outdoors of
50 Pascals.
. Resulting building tightness should be 3 to 5 Air Changes per Hour (AC/H). (Curatorial storage buildings should be 1 AC/H at 50 Pascals).
. If building falls outside of this range, make improvements to building envelope and re-test until within recommended range.
. Infrared thermography could be used in conjunction with blower door testing to identify areas of air leakage and building components that are significant sources of heat loss/heat gain.
Yes Refrigerant Management Zero Use of Ozone Depleting Compounds
(Chlorofluorocarbon (CFC) and Hydrofluorocarbon (HCFC)
X Zero use of CFC based refrigerants in HVAC and refrigerant systems.
Ozone Depleting Compounds and High Global Warning Potential (GWP) Chemicals (pdf) If existing HVAC systems are used, a CFC phase out conversion will occur prior to project
(Guiding Principles for Sustainable Federal Buildings 2016) completion. Refrigerant will be recovered and recycled.
Examples of refrigerants with zero ozone depleting potential: HFC-23, 134a, 245fa, 404A, 407C, 410A, 507A
Yes Energy Performance Demonstrate a percent improvement over ASHRAE 90.1
New buildings:
Part 433 - Energy Efficiency Standards for the Design and Construction of new 12%
Federal Commercial and Multi-Family High-Rise Residential Buildings 14%
(10 CFR - Energy) 16%
18%
Energy Efficiency (pdf) 20%
(Guiding Principles for Sustainable Federal Buildings 2016) 22%
24%
Optimize Energy Performance.** 26%
(Federal Regulations require an energy consumption reduction of 30% for New Construction 28% and 20% for Existing Building Renovation as compared to an ASHRAE 90.1 baseline.) X 30% (Federal Requirement)*
32%
34%
36%
38%
40%
42%
46%
48%
Other: %
Existing buildings:
8%
10%
12%
14%
16%
Schematic Design (SD) - NPS Project Sustainability Checklist - page 4 of 12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12 https://www.ecfr.gov/cgi-bin/text-idx?mc=true&node=pt10.3.433&rgn=div5 https://www.ecfr.gov/cgi-bin/text-idx?mc=true&node=pt10.3.433&rgn=div5 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=9
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
18%
20% (Federal Requirement)*
22%
24%
26%
28%
30%
32%
34%
36%
38%
40%
42%
44%
Other: %
Federal Energy performance is based on compliance with ASHRAE 90.1 current version.
Yes Reduce Fossil Fuel Derived Energy Demonstrate Reduction in Fossil Fuel Derived Energy
(For new construction and major renovations greater than $2,500,000.)
X 80% reduction by 2020
Section 433 Federal Building Energy Efficiency Performance Standards (pdf) 95% reduction by 2025
EISA 2007 100% reduction by 2030
Other:
Fossil fuel derived energy should be reduced compared to a similar building from fiscal year 2003 as measured by the Commercial Buildings Energy Consumption Survey.
N/A Procure Environmentally Sustainable Electronic Products Energy Efficient Electronic Products
(Predominantly relates to purchases of desktop/laptop computer and peripherals.) Electronic Product Environmental Assessment Tool (EPEAT) Products:
Desktop computers
EO 13963 Planning for Federal Sustainability in the Next Decade Laptop computers
Computer workstations
Energy Efficiency (pdf) Computer monitors
(Guiding Principles for Sustainable Federal Buildings 2016) Other:
Yes Energy Star and Federal Energy Management Program (FEMP) Energy Star or FEMP Designated Products
Lighting
Section 436.4 Purpose and Scope (pdf) X Commercial HVAC equipment and motors
(CFR - Title 10 Energy - Part 436 Federal Energy Management and Planning Programs - Food service equipment
Subpart C Agency Procurement of Energy Efficient Products) Office equipment
Home electronics
Procure Energy Star or FEMP Designated Products X Appliances
Residential HVAC equipment and motors
X Plumbing equipment
Building envelope components
X Water Sense labeled products
Energy Star or FEMP designated products - not available.
Schematic Design (SD) - NPS Project Sustainability Checklist - page 5 of 12 https://www.govinfo.gov/content/pkg/BILLS-110hr6enr/pdf/BILLS-110hr6enr.pdf#page=121 https://www.epa.gov/greeningepa/executive-order-13693-planning-federal-sustainability-next-decade https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=9 https://www.govinfo.gov/content/pkg/FR-2009-03-13/pdf/E9-5459.pdf#page=6 https://www.energystar.gov/index.cfm?c=fed_agencies.fed_ag_efficient
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
Energy Star and FEMP designated projects - not cost effective over life of product.
Energy Star and FEMP designated projects - do not meet functional requirements of project.
Other:
Yes Premium Efficiency Electric Motors Premium Efficiency Motors
X Provided on all motors greater than or equal to 1.0 horse power.
Section 104 - Procurement of Energy Efficiency Products (pdf) Other:
(EPA 2005) This includes motors specified under both Mechanical and Electrical Divisions.
No On-Site Renewable Energy*** Solar Thermal
Solar Thermal for Hot Water Drain Back solar water heating system
(Choose N/A if proven not life cycle cost effective.) Thermosiphon solar water heating system
Direct circulation system
Section 523 - Standard Relating to Solar Hot Water Heaters (pdf) Indirect water heating system
(EISA 2007) Solar thermal is not life cycle cost effective over 40 years.
Other:
Yes Metering - Measurement and Verification Building Meters
X Natural gas
Metering (pdf) Steam
(Guiding Principles for Sustainable Federal Buildings 2016) X Electric
Other:
EO 13693 - Planning for Federal Sustainability in the Next Decade (pdf)
MATERIALS AND RESOURCES
Yes Storage and Collection of Recyclables Recyclables - Storage & Collection
X Designate an area for recyclable collection and storage appropriately sized and located in
Waste Diversion and Materials Management (pdf) convenient area.
(Guiding Principles for Sustainable Federal Buildings 2016) X Identify local waste handlers and buyers for glass, plastic, metals, office paper, newspaper, and organic wastes.
X Instruct occupants on recycling procedures.
Install cardboard balers.
Install aluminum can crushers.
Install recycling chutes.
Other:
Yes Construction Waste Management Construction Waste Management - Divert Minimum 50% from Disposal
% diversion rate:
Waste Diversion and Materials Management (pdf) X Develop waste management plan.
(Guiding Principles for Sustainable Federal Buildings 2016) X Identify materials to be recycled.
Establish if measure will be weight or volume.
Establish if materials will be sorted on site or comingled.
Other:
Yes Recycled Content Regional Materials
X Onsite salvaged materials
Recycled Content and Comprehensive Procurement Guidelines (pdf) X Regionally obtained concrete
Schematic Design (SD) - NPS Project Sustainability Checklist - page 6 of 12 http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=109_cong_bills&docid=f:h6enr.txt.pdf#page=16 https://www.govinfo.gov/content/pkg/BILLS-110hr6enr/pdf/BILLS-110hr6enr.pdf#page=171 https://sftool.gov/Content/attachments/guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf#page=15 https://www.gpo.gov/fdsys/pkg/FR-2015-03-25/pdf/2015-07016.pdf https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
(Guiding Principles for Sustainable Federal Buildings 2016) X Regionally obtained lumber
X Regionally obtained plant based materials
RCRA Section 6002 Other:
(Products that meet or exceed / recycled content recommendations.)
EO 13693 - Planning for Federal Sustainability in the Next Decade (pdf)
Yes Bio-Based Products BioPreferred Products
BioPreferred form release agent
EO 13693 - Planning for Federal Sustainability in the Next Decade (pdf) X BioPreferred carpet
X BioPreferred sealants and coatings
USDA BioPreferred Other:
N/A Certified Wood Certified Wood*
Certified wood for permanent installation
Identifying Greener Wood Products Certified wood for temporary use (forms, bracing, scaffolding, etc.)
Other:
*Suggested wood certifications include Forest Stewardship Council (FSC), Sustainable Forestry
Initiative (SFI), and Canadian Standards Association (CSA).
INDOOR ENVIRONMENTAL QUALITY
Yes Indoor Air Quality (IAQ) Minimum IAQ
X Meet the requirements of ASHRAE 62.1-2007.
Enhance Indoor Environmental Quality (pdf) Other:
(Guiding Principles for Sustainable Federal Buildings 2016)
No Environmental Tobacco Smoke (ETS) Control Environmental Tobacco Smoke Control
Smoking will be prohibited in the building and anywhere within 25 feet of entries, outdoor air
Enhance Indoor Environmental Quality (pdf) intakes, and operable windows.
(Guiding Principles for Sustainable Federal Buildings 2016) X Signage is provided to allow smoking in designated areas, prohibit smoking in other areas, or prohibit smoking on entire property.
Other:
Yes IAQ Management Plan - During Construction Construction IAQ Management Plan - During Construction
X Prepare IAQ management plan.
Enhance Indoor Environmental Quality (pdf) X Do not use permanent HVAC systems during demolition and/or construction.
(Guiding Principles for Sustainable Federal Buildings 2016) X Protect equipment from dust and odors and seal all duct and equipment openings with plastic.
If permanent systems will be used during demolition and/or construction, install and maintain filters (Minimum Efficiency Reporting Value (MERV) 8 minimum) on all returns.
If permanent systems will be used during demolition and/or construction and an unducted plenum over the construction zone must be used, all ceiling tiles will be in place.
X All filtration media shall be replaced after construction and before occupancy.
X Construction activities shall be isolated to prevent contamination of clean or occupied spaces.
X Cleaning activities to control contaminants in building.
Other:
Yes IAQ Management Plan - Before Occupancy Construction IAQ Management Plan - Before Occupancy
Schematic Design (SD) - NPS Project Sustainability Checklist - page 7 of 12 https://public.ornl.gov/sesa/sustainability/epp/rcra.htm https://www.gpo.gov/fdsys/pkg/FR-2015-03-25/pdf/2015-07016.pdf https://www.gpo.gov/fdsys/pkg/FR-2015-03-25/pdf/2015-07016.pdf https://www.biopreferred.gov/BioPreferred/ https://www.epa.gov/greenerproducts/identifying-greener-wood-products https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=17 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=17
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
X Prepare IAQ management plan.
Enhance Indoor Environmental Quality (pdf) Perform building flushout (14,000 cubic foot per square feet of building) with air 60 degrees
(Guiding Principles for Sustainable Federal Buildings 2016) Fahrenheit or higher and less than 60% RH (relative humidity).
Perform flushout (3500 cubic feet per square foot of building) and after occupancy, provide a minimum 0.30 cubic feet per minute per square foot (cfm/sf) outside air or as determined by
ASHRAE 62.1-2007, whichever is greater, until a total of 14,000 cubic feet per square foot of building has been delivered to the space.
X Conduct baseline IAQ testing, after construction and before occupancy, in accordance with
"Environmental Protection Agency (EPA) Compendium of Methods for the Determination of Air
Pollutants in Indoor Air".
Other:
Yes Low-Emitting Materials - Adhesives and Sealants Low Emitting Adhesives and Sealants
X Low volatile organic compound (VOC) carpet adhesive
Enhance Indoor Environmental Quality (pdf) X Low VOC carpet pad adhesive
(Guiding Principles for Sustainable Federal Buildings 2016) Low VOC wood flooring adhesive
X Low VOC rubber floor adhesive
X Low VOC subfloor adhesive
Low VOC ceramic tile adhesive
Low VOC vinyl composition tile (VCT) and asphalt adhesive
X Low VOC drywall and panel adhesive
Low VOC cove base adhesive
Low VOC multipurpose construction adhesive
Low VOC structural glazing adhesive
Low VOC polyvinyl chloride (PVC) glue
Low VOC chlorinated polyvinyl chloride (CPVC) glue
Low VOC acrylonitrile butadiene styrene (ABS) glue
Low VOC plastic welding
Low VOC plastic primer
Low VOC contact adhesive
Low VOC structural wood member adhesive
Low VOC sheet applied rubber lining
Low VOC top and trim adhesive
X Low VOC architectural sealant
Low VOC nonmembrane roof sealant
Low VOC roadway sealant
Low VOC single ply roof membrane sealant
Low VOC sealant primer, architectural nonporous
Low VOC sealant primer, architectural porous
Low VOC metal to metal adhesive
Low VOC plastic foam adhesive
Low VOC porous material (except wood) adhesive
Low VOC wood adhesive
Low VOC fiberglass adhesive
Other:
Schematic Design (SD) - NPS Project Sustainability Checklist - page 8 of 12
Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility
No, N/A
Sustainability Feature X Concisely explain how all requirements are met at this milestone.
Yes Low-Emitting Materials - Paints and Coatings Low Emitting Paints & Coatings
Low volatile organic…