Sol_140P2024R0115_Amd_0004.pdf

PDF 89 KB Posted

Attached to
ZION Construction Bus Charging Phase 3 Federal contract opportunity
Solicitation number
140P2024R0115
Issued by
Department of the Interior National Park Service National Office

About this file

This document is Amendment 4 to Solicitation 140P2024R0115 for the ZION Construction Bus Charging Phase 3 project. The purpose of this amendment is to answer questions received. Key details are:

The last day to submit questions is Tuesday, September 10, 2024 by 2PM MT via email to the Contracting Officer, Rachel Dyer. A bid bond is required for this project. The solicitation will close on Thursday, September 12, 2024 at 2PM MT, with proposals to be emailed to Rachel Dyer. The amendment addresses a question about the generator fuel type, clarifying that the contractor may select a different manufacturer's generator that meets the specified salient characteristics.

View the file

Other files for this federal contract opportunity

Other files attached to ZION Construction Bus Charging Phase 3, newest first.
File Type Posted
B08_ATT4_Amd5_ZION_240182_EV_Division_1_Specifications_FINAL_REV1_2024-09-10_0005.pdf PDF
Sol_140P2024R0115_Amd_0005.pdf PDF
B08_ATT3_Amd5_UpdatedContractPriceSchedule-ZION_240182-blank_0005.xlsx XLSX spreadsheet
B08_ATT5_Section_H_and_M_Updated-Amendment_5_0005.docx DOCX document
B08_ATT1_Amd5_Questions_and_clarifications2_0005.pdf PDF
B08_ATT2_Amd5_SBMTL__002_-ATS_ZION_EV_phase_3_0005.pdf PDF
Sol_140P2024R0115_Amd_0003.pdf PDF
Sol_140P2024R0115_Amd_0002.pdf PDF
B08_Amd2_Att1a_General_Questions_and_Clarifications1_0002.pdf PDF
B08_Amd2_Att2a_phase_2-partial_asbuilts_0002.pdf PDF
B08_Amd2_Att4a_PTI_waterline_info_0002.pdf PDF
B08_Amd2_Att5a_CE_20240207_EV-Charging_0002.pdf PDF
B08_Amd2_Att6a_ZION_240182_EV_specs_VOL_1-2__REV_9-4-24pdf_0002.pdf PDF
B08_Amd2_Att3a_ZION_240182_Geotechnical_Evaluation_FINAL_0002.pdf PDF
Sol_140P2024R0115_Amd_0001.pdf PDF
B09_SF30_140P2024R0115_A0001RD_0001.pdf PDF
Sol_140P2024R0115.pdf PDF
B08_Att_1_ZION_240182-EV_Specifications_FINAL.pdf PDF
B08_Att_2_ZION_240182_Phase_III_EV_FInal_CD_Package_Drawings.pdf PDF
B08_Att_5_General_Refrences.pdf PDF
B08_Att_4_Wage_Determination_UT20240094.pdf PDF
B08_140P2024R0115_RFP_Construction_SF1442_REQD_Conformed.pdf PDF
B08_Att_6_Subcontract_Percentage_Worksheet.xlsx XLSX spreadsheet
B08_Att_3_ZION_240182_-__Price_Schedulek.xlsx XLSX spreadsheet
B08_Att_7_Past_Performance_Questionnaire.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0115 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

08/08/20240004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/08/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

THE PURPOSE OF AMENDMENT 4 IS TO ANSWER QUESTIONS ASKED.

PER AMENDMENT 3 - THE LAST DAY TO ASK QUESTIONS FOR THIS PROJECT IS TUESDAY, SEPTEMBER 10, 2024 NO LATER THAN 2PM MT VIA EMAIL TO RACHEL DYER, CONTRACTING OFFICER, AT

RACHEL_DYER@NPS.GOV.

PER AMENDMENT 3 - A BID BOND IS REQUIRED FOR THIS PROJECT.

PER AMENDMENT 3 - THIS SOLICITATION WILL CLOSE ON THURSDAY, SEPTEMBER 12, 2024, AT 2PM MT.

ALL PROPOSALS SHALL BE EMAILED TO RACHEL DYER, CONTRACTING OFFICER, AT RACHEL_DYER@NPS.GOV.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rachel Dyer

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0115/0004

PER AMENDMENT 4:

QUESTION 1. BOTH OF OUR ELECTRICIANS BIDDING ON

THIS PROJECT HAVE STATED THAT THE MODEL OF

GENERATOR PROVIDED IS NOT AVAILABLE AS PROPANE

FUEL SUPPLY AS DESIGNED. BOTH ARE STATING THAT

DIESEL IS WHAT IS PROVIDED. PLEASE ADVISE.

ANSWER 1. THE ELECTRICAL DESIGN WAS DEVELOPED

USING A CATERPILLAR CG132-12 MODEL GENERATOR. THE

CONTRACTOR MAY SELECT A DIFFERENT MANUFACTURER OF

THE GENERATOR THAT MEETS THE SALIENT

CHARACTERISTICS IDENTIFIED IN SECTION 26 32 15

(ENGINE GENERATOR ¿ PROPANE) OF THE PROJECT

SPECIFICATIONS.