B08_ATT1_Amd5_Questions_and_clarifications2_0005.pdf

PDF 154 KB Posted

Attached to
ZION Construction Bus Charging Phase 3 Federal contract opportunity
Solicitation number
140P2024R0115
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains a set of questions and answers related to a federal contract opportunity for the ZION 240182 EV PHASE 3 project. The key details are:

The solicitation is for a construction project to install bus charging infrastructure. The federal agency involved is the Department of the Interior National Park Service National Office. The period of performance is expected to be October 15, 2024 to February 28, 2025, but this may be extended if additional time is needed for material/equipment lead times.

The document addresses several questions, including clarification on the generator specifications (size and voltage), the government's openness to alternate generator proposals, requirements for key personnel, and the availability of a provided automatic transfer switch. The government has indicated the contractor may select a different generator manufacturer than the basis of design, as long as it meets the salient characteristics in the specifications.

View the file

Other files for this federal contract opportunity

Other files attached to ZION Construction Bus Charging Phase 3, newest first.
File Type Posted
B08_ATT2_Amd5_SBMTL__002_-ATS_ZION_EV_phase_3_0005.pdf PDF
B08_ATT4_Amd5_ZION_240182_EV_Division_1_Specifications_FINAL_REV1_2024-09-10_0005.pdf PDF
Sol_140P2024R0115_Amd_0005.pdf PDF
B08_ATT3_Amd5_UpdatedContractPriceSchedule-ZION_240182-blank_0005.xlsx XLSX spreadsheet
B08_ATT5_Section_H_and_M_Updated-Amendment_5_0005.docx DOCX document
Sol_140P2024R0115_Amd_0004.pdf PDF
Sol_140P2024R0115_Amd_0003.pdf PDF
B08_Amd2_Att3a_ZION_240182_Geotechnical_Evaluation_FINAL_0002.pdf PDF
Sol_140P2024R0115_Amd_0002.pdf PDF
B08_Amd2_Att1a_General_Questions_and_Clarifications1_0002.pdf PDF
B08_Amd2_Att2a_phase_2-partial_asbuilts_0002.pdf PDF
B08_Amd2_Att4a_PTI_waterline_info_0002.pdf PDF
B08_Amd2_Att5a_CE_20240207_EV-Charging_0002.pdf PDF
B08_Amd2_Att6a_ZION_240182_EV_specs_VOL_1-2__REV_9-4-24pdf_0002.pdf PDF
B09_SF30_140P2024R0115_A0001RD_0001.pdf PDF
Sol_140P2024R0115_Amd_0001.pdf PDF
B08_Att_6_Subcontract_Percentage_Worksheet.xlsx XLSX spreadsheet
B08_Att_3_ZION_240182_-__Price_Schedulek.xlsx XLSX spreadsheet
B08_Att_7_Past_Performance_Questionnaire.docx DOCX document
Sol_140P2024R0115.pdf PDF
B08_Att_1_ZION_240182-EV_Specifications_FINAL.pdf PDF
B08_Att_2_ZION_240182_Phase_III_EV_FInal_CD_Package_Drawings.pdf PDF
B08_Att_5_General_Refrences.pdf PDF
B08_Att_4_Wage_Determination_UT20240094.pdf PDF
B08_140P2024R0115_RFP_Construction_SF1442_REQD_Conformed.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/10/24 Question/Answers set #2

ZION 240182 EV PHASE 3 project.

General Questions and Clarifications:

Question 1.Please clarify the Generator. It appears to have a conflicted spec between the drawings and the specs. The Spec states the Generator voltage is to be 13,800 volts and the drawing one lines have it as a 480-volt Generator see below. Also, the size in the spec states 600kw and the drawings depict a 500kw. In addition, there are no annotations related to the load bank on the drawings, is this to be a stationary unit?

Specifications supersede the plans, generator should be 600kW as specified in the Specification 26 32 15 – Engine Generator – Propane.

Question 2.Please clarify due to the spec conflict with the generator, would the government entertain an alternate solution of paralleling multiple 150kw propane generators to fulfill the design intent?

Value engineering of the generator as designed may be proposed by the contractor during construction.

Question 3. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?

The Superintendent and Safety manager can be the same person, but the QC manager must be a separate person.

Question 4. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?

The period of performance is expected to be Oct 15, 2024 to February 28, 2025. If additional time is needed for led times this can be discussed. For bidding purposes assume the POP stated above.

Question 5. Please provide bidding quantities for deteriorated base course (paving).

Quantities are the responsibility of the bidders.

Question 6. Amendment 4 instructs to use another manufacturer if I'm reading this correctly. Our Electrical Subcontractor spoke with CAT and Generac and received the same response. Also, to meet the propane generator requirement, CAT would have to manufacture this unit in Germany.

Generac does not offer a 500KW unit in propane.

The generator manufacturer is not restricted, but the selected generator must meet the salient characteristics contained within the project specifications.

This is the information sent by Caterpillar:

• The CG132B-12 (government indicates this is the basis of design) is a Caterpillar product built in Germany. On propane the unit maxes out at 323kW at sea level. The rating will be lower at the Zions site.

• There is a CG132B-16 again built in Germany, but it maxes out at 434kw at sea level. This again will be lower at the customer site.

• These German units have very limited transient capability for standby loads.

• Technical support and parts support is available but will be limited compared to the Caterpillar offerings built in the US.

• Built in the US is the Caterpillar G3512. The one unit that might fit the bill is the Caterpillar G3512 at 609 kW at sea level. It may be close to 500kW at customer site. I can go push Caterpillar on this option if that is desirable.

• To my knowledge there isn’t published transient data that Caterpillar would guarantee to, but this would probably be the best unit in that regard.

• We will need to work with CAT to get a custom gas train for this unit.

• All this will take time and we would need a couple weeks to work through all the questions and the custom design.

Question 7. On page 196 of 258, in the specification, the basis of design for the generator shows a 600 kW,while in the plans on E102 it states to supply a 500-kW generator. What size generator should we plan on supplying

See question 1 above.

Question 8. It is our understanding that the Automatic Transfer Switch will be provided by the Government as stated in the table on sheet E605 titled “BILL OF MATERIALS”. It also our understanding that, per Amendment 0004, issued 9/10/2024, that “THE ELECTRICAL DESIGN

WAS DEVELOPED USING A CATERPILLAR CG132-12 MODEL GENERATOR. THE

CONTRACTOR MAY SELECT A DIFFERENT MANUFACTURER OF THE GENERATOR

THAT MEETS THE SALIENT CHARACTERISTICS IDENTIFIED IN SECTION 26 32 15

(ENGINE GENERATOR ¿ PROPANE) OF THE PROJECT SPECIFICATIONS.”

The specifications section 26 30 00 does not appear to specify a specific model. With the direction for the generator, we are concerned that the generators priced and proposed may not match/communicate with the transfer switch to be provided and therefore, the bids will not likely be an apples-to-apples comparison and the generator may not work with the switch selected and provided. To avoid this conflict, will the government please provide the intended transfer switch make and model selected by the government so that we can ensure a generator priced can communicate with the transfer switch being purchased?

See attachment SBMTL #002.

Additionally, the generator has been changed to an option as shown on the revised sheet here.

A revised contract price sheet is included with this addendum.