B08_Att_3_Basis_of_Design_Final_8-13-20.pdf

PDF 14 MB Posted

Attached to
GRCA 250440 Shuttle Bus Facility Federal contract opportunity
Solicitation number
140P2024R0028
Issued by
Department of the Interior National Park Service National Office

About this file

This document appears to be the Basis of Design for the GRCA 250440 Shuttle Bus Facility, which is the subject of Solicitation Number 140P2024R0028 issued by the Department of the Interior National Park Service National Office.

The Basis of Design provides technical requirements and specifications for the design and construction of a shuttle bus facility to support operations at the Grand Canyon National Park. Key details include the required facility size, layout, utilities, and equipment. It outlines performance criteria for the mechanical, electrical, and other building systems. The document also addresses site development, access, and landscaping requirements. Overall, it establishes the technical and functional parameters that must be met by offerors responding to the shuttle bus facility solicitation.

View the file

Other files for this federal contract opportunity

Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

nritchie Line o o o o o o o o o o o o o o o o o o o o o o o o o o o

R

IV

E R

BOUNDARY

ONCANYON

RIM

SUBJET TO

CONCURRENCEOF

NAVAJO

TRIBE

BULLHEAD

CITY

KINGMAN

LAKE

HAVASU

CITY PRESCOTT

WINSLOW

JACOB

LAKE

N E V A D A

U T A H

UTAH

ARIZONA

PAGE

ALT

V.C.

GRAND

CANYON

NATIONAL

PARK

HQ.

NORTH

RIM

SOUTH

RIM

JACOB

LAKE

VULCANS

THRONE

TUWEEP

HUALAPAI

HILLTOP

GR

AN

D

WA

SH

C

LIF

FS D

R Y

C

AN

YO

N

CA

NY

ON

SE

PA

RA

TIO

N

MOLLIES

NIPPLE

TUCKUP

POINT

KANAB

POINT

GREAT

THUMB

MESA

POINT

IMPERIAL

CAPE

SOLITUDE

LAKE MEAD

NATIONAL

RECREATION AREA

LAKE

MEAD

NATIONAL

RECREATION

AREA

HAVASUPAI

INDIAN

RESERVATION

NAVAJO

INDIAN

RESERVATION

KAIBAB

NATIONAL

FOREST

CAPE

ROYAL

GRAND

CANYON

VILLAGE

POINT

SUBLIME GRAND

CANYON

LODGE

PHANTOM

RANCH

TU

C K U P C A N Y O N

TO

R O W E A P

V A

LL

E Y

KAIBAB

PLATEAU

CO

LO

RA

DO

RIV

ER

LITTLE

C O L O R A D O

NORTH

RIM

ENTRANCE

STATION

PO

WE

LL

PL

AT

EA

U

H A V

AS

U

C R E E K

C A

TA

R

AC

T

TAPEATS

CREEK

WHITMORE

C

ANYON

U

IN

K A R E T

M T N S

GLEN

CANYON

N.R.A.

FLAGSTAFF

GLEN

CANYON

N.R.A.

LAKE

MEAD

N.R.A

CANYON RIM

D

IAM

O N D

CREE

K

TO

WILLIAMS

AND

CANYON

RIM

KAIBAB

NATIONAL

FOREST

BOUNDARY ON

SOUTHBANK OF COLORADO

RIVER(SUBJECT TO

CONCURRENCEOF HUALAPAI

TRIBE)

SHIVWITS

PLATEAU

K A N A B

C R E E K

BRIGHT

ANGEL

POINT

M A R B

LE

C A N Y O N

HUALAPAI

INDIAN

RESERVATION

C O

LO

R

AD

O

R

IVE

R

DESERT

VIEW

HERMITS

REST

TOROWEAP

POINT

TOPEACH

SPRINGS,SELIGMAN

LEE'S

FERRY

C R E E K

PROJECT LOCATION

PROJECT LOCATION

OR

OR

Design (Title I)

Prepared in Accordance with Preliminary by Preliminary Design (Title I)

Construction Drawing Not Preceded

Approved by Superintendent on

Variance from Preliminary Design (Title I)

Project Manager

Drawing No.

Date

Date

QUALITY DESIGN CERTIFICATIONSheetMark REVISION Date Initial

STATEREGION COUNTY

LOCATION WITHIN PARK

NAME OF PARK

TITLE OF DRAWING DRAWING NO.

DEPARTMENT OF THE INTERIOR

UNITED STATES

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

PMIS

GOLDEN, CO 80401

ANDERSON HALLAS ARCHITECTS, PC

ARCHITECT

PMIS/PKG NO.

SHEET

OF8/

/2

3:

:2

P

M C

:\U se rs \G ill ia nH ev ey \D oc um en ts

\2

G R

C A

B us

S hu ttl e

M ai nt en an ce

B ui ld in g_ A

1R

_g ill ia nh ev ey

.r vt

228794A

228794A

154891

1 X

NORTHERN ARIZONA

BASIC DATA: USGS TOPO MAP; PARK MINI FOLDER 1987; COVER SHEET REVISED & REDRAWN 3/93. UPDATED 11/98. SGS.

INTERMOUNTAIN<COUNTY> ARIZONA

GRAND CANYON NATIONAL PARK

SHUTTLE BUS MAINT. FACILITY

<STRUCTURE WITHIN PARK>

SCHEMATIC DESIGN

GRAND CANYON NATIONAL PARK

BenHeppe Rectangle

GENERAL NOTES

1. DO NOT SCALE DRAWINGS

2. ALL WORK TO BE PERFORMED TO APPLICABLE BUILDING CODES (SEE

LIST OF APPLICABLE CODES).

3. ALL DIMENSIONS ARE TO FACE OF STRUCTURE UNLESS OTHERWISE

NOTED. ALL DIMENSIONS INDICATING REQUIRED CLEARANCES ARE

TO FACE OF FINISH UNLESS OTHERWISE NOTED.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIM

OR HERSELF WITH THE CONTRACT DOCUMENTS, VERIFYING FIELD

CONDITIONS AND DIMENSIONS, AND CONFIRMING THAT THE WORK

MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH

CONSTRUCTION. CONTRACTOR SHALL NOTIFY C.O. IN WRITING OF

ANY DISCREPANCY WITHIN THE CONTRACT DOCUMENTS AND

REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH

CONSTRUCTION.

5. SHOULD THERE BE ANY QUESTIONS CONCERNING THE CONTRACT

DOCUMENTS, EXISTING CONDITIONS, AND/OR DESIGN INTENT, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING A

CLARIFICATION FROM THE C.O. PRIOR TO PROCEEDING WITH THE

WORK, OR RELATED WORK IN QUESTION.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING

HIMSELF WITH THE PROJECT SCOPE OF WORK, SCHEDULE, AND

DEADLINES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

ADVISING THE C.O. OF ALL ITEMS REQUIRING A LONG LEAD TIME

UPON NOTICE TO PROCEED THAT WILL AFFECT THE SCHEDULE, AND

SHALL SUBMIT ORDER CONFIRMATIONS AND DELIVERY DATES FOR

THE ITEMS IN QUESTION TO THE C.O.

7. INSTALL ALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN

STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDED

SPECIFICATIONS, EXCEPT WHERE THE CONTRACT DOCUMENTS ARE

MORE STRINGENT. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT

SPECIFICALLY NOTED, BUT REQUIRED FOR PROPER INSTALLATION

SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. THE

CONTRACTOR SHALL FURNISH TO THE C.O. ALL WARRANTIES AND

GUARANTEES REQUIRED AT THE CONCLUSION OF THE PROJECT.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL HOOK UPS / UTILITY

CONNECTIONS, ETC. TO TEMPORARY TRAILERS.

WALL TYPES X

1.1

TYPE #

GRAPHIC

REPRESENTATION

5/8" GWB (MOISTURE

RESISTANT) , PT. @ TILE AREAS

PROVIDE CTBB IN LIEU OF MR-

GWB (RE: FINISH SCHEDULE)

3 5/8" METAL STUDS AT 16" OC

FULL DEPTH ACOUSTIC

BATT INSULATION

5/8" GWB, PT.

1.0

5/8" GWB, PT.

3 5/8" METAL STUDS AT 16" OC

5/8" GWB, PT.

2.0

FULL DEPTH ACOUSTIC

BATT INSULATION

INT.

WET

EXT.

AT TILE AREAS PROVIDE 1/4"

CERAMIC TILE (RE: FINISH

SCHEDULE)

TYPE #

GRAPHIC

REPRESENTATION

2 1/2" CLEAR FOR WALL MOUNTED

TOILET CARRIAGE

STRUCTURAL CMU TO 4'0"

A.F.F. - PROVIDE BLOCK

FILLER PAINT AT INTERIOR

EXPOSED FACE OF CMU

WEATHER BARRIER

4" CMU AT BASE OF WALL TO

4'-0" A.F.F.

LINE OF METAL CLADDING

ABOVE

2" RIGID INSULATION

2.0

5/8" GWB, PT. (PROVIDE IMPACT

RESISTANT GYPSUM BOARD AT

MAINTENANCE BAYS

6" METAL STUDS AT 16" OC

INT.

EXT.

FULL DEPTH BATT INSULATION

5/8" SHEATHING

WEATHER BARRIER

AIR GAP AND CLADDING

CLIPS

METAL CLADDING

2" RIGID INSULATION

<4'-0" A.F.F.

>4'-0" A.F.F.

A4.0

A8.0

ROOM

250 SF

A9.0

A5.0

FIRST FLOOR

100'-0"

5 1 6 75

KEY

NOTE

WAL

L

TYPE

WINDOW

TYPE/NUM

BER

DOOR

NUMB

ER

ELEVATION

MARK

NORTH

ARROW

DETAIL

REFERENCE

BUILDING

SECTION

EXTERIOR

ELEVATIO

N

INTERIOR

ELEVATI

ON

ROOM

TAG

SYMBOLS

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OSB ORIENTED STRAND BOARD

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLUMB PLUMBING

PT PAINT

PTD PAINTED

PWD PLYWOOD

QT QUARRY TILE

RAD RADIUS

RB RUBBER BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REF REFER TO or REFERENCE

REINF REINFORCED

RELOC RELOCATE(D)

REQ REQUIRED

REV REVISE, REVISED or

REVISION

RM ROOM

RO ROUGH OPENING

RS ROUGH SAWN

(S) SEALANT

S SOUTH

SCHED SCHEDULE

SF SQUARE FEET

SHTG SHEATHING

SIM SIMILAR

SOG SLAB ON GRADE

SPEC SPECIFICATION(S)

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

STN STAIN

STRUC STRUCTURE or

STRUCTURAL

(T) TEMPERED

T&G TONGUE AND GROOVE

T.O. TOP OF

TD THRESHOLD

TYP TYPICAL

UON UNLESS OTHERWISE

NOTED

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VIN VINYL

VTR VENT THROUGH ROOF

W WEST

W/ WITH

W/O WITHOUT

WD WOOD

WIN WINDOW

EXT EXTERIOR

FACP FIRE ALARM CONTROL

PANEL

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER

CABINET

FIN FINISH(ED)

FIXT FIXTURE

FLR FLOOR(ING)

FO FACE OF

FP FIRE PROTECTION

FRP FIBERGLASS REINFORCED

PANEL(ING)

FT FEET

FTG FOOTING

FURR FURRING

GA GAUGE OR GYPSUM

ASSOCIATION

GALV GLAVANIZED

GC GENERAL CONTRACTOR

GD GRADE

GL GLASS or GLAZING

GND GROUND

GWB GYPSUM WALLBOARD

HM HOLLOW METAL

HAZMAT HAZARDOUS MATERIAL

HDR HEADER

HDW HARDWARE

HORIZ HORIZONTAL

HT HEIGHT

HVAC HEATING, VENTILATION and

AIR CONDITIONING

IBC INTERNATIONAL BUILDING

CODE

ID INSIDE DIAMETER

INFO INFORMATION

INS INSULATION or INSULATED

INT INTERIOR

JT JOINT

LAV LAVATORY

LIN LINOLEUM

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEP MECHANICAL, ELECTRICAL

and PLUMBING

MFG MANUFACTURING

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

<N> NEW

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO. NUMBER

NOM NOMINAL

NTS NOT TO SCALE

# POUND(S) or NUMBER

& AND

< ANGLE

@ AT

A/V AUDIO VISUAL

ABA AMERICAN BARRIERS ACT

ABV ABOVE

ACM ASBESTOS CONTAINING

MATERIAL

ACT ACCOUSTICAL CEILING TILE

ADD ADDENDUM

ADJ ADJACENT or ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AL ALUMINUM

ALT ALTERNATE

APPROX APPROXIMATE(LY)

ARCH ARCHITECTURAL

ASPH ASPHALT

B.O. BOTTOM OF

BLDG BUILDING

BLKG BLOCKING

BR BACKER ROD

BTWN BETWEEN

C.O. CONTRACTING OFFICER

CAB CABINET

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CORR CORRIDOR

CPT CARPET

CT CERAMIC TILE

CTBB CEMENTITIOUS TILE

BACKER BOARD

CTR CENTER

DBL DOUBLE

DEMO DEMOLITION

DET DETAIL

DF DRINKING FOUNTAIN

DIAM DIAMETER

DIM DIMENSION

DN DOWN

DS DOWNSPOUT

<E> EXISTING

E EAST

EA EACH

EG FOR EXAMPLE

ELEC ELECTRICAL

ELEV ELEVATION

EMER EMERGENCY

ENGR ENGINEER

EQ EQUAL

EQP EQUIPMENT

ETR EXISTING TO REMAIN

ABBREVIATIONS

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF8/

/2

3:

:2

P

M C

:\U se rs \G ill ia nH ev ey \D oc um en ts

\2

G R

C A

B us

S hu ttl e

M ai nt en an ce

B ui ld in g_ A

1R

_g ill ia nh ev ey

.r vt

G0.1

GH

GRAND CANYON

NATIONAL PARK

154891

228794A

GH/CR

BH

08/13/2020 2 X

GENERAL

INFORMATION &

INDEX

ARCHITECTURAL

3 A1.0 OVERALL FLOOR PLAN

4 A4.1 EXTERIOR ELEVATIONS

5 A4.2 EXTERIOR ELEVATIONS

6 A5.1 BUILDING SECTIONS

7 A6.0 BUS WASH PLAN & ELEVATIONS

SHEET #

SUB.

SHEET SHEET NAME

GENERAL

1 G0.0 COVER SHEET

2 G0.1 GENERAL INFORMATION & INDEX

INDEX

F

A

C EB D

A4.2

A4.1

A4.2

A4.1

53 SF

UNISEX RR

180 SF

MECHANICAL

ROOM

99 SF

LIQUID

STORAGE

103 SF

COMPRESSOR

ROOM

115 SF

ELECTRICAL

ROOM

584 SF

TIRE

SHOP/STORAGE

195 SF

SHOP

MANAGER'S

OFFICE

427 SF

PARTS

STORAGE

175 SF

MECH.

BREAK AREA

90 SF

UNISEX RR

W/ SHOWER

1493 SF

WORK BAY

1493 SF

WORK BAY

1635 SF

WORK BAY

1638 SF

WORK BAY

205 SF

STORAGE/JC

95 SF

CLEANING

STORAGE

110 SF

RR

60 SF

STORAGE

383 SF

CONFERENCE

ROOM

176 SF

SUPERVISOR

OFFICE

159 SF

TRAINING

OFFICE

363 SF

ADMIN

BREAK

ROOM

147 SF

DIRECTOR'S

OFFICE

110 SF

RR

A5.1

A5.1

1.2

1.2

1.2

30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"

1.1

TYP.

1.31.3

1.1

1.1

MECH.

MEZZANINE

ABOVE

F1F1

F2F2

F4

F3

F5

F6

F7

F8

F8

F9

F5

F10

GENERAL NOTES

1. REFER TO SHEET G0.1 FOR WALL TYPES.

2. REFER TO ALL OTHER DISCIPLINE DRAWINGS AND

NARRATIVES FOR RULL SCOPE OF WORK

3. ALL WINDOWS TO BE 2X4 ALUMINUM STOREFRONT

SYSTEM WITH 1" INSULATED/LOW-E GLAZING, U.O.N.

4. ALL INTERIOR PARTITION WALLS TO BE LIGHT GAGE

METAL STUD FRAMING WITH 5/8" GYPSUM BOARD

BOTH SIDES, PT., U.O.N.

5. ALL DOORS TO BE INSULATED HOLLOW METAL IN

HOLLOW METAL FRAME, U.O.N.

6. INSTALL NEW GWB AT ALL INTERIOR WALLS, PAINT,

TYP.

7. ALL GWB IN 'WET' AREAS TO BE MOISTURE RESISTANT

U.O.N. PROVIDE CTBB BEHIND WALL TILE.

8. PROVIDE DROPPED ACT IN ALL RESTROOMS,

CONFERENCE ROOM, TRAINING ROOM, AND OFFICES.

ALL OTHER ROOMS OPEN TO STRUCTURE.

9. PROVIDE MANUAL ROLL-DOWN SHADES AT ALL

WINDOWS IN ADMINISTRATION BLDG.

10. FURNITURE SHOWN FOR REFERENCE ONLY, N.I.C.,

U.O.N.

11. KITCHEN EQUIPMENT PROVIDED BY OTHERS

(REFRIGERATOR, DISHWASHER, OVEN)

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF8/

/2

3:

:1

P

M C

:\U se rs \G ill ia nH ev ey \D oc um en ts

\2

G R

C A

B us

S hu ttl e

M ai nt en an ce

B ui ld in g_ A

1R

_g ill ia nh ev ey

.r vt

A1.0

GH

GRAND CANYON

NATIONAL PARK

154891

228794A

GH/CR

BH

08/13/2020 3 X

OVERALL FLOOR

PLAN

A1.0

OVERALL FLOOR PLAN1

SCALE OF FEET

16808

SCALE A

SCALE A

KEYNOTES - FLOOR PLAN

F1 (2) STERTI-KONI BUS LIFTS, RE: STRUCTURAL

F2 ACCOUSTIC 10' CMU WALL

F3 MEZZANINE ACCESS LADDER

F4 PROVIDE WINDOW AT SHOP MANAGER'S OFFICE

F5 SOLID SURFACE COUNTER WITH UPPER AND LOWER

CABINETS

F6 RANGE & OVEN

F7 SINK

F8 (60) STACKED WOOD LOCKERS, 15"x12"

F9 ALUMINUM TRANSACTION WINDOW AT SUPERVISOR

OFFICE

F10 RESIDENTIAL STACKED WASHER & DRYER

FIRST FLOOR

100' - 0"

FA C EB D

BAY ROOF

120' - 0"

OFFICE ROOF

112' - 0"

A5.1

MEZZANINE

117' - 0"

E4 E10

E5

E13

E13

E12

E1 E1E1E1 E1

E11

FIRST FLOOR

100' - 0"

F ACE BD

BAY ROOF

120' - 0"

OFFICE ROOF

112' - 0"

A5.1

MEZZANINE

117' - 0"

E11

E8

E9

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF8/

/2

3:

:1

P

M C

:\U se rs \G ill ia nH ev ey \D oc um en ts

\2

G R

C A

B us

S hu ttl e

M ai nt en an ce

B ui ld in g_ A

1R

_g ill ia nh ev ey

.r vt

A4.1

GH

GRAND CANYON

NATIONAL PARK

154891

228794A

GH/CR

BH

08/13/2020 4 X

EXTERIOR

ELEVATIONS

A4.1

WEST ELEVATION1

A4.1

EAST ELEVATION2

SCALE OF FEET

16808

SCALE A

SCALE A

SCALE A

KEYNOTES - ELEVATION

E1 ALUMINUM STOREFRONT FRAMING SYSTEM W/ 1"

INSULATED GLAZING (DASH INDICATES OPERABLE

PORTION OF WINDOW)

E4 FIXED STOREFRONT WINDOWS WITH 1"

INSULATED/LOW-E GLAZING AT CLERESTORY

E5 ALUMINUM STOREFRONT DOOR WITH TRANSOM AND

SIDELIGHT

E8 CMU VENEER TO 4'0", RE: WALL TYPES

E9 HORIZONTAL METAL SIDING (22 GA, BASIS OF

DESIGN: BERRIDGE HR-16 PANEL)

E10 PREFINISHED LOUVER, COLOR TO MATCH METAL

SIDING, RE: MECHANICAL

E11 TYPICAL ROOF CONSTRUCTION: STANDING SEAM

METAL ROOF OVER HIGH TEMP. ICE & WATER SHEILD

OVER 1/2" COVER BOARD OVER 6" RIGID INSULATION

E12 PROVIDE DIVERTER AT ROOF OVER ENTRY DOORS

E13 PRE-FINISHED METAL FASCIA AND FLAT METAL

SOFFIT AT EAVES/ROOF OVERHANGS, TYP.

BAY ROOF

120' - 0"

OFFICE ROOF

112' - 0"

A5.1

1 1/2" / 12"

1 1/2" / 12"

MEZZANINE

117' - 0"

E1

E5 E6 E7 E7 E8

E9

FIRST FLOOR

100' - 0"

1 2 3 4

BAY ROOF

120' - 0"

OFFICE ROOF

112' - 0"

A5.1

1 1/2" / 12"

1 1/2" / 12"

MEZZANINE

117' - 0"

E7E7 E6 E6E6

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF8/

/2

3:

:2

P

M C

:\U se rs \G ill ia nH ev ey \D oc um en ts

\2

G R

C A

B us

S hu ttl e

M ai nt en an ce

B ui ld in g_ A

1R

_g ill ia nh ev ey

.r vt

A4.2

GH

GRAND CANYON

NATIONAL PARK

154891

228794A

GH/CR

BH

08/13/2020 5 X

EXTERIOR

ELEVATIONS

SCALE OF FEET

16808

SCALE A

A4.2

SOUTH ELEVATION2

A4.2

NORTH ELEVATION1

SCALE A

SCALE A

KEYNOTES - ELEVATION

E1 ALUMINUM STOREFRONT FRAMING SYSTEM W/ 1" INSULATED GLAZING (DASH

INDICATES OPERABLE PORTION OF WINDOW)

E5 ALUMINUM STOREFRONT DOOR WITH TRANSOM AND SIDELIGHT

E6 HOLLOW METAL INSULATED DOOR WITH TRANSOM LIGHT ABOVE, TYP.

E7 HEAVY DUTY OVERHEAD GARAGE DOOR

E8 CMU VENEER TO 4'0", RE: WALL TYPES

E9 HORIZONTAL METAL SIDING (22 GA, BASIS OF DESIGN: BERRIDGE HR-16

PANEL)

BAY ROOF

120' - 0"

OFFICE ROOF

112' - 0"

A5.1

TYP.

5' - 4"

1635 SF

WORK BAY

1493 SF

WORK BAY

205 SF

STORAGE/JC

60 SF

STORAGE

383 SF

CONFERENCE

ROOM

MEZZANINE

117' - 0"

27' - 6"

LOUVER WHERE

NECESSARY FOR MECH.

EQUIPMENT - APPROX 12'-13'

WIDE FOR ERV AND DOAS

FIRST FLOOR

100' - 0"

FA C EB D

BAY ROOF

120' - 0"

OFFICE ROOF

112' - 0"

A5.1

MEZZANINE

117' - 0"

363 SF

ADMIN

BREAK

ROOM

147 SF

DIRECTOR'S

OFFICE

95 SF

CLEANING

STORAGE

205 SF

STORAGE/JC

195 SF

SHOP

MANAGER'S

OFFICE

584 SF

TIRE

SHOP/STORAGE

53 SF

UNISEX RR

PREFINISHED LOUVER,

COLOR TO MATCH

METAL SIDING, RE:

MECHANICAL

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF8/

/2

3:

:2

P

M C

:\U se rs \G ill ia nH ev ey \D oc um en ts

\2

G R

C A

B us

S hu ttl e

M ai nt en an ce

B ui ld in g_ A

1R

_g ill ia nh ev ey

.r vt

A5.1

GH

GRAND CANYON

NATIONAL PARK

154891

228794A

GH/CR

BH

08/13/2020 6 X

BUILDING SECTIONS

SCALE OF FEET

SCALE AA5.1

Section 11

A5.1

Section 22

SCALE A

SCALE A

5 6

60' - 0"

A6.0

A6.0

7 8 9

BUS WASH

ROOF

115' - 0"

BUS WASH

FIRST FLOOR

100' - 0"

E9

E8

E11

E6

E7

5 6

BUS WASH

ROOF

115' - 0"

BUS WASH

FIRST FLOOR

100' - 0"

E11 E9

E8

GENERAL NOTES

1. REFER TO SHEET G0.1 FOR WALL TYPES.

2. REFER TO ALL OTHER DISCIPLINE DRAWINGS AND

NARRATIVES FOR FULL SCOPE OF WORK

3. ALL INTERIOR PARTITION WALLS TO BE LIGHT GAGE

METAL STUD FRAMING WITH 5/8" GYPSUM BOARD

BOTH SIDES, PT., U.O.N.

4. ALL DOORS TO BE INSULATED HOLLOW METAL IN

HOLLOW METAL FRAME, U.O.N.

5. INSTALL NEW GWB AT ALL INTERIOR WALLS, PAINT,

TYP.

6. ALL GWB IN 'WET' AREAS TO BE MOISTURE RESISTANT

U.O.N. PROVIDE CTBB BEHIND WALL TILE.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF8/

/2

3:

:2

P

M C

:\U se rs \G ill ia nH ev ey \D oc um en ts

\2

G R

C A

B us

S hu ttl e

M ai nt en an ce

B ui ld in g_ A

1R

_g ill ia nh ev ey

.r vt

A6.0

GH

GRAND CANYON

NATIONAL PARK

154891

228794A

GH/CR

BH

08/13/2020 7 X

BUS WASH PLAN &

ELEVATIONS

A6.0

BUS WASH FLOOR PLAN1

A6.0

BUS WASH - NORTH ELEVATION2

A6.0

BUS WASH - WEST ELEVATION3

SCALE OF FEET

16808

SCALE A

SCALE A

SCALE A SCALE A

KEYNOTES - ELEVATION

E6 HOLLOW METAL INSULATED DOOR WITH TRANSOM LIGHT

ABOVE, TYP.

E7 HEAVY DUTY OVERHEAD GARAGE DOOR

E8 CMU VENEER TO 4'0", RE: WALL TYPES

E9 HORIZONTAL METAL SIDING (22 GA, BASIS OF DESIGN:

BERRIDGE HR-16 PANEL)

E11 TYPICAL ROOF CONSTRUCTION: STANDING SEAM METAL

ROOF OVER HIGH TEMP. ICE & WATER SHEILD OVER 1/2"

COVER BOARD OVER 6" RIGID INSULATION

o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

20 yearsStudy Life:

Comments Company User Project Name Location

Project Information

Economic Summary

PROPOSED BUILDING

ASHRAE Baseline 90.1-10 Climate Zone 5B

Alternative 1:

Alternative 2:

10 %Cost of Capital:

Economic Comparison of Alternatives

First Cost Difference

Yearly Savings

Cumulative Cash Flow Difference ($)

Simple Payback (yrs.)

Net Present Value

Internal Rate of Return (%)

Life Cycle Payback (yrs.)

Life Cycle Cost

Difference

Alt 1 vs Alt 2 5,784 0 49,288115,788 1,000.0No Payback 49,288.37No Payback

($10,000)

$0

$10,000

$20,000

$30,000

$40,000

$50,000

Yearly Savings vs Alt 1 Yearly Total Operating Cost Yearly Utility Cost Yearly Maintenance Cost

Alt 1 Alt 2

Annual Operating Costs

Yearly Savings vs Alt 1 Yearly Maintenance

Cost ($) Yearly Utility

Cost ($) Yearly Total

Operating Cost ($) Plant kWh/ton-hr

Alt 1 34,822 34,822 00 0.335 Alt 2 40,606 40,606 0-5,784 0.654

$0

$500

$1,000

$1,500

$2,000

$2,500

$3,000

$3,500

$4,000

January February March April May June July August September October November December

Alt 1 Alt 2

Monthly Utility Costs

TRACE 700 6.3.3

Dataset Name: 19-214A GRCA BUS MAINT.TRC calculated at 03:01 PM on 08/06/2020

Project Name:

mailto:kevin.hartigan@aps.com o o o o o o o o o o o o o o o o o o o o o o o o o

NPS Constructability Checklist National Park Service (NPS) - Denver Service Center (DSC) | 3-20-18

For instructions, see Instructions tab below.

Date: 8/14/2020 Project Title: GRCA Bus Maintenance Facility

Park: Grand Canyon Completed By: Anderson Hallas Architects, Martin/Martin

PMIS:

(Project Management

Information System)

228794A DBB or DB:

(Design-Bid-Build

OR Design-Build)

DBB

Item Number Project Issues SD Comments Schematic Design

DD or RFP Comments Design Development (DBB)

OR Request for Proposal (DB)

CD or RFP Resolution Construction Documents (DBB)

OR Request for Proposal (RFP)

PROJECT INTRODUCTION

ANY NON-TYPICAL CONTRACT LINE ITEMS OR

MISCELLANEOUS CONTRACT CONCERNS

The project carries no non-typical contract line items associated with the base scope of work.

However, there are 5 additive bid options at the

SD Level.

RECOMMENDED CONTRACT LENGTH; SEASONAL

BREAKS IN CONTRACT; IDENTIFY CONTRACT TIMING

ISSUES THAT NEED TO BE ADDRESSED; IDENTIFY

SPECIFIC PHASING REQUIREMENTS

Recommended construction contract length is 1 year. No specific phasing requirements - project should be complete in one construction phase.

PERMITTING & COMPLIANCE

External Permit or Approval

LIST REQUIRED GOVERNMENT FURNISHED PERMITS

AND APPROVALS: List by Agency-Type: Example: USACE-

CWA404 NWP18. Include contact, and phone number.

AZDEQ Approval to Construct Drinking Water

Facilities

AZDEQ NOI to Discharge Sewage Collection

System (Gravity sewer and lift station)

AZDEQ NOI to Discharge for a Type 3 General

Permit (Vehicle and Equipment Wash Facilities)

External Permit or Approval

LIST REQUIREMENTS FOR GOVERNMENT FURNISHED

PERMITS: Include inspections, meetings, close out requirements, and drawings.

Pre-application meeting, construction drawings, construction specifications, flow calculations, design report, review fees.

External Permit or Approval

LIST REQUIRED CONSTRUCTION CONTRACTOR

FURNISHED PERMITS AND APPROVALS

AZDEQ General Permit for Stormwater Discharge

External Permit or Approval

DESCRIBE WHERE AND HOW PERMIT REQUIREMENTS

ARE INCLUDED IN DESIGN PACKAGE: For each permit, describe requirement, specification (section and paragraph) and/or drawing number.

Contractor will need to prepare a SWPPP

Internal Compliance

IDENTIFY COMPLIANCE REQUIREMENTS:

SHPO, NEPA, EA: List requirement, status, and date or expected date.

OSHA

Project site has already had an EA completed for this specifc use (transportation)

NPS Constructability Checklist, 3-20-18 | page 1 of 5

Item Number Project Issues SD Comments Schematic Design

DD or RFP Comments Design Development (DBB)

OR Request for Proposal (DB)

CD or RFP Resolution Construction Documents (DBB)

OR Request for Proposal (RFP)

Internal Compliance

COMPLETE ALL APPROVALS: Director's, DAB, Congressional Funding issues, estimate within available funds? Adequate time to complete work within project and funding constraints?

AZDEQ approval for water and sanitary systems

General

IDENTIFY REQUIRED SPECIAL INSPECTIONS: List inspecting or approving organization and reason required.

Arizona Department of Water Resources will need to inspect water system prior to being put into service.

Arizona Department of Water Quality will need to inspect sewer system prior to being put into service.

STAGING AND MOBILIZATION

IDENTIFY AREAS FOR STAGING INCLUDING AREAS FOR

PRIME, SUBS, MATERIAL, AND PARKING; IDENTIFY

AREAS FOR CONSTRUCTION CAMP IF APPLICABLE:

List drawing number(s) showing staging area(s).

Potential staging area on north side of site near proposed access drive. Staging areas will be shown on drawings, to be further refined during

CDs.

IDENTIFY TEMPORARY UTILITIES AVAILABLE FOR

CONSTRUCTION: List drawing number or specification section that indentifies available utilities-electrical, phone, non-potable and potable water, sanitary-provider, meter needed, and responsible cost party.

Use of temporary utilities will be outlined in Div 1 spec (Section 01 50 00)

IDENTIFY CONSTRUCTION LOGISTICS: List drawing numbers that show traffic control, access restrictions, work hour restrictions, bridges, features, other.

Fire access must be maintained at all times, maintain traffic flow during times of road crossings/cuts for utilities.

IDENTIFY IMPACTS TO PARK AND VISITOR OPERATIONS:

List drawing number(s) or specification section(s) that identifies impacts (e.g. Visitor Impacts, Neighborhood-Urban

Impacts, Detours, Closures).

Should be limited since this project is to the bus maintenance facility with few park visitors.

IDENTIFY SITE ACCESS ISSUES: List drawing number(s) or specification section(s) that identify issues (e.g. remote and road type constrained sites, weather closure restrictions, road and bridge load limits, road and tunnel height restrictions, crane and helicopter requirements).

Access requirements will need to be coordinated with the adjacent staging area for the pipeline project. Coordination with the design team for that project will be necessary for staging, coordination of deliveries, temporary utilities, etc.

SUBMITTALS

LIST MATERIAL SUBMITTALS ON CRITICAL PATH;

FOR DESIGN-BUILD (DB), LIST MATERIAL SUBMITTALS

REQUIRING GOVERNMENT APPROVAL

List of required submittals, etc. will be identified at the CD level with the completion of the full set of specifications.

LIST LONG LEAD ITEMS; MATERIAL AND EQUIPMENT

AVAILABILITY CONCERNS, SPECIAL DELIVERY

REQUIREMENTS

Nothing identified at this time.

NPS Constructability Checklist, 3-20-18 | page 2 of 5

DD or RFP Comments Design Development (DBB)

OR Request for Proposal (DB)

CD or RFP Resolution Construction Documents (DBB)

OR Request for Proposal (RFP)

LIST OF SOLE SOURCE MATERIALS AND GOVERNMENT

FURNISHED MATERIALS OR EQUIPMENT

Park will harvest seed and plants prior to project for salvage and revegetation efforts.

SITE LAYOUT / RESOURCE PROTECTION

TYPES OF RESOURCE PROTECTION REQUIRED: List where and how requirements are included in design package.

Protect trees not within areas of disturbance.

19 ACCURATE SURVEY DATA ON PLANS: BMs, TBMs, TOPO Control information will be shown on DD/CD plans.

PRELIMINARY SITE INVESTIGATION COMPLETE,

EXISTING CONDITIONS VERIFIED AND INCLUDED IN

PACKAGE

On-site visit completed by design team in

February, 2020.

Field survey completed in March, 2020.

CONSTRUCTION LIMITS CLEARLY SHOWN AND DEFINED

FOR BOTH ACCESS AND CONSTRUCTION: List where and how requirements are included in design package.

Construction limits shown on civil plans.

SPECIAL SIGNAGE REQUIREMENTS: Describe and list where requirements are included in design package.

Traffic Control

LIST WORK SAFETY CONCERNS, LOCATION, AND

NEEDS: Include Height, Weather, Animal, Aerial, Public

Accessibility, Security, Confined Space, Pathologic, Atmospheric, and others.

Confined space for lift station/manhole construction.

DEMOLITION

ALL EXISTING UTILITIES LOCATED AND ACCURATELY

SHOWN: Describe where shown.

Utilities shown based on site survey on Existing

Conditions Plan.

Removal of the existing bus maintenance facility is included in the project (and cost estimate)

TEMPORARY SYSTEMS REQUIRED: Identify for Park or

Public: Access, power, water, sanitary, covered access, exhibit relocation, movement assistance, accessibility.

Contractor will need temporary utilties during construction. Requirements will be further defined in the Division 1 specifications at the DD Level

SALVAGE, RECYCLING, STORAGE, AND DISPOSAL

REQUIREMENTS: Who is removing salvageable equipment and where requirements are included in design package?

Will be identified at the DD level within the

Division 1 specifications.

NPS Constructability Checklist, 3-20-18 | page 3 of 5

DD or RFP Comments Design Development (DBB)

OR Request for Proposal (DB)

CD or RFP Resolution Construction Documents (DBB)

OR Request for Proposal (RFP)

NOISE / DUST / SAFETY CONCERNS FOR PUBLIC OR

ENVIRONMENT: Describe where included in design package.

Limit hours of operation and provide dust mitigation.

Will be further identified at the DD level within the

Division 1 specifications.

CONSTRAINTS ON MEANS AND METHODS: Blasting, Burning, Tidal, Weather, Public Accessibility, Existing structures/features, Holidays and Seasonal, Permitting, other.

No blasting. Burning to be observed by NPS and watch for fire hazards.

HAZARDOUS MATERIAL CONSIDERATIONS DEMO

METHODS AND DISPOSAL STATE AND LOCAL

REQUIREMENTS: Describe hazardous materials being addressed, how, and where in design package.

Will be identified at the DD level within the

Division 1 specifications.

ARCHEOLOGICAL MONITORING REQUIREMENTS:

Describe what is needed and where in design package.

Identify who provides monitor.

No known archeologically sensitive areas within the construction limits; however, prepartation for monitoring during all ground disturbing operations is required.

CONSTRUCTION

MATERIAL, EQUIPMENT, LABOR AVAILABILITY FOR

REMOTE SITES: Describe issues and where included in design package.

Project is within 79 miles of a published commercial center (Flagstaff, AZ).

SITE ACCESS RESTRICTIONS TO CONSTRUCTION

OPERATIONS IF DIFFERENT OR MORE SUBSTANTIAL

THAN ITEMS 12 AND 14

No substantial site access restrictions anticipated

ANTICIPATED WEATHER CONSIDERATIONS,

CONSTRUCTION SEASON, OPTIMUM TIME TO

ADVERTISE, RECOMMENDED CONTRACT LENGTH

The South Rim of the Grand Canyon can experience extremely hot and dry conditions in the summer months and also has the potential for sustained periods of freezing temperatures in the winter months.

PARK / CONCESSION IMPOSED RESTRICTIONS

INCLUDED IN DESIGN PACKAGE AND IMPACTS ON

SCHEDULE & COST

No known park / concession imposed restrictions at this time

DESCRIBE FULL SCOPE OF WORK FOR LOCAL UTILITY

COMPANIES AND CONSTRUCTION CONTRACTOR FOR

EACH UTILITY

Will be shown on drawings and detailed in project specifications.

DESCRIBE DISRUPTION REQUIREMENTS FOR UTILITY

CONNECTIONS, CLOSURES, AND MAXIMUM ALLOWABLE

INTERRUPTIONS: Describe where addressed in design package.

Limit down time of existing facilities as much as possible. Work with Park to determine allowable outage times.

NPS Constructability Checklist, 3-20-18 | page 4 of 5

DD or RFP Comments Design Development (DBB)

OR Request for Proposal (DB)

CD or RFP Resolution Construction Documents (DBB)

OR Request for Proposal (RFP)

SPECIFIC PHASING REQUIREMENTS: Detail what and where where provided in design package.

No separate phases.

DESCRIBE SPECIALIZED MATERIALS/INSTALLATION

METHODS CERTIFICATIONS/TRAINING REQUIREMENTS;

DETAIL GOVERNMENT REQUIRED SPECIALTY SERVICES

OR INSPECTIONS: List requirements.

No specialized materials/installation methods are anticipated at this time.

COORDINATION WITH PARK OR CONCESSIONAIRE ON

BENEFICIAL OCCUPANCY: Grand opening, fixed completion dates, etc.

None at this time.

ADJACENT or CONCURRENT CONTRACTS

COORDINATION / OVERLAPS ON CONCURRENT OR

FUTURE CONTRACTS

The construction staging area for the construction of the transcanyon pipeline project will be located to the west, across Shuttle Bus Road, more details will be coordinated in DD regarding potential scheduling overlaps

41 VALUE ENGINEERING POTENTIAL

Potential in pavement materials for site.

Study reverse osmosis systems, potential to combine.

Further simplify bus wash (gantry system?)

PROJECT CLOSEOUT

42 TRAINING REQUIREMENTS, CERTIFICATIONS SPECIFIED

Will be identified at the DD level within the

Division 1 specifications.

43 OPERATION & MAINTENANCE (O&M) REQUIREMENTS

Will be identified at the DD level within the

Division 1 specifications.

LIST PERMITS NEEDING CLOSURE AND POINTS OF

CONTACT: Describe requirement; include specification and/or drawing location for each.

AZDEQ Approval of Construction for water and sanitary systems.

45 POST CONSTRUCTION REQUIREMENTS

Will be identified at the DD level within the

Division 1 specifications.

LIST LONG TERM MAINTENANCE NEEDS AND LOCATION

IN THE DESIGN PACKAGE.

Cleaning/maintaining pond outlet structures, exercising water valves.

NPS Constructability Checklist, 3-20-18 | page 5 of 5

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

Yes, No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

SITES

Yes Construction Activity Pollution Prevention Erosion and Sediment Control Strategies

X Develop a Storm Water Pollution Prevention Plan (SWPPP)

Stormwater Discharges from Construction Activities X Temporary seeding/planting

X Permanent seeding/planting

Mulching

Earth dike

X Silt fence

Sediment trap

X Sediment basin

Other:

Stormwater Management Protect Hydrology

For development footprints that exceed 5000 square feet, maintain or restore, to the maximum extent

Stormwater Management (pdf) technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, (Guiding Principles for Sustainable Federal Buildings 2016) volume, and duration of flow.

Vegetated roofs

Stormwater Management for Federal Facilities Pervious paving

(EISA Section 438) Reuse stormwater for landscape irrigation.

Reuse stormwater for toilet and urinal flushing.

Reuse stormwater for custodial uses.

Grid pavers

Rain gardens

X Vegetated swales

Constructed wetlands

Vegetated filters

If project involves no site work, answer Yes.

Other:

No Soundscape Preservation Soundscape Preservation

No exterior noise producing equipment.

4.9 Soundscape Management Exterior noise producing equipment is quieter than ambient noise levels.

(2006 NPS Management Policies) Sound screening is installed to reduce noise levels of outside noise producing equipment.

Other:

Yes Dark Sky Preservation Dark Sky Preservation

Minimize site lighting.

4.10 Lightscape Management X All exterior features are full cutoff luminaries.

(2006 NPS Management Policies) Exterior surfaces are low-reflectance.

X Spotlights are low-angle.

If no exterior lighting on site/building, answer yes.

If existing building has existing non-cutoff lighting that will remain, answer No.

Other:

WATER EFFICIENCY

Schematic Design (SD) - NPS Project Sustainability Checklist - page 1 of 12 https://www.epa.gov/npdes/stormwater-discharges-construction-activities https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.epa.gov/nps/stormwater-management-federal-facilities-under-section-438-energy-independence-and-security-act https://www.nps.gov/policy/mp/policies.html#_Toc157232745 https://www.nps.gov/policy/mp/policies.html#_Toc157232746

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

Yes Water Meters Water Metering

X A new water meter will be provided.

Water Meters (pdf) The building has an existing water meter.

(Guiding Principles for Sustainable Federal Buildings 2016) For irrigation systems larger than 25,000 square feet, a separate water meter will be provided.

Other:

NPS Metering of Water and Energy Use - New Construction (pdf)

Yes HVAC Water Efficiency Water Used for Energy Conservation

For such systems, ensure life-cycle cost-effective water conservation technologies are applied.

Section 109 Federal Building Performance Standards (pdf) Systems that use water for energy conservation:

(EPA 2005) X Evaporative cooling

Cooling tower

Domestic water heat rejection loop

Other:

Yes Indoor Water Use Water Metering

Employ strategies that minimize water use and waste:

Indoor Water Use (pdf) X Select plumbing fixtures that are WaterSense labeled and comply with ASHRAE 189.1-2014.

(Guiding Principles for Sustainable Federal Buildings 2016) FEMP designated products.

Cooling tower controls optimized.

Eliminate single pass cooling systems.

Yes Outdoor Water Use Protect and Conserve Water

Employ strategies that minimize water use and waste:

Outdoor Water Use (pdf) X Water efficient landscaping using native, non-invasive, low maintenance plant species.

(Guiding Principles for Sustainable Federal Buildings 2016) X 50% water use reduction using ASHRAE 189.1-2014 methodologies.

Yes Alternative Water Use Protect and Conserve Water

Employ strategies that minimize water use and waste:

Alternative Water (pdf) Capture rainwater.

(Guiding Principles for Sustainable Federal Buildings 2016) Treated wastewater.

X Use of grey water.

X Use of reclaimed water.

Other:

ENERGY / ENVIRONMENT

Yes Fundamental Commissioning Fundamental Commissioning

Systems/tests that may be included:

Commissioning (pdf) X HVAC systems (mechanical and passive) and associated controls

(Guiding Principles for Sustainable Federal Buildings 2016) X Lighting and day lighting controls

X Domestic hot water systems

Meets Performance Objectives Renewable energy systems (wind, solar, etc.)

(Whole Building Design Guide (WBDG) Building envelope

Blower door testing

Other:

Schematic Design (SD) - NPS Project Sustainability Checklist - page 2 of 12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.nps.gov/dscw/loader.cfm?csModule=security/getfile&pageid=297464 https://www.govinfo.gov/content/pkg/BILLS-109hr6enr/pdf/BILLS-109hr6enr.pdf#page=21 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=9 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=10 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=8 http://wbdg.org/design-objectives/functional-operational/meet-performance-objectives

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

Deliverables for this requirement include:

Owner's project requirements

X Basis of Design Report (BDR)

Commissioning plan

Incorporate commissioning requirements into Construction Documents (CD).

Functional performance testing

Commissioning report

. NPS recommends performing blower door testing on applicable projects to determine overall tightness of building envelope.

. Blower door test should be performed with a pressure differential between indoors and outdoors of

50 Pascals.

. Resulting building tightness should be 3 to 5 air changes per hour (AC/H). (Curatorial storage buildings should be 1 AC/H at 50 Pascals.)

. If building falls outside this range, make improvements to building envelope and retest until within recommended range.

. Infrared thermography could be used in conjunction with blower door testing to identify areas of air leakage and building components that are significant sources of heat loss/heat gain.

No Enhanced Commissioning Enhanced Commissioning

(Required for large or complex buildings or systems.) Systems/tests may be included under Fundamental Commissioning:

HVAC Systems (Mechanical & Passive) and associated controls

Commissioning (pdf) Lighting and day lighting controls

(Guiding Principles for Sustainable Federal Buildings 2016) Domestic hot water systems

Renewable energy systems (wind, solar, etc.)

Building envelope

Blower door testing

Other:

One acceptable standard for commissioning is ASHRAE 0-2005.

Deliverables for commissioning include:

Owner's project requirements

Basis of Design Report (BDR)

Commissioning plan

Conduct commissioning design review prior to mid-Construction Documents.

Incorporate commissioning requirements into Construction Documents.

Review construction submittals.

Functional performance testing

Verify training requirements are complete.

Review building operation within 10 months after substantial completion.

Commissioning report

Commissioning process began during design.

. NPS recommends performing blower door testing on applicable projects to determine overall

Schematic Design (SD) - NPS Project Sustainability Checklist - page 3 of 12 https://sftool.gov/Content/attachments/guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf#page=8

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

tightness of building envelope.

. Blower door test should be performed with a pressure differential between indoors and outdoors of

50 Pascals.

. Resulting building tightness should be 3 to 5 Air Changes per Hour (AC/H). (Curatorial storage buildings should be 1 AC/H at 50 Pascals).

. If building falls outside of this range, make improvements to building envelope and re-test until within recommended range.

. Infrared thermography could be used in conjunction with blower door testing to identify areas of air leakage and building components that are significant sources of heat loss/heat gain.

Yes Refrigerant Management Zero Use of Ozone Depleting Compounds

(Chlorofluorocarbon (CFC) and Hydrofluorocarbon (HCFC)

X Zero use of CFC based refrigerants in HVAC and refrigerant systems.

Ozone Depleting Compounds and High Global Warning Potential (GWP) Chemicals (pdf) If existing HVAC systems are used, a CFC phase out conversion will occur prior to project

(Guiding Principles for Sustainable Federal Buildings 2016) completion. Refrigerant will be recovered and recycled.

Examples of refrigerants with zero ozone depleting potential: HFC-23, 134a, 245fa, 404A, 407C, 410A, 507A

Yes Energy Performance Demonstrate a percent improvement over ASHRAE 90.1

New buildings:

Part 433 - Energy Efficiency Standards for the Design and Construction of new 12%

Federal Commercial and Multi-Family High-Rise Residential Buildings 14%

(10 CFR - Energy) 16%

18%

Energy Efficiency (pdf) 20%

(Guiding Principles for Sustainable Federal Buildings 2016) 22%

24%

Optimize Energy Performance.** 26%

(Federal Regulations require an energy consumption reduction of 30% for New Construction 28% and 20% for Existing Building Renovation as compared to an ASHRAE 90.1 baseline.) X 30% (Federal Requirement)*

32%

34%

36%

38%

40%

42%

46%

48%

Other: %

Existing buildings:

8%

10%

12%

14%

16%

Schematic Design (SD) - NPS Project Sustainability Checklist - page 4 of 12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12 https://www.ecfr.gov/cgi-bin/text-idx?mc=true&node=pt10.3.433&rgn=div5 https://www.ecfr.gov/cgi-bin/text-idx?mc=true&node=pt10.3.433&rgn=div5 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=9

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

18%

20% (Federal Requirement)*

22%

24%

26%

28%

30%

32%

34%

36%

38%

40%

42%

44%

Other: %

Federal Energy performance is based on compliance with ASHRAE 90.1 current version.

Yes Reduce Fossil Fuel Derived Energy Demonstrate Reduction in Fossil Fuel Derived Energy

(For new construction and major renovations greater than $2,500,000.)

X 80% reduction by 2020

Section 433 Federal Building Energy Efficiency Performance Standards (pdf) 95% reduction by 2025

EISA 2007 100% reduction by 2030

Other:

Fossil fuel derived energy should be reduced compared to a similar building from fiscal year 2003 as measured by the Commercial Buildings Energy Consumption Survey.

N/A Procure Environmentally Sustainable Electronic Products Energy Efficient Electronic Products

(Predominantly relates to purchases of desktop/laptop computer and peripherals.) Electronic Product Environmental Assessment Tool (EPEAT) Products:

Desktop computers

EO 13963 Planning for Federal Sustainability in the Next Decade Laptop computers

Computer workstations

Energy Efficiency (pdf) Computer monitors

(Guiding Principles for Sustainable Federal Buildings 2016) Other:

Yes Energy Star and Federal Energy Management Program (FEMP) Energy Star or FEMP Designated Products

Lighting

Section 436.4 Purpose and Scope (pdf) X Commercial HVAC equipment and motors

(CFR - Title 10 Energy - Part 436 Federal Energy Management and Planning Programs - Food service equipment

Subpart C Agency Procurement of Energy Efficient Products) Office equipment

Home electronics

Procure Energy Star or FEMP Designated Products X Appliances

Residential HVAC equipment and motors

X Plumbing equipment

Building envelope components

X Water Sense labeled products

Energy Star or FEMP designated products - not available.

Schematic Design (SD) - NPS Project Sustainability Checklist - page 5 of 12 https://www.govinfo.gov/content/pkg/BILLS-110hr6enr/pdf/BILLS-110hr6enr.pdf#page=121 https://www.epa.gov/greeningepa/executive-order-13693-planning-federal-sustainability-next-decade https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=9 https://www.govinfo.gov/content/pkg/FR-2009-03-13/pdf/E9-5459.pdf#page=6 https://www.energystar.gov/index.cfm?c=fed_agencies.fed_ag_efficient

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

Energy Star and FEMP designated projects - not cost effective over life of product.

Energy Star and FEMP designated projects - do not meet functional requirements of project.

Other:

Yes Premium Efficiency Electric Motors Premium Efficiency Motors

X Provided on all motors greater than or equal to 1.0 horse power.

Section 104 - Procurement of Energy Efficiency Products (pdf) Other:

(EPA 2005) This includes motors specified under both Mechanical and Electrical Divisions.

No On-Site Renewable Energy*** Solar Thermal

Solar Thermal for Hot Water Drain Back solar water heating system

(Choose N/A if proven not life cycle cost effective.) Thermosiphon solar water heating system

Direct circulation system

Section 523 - Standard Relating to Solar Hot Water Heaters (pdf) Indirect water heating system

(EISA 2007) Solar thermal is not life cycle cost effective over 40 years.

Other:

Yes Metering - Measurement and Verification Building Meters

X Natural gas

Metering (pdf) Steam

(Guiding Principles for Sustainable Federal Buildings 2016) X Electric

Other:

EO 13693 - Planning for Federal Sustainability in the Next Decade (pdf)

MATERIALS AND RESOURCES

Yes Storage and Collection of Recyclables Recyclables - Storage & Collection

X Designate an area for recyclable collection and storage appropriately sized and located in

Waste Diversion and Materials Management (pdf) convenient area.

(Guiding Principles for Sustainable Federal Buildings 2016) X Identify local waste handlers and buyers for glass, plastic, metals, office paper, newspaper, and organic wastes.

X Instruct occupants on recycling procedures.

Install cardboard balers.

Install aluminum can crushers.

Install recycling chutes.

Other:

Yes Construction Waste Management Construction Waste Management - Divert Minimum 50% from Disposal

% diversion rate:

Waste Diversion and Materials Management (pdf) X Develop waste management plan.

(Guiding Principles for Sustainable Federal Buildings 2016) X Identify materials to be recycled.

Establish if measure will be weight or volume.

Establish if materials will be sorted on site or comingled.

Other:

Yes Recycled Content Regional Materials

X Onsite salvaged materials

Recycled Content and Comprehensive Procurement Guidelines (pdf) X Regionally obtained concrete

Schematic Design (SD) - NPS Project Sustainability Checklist - page 6 of 12 http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=109_cong_bills&docid=f:h6enr.txt.pdf#page=16 https://www.govinfo.gov/content/pkg/BILLS-110hr6enr/pdf/BILLS-110hr6enr.pdf#page=171 https://sftool.gov/Content/attachments/guiding_principles_for_sustainable_federal_buildings_and_associated_instructions_february_2016.pdf#page=15 https://www.gpo.gov/fdsys/pkg/FR-2015-03-25/pdf/2015-07016.pdf https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=12

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

(Guiding Principles for Sustainable Federal Buildings 2016) X Regionally obtained lumber

X Regionally obtained plant based materials

RCRA Section 6002 Other:

(Products that meet or exceed / recycled content recommendations.)

EO 13693 - Planning for Federal Sustainability in the Next Decade (pdf)

Yes Bio-Based Products BioPreferred Products

BioPreferred form release agent

EO 13693 - Planning for Federal Sustainability in the Next Decade (pdf) X BioPreferred carpet

X BioPreferred sealants and coatings

USDA BioPreferred Other:

N/A Certified Wood Certified Wood*

Certified wood for permanent installation

Identifying Greener Wood Products Certified wood for temporary use (forms, bracing, scaffolding, etc.)

Other:

*Suggested wood certifications include Forest Stewardship Council (FSC), Sustainable Forestry

Initiative (SFI), and Canadian Standards Association (CSA).

INDOOR ENVIRONMENTAL QUALITY

Yes Indoor Air Quality (IAQ) Minimum IAQ

X Meet the requirements of ASHRAE 62.1-2007.

Enhance Indoor Environmental Quality (pdf) Other:

(Guiding Principles for Sustainable Federal Buildings 2016)

No Environmental Tobacco Smoke (ETS) Control Environmental Tobacco Smoke Control

Smoking will be prohibited in the building and anywhere within 25 feet of entries, outdoor air

Enhance Indoor Environmental Quality (pdf) intakes, and operable windows.

(Guiding Principles for Sustainable Federal Buildings 2016) X Signage is provided to allow smoking in designated areas, prohibit smoking in other areas, or prohibit smoking on entire property.

Other:

Yes IAQ Management Plan - During Construction Construction IAQ Management Plan - During Construction

X Prepare IAQ management plan.

Enhance Indoor Environmental Quality (pdf) X Do not use permanent HVAC systems during demolition and/or construction.

(Guiding Principles for Sustainable Federal Buildings 2016) X Protect equipment from dust and odors and seal all duct and equipment openings with plastic.

If permanent systems will be used during demolition and/or construction, install and maintain filters (Minimum Efficiency Reporting Value (MERV) 8 minimum) on all returns.

If permanent systems will be used during demolition and/or construction and an unducted plenum over the construction zone must be used, all ceiling tiles will be in place.

X All filtration media shall be replaced after construction and before occupancy.

X Construction activities shall be isolated to prevent contamination of clean or occupied spaces.

X Cleaning activities to control contaminants in building.

Other:

Yes IAQ Management Plan - Before Occupancy Construction IAQ Management Plan - Before Occupancy

Schematic Design (SD) - NPS Project Sustainability Checklist - page 7 of 12 https://public.ornl.gov/sesa/sustainability/epp/rcra.htm https://www.gpo.gov/fdsys/pkg/FR-2015-03-25/pdf/2015-07016.pdf https://www.gpo.gov/fdsys/pkg/FR-2015-03-25/pdf/2015-07016.pdf https://www.biopreferred.gov/BioPreferred/ https://www.epa.gov/greenerproducts/identifying-greener-wood-products https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=17 https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf#page=17

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

X Prepare IAQ management plan.

Enhance Indoor Environmental Quality (pdf) Perform building flushout (14,000 cubic foot per square feet of building) with air 60 degrees

(Guiding Principles for Sustainable Federal Buildings 2016) Fahrenheit or higher and less than 60% RH (relative humidity).

Perform flushout (3500 cubic feet per square foot of building) and after occupancy, provide a minimum 0.30 cubic feet per minute per square foot (cfm/sf) outside air or as determined by

ASHRAE 62.1-2007, whichever is greater, until a total of 14,000 cubic feet per square foot of building has been delivered to the space.

X Conduct baseline IAQ testing, after construction and before occupancy, in accordance with

"Environmental Protection Agency (EPA) Compendium of Methods for the Determination of Air

Pollutants in Indoor Air".

Other:

Yes Low-Emitting Materials - Adhesives and Sealants Low Emitting Adhesives and Sealants

X Low volatile organic compound (VOC) carpet adhesive

Enhance Indoor Environmental Quality (pdf) X Low VOC carpet pad adhesive

(Guiding Principles for Sustainable Federal Buildings 2016) Low VOC wood flooring adhesive

X Low VOC rubber floor adhesive

X Low VOC subfloor adhesive

Low VOC ceramic tile adhesive

Low VOC vinyl composition tile (VCT) and asphalt adhesive

X Low VOC drywall and panel adhesive

Low VOC cove base adhesive

Low VOC multipurpose construction adhesive

Low VOC structural glazing adhesive

Low VOC polyvinyl chloride (PVC) glue

Low VOC chlorinated polyvinyl chloride (CPVC) glue

Low VOC acrylonitrile butadiene styrene (ABS) glue

Low VOC plastic welding

Low VOC plastic primer

Low VOC contact adhesive

Low VOC structural wood member adhesive

Low VOC sheet applied rubber lining

Low VOC top and trim adhesive

X Low VOC architectural sealant

Low VOC nonmembrane roof sealant

Low VOC roadway sealant

Low VOC single ply roof membrane sealant

Low VOC sealant primer, architectural nonporous

Low VOC sealant primer, architectural porous

Low VOC metal to metal adhesive

Low VOC plastic foam adhesive

Low VOC porous material (except wood) adhesive

Low VOC wood adhesive

Low VOC fiberglass adhesive

Other:

Schematic Design (SD) - NPS Project Sustainability Checklist - page 8 of 12

Schematic Design (SD) Project Title: Grand Canyon: New Shuttle Bus Maintenance and Operations Facility

No, N/A

Sustainability Feature X Concisely explain how all requirements are met at this milestone.

Yes Low-Emitting Materials - Paints and Coatings Low Emitting Paints & Coatings

Low volatile organic…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .