B08_Att_2_ZION_240182_Phase_III_EV_FInal_CD_Package_Drawings.pdf
PDF 39 MB Posted
- Attached to
- ZION Construction Bus Charging Phase 3 Federal contract opportunity
- Solicitation number
- 140P2024R0115
About this file
This document appears to be a set of drawings for the ZION 240182 Construction Bus Charging Phase 3 project, which is the subject of Solicitation Number 140P2024R0115 issued by the Department of the Interior National Park Service National Office.
The drawings provide detailed technical information related to the construction of an electric vehicle charging infrastructure project. The project involves the design and installation of new electric bus charging stations and supporting infrastructure at the Zion National Park. Key details include the required products and services, project phasing, and technical specifications for the electrical, civil, and architectural elements of the construction work.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
INDEX
SHEET
SUB
SHEET TITLE OF SHEET
G001
G002
G003
G004
C101
C102
C103
C201
C301
C501
C502
S101
S102
S103
S104
E101
E102
E201
E202
E203
E501
E502
E503
E504
E505
E601
E602
E603
E604
E605
COVER SHEET
LEGEND
ABBREVIATIONS
GENERAL NOTES
PARKING LOT REMOVAL PLAN
PARKING LOT GRADING PLAN
BOX CULVERT SITE PLAN
BOX CULVERT PLAN & PROFILE
PARKING LOT GRADING SECTION(S) & PROFILE
PARKING LOT GRADING DETAILS
DRAINAGE CIVIL DETAILS
STRUCTURAL GENERAL NOTES
BOX CULVERT STRUCTURAL DETAILS
BOX CULVERT STRUCTURAL DETAILS
BOX CULVERT ORNAMENTAL FENCE DETAILS
ELECTRICAL SITE PLAN
ELECTRICAL LAYOUT
CHARGER PAD AND DETAILS
ELECTRICAL DETAILS
EQUIPMENT PAD DETAILS
DUCT BANK DETAILS
GENERAL DETAILS
GAS LINE DETAILS
MAIN SWBD DETAIL (EXISTING)
SWITCHBOARD DETAILS (PROPOSED)
SWITCHBOARD SCHEDULES
EXISTING ONE LINE DIAGRAM
ONE LINE DIAGRAM
FEEDER SCHEDULE
BILL OF MATERIALS
192841
05/31/2024
No. 12890621
MICHAEL
FLICK
2 30
192841
240182
J. WILKERT
J. WILKERT
M. FLICK
4/12/2024 205/31/2024
No. 12890621
1. THESE ABBREVIATIONS APPLY TO THE ENTIRE SET
OF CONTRACT DRAWINGS.
2. LISTING OF ABBREVIATIONS DOES NOT IMPLY THAT
ALL ABBREVIATIONS ARE USED IN THE CONTRACT
DRAWINGS.
3. ABBREVIATIONS SHOWN ON THIS SHEET INCLUDE
VARIATIONS OF A WORD. FOR EXAMPLE, "MOD"
MAY MEAN MODIFY OR MODIFICATION; "INC" MAY
MEAN INCLUDED OR INCLUDING AND "REINF" MAY
MEAN EITHER REINFORCE OR REINFORCING.
4. SEE INSTRUMENTATION LEGEND SHEET FOR
PROJECT-SPECIFIC EQUIPMENT SYMBOLS,
EQUIPMENT ABBREVIATIONS, AND PIPING SYSTEM
ABBREVIATIONS.
TOP OF BOLT, TOP OF BANK,
TOP OF BEAM, TOP OF BERM
TOP OF CURB, TOP OF CONCRETE
TOP OF DUCT
TOP OF FOOTING
TOP OF GRATING
TOLERANCE, TOP OF LEDGER
TOP OF MASONRY
TOP OF PLATE
TOPOGRAPHY
TOP OF SLAB, TOP OF STEEL,
TOE OF SLOPE
TOP OF WALL
TOILET PARTITION, TELEPHONE POLE,
TOE PLATE, TRAP PRIMER
TOILET PAPER DISPENSER
TOPPING, THROUGH PLATE GIRDER
TRANSOM
TRANSITION
TRENCH DRAIN
TYPICAL
URINAL
UNDERGROUND
ULTIMATE
UNFINISHED
UNLESS NOTED OTHERWISE
UTILITY
VENT, VELOCITY, VOLT
VOLT AMPERE
VACUUM
VARNISH, VARIABLE,
VOLT AMPERES REACTIVE
VAPOR BARRIER, VINYL BASE,
VALVE BOX
VERTICAL CURVE
VITRIFIED CLAY PIPE
VINYL COMPOSITION TILE,
VERTICAL CENTERLINE
VELOCITY
VENTILATION
VERTICAL
VERTICAL GRAIN
VERIFY IN FIELD
VINYL
VOLUME
VERTICAL POINT OF CURVATURE
VERTICAL POINT OF INTERSECTION
VERTICAL POINT OF TANGENCY
VERSUS, VAPOR SEAL
VENT THROUGH ROOF
VINYL WALL COVERING
WITH
WITHOUT
WATT, WEST, WIDE, WINDOW, WIRE,
WIDE FLANGE BEAM
WOOD BASE
WATER CLOSET, WATER COLUMN
WOOD, WIDTH
WIDE FLANGE, WASH FOUNTAIN
WIRE GLASS, WATER GAGE
WALL HYDRANT, WEEP HOLE
WROUGHT IRON
WATER LEVEL
WELDED
WIRE MESH
WEATHERPROOF
WATERSTOP, WATER SURFACE
WAINSCOT
WEIGHT, WATER TIGHT
WATERPROOF, WORKING POINT
WELDED WIRE FABRIC
EXPLOSION-PROOF
EXTRA STRONG
CROSS SECTION
DOUBLE EXTRA STRONG
YARD HYDRANT
YIELD STRENGTH
TOB
TOC
TOD
TOF
TOG
TOL
TOM
TOP
TOPO
TOS
TOW
TP
TPD
TPG
TR
TRANS
TRD
TYP
U
UG
ULT
UNFN
UNO
UTIL
V
VA
VAC
VAR
VB
VC
VCP
VCT
VEL
VENT
VERT
VG
VIF
VIN
VOL
VPC
VPI
VPT
VS
VTR
VWC
W/ W/O W
WB
WC
WD
WF
WG
WH
WI
WL
WLD
WM
WP
WS
WSCT
WT
WTHP
WWF
XP
XS
XSECT
XXS
YH
YS
REMOVE AND REPLACE
REMOVE AND SALVAGE
RADIUS, REGISTER, RISER
RETURN AIR
RESILIENT BASE, ROCK BERM
RECEPTACLE
ROOF DRAIN
RECESS
RECEIVED
RECTANGULAR
REDUCER
REFERENCE
REINFORCING
REMOVE
REQUIRED
RESILIENT
RETAINING, RETURN
REVISION, REVERSE
RESILIENT FLOORING
ROOFING
REFLECTED, REFLECTOR
ROUGH
RIGID GALVANIZED STEEL
PVC COATED RGS
RELIEF HOOD, RIGHT HAND,
RELATIVE HUMIDITY
REQUIRED LAP
RELIEF AIR
ROUND
RUNNING
ROUGH OPENING
RIGHT-OF-WAY
REVOLUTIONS PER MINUTE
RAILROAD
ROCK SLOPE PROTECTION
RIGHT
RESILIENT VINYL TILE
READY
SOUTH, SINK
SUPPLY AIR
SOUND-ABSORBING MASONRY UNIT
SANITARY
SPLASH BLOCK
SOLID CORE
SCHEDULE
SCHEMATIC
SCREEN
STEEL/ALUMINUM EDGE
SECONDARY, SECONDS
SECTION
SEPARATE
SQUARE FOOT, SILT FENCE
SHEET GLASS, SEALANT GROOVE
SHOWER
SHEET
SHEATHING
SILENCE
SIMILAR
SLOPE
SLOTTED
SLEEVE
SEAMLESS
SLAB ON GRADE
SOUNDPROOF, STANDPIPE
SPACING
SPECIFICATION
SUPPLY
SINGLE POLE SINGLE THROW
SET POINT
SQUARE
SHORT RADIUS
SERVICE SINK
STAINLESS STEEL
STREET
STATION
STANDARD
STIFFENER
STIRRUP
STEEL
STORAGE
STRUCTURAL, STRAIGHT
SUBSTITUTE
SUCTION
SUSPENDED
SQUARE YARD
SYMBOL
SYMMETRICAL
SYNTHETIC
SYSTEM
TOP AND BOTTOM
TONGUE AND GROOVE
TILE, TREAD
TOILET ACCESSORY, TEMPERED AIR
TANGENT
TEMPORARY BENCHMARK
TEMPORARY CONSTRUCTION EASEMENT
TROWELED EPOXY FLOORING
TEMPORARY, TEMPERATURE
THREAD
THICK
THRESHOLD
TACK BOARD
R&R R&S R
RA
RB
RCPT
RD
REC
RECD
RECT
RED
REF
REINF
REM
REQD
RESIL
RET
REV
RF
RFG
RFL
RGH
RGS
RGS-PVC
RH
RL
RLFA
RND
RNG
RO
ROW
RPM
RR
RSP
RT
RVT
RY
S
SA
SAMU
SAN
SB
SC
SCH
SCHEM
SCN
SE
SEC
SECT
SEP
SF
SG
SH
SHT
SHTG
SIL
SIM
SL
SLTD
SLV
SMLS
SOG
SP
SPA
SPEC
SPLY
SPST
SPT
SQ
SR
SS
SST
ST
STA
STD
STIF
STIR
STL
STOR
STR
SUB
SUC
SUSP
SY
SYM
SYMM
SYN
SYS
T&B T&G T
TA
TAN
TBM
TCE
TEF
TEMP
THD
THK
THRESH
TKBD
NORTH, NEUTRAL
NOT APPLICABLE
NATURAL, NATIONAL
NORMALLY CLOSED
NEGATIVE
NEAR FACE, NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN, NUMBER
NOMINAL
NOMINAL PIPE SIZE
NATIONAL PIPE THREAD
NEAR SIDE
NOT TO SCALE
NORMAL WATER LEVEL
OUT TO OUT
OUTSIDE AIR, OVERALL
ON CENTER
OVER CURRENT PROTECTION DEVICE
OUTSIDE DIAMETER
OPEN END DUCT
OUTSIDE FACE, OFFICE FURNISHING
OWNER FURNISHED CONTRACTOR
INSTALLED
OWNER FURNISHED OWNER INSTALLED
ORIGINAL GROUND
OVERHEAD
OPENING
OPPOSITE
OPTIONAL
OUTSIDE RADIUS
OVERFLOW ROOF DRAIN
ORIGINAL
OVERFLOW
OVERHANG
OUNCE
PAINT
PUBLIC ADDRESS
PARALLEL, PARAPET
PANIC BAR, PULL BOX
PARTICLE BOARD
POINT OF CURVE, PIECE, PRECAST
POINT OF COMPOUND CURVATURE
POUNDS PER CUBIC FOOT
PERCENT
PLAIN END
PEDESTAL
PENETRATION
PERFORATED
PERMANENT
PERPENDICULAR
POWER FACTOR
PREFACED MASONRY UNIT
PROFILE GRADE LINE
PHASE
POINT OF INTERSECTION
PACKAGE
PLATE, PROPERTY LINE
PLASTER
PLATFORM
PLUMBING
POUNDS PER LINEAR FOOT
PNEUMATIC
POLISH
POSITIVE, POSITION
POLYPROPYLENE, POWER POLE
POINT OF REVERSE CURVATURE
PREFINISHED
PREFABRICATED
PRELIMINARY
PREPARE
PRESSURE
PRIMARY
PROPERTY, PROPOSED
PROTECTION
PIPE SUPPORT
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH GAGE
PRESTRESSED
POINT, POINT OF TANGENCY
PARTITION
POLYVINYL CHLORIDE, POINT OF
VERTICAL CURVE
PAVEMENT
PLYWOOD
PLYWOOD WEB JOIST
PIEZOMETER
RATE OF FLOW
QUARRY TILE
QUARTER
QUANTITY
QUALITY
N
NA
NAT
NC
NEG
NF
NIC
NO
NOM
NPS
NPT
NS
NTS
NWL
O TO O
OA
OC
OCPD
OD
OED
OF
OFCI
OFOI
OG
OH
OPNG
OPP
OPT
OR
ORD
ORIG
OVFL
OVHG
OZ
P
PA
PAR
PB
PBD
PC
PCC
PCF
PCT
PE
PED
PEN
PERF
PERM
PERP
PF
PFMU
PGL
PH
PI
PKG
PL
PLAS
PLAT
PLBG
PLF
PNEU
POL
POS
PP
PRC
PREF
PREFAB
PRELIM
PREP
PRES
PRI
PROP
PROT
PS
PSF
PSI
PSIA
PSIG
PST
PT
PTN
PVC
PVMT
PWD
PWJ
PZ
Q
QT
QTR
QTY
QUAL
ID
IE
IF
IH
IMP
IN
INC
INF
INSTR
INSUL
INT
INTR
INV
IPS
IPT
IR
IRR
ISO
JB
JCT
JF
JST
JT
K
KB
KCMIL
KD
KO
KSI
KW
L
LAD
LAM
LATL
LB
LCTB
LDG
LDR
LE
LF
LG
LH
LIN
LIQ
LLH
LLV
LMLU
LNG
LOC
LP
LPS
LR
LT
LTD
LTG
LTL
LTNG
LV
LVL
LVR
LW
LWC
LWL
MA
MACH
MAINT
MAN
MATL
MAX
MB
MBR
MC
MCB
MCJ
MDMJ
MECH
MED
MFR
MH
MIN
MIR
MISC
MJ
MLO
MMB
MO
MOD
MON
MPT
MRGWB
MS
MSL
MT
MU
MULL
MV
MW
INSIDE DIAMETER, INTERIOR DIMENSION
INVERT ELEVATION
INSIDE FACE
INTAKE HOOD
IMPACT
INCH
INCLUDE, INCANDESCENT
INFLUENT
INSTRUMENTATION
INSULATION
INTERIOR, INTERSECTION
INTERMEDIATE, INTERIOR
INVERT
IRON PIPE SIZE
INTERNAL PIPE THREAD
INSIDE RADIUS, IRON ROD
IRRIGATION
ISOMETRIC
JUNCTION BOX
JUNCTION
JOINT FILLER
JOIST
JOINT
KIP
KNEE BRACE
THOUSAND CIRCULAR MILS
KNOCK DOWN
KNOCK OUT
KIPS PER SQUARE INCH
KILOWATT
ANGLE, LENGTH, LAVATORY
LADDER
LAMINATE
LATERAL
LAG BOLT, POUND
LIQUID CHALK AND TACK BOARD
LANDING
LEADER
LIFTING EYE
LINEAR FOOT
LONG
LEFT HAND
LINEAR
LIQUID
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LIQUID MARKER LECTURE UNIT
LONGITUDINAL
LOCATION
LOW POINT
LOW-PRESSURE SODIUM
LONG RADIUS
LEFT
LIMITED
LIGHTING
LINTEL
LIGHTNING
LOW VOLTAGE
LAMINATED VENEER LUMBER
LOUVER
LIGHTWEIGHT
LIGHTWEIGHT CONCRETE
LOW WATER LEVEL
MIXED AIR
MACHINED
MAINTENANCE
MANUAL
MATERIAL
MAXIMUM
MACHINE BOLT
MEMBER
MECHANICAL CONTRACTOR,
MECHANICAL COUPLING
METAL CORNER BEAD
MASONRY CONTROL JOINT
MODIFIED DOUBLE MECHANICAL JOINT
MECHANICAL
MEDIUM
MANUFACTURER
MANHOLE, METAL HALIDE
MINIMUM
MIRROR
MISCELLANEOUS
MECHANICAL JOINT
MAIN LUGS ONLY
MEMBRANE
MASONRY OPENING
MODULAR, MODIFY
MONUMENT
MALE PIPE THREAD
MOISTURE-RESISTANT
GYPSUM WALLBOARD
MOP SINK
MEAN SEA LEVEL
MOUNT
MASONRY UNIT
MULLION
MEDIUM VOLTAGE
MONITORING WELL
F TO F
F&B
FAB
FB
FBD
FBG
FBM
FBO
FC
FCA
FD
FDC
FDR
FDTN
FE
FEC
FES
FEXT
FF
FG
FH
FIG
FIN
FJT
FL
FLEX
FLG
FLOR
FLR
FLS
FN
FO
FOB
FOC
FOF
FOM
FOS
FOT
FPT
FR
FRP
FRTM
FS
FT
FTG
FUR
FURN
FUT
FV
FW
FWD
FWE
FXTR
G
GA
GAL
GALV
GB
GC
GD
GEN
GFCI
GFMU
GG
GJ
GL
GLB
GND
GP
GR
GRTG
GSB
GT
GVL
GW
GWB
GYP
H
HB
HBD
HC
HCL
HD
HDR
HDW
HEX
HGR
HH
HID
HM
HORIZ
HP
HPC
HPS
HPT
HR
HS
HSS
HT
HTG
HV
HVAC
HWD
HWL
HYD
HZ
FACE TO FACE
FACE & BYPASS
FABRICATE
FLOOR BEAM
FIBERBOARD
FIBERGLASS
BOARD FOOT MEASURE
FURNISHED BY OWNER
FLUSHING CONNECTION
FLANGED COUPLING ADAPTER
FLOOR DRAIN
FLEXIBLE DUCT CONNECTION
FEEDER
FOUNDATION
FLANGED END
FIRE EXTINGUISHER CABINET
FLARED END SECTION
FIRE EXTINGUISHER
FAR FACE, FACTORY FINISH, FLAT FACE
FINISHED GRADE
FIRE HYDRANT
FIGURE
FINISH
FLUSH JOINT
FLOW, FLOW LINE
FLEXIBLE
FLANGE
FLUORESCENT
FLOOR
FLASHING, FLUSH
FENCE
FINISHED OPENING
FLAT ON BOTTOM
FACE OF CONCRETE, FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF STUDS
FLAT ON TOP
FEMALE PIPE THREAD
FRAME
FIBERGLASS REINFORCED PLASTIC
FIRE RETARDANT TREATED MATERIAL
FLOOR SINK, FAR SIDE
FEET, FOOT
FOOTING, FITTING
FURRED, FURRING
FURNITURE, FURNISH
FUTURE
FACE VELOCITY
FIELD WELD, FIRE WALL
FORWARD
FURNISHED WITH EQUIPMENT
FIXTURE
GRILLE, GROUND
GAGE (METAL THICKNESS)
GALLON
GALVANIZED
GRAB BAR, GRADE BREAK
GROOVED COUPLING
GUARD
GENERAL
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FACE MASONRY UNIT
GUTTER GRADE
GROOVED JOINT
GLASS
GLASS BLOCK, GLULAM BEAM
GROUND
GUY POLE
GRADE
GRATING
GYPSUM SHEATHING BOARD
GREASE TRAP
GRAVEL
GUY WIRE
GYPSUM WALLBOARD
GYPSUM HARDBOARD
HIGH
HOSE BIB
HARDBOARD
HANDICAPPED, HOLLOW CORE ,HORIZONTAL CURVE
HORIZONTAL CONTROL LINE
HEAD
HEADER
HARDWARE
HEXAGONAL
HANGER
HANDHOLE
HIGH-INTENSITY DISCHARGE
HOLLOW METAL
HORIZONTAL
HIGH POINT, HORSEPOWER
HORIZONTAL POINT OF CURVATURE
HIGH-PRESSURE SODIUM
HORIZONTAL POINT OF TANGENCY
HOSE REEL, HOUR
HEADED STUD, HIGH STRENGTH
HOLLOW STRUCTURAL SHAPE
HEIGHT
HEATING
HIGH VOLTAGE
HEATING, VENTILATING AND
AIR CONDITIONING
HARDWOOD
HIGH WATER LEVEL
HYDRAULIC
HERTZ, CYCLES PER SECOND
CLG
CLJ
CLKG
CLR
CMH
CMP
CMU
CO
COL
COM
COMB
COMM
COMP
CON
CONC
CONN
CONST
CONT
COOR
CORR
CP
CPLG
CRL
CSC
CSK
CSS
CT
CTR
CTRL
CVT
CU
CW
CY
d D
DB
DBA
DBL
DC
DEG
DEG C
DEG F
DEMO
DEP
DEPT
DET
DI
DIA
DIAG
DIFF
DIM
DISCH
DIST
DIV
DL
DMJ
DMPF
DN
DO
DP
DPDT
DPST
DS
DT
DUP
DWG
DWL
DWR
E
EA
EC
ECC
ED
EDB
EE
EF
EFF
EHH
EIFS
EJ
EL
ELEC
EMBD
EMER
EMH
ENCL
ENGR
ENTR
EOP
EQ
EQUIP
EQUIV
ES
ESEW
EST
EW
EWC
EWEF
EWTB
EXC
EXH
EXP
EXST
EXT
CEILING
CONTROL JOINT
CAULKING
CLEAR
COMMUNICATION MANHOLE
CORRUGATED METAL PIPE
CONCRETE MASONRY UNIT
CLEANOUT, CONCRETE OPENING
COLUMN
COMMON
COMBINATION
COMMUNICATION
COMPOSITION, COMPRESSIBLE,
COMPOSITE
CONCENTRIC
CONCRETE
CONNECTION
CONSTRUCTION
CONTINUOUS
COORDINATE
CORROSIVE, CORRUGATED
CHECKER PLATE, CONTROL POINT
COUPLING
CORROSION-RESISTANT LINING
COMPRESSION SLEEVE COUPLING
COUNTERSINK
CLINIC SERVICE SINK
CERAMIC TILE
CENTER
CONTROL
CULVERT
COPPER, CUBIC
CLOCKWISE
CUBIC YARD
PENNY (NAIL MEASURE)
DEEP, DIFFUSER, DRAIN
DUCT BANK, DECIBEL, DRY BULB
DEFORMED BAR ANCHOR
DOUBLE
DIRECT CURRENT
DEGREE
DEGREE CENTIGRADE
DEGREE FAHRENHEIT
DEMOLITION
DEPRESSED
DEPARTMENT
DETAIL
DROP INLET, DUCTILE IRON, DIGITAL INPUT
DIAMETER
DIAGONAL, DIAGRAM
DIFFERENTIAL, DIFFERENCE
DIMENSION
DISCHARGE
DISTANCE, DISTRIBUTION
DIVISION
DEAD LOAD
DOUBLE MECHANICAL JOINT
DAMP PROOFING
DOWN
DISSOLVED OXYGEN, DIGITAL OUTPUT, DITTO
DEPTH
DOUBLE POLE, DOUBLE THROW
DOUBLE POLE, SINGLE THROW
DOWN SPOUT
DOUBLE TEE, DRIP TRAP ASSEMBLY
DUPLICATE
DRAWING
DOWEL
DRAWER
EAST
EACH, EXHAUST AIR
ELECTRICAL CONTRACTOR
ECCENTRIC
EQUIPMENT DRAIN
ELECTRICAL DUCT BANK
EACH END
EACH FACE
EFFLUENT, EFFICIENCY
ELECTRICAL HANDHOLE
EXTERIOR INSULATION & FINISH SYSTEM
EXPANSION JOINT
ELBOW, ELEVATION
ELECTRICAL
EMBEDDED
EMERGENCY
ELECTRICAL MANHOLE
ENCLOSURE
ENGINEER
ENTRANCE
EDGE OF PAVEMENT
EQUAL
EQUIPMENT
EQUIVALENT
EACH SIDE, EQUAL SPACE,
EMERGENCY SHOWER
EMERGENCY SHOWER AND EYE WASH
ESTIMATE
EACH WAY, EMERGENCY
EYE/FACE WASH
ELECTRIC WATER COOLER
EACH WAY, EACH FACE
EACH WAY, TOP AND BOTTOM
EXCAVATION
EXHAUST
EXPANSION, EXPOSED
EXISTING
EXTERIOR, EXTERNAL, EXTENSION
A/C A/E A
AB
ABAN
ABC
ABT
AC
ACK
ACP
ACST
AD
ADDL
ADH
ADJ
AF
AFF
AFG
AGGR
AI
AIC
ALIG
ALT
ALUM
AM
AMB
ANC
AO
AP
APRX
APVD
ARCH
ASSY
AT
ATC
ATM
AUTO
AUX
AVE
AVG
AWG
AWT
B TO B
BAL
BBD
BC
BD
BE
BF
BITUM
BKG
BL
BLDG
BLK
BLKG
BM
BOC
BOD
BOG
BOL
BOP
BOR
BOT
BOU
BP
BRG
BRGP
BRKT
BS
BTU
BTW
BTWLD
BU
BUR
BW
BYP
C TO C
C&G C
CAB
CAP
CAT
CAV
CB
CCB
CCW
CDF
CE
CER
CF
CFL
CHBD
CHD
CHFR
CHH
CI
CIP
CIPB
CIRC
CJ
CKT
CL
AIR CONDITIONING
ARCHITECT/ENGINEER
AMPERE
ANCHOR BOLT
ABANDON
AGGREGATE BASE COURSE
ABOUT
ALTERNATING CURRENT
ACKNOWLEDGE
ACOUSTIC CEILING PANEL,
ASPHALTIC CONCRETE PAVEMENT
ACOUSTIC
ADDENDUM, AREA DRAIN
ADDITIONAL
ADHESIVE
ADJUSTABLE, ADJACENT
AMP FRAME, AMP FUSE
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
AGGREGATE
AREA INLET, ANALOG INPUT
AMPS INTERRUPTING CAPACITY
ALIGNMENT
ALTERNATE, ALTITUDE
ALUMINUM
ACOUSTICAL MATERIAL
AMBIENT
ANCHOR
ANALOG OUTPUT
ACCESS PANEL
APPROXIMATE
APPROVED
ARCHITECTURAL
ASSEMBLY
ACOUSTICAL TILE, AMP TRIP
ACOUSTICAL TILE CEILING
ATMOSPHERE
AUTOMATIC
AUXILIARY
AVENUE
AVERAGE
AMERICAN WIRE GAGE
ACOUSTICAL WALL TILE
BACK TO BACK
BALANCE
BULLETIN BOARD
BASE CABINET, BOTTOM CHORD,
BOLT CENTER, BOLT CIRCLE
BOARD
BOTH ENDS, BELL END
BOTH FACES, BOTTOM FACE,
BLIND FLANGE, BOARD FEET
BITUMINOUS
BACKING
BASE LINE
BUILDING
BLOCK
BLOCKING
BENCHMARK, BEAM
BACK OF CURB
BOTTOM OF DUCT
BOTTOM OF GRILLE
BOTTOM OF LOUVER, BOLLARD
BOTTOM OF PIPE
BOTTOM OF REGISTER
BOTTOM
BOTTOM OF UNIT
BASE PLATE
BEARING
BEARING PLATE
BRACKET
BOTH SIDES
BRITISH THERMAL UNIT
BETWEEN
BUTT WELD
BELL UP, BUILT-UP
BUILT-UP ROOFING
BOTH WAYS
BYPASS
CENTER TO CENTER
CURB AND GUTTER
CHANNEL SHAPE, CENTIGRADE,
CONDUIT
CABINET
CAPACITY
CATALOG, CATALOGIORY
CAVITY
CATCH BASIN
CONCRETE BLOCK
COUNTER CLOCKWISE
CONTROLLED-DENSITY FILL
CONCRETE EDGE
CERAMIC
CUBIC FEET (FOOT)
COUNTER FLASHING
CHALKBOARD
CHORD
CHAMFER
COMMUNICATION HANDHOLE
CURB INLET
CAST-IN-PLACE
CONCRETE INTERLOCKING PAVER
BALLAST
CIRCULATION, CIRCULAR
CONSTRUCTION JOINT
CIRCUIT
CENTERLINE, CLASS, CLOSE
GENERAL NOTES:
2/9/2024
J. WILKERT
J. WILKERT
4/12/2024
192841
240182
M. FLICK
30305/31/2024
No. 12890621
SWPPP NOTES:
1. ALL CONTRACTORS/SUBCONTRACTORS SHALL CONDUCT THEIR OPERATIONS IN A
MANNER THAT MINIMIZES EROSION AND PREVENTS SEDIMENTS FROM LEAVING THE
LIMITS OF CONSTRUCTION. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR
THE DEVELOPMENT, IMPLEMENTATION AND COMPLIANCE WITH THE REQUIREMENTS OF
THE PERMIT OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR THEIR
ENTIRE CONTRACT. THE RESPONSIBILITY SHALL BE FURTHER SHARED WITH
SUBCONTRACTORS WHOSE WORK IS A SOURCE OF POTENTIAL POLLUTION AS DEFINED
IN THE SWPPP.
2. INSTALL STABILIZED CONSTRUCTION ENTRANCE(S) AS NECESSARY TO REDUCE
SEDIMENT TRANSFER TO PUBLIC PRIVATE ROADS. MAINTAIN STABILIZED DRIVES TO
PREVENT SEDIMENT TRANSFER TO ADJACENT ROADWAYS. REMOVE ALL SEDIMENT
SPILLED, DROPPED, WASHED OR TRACKED ONTO ADJACENT ROADWAYS DAILY OR
MORE FREQUENTLY IF LARGE DEPOSITS OCCUR.
3. PRIOR TO BEGINNING GRADING, EXCAVATION OR CLEARING AND GRUBBING
OPERATIONS, SILT FENCE SHALL BE PLACED ALONG THE PERIMETER OF THE AREAS
TO BE DISTURBED AT LOCATIONS WHERE RUNOFF CAN MOVE OFF SITE. FOR AREAS
NEAR EXISTING WATERWAYS OR WASHES, A SILT CURTAIN SHALL BE CONSTRUCTED
ALONG THE DISTURBANCE AREAS. VEGETATION IN AREAS NOT NEEDED FOR
CONSTRUCTION SHALL BE PRESERVED. AS AREAS REACH THEIR FINAL GRADE,
ADDITIONAL SILT FENCES SHALL BE INSTALLED AS SPECIFIED IN THE PLANS AND/OR AS
REQUIRED BY THE CONTRACTING OFFICER. THIS WILL INCLUDE USING SILT FENCE OR
WATTLES AS DITCH CHECKS AND TO PROTECT EXISTING FACILITIES, TEMPORARY
STABILIZATION SHALL BE COMPLETED AS THE DISTURBANCE AREAS ARE
CONSTRUCTED. IF CONSTRUCTION ACTIVITY IS NOT PLANNED TO OCCUR IN A
DISTURBED AREA FOR AT LEAST 14 DAYS, THE AREA SHALL IMMEDIATELY BE
STABILIZED. THIS WORK SHALL BE DONE IN ACCORDANCE WITH THE SPECIFICATIONS.
THE CONSTRUCTION WILL BE COMPLETED WITH ESTABLISHMENT OF SUBSTANTIAL
NATIVE VEGETATION OF ALL DISTURBED AREAS BY THE EROSION CONTROL
CONTRACTOR.
4. ALL CONTRACTORS MUST ADHERE TO GOOD HOUSEKEEPING BEST MANAGEMENT
PRACTICES (BMP's). GOOD HOUSEKEEPING BMP's SUCH AS SANITARY WASTE
MANAGEMENT, SOLID WASTE MANAGEMENT, MATERIAL DELIVERY AND STORAGE,
STREET CLEANING/SWEEPING AND VEHICLE AND EQUIPMENT FUELING AREAS MUST BE
ADDRESSED IN ACCORDANCE WITH THE STATE OF UTAH DEPARTMENT OF
ENVIRONMENTAL QUALITY DIVISION OF WATER QUALITY. CONTRACTOR DISPOSAL OF
UNUSED CONSTRUCTION MATERIALS AND CONSTRUCTION MATERIAL WASTES SHALL
COMPLY WITH APPLICABLE STATE AND LOCAL WASTE DISPOSAL REGULATIONS. IN THE
EVENT OF A CONFLICT WITH OTHER GOVERNMENTAL LAWS, RULES AND REGULATIONS,
THE MORE RESTRICTIVE LAWS, RULES OR REGULATIONS SHALL APPLY.
5. THE CONTRACTOR IS REQUIRED TO MAINTAIN ALL TEMPORARY EROSION CONTROL
MEASURES IN PROPER WORKING ORDER, INCLUDING CLEANING, REPAIRING OR
REPLACING THEM THROUGHOUT THE CONTRACT PERIOD. CLEANING OF SILT
CONTROL DEVICES SHALL BEGIN WHEN THE FEATURES HAVE LOST 50% OF THEIR
CAPACITY.
6. DURING ACTIVE CONSTRUCTION, PERMITTEES MUST INSPECT DESIGNATED AREAS AT
LEAST ONCE EVERY 14 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM
AND/OR SNOW MELT EVENT OF 0.5 INCHES OR GREATER. NPS REQUIRES THAT
PERMITTEES PERFORM A "WALK THROUGH" INSPECTION OF THE CONSTRUCTION SITE
BEFORE ANTICIPATED STORM EVENTS (OR SERIES OF EVENTS SUCH AS INTERMITTENT
SHOWERS OVER A PERIOD OF DAYS) THAT COULD POTENTIALLY YIELD A SIGNIFICANT
AMOUNT OF RUNOFF. INSPECTIONS MUST BE PERFORMED BY QUALIFIED PERSONNEL
WITH EITHER THE OPERATOR'S OWN PERSONNEL OR CONSULTANTS HIRED TO
PERFORM THE INSPECTIONS. THE INSPECTORS MUST BE KNOWLEDGEABLE AND
POSSESS THE SKILLS TO ASSESS CONDITIONS AT THE CONSTRUCTION SITE THAT
COULD IMPACT STORM WATER QUALITY AND ASSESS THE EFFECTIVENESS OF
CONDITIONS AT THE CONSTRUCTION SITE THAT COULD IMPACT STORM WATER
QUALITY AND ASSESS THE EFFECTIVENESS OF SEDIMENTATION AND EROSION
CONTROL MEASURE CHOSEN TO CONTROL THE QUALITY OF THE SITES STORM WATER
DISCHARGES.
7. ALL CONTRACTORS MUST COMPLY WITH ALL NOISE AND DUST CONTROL
REQUIREMENTS FOR THE STATE OF UTAH AND ZION NATIONAL PARK.
8. BARRICADES SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD).
9. ALL CONTRACTORS SHALL COMPLY WITH NPS REQUIREMENT FOR 100% NATURAL
MATERIALS IN EROSION CONTROL BATTING, ETC.
GENERAL NOTES:
1. AT ALL TIMES THE CONTRACTOR SHALL BE SOLELY
RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE
INCLUDING SAFETY OF PERSONS AND PROPERTY.
2. CONTRACTOR SHALL AT ALL TIMES COMPLY WITH THE
RULES AND REGULATIONS ESTABLISHED BY ALL
FEDERAL, STATE AND LOCAL AGENCIES HAVING
JURISDICTION OVER THE WORK.
3. CONTRACTOR SHALL FIELD VERIFY ALL UTILITY
LOCATIONS, WHETHER SHOWN ON THE DRAWINGS OR
NOT, PRIOR TO EXCAVATION.
4. ALL EQUIPMENT AND VEHICLES BROUGHT TO THE SITE
WILL REQUIRE INSPECTION BY COR ENVIRONMENTAL
PRIOR TO BEING ALLOWED ON THE SITE TO ENSURE
THAT NO SEEDS OR OTHER DELETRIOUS MATERIALS
ARE BROUGHT INTO THE PARK.
5. UNDERGROUND UTILITY LOCATIONS SHOWN ARE FROM
INFORMATION PROVIDED BY UTILITY COMPANIES.
UTILITY COMPANIES MAKE NO WARRANTEES OR
GUARANTEES REGARDING THE ACCURACY OF THE
INFORMATION CONTAINED IN THEIR DOCUMENTS &
PROVIDES IT ONLY AS GENERAL INFORMATION TO THE
RECEIVER. FOR SPECIFIC LOCATIONS DURING
CONSTRUCTION CALL "DIGGERS HOTLINE" 1-800-662-4111
PRIOR TO DIGGING.
2/9/2024
J. WILKERT
J. WILKERT
4/12/2024
192841
240182
M. FLICK
30405/31/2024
No. 12890621
0.87
1.04
0.5
0.280.25
0.21
10+00 11+00 12+00 13+00 14+00
BP
0+
20+00
21+00 21+14.86
EDGE OF PHASE 3
EDGE OF PROPOSED PARKING LOT GRADING
MATCH EXISTING
TO MAINTENANCE FACILITY
EXISTING PHASE 1 AND 2 BUS CHARGING
DISPENSER ISLANDS (TYP)
EXISTIN
G
PAR
KIN
G
LO
T AC
C
ESS
PHASE 3 PARKING LOT
CENTERLINE HCL
SAM
M
Y'S C
AN
YO
N
D R
AIN
AG
EW
AY
EXISTING PARKING LOT
TIE-IN HCL
REMOVAL OF
ASPHALT MAT 3,052 SY
RPT#1
RPT#2
RPT#3
RPT#4
RPT#5
RPT#6
RPT#7
LEGEND:
ASPHALT MAT REMOVAL
NOTES:
1. LIMITS OF REMOVAL DESIGNATED BY (RPT) POINTS.
EDGE OF EXISTING ASPHALT IS ASSUMED AS REMOVAL
BOUNDARY FOR ALL AREAS NOT DESIGNATED
BY POINTS.
2. SEE SHEET C301 FOR PHASE 3 PARKING LOT
CENTERLINE HCL & EXISTING PARKING LOT
TIE-IN HCL LAYOUT INFORMATION.
3. SEE SHEETS C103, C201 & C502 FOR STORM
DRAINAGE LAYOUT INFORMATION AND DETAILS.
EXISTING 48" CULVERTS TO BE REMOVED
(3X) 52 LF EACH
RPT#_ REMOVAL POINT
RPT#8
PRESERVE AND PROTECT EXISTING ASPHALT
SURFACES NOT SLATED FOR REMOVAL
EXISTING CULVERT
TO BE REMOVED
106 LF
2/9/2024
J. WILKERT
J. WILKERT
4/12/2024
192841
240182
M. FLICK
30505/31/2024
No. 12890621
0.87
1.04
0.5
0.280.25
0.21
1.01
SL
-1
+0
SL
-2
+0
SL
-3
+0
SL
-4
+2
5.
10+00 11+00 12+00 13+00 14+00 14+72.81
BP
0+
20+00
21+00 21+14.86
C
C
C
C
EDGE OF PHASE 3
EDGE OF PROPOSED PARKING LOT GRADING
MATCH EXISTING
TO MAINTENANCE FACILITY
EXISTING CONTOURS
PROPOSED CONTOURS
EXISTING PHASE 1 AND 2 BUS CHARGING
DISPENSER ISLANDS (TYP)
PHASE 3 BUS CHARGING STATIONS
TURN AROUND LOT (BASE COURSE SURFACING)
(SEE NOTE 6)
EXISTIN
G
PAR
KIN
G
LO
T AC
C
ESS PT#1
MATCH EXISTING EDGE OF PAVEMENT
R =50'
R=30'
1:1 BOULDER WALL TO
REMAIN CLEAR SAMMYS CANYON
DRAINAGEWAY(SEE DETAIL SHEET)
3:1 FILL SLOPE
TYP
PHASE 3 PARKING LOT
CENTERLINE HCL
LIMIT OF 1:1 BOULDER WALL
N: 10040340.5203 E: 1208134.321
LIMIT OF 1:1 BOULDER WALL
N: 10040302.2438 E: 1208146.4788
PHASE 3 BUS CHARGING STATIONS
TURN AROUND LOT (BASE COURSE SURFACING)
(SEE NOTE 6)
SAM
M
Y'S C
AN
YO
N
D R
AIN
AG
EW
AY
EXISTING PARKING LOT TIE-IN HCL
(SEE PROFILE SHEET C301)
PHASE 3 BUS CHARGING STATIONS
PARKING LOT (ASPHALT SURFACING)
PT#2
PT#3
PT#4
PT#5
PT#6
PT#7PT#8
PT#9
PT#10
PT#11
PT#12
PT#13
PT#14
PT#15
PT#16
PT#17 PT#18
PT#19
PT#20
PT#21
PT#22
PT#23
3:1 FILL SLOPE
TYP
3:1 FILL SLOPE
TYP
R =48'
R =160'
EDGE OF PHASE 3
EDGE OF PROPOSED PARKING LOT GRADING
MATCH EXISTING
LEGEND:
BASE COURSE SURFACING
ASPHALT SURFACING
EDGE OF ASPHALT SURFACING
EXISTING EMPLOYEE PARKING LOT
NOTES:
1. SEE SHEET C301 FOR PHASE 3 PARKING LOT
CENTERLINE HCL & EXISTING PARKING LOT
TIE-IN HCL LAYOUT INFORMATION.
2. SEE SHEET C501 FOR 1:1 BOULDER WALL DETAILS.
3. SEE SHEET C301 FOR SECTION AND PROFILE VIEWS.
4. SEE SHEETS C103, C201, C502 FOR STORM DRAINAGE
LAYOUT INFORMATION AND DETAILS.
5. SEE SURFACING SECTION DETAILS SHEET C501.
6. BASE COURSE AREAS ARE TEMPORARY UNTIL
REGRADED AND SURFACE COURSE IS ADDED IN THE
ULTIMATE SOUTH ENTRANCE PROJECT IS
CONSTRUCTED.
7. PAVEMENT / GRADING SHOULD MATCH EXISTING
FINISH GRADED ELEVATIONS ANYWHERE LINEAR
JOINTS OCCUR.
APT#1APT#2
APT#3
APT#4
APT#5
APT#6
C501
C501
C501
C501
PARKING LOT GRADING POINT
ASPHALT LIMIT GRADING POINT
PT#_
APT#_
APT#7
APT#8
APT#9
169' LANDSCAPE WALL
SOLAR CANOPY (FUTURE WORK)
NOT TO BE CONSTRUCTED AS PART
OF THIS PROJECT
2/9/2024
J. WILKERT
J. WILKERT
4/12/2024
192841
240182
M. FLICK
30605/31/2024
No. 12890621
2/9/2024
192841
1.68% -33.36%
.3
7' L
EL
1.
0.
EL
2.
0.
EL
2.
.4
7' R
EL
3.
.1 8'
R
EL
1.
-4.14%
-1.79% 2.10%
-20.34% -7.48%
-3.40%
-2.12%
-13.26% -4.74%
-2.39% 2.17%
-33.31%
.2
7' L
EL
0.
0.
EL
2.
0.
EL
2.
.6
2' R
EL
2.
.9
6' R
EL
3.
.4
5' R
EL
8.
.2
7' L
EL
0.
0.
EL
2.
0.
EL
2.
.6
2' R
EL
2.
.9
6' R
EL
3.
.4
5' R
EL
8.
.5
8' L
EL
2.
.2
0' L
EL
7.
0.
EL
7.
0.
EL
7.
.2
6' R
EL
7.
.6 9'
R
EL
6.
.0
0' R
EL
3.
161.20' L
EL 3948.21 15
6.
' L
EL
8.
0.
' L
EL
8.
0.
' L
EL
0.
.5
0' L
EL
1.
0.
EL
1.
0.
EL
1.
.1
9' R
EL
3.
59.51' R
EL 3952.65
20+00 21+00 21+50
3.64%
VP
I S
TA
0+
EL
1.
VP
I S
TA
0+
.4
EL
5.
VP
I S
TA
0+
EL
1.
VP
I S
TA
0+
.4
EL
5.
.8
.3
.7
.1
.6
.8
.5
.7
.4
EXISTING
PARKING LOT
TIE-IN PROFILE
EXISTING GROUND
PROPOSED GROUND
EXISTING GROUND
PROPOSED GROUND
EXISTING GROUND
PROPOSED GROUND
EXISTING GROUND
PROPOSED GROUND
MATCH EXISTING EDGE OF PAVEMENT
MATCH EXISTING EDGE OF PAVEMENT
SECTION SL-1
C103
SECTION SL-2
C103
SECTION SL-3
C103
SECTION SL-4
C103
EXISTING ELEVATION
PROPOSED ELEVATION
EXISTING GROUND
PROPOSED GROUND
2/9/2024
J. WILKERT
J. WILKERT
4/12/2024
192841
240182
M. FLICK
05/31/2024
No. 12890621
ROCK WALL NOTES:
1.) SOILS SHALL BE FREE DRAINING (SANDY
GRAVELS) WITH MINIMAL AMOUNTS OF CLAY OR
SILT.
2.) ROCKS SHALL BE ANGULAR GRANITE OR
DOLOMITE SOTNES, EACH WHICH ARE
NON-SOLUBLE, HARD AND DURABLE.
3.) ROCKS SHALL BE KEYED TOGETHER AND
INTERLOCKED WITH LOWER ROCKS.
4.) BASE ROCKS SHALL BE BURIED TO THE DEPTH
SHOWN.
5.) EARTH SHALL BE THOROUGHLY COMPACTED
BEFORE PLACEMENT OF ROCKS.
6.) A SOILS REPORT PREPARED BY A LICENSED
GEOTECHNICAL ENGINEER SHALL BE DONE
WHERE WATER IS ENCOUNTERED OR WHERE
CLAY & SILT EXISTS.
7.) BASE ROCK DIAMETERS SHALL NOT BE LESS
THAN 3'6". UPPER ROCKS SHALL NOT BE LESS
THAN 2'-0" DIAMETER.
8.) ROCK WALLS HIGHER THAN 4'-0" SHALL HAVE
MINIMUM ROCK FALL AREAS (OR LANDINGS),
CLEAR OF ALL BUILDINGS, OF 10'-0" WIDTH AND
THESE AREAS SHALL HAVE A MINIMUM SLOPE OF
NOT OVER 5%.
9.) ESTABLISHED VEGETATION ALONG THE TOP OF
ALL WALLS IS REQUIRED TO PREVENT WASHING
AND EROSION.
SCALE=
1:1 BOULDERED RETAINING WALL
NTS
C102
SCALE=
ASPHALT PAVING SECTION
NTS
C102
ROCK WALL SCHEDULE
MAX. S
LO
PE
HEIGHT SET BACK
3'-6" 3'-6"
4'-0" 4'-0"
4'-6" 4'-6"
5'-0" 5'-0"
5'-6" 5'-6"
6'-0" 6'-0"
6'-6" 6'-6"
7'-0" 7'-0"
7'-6" 7'-6"
1ST COURSE 2.5'Ø
2ND COURSE 2'Ø
3RD COURSE 1.5'Ø
1ST COURSE 3'Ø
2ND COURSE 2.5'Ø
3RD COURSE 1.5'Ø
1ST COURSE 3.5'Ø
2ND COURSE 2.5'Ø
3RD COURSE 1.75'Ø
1ST COURSE 3.5'Ø
2ND COURSE 3'Ø
3RD COURSE 2'Ø
1ST COURSE 3.75'Ø
2ND COURSE 3.25'Ø
3RD COURSE 2.25'Ø
1ST COURSE 3.5'Ø
2ND COURSE 2.75'Ø
3RD COURSE 2.25'Ø
4TH COURSE 1.5'Ø
1ST COURSE 3.5'Ø
2ND COURSE 3'Ø
3RD COURSE 2.5'Ø
4TH COURSE 1.75'Ø
1ST COURSE 3.75'Ø
2ND COURSE 3'Ø
3RD COURSE 2.5'Ø
4TH COURSE 2'Ø
1ST COURSE 3.5'Ø
2ND COURSE 3'Ø
3RD COURSE 2.5'Ø
4TH COURSE 2'Ø
5TH COURSE 1.25'Ø
DIA. ROCK HEIGHT SET BACK
8'-0" 8'-0"
8'-6" 8'-6"
9'-0" 9'-0"
9'-6" 9'-6"
10'-0" 10'-0"
DIA. ROCK
1ST COURSE 3.75'Ø
2ND COURSE 3.25'Ø
3RD COURSE 2.5'Ø
4TH COURSE 2'Ø
5TH COURSE 1.5'Ø
1ST COURSE 4'Ø
2ND COURSE 3.5'Ø
3RD COURSE 2.75'Ø
4TH COURSE 2'Ø
5TH COURSE 1.5'Ø
1ST COURSE 4'Ø
2ND COURSE 3.5'Ø
3RD COURSE 3'Ø
4TH COURSE 2.5'Ø
5TH COURSE 1.5'Ø
1ST COURSE 4.25'Ø
2ND COURSE 3.5'Ø
3RD COURSE 3'Ø
4TH COURSE 2.5'Ø
5TH COURSE 2'Ø
1ST COURSE 4.5'Ø
2ND COURSE 3.75'Ø
3RD COURSE 3.25'Ø
4TH COURSE 2.5'Ø
5TH COURSE 2'Ø
ASPHALT SURFACE COURSE
(PG 64-28) NON-RUTTING
PLACED IN 3" LIFTS
STABILIZED AGGREGATE BASE COURSE
EXISTING GROUND
6"
10"
SCALE=
BASE COURSE SECTION
NTS
C102
STABILIZED AGGREGATE BASE COURSE
COMPACTED TO 95% IN 4" LIFTS
EXISTING GROUND
16"
BOTTOM ROCKS TO BE BURIED 2'
BELOW FINISH GRADE
FINISH GRADE
ROCKS MUST BE KEYED TOGETHER
AND INTERLOCKED ON LOWER
ROCKS
FINISH
GRADE
M
AX
IM
U
M H
EI
G
H T
2'
3' SHELF
BASE SHALL BE THOROUGHLY
COMPACTED BEFORE ROCKS
ARE PLACED
2/9/2024
J. WILKERT
J. WILKERT
4/12/2024
192841
240182
M. FLICK
301005/31/2024
No. 12890621
06/03/2024
1. EXISTING MEDIUM VOLTAGE JUNCTION
CABINET (ROCKY MOUNTAIN POWER)
2. EXISTING MEDIUM VOLTAGE CONDUCTOR
(ROCKY MOUNTAIN POWER)
3. EXISTING 1500 kVA, 480Y/277V TRANSFORMER
(ROCKY MOUNTAIN POWER)
4. EXISTING 1600 A SWITCHBOARD. SEE SHEET
E504
5. ELECTRIC BUS CHARGERS INSTALLED BY
OTHERS (PHASE I & II)
6. CHARGER DISPENSER (PHASE I & II) (TYP).
INSTALLED BY OTHERS
7. NOT USED
8. PROPOSED 800 A SWITCHGEAR & ATS.
PURCHASED BY GOVERNMENT.
9. PROPOSED PHASE 3 BUS CHARGERS (7
RHOMBUS 60kW). PURCHASED BY
GOVERNMENT AND INSTALLED PER THIS
CONTRACT
10. PROPANE GENERATOR. (16'X9' APPROXIMATE
FOOTPRINT). REFER TO SHEET E503 FOR FUEL
LINE TIE-IN SCHEMATIC
11. PHASE III CHARGER DISPENSERS (TYP OF 13).
PURCHASED BY GOVERNMENT
12. PROPOSED GAS LINE (2" NOM, HDPE, SDR 11)
AND MAIN COMMUNICATION LINE (3" SCH40
PVC). GAS LINE TO BE CONCRETE ENCASED A
MINIMUM OF 2X DIAMETER OF OUTSIDE PIPE.
13. EXISTING 30,000 GALLON PROPANE TANK TO
FEED GENERATOR. REFER TO SHEET E503
FOR FUEL LINE TIE-IN SCHEMATIC.
14. 480 VAC FEED FROM EXISTING SWITCHBOARD
TO PROPOSED SWITCHBOARD
15. FUTURE STORAGE SHED
16. EXISTING COMMUNICATION ENCLOSURE
INSTALLED AS PART OF PHASE II
17. RH80 VAPORIZER PAD WITH 2 PROTECTION
BOLLARDS AND FENCING. FIELD LOCATE AT
LEAST 15FT OUTSIDE OF PROPANE TANK
FENCING.
18. PULL BOX FOR COMMUNICATION CONDUIT TO
BUS MAINTENANCE FACILITY
19. INSTALL TWO 75 FOOT SPARE 3" PVC
CONDUITS CROSSING THE PROPOSED
CULVERT AS SHOWN. CAP CONDUIT AND BURY
FOR FUTURE USE.
SEE EXPANDED
BUS PARKING PLAN
ON SHEET E102
05/31/2024
No. 13153174
ALEXANDER
DANIEL MANCINI
CD1-2
CD2-2
CD1-1 CD2-1
CD4-2 CD5-2
CD4-1 CD5-1
CD3-1
CD7-2
CD6-2
CD6-1
CD7-1
1. PROPOSED 800 A SWITCHGEAR & ATS.
PURCHASED BY GOVERNMENT
2. PROPOSED BUS CHARGERS (7 RHOMBUS
60kW). PURCHASED BY GOVERNMENT
3. 500 kW GENERATOR. PURCHASED AND
INSTALLED PER THIS CONTRACT
4. PHASE III CHARGER DISPENSERS (TYP OF 13).
PURCHASED BY GOVERNMENT
5. PROPOSED GAS LINE AND MAIN
COMMUNICATION LINE
6. 480 VAC FEED FROM EXISTING SWITCHBOARD
TO PROPOSED SWITCHBOARD - SEE ONE LINE
DIAGRAM AND FEEDER SCHEDULE ON SHEET
E602
7. CONDUIT AND CABLE FROM CHARGER TO
DISPENSER - SEE ONE LINE DIAGRAM AND
FEEDER SCHEDULE
8. NOT USED
9. FUTURE STORAGE SHED
10. NOT USED
11. PROVIDE 18" TALL BY 4" SQUARE RECEPTACLE
BOLLARD WITH (1) 20 AMP GFCI RECEPTACLE
EQUAL TO B-K LIGHTING: RB-RE1-BLW (TYP)
CS1 CS3 CS5 CS7
CS6CS4CS2
SEE DETAIL 1 ON
SHEET E201
SEE DETAIL 3 ON
SHEET E201 FOR
TYPICAL DUAL
DISPENSER
SEE DETAIL 2 ON
SHEET E201 FOR
TYPICAL SINGLE
DISPENSER
F E501
C E501
D E501
F E501
E E501
A E501
D E501
F E501
G E501
05/31/2024
No. 13153174
SCALE: NTS
SCALE: NTS
PROPOSED 800A SWBD
SEE SHEET E505
PROPOSED 800A ATS
B E501
H E501
K E501
I E501
CS1 CS3 CS5 CS7
CS2 CS4 CS6
05/31/2024
No. 13153174
SCALE: NTS
SCALE: NTS
05/31/2024
No. 13153174
SCALE: NTS
05/31/2024
No. 13153174
2 3-1
4-1
3-23-2 (TYP) 4-2 (TYP)
1 1 1 2 2 2
2 2 2
3-1 3-1 3-1 3-1 3-1 3-1
3-1 3-1 3-1 4-1
3-2 (TYP)
5-25-1 (TYP)
5-2
5-1
5-1
5-1 (TYP)
PH2-COMS
6-1 (TYP)
6-1 (TYP)
6-1 (TYP)
1. REFER TO FEEDER SCHEDULE ON E604 FOR
CONDUIT AND CABLE RUN DETAILS
2. ALL DUCT BANKS TO BE CONCRETE ENCASED
UNLESS OTHERWISE SPECIFIED
3. REFER TO CALLOUTS ON E102 FOR DUCT
BANK ROUTING
05/31/2024
No. 13153174
SCALE: NTS SCALE: NTS
05/31/2024
No. 13153174
NOTES
REFER TO SHEET E101 FOR GENERAL LOCATION OF EQUIPMENT.
EQUIPMENT, PIPING, AND INSTALLATION MUST BE IN ACCORDANCE
WITH PROVISIONS OF NFPA 58, AND ALL APPLICABLE STATE,
PROVINCIAL AND LOCAL CODES.
PSI
G
PSI
G 2
1" EQUIPMENT
CONNECTION: OUTLET 13
TIE TO EXISTING
PROPANE LIQUID LINE
TYP
6 3/4" EQUIPMENT
CONNECTION INLET
PSI
G
PSI
G
3 REGULATOR OUTLET PRESSURE MUST BE ADJUSTED TO A PRESSURE
BELOW THE VAPOR PRESSURE OF THE SATURATED LP-GAS AT
LOWEST OPERATING TEMPERATURE OR VAPOR MAY RELIQUEFY IN
DOWNSTREAM PIPING
LIQUID PIPING SYSTEM MUST ALLOW FOR OCCASIONAL REVERSE
FLOW TOWARD SUPPLY TANK TO PREVENT EXCESSIVE PRESSURES
DURING OPERATION
16#
ANODE
5 STEEL TO PLASTIC PIPE
TRANSITION FITTING
TO VAPORIZER UNIT (SEE VAPORIZER
SCHEMATIC)
FROM PROPANE TANK
TIE-IN
16#
ANODE
TO GENERATOR UNIT
(SEE GENERATOR
SCHEMATIC)
IF REQUIRED BY THE AUTHORITY HAVING JURISDICTION THE BURNER
CONTROL REGULATOR SHOULD BE PIPED AWAY TO A SAFE DISTANCE
FROM THE VAPORIZER
PIPING SHALL BE FIELD ROUTED AND FINAL TIE-IN LOCATIONS SHALL
BE DETERMINED IN THE FIELD AND VERIFIED BY THE CO.
FIELD FIT FINAL EQUIPMENT CONNECTIONS.
OUTLET PRESSURE REGULATOR SHOULD BE NO MORE THAN 24
INCHES FROM VAPORIZER OUTLET AND LOCATED AT OR ABOVE
CENTRERLINE OF VAPORIZER OUTLET
DO NOT INSTALL A SEPERATOR, DRIPLEG OR OTHER LIQUID TRAP
UPSTREAM OF OUTLET PRESSURE REGULATOR
EXISTING TANK SCHEMATIC (DISPLAYING TIE-IN OF VAPORIZER)
NTS
VAPORIZER
SCHEMATIC
NTS
FIELD FIT FINAL
EQUIPMENT
CONNECTION
GENERATOR
UNIT
STEEL TO PLASTIC PIPE
TRANSITION FITTING
16#
ANODE
GENERATOR SCHEMATIC
NTS
FROM VAPORIZER UNIT
(SEE VAPORIZER
SCHEMATIC)
VA
PO
R
IZ
ER
U
N
IT
05/31/2024
No. 13153174
PXM
2260 SPD 1 P
3 P
5 P
RGH
45" 36"
36"
P 2 P 4
P 6
30.00"
3.00" 12.00"
2.50"
13"
39" 3.00" 3.00"
30"
1. SEE EXISTING SWITCHBOARD SCHEDULE ON
SHEET E601
INSTALL NEW CONDUIT FOR
PROPOSED SWITCHBOARD
05/31/2024
No. 13153174
PXM
2260 SPD 1 P
3 P
5 P
RGH
45" 36"
36"
P 2 P 4
P 6
30.00"
3.00" 12.00"
2.50"
13"
39" 3.00" 3.00"
30"
1. EXAMPLE SWITCHBOARD DRAWINGS. TO BE
FINALIZED PRIOR TO EQUIPMENT
PROCUREMENT
2. SEE PROPOSED SWITCHBOARD SCHEDULE ON
E601
05/31/2024
No. 13153174
EXISTING SWITCHBOARD SCHEDULE
PROPOSED 800A SWITCHBOARD SCHEDULE
EXISTING PANEL SCHEDULE (PANEL A)
TO BE REPLACED
WITH 800 A
BREAKER UNDER
PHASE 3 PROJECT
1. PER ROCKY MOUNTAIN POWER EMS MUST
LIMIT DEMAND TO LESS THAN 1000 KVA
2. REFER TO NEC 625.42 AND 750.30(C) FOR
ENERGY MANAGEMENT REQUIREMENTS
UTILIZE SPARE FOR
PHASE 3 ISLAND
RECEPTACLES AND
COM CABINET
REPLACE WITH NEW
60A BREAKER FOR
FUTURE STORAGE
SHED
05/31/2024
No. 13153174
REPLACE EXISTING 100 A
BREAKER WITH 800 A
BREAKER
1. UTILIZE SPACE RESERVED FOR (4) 100 A 3PH
BREAKERS FOR (1) 800 A 3PH BREAKER
2. UTILIZE SPARE BREAKERS IN PANEL A FOR
ISLAND RECEPTACLES AND PROPOSED
STORAGE SHED
3. CONTRACTOR TO PURCHASE AND INSTALL
BREAKER
05/31/2024
No. 13153174
No. 13153174
05/31/2024
No. 13153174
No. 13153174
File details come from the government source that posted it. Updated .