B08_Att_(1)_LAKE_324894_Echo_Bay_SPECS_FINAL_July_2024_-_Copy.pdf
PDF 8 MB Posted
- Solicitation number
- 140P2025R0071
About this file
This document is a Geotechnical Exploration Report for the relocation of the Echo Bay public launch ramp at Lake Mead National Recreation Area in Clark County, Nevada. The project involves constructing a new boat launch ramp, a 2,400-foot-long two-lane gravel access road, and a gravel parking area approximately 100 by 400 feet. The ramp will be 60 feet wide, utilizing cast-in-place concrete in areas above the current water level and precast panels in areas below water, designed to accommodate lake levels between 1,060 and 1,000 feet above mean sea level.
The geotechnical investigation was conducted by Kleinfelder, involving eight borings drilled to depths of 11.5 to 21.5 feet, laboratory soil testing, and a field geological reconnaissance. Key recommendations include site preparation involving potential cuts up to 20 feet to establish a 12% grade, use of engineered fill, aggregate base course, and riprap at ramp terminations. The report provides detailed guidance on subgrade stabilization, concrete slab construction, and construction considerations, with particular attention to soil conditions, potential excavation challenges, and engineering requirements for the launch ramp and associated infrastructure.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE MEAD NATIONAL RECREATION AREA
NEVADA - LAKE
SOLICITATION # TBD
RELOCATE PUBLIC LAUNCH RAMP AT ECHO BAY
PMIS NO. 324894
PROJECT SPECIFICATIONS
FINAL
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
July 2024
06/30/2025
Instructions & Table of Contents (TOC) | NPS DSC Division 1 Specifications | 012822 page 1 of 1
NPS DSC Division 1 Specifications Table of Contents
National Park Service (NPS) - Denver Service Center (DSC) | 1-28-22
Table of Contents (TOC)
Division 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 26 01 Contract Modification Procedures
01 27 00 Definition of Contract Line Items
01 31 00 Project Management and Coordination
01 32 16 Construction Schedule
01 33 23 Submittal Procedures
01 35 23 Safety Requirements
01 40 00 Quality Requirements
01 42 00 Reference Standards
01 50 00 Temporary Facilities and Controls
01 57 23 Temporary Storm Water Pollution Prevention (SWPP)
01 67 00 Product Requirements
01 73 40 Execution
01 74 19 Construction Waste Management and Disposal
01 77 00 Closeout Procedures
Division 03 – CONCRETE
03 33 00 Cast-in-Place Concrete
03 41 00 Plant Precast Structural Concrete
Division 31 - EARTHWORK
31 10 00 Site Preparation
31 23 16 Excavation
31 23 23 Fill
31 37 16.13 Rubble Stone Riprap
Division 32 – EXTERIOR IMPROVEMENTS
32 11 23 Aggregate Base Courses
Division 35 – WATERWAY AND MARINE CONSTRUCTION
35 01 01 Turbidity Curtain
SUPPORTING DOCUMENTS
Submittal List Template (01 33 23)
Project Waste Management Plan Worksheet Sample (01 74 19)
Closeout Requirements Template (01 77 00)
APPENDICES
Appendix A – Geotechnical Investigation Report
Appendix B – 2018 Biological Opinion
LAKE – PMIS #324894 01 11 00 - 1
112723 SUMMARY OF WORK
NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 11-27-23
PMIS #324894
SECTION 01 11 00 - SUMMARY OF WORK
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Government-Furnished Materials
3. Construction Contractor Use of Site
4. Public Use of Site
5. Conduct of Operations
6. Work Restrictions
7. Special Construction Requirements
8. Soils Investigation Report
9. Construction Materials
10. Permits
11. Verification of Earth Moving Quantities
12. Resource Protection
13. Excess Excavation Haul Route and Placement Location
14. Maps and Mileage Charts for Lake Mead NRA
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Echo Bay (EB) within Lake Mead National Recreation Area, Nevada. See 1.19 –
Maps amd Mileage Charts at the end of this section for additional information.
B. The Work consists of:
1. The work of this contract consists of general construction for a new gravel surfaced road along with a launch ramp and gravel parking area. The work to construct these facilities includes excavation, grading, placement of aggregate base, construction of cast-in-place and pre-cast concrete launch ramps and placement of a riprap perimeter. It is assumed that work may be completed in up to 40-foot water depths.
C. Project will be constructed under a single prime contract.
D. The contractor will field verify all existing conditions affecting the work in this contract before providing pricing or ordering materials. The scheduling of field verification site visit(s) shall be coordinated with the Contracting Officer’s Representative (COR)
E. Current water levels at Echo Bay vary. The water levels can be obtained from the Bureau of
Reclamations 24- month projections and may not be the levels actually encountered during the time of construction.
LAKE – PMIS #324894 01 11 00 - 2
F. Period of Performance: 730 calendar days from Notice to Proceed. Government may pause or terminate the contract due to water depths exceeding 40-feet.
1.3 GOVERNMENT-FURNISHED MATERIALS
A. In case of Government -furnished materials:
1. Government will arrange and pay for delivery of Government-furnished items according to Construction Contractor’s Construction Schedule.
2. Construction Contractor is responsible for initial inspection, receiving, unloading, and handling Government-furnished items at Project site.
3. Government will inspect delivered items for damage after delivery. Construction
Contractor shall be present for and assist in Government’s inspection.
4. Government will arrange for replacement if Government-furnished items are damaged, defective, or missing.
5. Construction Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.
6. If Government-furnished items are damaged as a result of Construction Contractor’s operations, Construction Contractor shall repair or replace them.
7. Construction Contractor shall install and otherwise incorporate Government-furnished items into Work.
B. Government-Furnished Materials:
1. 5-Ton Capacity Lifting Beam – The government will furnish, for Contractor’s use, a 5 Ton
Capacity Lifting Beam for moving precast concrete panels.
2. There is a stockpile of existing precast panels near the existing launch ramp which includes
Forty-Four (44) usable panels and Fifty-Two (52) unusable/broken panels. The
Contractor shall leave eighteen (18) of the usable panels in the stockpile as spare panels for the Park and dispose of the 52 unusable/broken panels. The Contractor shall provide the Park with new connection hardware for the eighteen (18) spare panels which includes
36 stainless steel plates, 36 stainless steel cotter pins, and 36 stainless steel “U” connectors.
1.4 CONSTRUCTION CONTRACTOR USE OF SITE
A. General: Construction Contractor shall have full use of the site for construction operations during the construction period. Construction Contractor’s use of the site is limited only by the Government’s right to perform work or to retain other Construction Contractors on portions of Project.
B. General: Construction Contractor shall have limited use of site for construction operations. Limit use of premises to Construction Limits indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine construction operations to the Construction Limits and area identified in erosion control plans outlined on the construction drawings.
LAKE – PMIS #324894 01 11 00 - 3
C. Storage of Materials: Confine storage of materials to the staging / laydown / storage areas identified in the construction drawings or as established at the preconstruction meeting. Per NDEP, all staging areas and vehicle maintenance area shall be at least 100 feet from the water’s edge.
D. Parking: Confine parking of vehicles and heavy equipment to designated areas for contractor use or as established at the preconstruction meeting. Vehicles are not permitted within long-term or overnight parking along roads or in associated overlooks / pullouts.
E. Stockpiling: Confine stockpiling to the areas identified in the construction drawings or as established at the preconstruction meeting.
F. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
G. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to
Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
H. Construction Camp: Establishment of a camp within park will not be permitted.
I. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Construction Contractor of liability for damage which may result from moving of equipment.
J. Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.
K. Park Regulations: Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
LAKE – PMIS #324894 01 11 00 - 4
1.5 PUBLIC USE OF SITE
A. Construction Contractor shall not impede the operation of the existing launch ramp during construction. Temporary and partial closures may be permitted upon specific written approval of the
Contracting Officer.
B. Construction Contractor shall conduct his operations to ensure the least inconvenience to public.
Temporary and partial closures may be permitted, when required, upon specific approval of
Contracting Officer.
1.6 CONDUCT OF OPERATIONS
A. Construction Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the
Work Restrictions below or without prior consent from the Contracting Officer. Submit requests 7 calendar days in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
D. The use of coffer dams and blasting are not allowed methods of construction.
1.7 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of
6 am to 6 pm, Monday through Friday, except when otherwise indicated and excluding government holidays.
1. Razorback Sucker spawning Season
a. December 1 through May 1
2. Government Holidays
a. January 1, New Year's Day
1) January 1 on Saturday, New Year's Day observed on Friday
2) January 1 on Sunday, New Year's Day observed on Monday
b. 3rd Monday in January, Martin Luther King, Jr Birthday
c. 3rd Monday in February, Washington's Birthday (Presidents' Day)
d. 4th Monday in May, Memorial Day
e. June 19, Juneteenth
1) June 19 on Saturday, Juneteenth observed on Friday
2) June 19 on Sunday, Juneteenth observed on Monday
f. July 4, Independence Day
1) July 4 on Saturday, Independence Day observed on Friday
2) July 4 on Sunday, Independence Day observed on Monday
g. 1st Monday in September, Labor Day
LAKE – PMIS #324894 01 11 00 - 5
h. 2nd Monday in October, Columbus Day
i. November 11, Veterans Day
1) November 11 on Saturday, Veterans Day observed on Friday
2) November 11 on Sunday, Veterans Day observed on Monday
j. 4th Thursday in November, Thanksgiving Day
k. December 25, Christmas Day
1) December 25 on Saturday, Christmas observed on Friday
2) December 25 on Sunday, Christmas observed on Monday
B. Existing Utilities
1. Construction Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
2. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Nonsmoking Building/Tobacco Use/Vaping: Smoking is not permitted within building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.8 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Management and Communication Software: Software administered by NPS shall be used to manage communication and document sharing during construction.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using
NPS project management and communication software.
B. The Contractor shall clean all equipment that will be used off surfaced roadways, or approved roads, prior to the equipment entering Lake Mead National Recreation Area.
1. Cleaning shall be accomplished by pressure washing using water only.
2. All equipment surfaces shall be cleaned, with special emphasis given to the undercarriage.
3. This includes, but is not limited to: wheel wells, bumpers, radiator grills, springs, shock absorbers, wire harnesses, skid plates, oil plans, axles, frame ledges, buckets, tracks, etc.
4. Cleaning shall also include all dirt and debris inside the cab, or operator area.
5. A Shop-Vac or commercial car wash vacuum system may be used for operator compartments, provided the method used effectively removes all visible debris.
6. Cleaning shall be performed in a manner that will reasonably remove all visible soil, plant and other foreign material larger than ¼ IN DIA.
7. All equipment that requires washing is subject to inspection by the government personnel, or Contractor/Partners assigned to this duty, to ensure compliance.
C. Equipment that requires washing is defined as track or rubber-tired machinery intended for use primarily off-road.
1. Examples include backhoes, loaders, earthmovers, graders, rollers, bulldozers, water trucks, etc; or four-wheel drive or passenger vehicles that show evidence of being driven in off-road areas.
LAKE – PMIS #324894 01 11 00 - 6
2. Equipment may also be stationary, such as a material screening plant, or a mobile office
(mobile offices may be cleaned in the same manner as operator compartments as outlined above.
3. The equipment is generally under the direct control of the Contractor or subcontractors, is likely to remain on the construction site for an extended period of time and may contain adhered soil and seed from other projects sites.
D. Equipment/Vehicles that do not require washing are defined as those normally used for highway driving only and travel primarily on paved surfaces and well-maintained service roads and parking areas (this includes approved staging areas).
1. Examples include semi-tractor trailers, dump trucks, concrete trucks, pickup trucks, fuel trucks, service trucks, etc.
2. These delivery and passenger vehicles are generally not under the direct control of the
Contractor, have no earth-moving function, and do not remain on the project site.
3. These vehicles have a low probability of carrying adhered soil and seed from other Projects.
E. Equipment inspections:
1. All equipment that will be used off surfaced roadways may be inspected by government, or other authorized personnel prior to entering the Park.
2. Equipment determined to be free of soil or mud based on visual examination by government personnel will be cleared to enter the Park.
3. The Contractor shall notify the NPS inspection office no less than seven (7) calendar days prior to the time the Contractor wishes to move equipment into the Park that will be used off surfaced roadways.
a. Equipment not passing initial inspection must be rewashed outside the park at no additional expense to the government.
b. All equipment that will be entering the water shall be inspected daily and documented by the Contractor. The inspection should check for leaks, and other contaminants that may occur from damage to the vehicle.
1.9 SOILS INVESTIGATION REPORT
A. A Geotechnical Report dated November 21, 2022, Revised January 13, 2023, by Kleinfelder, Inc.
has been prepared for this project. A copy of the report is included in Appendix A.
B. In case of conflict between report and drawings or specifications, the drawings and specifications govern.
1.10 CONSTRUCTION MATERIALS
The work includes the excavation of in-situ material to construct the boat launch ramp. All excess ex-cavated material shall be disposed of at the old sewer lagoons. A map of the lagoons is provided at the end of this Section. Debris, vegetation and other deleterious surface material shall be removed and disposed of outside the Park. Other construction materials shall be as described below:
A. Aggregate base required for the construction of the project shall be obtained from offsite commercial sources outside the Park.
LAKE – PMIS #324894 01 11 00 - 7
B. Borings and seismic surveys indicate that the material sampled in areas of excavation are rippable.
However, material requiring rock excavation methods during construction may be present.
C. Riprap required for the construction of the project shall be obtained from offsite commercial sources outside the Park.
D. Organic material included in clearing and grubbing shall be disposed of at the old sewer lagoons. See the map provided at the end of this Section. Disposal shall be in accordance with local regulations.
1.11 PERMITS
The Contractor shall prepare and implement a Dust Control Permit with Clark County, Nevada for land-disturbing activities greater than ¼ acre or mechanized trenching activity exceeding 100 feet, if required.
The Contractor shall prepare and implement a Temporary Storm Water Pollution Prevention Plan in accordance with Section 01 57 23. The Contractor shall be responsible for drafting, applying for, and obtaining a construction stormwater NPDES permit for any area of disturbance greater than 1-acre.
The permit application will include, as a minimum, the erosion control measures included in the drawings and in Section 01 57 23 and such Best Management Practices appropriate to the proposed construction activities. The Contractor shall coordinate with the Nevada Department of Environmen-tal Protection (NDEP) in obtaining the permit, if required, as well as in constructing, maintaining and closing out the project subject to the permit.
Per the Nevada Department of Environmental Protection (NDEP), the Contractor is not required to replace equipment hydraulic fluid with biodegradable fluid when working within waterways. If the contractor chooses to replace the hydraulic fluid, it shall be at no additional cost to the owner.
1.12 VERIFICATION OF EARTH MOVING QUANTITIES
The Contractor shall be responsible for verifying the quantities of excavation, fill, aggregate base and riprap required for the project. AutoCAD files are available upon request and will be provided to the
Contractor for information only. Fill quantities shall allow for potential shrink.
1.13 RESOURCE PROTECTION
A. General: The Park is committed protecting natural and cultural resources found within the park and adjacent lands. The Contractor must comply with the following rules and conditions:
1. Invasive Species: The introduction of non-native invasive species can threaten rare and endangered species or can create new populations of non-native species not traditionally found in the park. The contractor is required to inform personnel, subcontractors, and vendors to thoroughly clean all vehicles, equipment, tools, supplies, and materials prior to packing / loading. The Park requires, and will perform, inspections to ensure non-transport of non-native species PRIOR to arriving at the park entrance. Contact the CMR at least seven (7) days in advance of park entry to arrange for inspection(s).
LAKE – PMIS #324894 01 11 00 - 8
2. Endangered Species: Endangered species are protected by Federal law. Obey all park regulations. Drivers must obey all traffic laws and keep an eye out for animals on or alongside road. Contact CO immediately if animal is hit or injured or will not move off the road. All contractor’s personnel working in Lake Mead National Recreation Area must have up-to-date Lake Mead Desert Tortoise awareness training. Prior to starting work, contact the CMR at least seven (7) business days in advance to schedule the Desert
Tortoise awareness training.
The following endangered species are found within the park and require certain considerations.
a. Desert Tortoise – Desert Tortoise are frequently along the roadsides at Lake Mead
National Recreation Area and do not readily move when approached by cars. If there is a Desert Tortoise on the road, drivers must stop and allow the Desert Tortoise to move away on its own.
b. Razorback Sucker – Lake Mead is considered a critical habitat for razorback sucker.
Razorback suckers are known to use the waters near the project location as a spawning area. Therefore, water-based construction activities shall not occur during spawning season, December 1 through May 1.
Prior to the start of in water work, the Contractor shall conduct a survey of the work area with a trained diver to verify that no evidence of Razorback Sucker spawning is present. If spawning is discovered, notify the Contracting Officer and cease construction activities.
3. Archaeological Resources: Archaeological resources are physical evidence of past human activity, including evidence of the effects of that activity on the environment.
Archaeological resources are found above and below ground and underwater. If the
Government furnished archaeological monitor discovers resources, the contractor shall stop work and contact the contracting officer and/or construction management representative immediately. Archaeologically sensitive areas and resources typically found in the park or at the project site will be discussed further at the preconstruction meeting.
4. Soundscape / Noise: The contractor shall minimize noise levels at the project site to protect the soundscape of the park. Perform noise-producing work in less sensitive hours of the day or week or as directed by the contracting officer.
1.14 EXCESS EXCAVATION HAUL ROUTE AND PLACEMENT LOCATION
All saturated excavated spoils shall be placed in the new parking lot location for decanting and ar-chaeological monitoring prior to being hauled to the old sewer lagoons site. See plans.
LAKE – PMIS #324894 01 11 00 - 9
All excess excavation shall be hauled and placed at the old sewer lagoons as directed by the Contract-ing Officer. The Contractor shall collect soil samples and have laboratory tests completed for heavy metals with a report for the waste site prior to any placement of excess excavation. Quantity and loca-tion of the collected samples shall be as directed by the Contracting Officer.
The waste site is located ~2.7 miles from the project at the “old sewage lagoons” through the Lake
Mead RV village at Echo Bay. The shape, depth and size parameters of the waste site shall be deter-mined by the Contracting Officer. No revegetation efforts are necessary for the waste site. The fol-lowing map shows the location of waste site in reference to the project location:
1.15 MAP AND MILEAGE CHARTS FOR LAKE MEAD NRA
The following maps and mileage charts are provided for information to the Contractor:
LAKE – PMIS #324894 01 11 00 - 10
LAKE – PMIS #324894 01 11 00 - 11
LAKE – PMIS #324894 01 11 00 - 12
LAKE – PMIS #324894 01 11 00 - 13
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
LAKE – PMIS #324894 01 26 01 - 1
012721 CONTRACT MODIFICATION PROCEDURES
NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
PMIS #324894
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating
General Conditions:
1. Project Manager (PM), Assistant Project Manager
LAKE – PMIS #324894 01 26 01 - 2
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General
Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
LAKE – PMIS #324894 01 26 01 - 3
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General
Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank
LAKE – PMIS #324894 01 26 01 - 4
by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of
Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.
3. Requests for extensions of contract time as a result of change must be justified with a
Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) upon request.
5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. Labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for work being performed.
2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.
3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
http://www.nps.gov/dscw/publicforms.htm#CP___PAGEID=396735|
LAKE – PMIS #324894 01 26 01 - 5
a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense
Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.
6. Standby unit rates used in accordance with paragraph 1.3, D, 2, above. If the U.S. Army
Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then 1/2 of equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, established standby rate shall apply from the first day of the delay.
8. Equipment not used and on job site for up to five consecutive days may be classified at standby rates, provided the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………10%
Profit…………………...10%
2. Total aggregate limit of markup (OH&P) for Contractor and Subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If Contractors form a partnership, partnership may only receive home office overhead and profit in same amount as an individual Contractor (refer to paragraph 1.3,E,1 above). It is the responsibility of the partners to decide on division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, overhead and profit mark-ups are required on net increases and deducted on net decreases.
LAKE – PMIS #324894 01 26 01 - 6
5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION 01 26 01
LAKE – PMIS #324894 01 27 00 - 1
012721 DEFINITION OF CONTRACT LINE ITEMS
NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
PMIS #324894
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line-Item No.01 – Gravel Roadway and Launch Ramp Parking Area
1. This work is for construction of approximately 1,830 lineal feet of gravel roadway and an approximate 6,900 square yard gravel parking area at Echo Bay (EB) including but not limited to site clearing, excavation, fill, trenching, geotextile fabric, aggregate base courses, riprap, signage, layout, testing and other incidental items. This line item includes the installation of super elevated curves and slope rounding for the new gravel roadway. This line item includes installing riprap ditches, rock check dams, and a drainage ditch.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.01 as specified.
4. Payment(s) will be made monthly.
LAKE – PMIS #324894 01 27 00 - 2
B. Contract Line-Item No.02 – Cast-in-Place and Precast Launch Ramp (1,064’ – 1,049’)
1. This work is for construction of a 60’ wide Cast-in-Place and Precast Concrete Launch
Ramp at Echo Bay (EB) from approximately elevation 1,064’ to 1,049’ including but not limited to Traffic Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and
Installing New Plant Precast Concrete Panels, installing existing stockpiled Precast
Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter Pins for Precast
Panels and Riprap Perimeter Trench installed underwater along ramp edges. This line item includes installing approximately three thousand five hundred and fifty-five (3,555) square feet of cast-in-place launch ramp with thickened edges. This line item includes installing approximately two thousand nine hundred and twenty-five (2,925) square feet of precast launch ramp. This line item includes installing twenty-six (26) Existing, stockpiled, Precast Panels and providing and installing twenty-two (22) new Plant
Precast Concrete Panels. The Contractor shall leave eighteen (18) usable precast panels in the stockpile for use as spare panels for the Park and dispose of approximately fifty-two (52) broken or unusable panels in the stockpile. This line item includes providing and installing ninety-six (96) Stainless Steel Clips, Plates and Cotter Pins. Thirty-six
(36) additional Stainless-Steel Clips, Plates and Cotter Pins shall be provided to the Park as extra stock for the saved eighteen (18) existing Precast Panels.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.02 as specified.
C. Contract Line-Item No.03 – Precast Launch Ramp (1,049’ – 1,042’)
1. This work is for construction of a 60’ wide Precast Concrete Launch Ramp at Echo Bay
(EB) from approximately elevation 1,049’ to 1,042’ including but not limited to Traffic
Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and Installing New Plant
Precast Concrete Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter
Pins for Precast Panels and Riprap Perimeter Trench installed underwater along ramp edges. This line item includes installing approximately two thousand nine hundred and twenty-five (2,925) square feet of launch ramp. This line item includes providing and installing forty-eight (48) new Plant Precast Concrete Panels. This line item includes providing and installing ninety-six (96) Stainless Steel Clips, Plates and Cotter Pins.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.03 as specified.
D. Contract Line-Item No.04 – Precast Launch Ramp (1,042’ – 1,035’)
(EB) from approximately elevation 1,042’ to 1,035’ including but not limited to Traffic
Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and Installing New Plant
LAKE – PMIS #324894 01 27 00 - 3
Precast Concrete Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter
Pins for Precast Panels and Riprap Perimeter Trench installed underwater along ramp edges. This line item includes installing approximately three thousand one hundred and ten (3,100) square feet of launch ramp. This line item includes providing and installing fifty-one (51) new Plant Precast Concrete Panels. This line item includes providing and installing one hundred and two (102) Stainless Steel Clips, Plates and Cotter Pins.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.04 as specified.
E. Contract Line-Item No.05 – Precast Launch Ramp (1,035’ – 1,028’)
(EB) from approximately elevation 1,035’ to 1,028’ including but not limited to Traffic
Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and Installing New Plant
Precast Concrete Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter
Pins for Precast Panels and Riprap Perimeter Trench installed underwater along ramp edges. This line item includes installing approximately two thousand nine hundred and twenty-five (2,925) square feet of launch ramp. This line item includes providing and installing forty-eight (48) new Plant Precast Concrete Panels. This line item includes providing and installing ninety-six (96) Stainless Steel Clips, Plates and Cotter Pins.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.05 as specified.
F. Contract Line-Item No.06 – Precast Launch Ramp (1,028’ – 1,021’)
(EB) from approximately elevation 1,028’ to 1,021’ including but not limited to Traffic
Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and Installing New Plant
Precast Concrete Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter
Pins for Precast Panels and Riprap Perimeter Trench installed underwater along ramp edges. This line item includes installing approximately two thousand nine hundred and twenty-five (2,925) square feet of launch ramp. This line item includes providing and installing forty-eight (48) new Plant Precast Concrete Panels. This line item includes providing and installing ninety-six (96) Stainless Steel Clips, Plates and Cotter Pins.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.06 as specified.
LAKE – PMIS #324894 01 27 00 - 4
G. Contract Line-Item No.07 – Precast Launch Ramp (1,021’ – 1,014’)
(EB) from approximately elevation 1,021’ to 1,014’ including but not limited to Traffic
Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and Installing New Plant
Precast Concrete Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter
Pins for Precast Panels and Riprap Perimeter Trench installed underwater along ramp edges. This line item includes installing approximately two thousand nine hundred and twenty-five (2,925) square feet of launch ramp. This line item includes providing and installing forty-eight (48) new Plant Precast Concrete Panels. This line item includes providing and installing ninety-six (96) Stainless Steel Clips, Plates and Cotter Pins.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.07 as specified.
H. Contract Line-Item No.08 – Precast Launch Ramp (1,014’ – 1,007’)
(EB) from approximately elevation 1,014’ to 1,007’ including but not limited to Traffic
Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and Installing New Plant
Precast Concrete Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter
Pins for Precast Panels and Riprap Perimeter Trench installed underwater along ramp edges. This line item includes installing approximately three thousand one hundred and ten (3,100) square feet of launch ramp. This line item includes providing and installing fifty-one (51) new Plant Precast Concrete Panels. This line item includes providing and installing one hundred and two (102) Stainless Steel Clips, Plates and Cotter Pins.
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.08 as specified.
I. Contract Line-Item No.09 – Precast Launch Ramp (1,007’ – 1,000’)
(EB) from approximately elevation 1,007’ to 1,000’such that the launch ramp is usable at elevation 1000 (Powerhouse Datum) including but not limited to Traffic Control, Turbidity Curtain, Site Preparation, Excavation, Grading, Aggregate Base, Providing and Installing 4” Diameter Leveling Pipe, Providing and Installing New Plant Precast
Concrete Panels, Providing and Installing Stainless Steel Clips, Plates and Cotter Pins for Precast Panels and Riprap Perimeter Trench installed underwater along ramp edges.
This line item includes installing approximately four thousand three hundred and ninety
(4,390) square feet of launch ramp. This line item includes providing and installing seventy-two (72) new Plant Precast Concrete Panels. This line item includes providing and installing one hundred and forty-four (144) Stainless Steel Clips, Plates and Cotter
Pins.
LAKE – PMIS #324894 01 27 00 - 5
2. Measurement shall be made by a percentage of the Lump Sum of work installed, completed and accepted, per the Schedule of Values.
3. Payment shall be made at the contract Lump Sum (LS) price. This price item consists of all necessary material, labor, and equipment required to complete the installation of
Contract Line-Item No.09 as specified.
END OF SECTION 01 27 00
LAKE – PMIS #324894 01 31 00 - 1
112723 PROJECT MANAGEMENT AND COORDINATION
NPS DSC Division 1 Specifications National Park Service (NPS) - Denver Service Center (DSC) | 11-27-23
PMIS #324894
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Definitions
2. Construction Coordination
3. Submittals
4. Coordination Drawings
5. Requests for Information (RFIs)
6. NPS Project Management and Communication Software
7. Project Meetings
8. Environmental Coordination
9. Permits
B. Related Requirements:
1. Section 01 32 16 "Construction Schedule" for preparing and submitting Construction
Contractor’s construction schedule.
2. Section 01 73 40 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. Agency with Jurisdiction
B. Construction Permits – Contractor Provided
C. Government Furnished Permits
1.3 CONSTRUCTION COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.
http://www.nps.gov/dscw/definitionsdc_a.htm#awj http://www.nps.gov/dscw/definitionsdc_c.htm#cpcp http://www.nps.gov/dscw/definitionsdc_g.htm#gfperm
LAKE – PMIS #324894 01 31 00 - 2
1. Schedule construction operations in sequence required to obtain best results where installation of one part of the…