B09_AMD_006_Att_(5)_54467_NVW_Echo_Bay_Boat_Launch_Issuance_Letter-Signed_0006.pdf
PDF 31 KB Posted
- Solicitation number
- 140P2025R0071
About this file
This document is a temporary permit letter issued by the Nevada Division of Environmental Protection to the National Park Service for the Echo Bay Boat Launch project. The permit authorizes work in state waters from October 1, 2024, through March 30, 2025, for the Lake Mead boat ramp extension project.
The permit requires daily monitoring and monthly Discharge Monitoring Reports (DMRs), with the first DMR due on November 28, 2024, and the final DMR and narrative report with documentary photos due by April 28, 2025, or by the 28th day following project completion. The permit was issued based on an application and engineering design plans received on September 24, 2024, and any significant changes would necessitate a new permit. The document is addressed to Sam Luke at the National Park Service's Nevada Way location in Boulder City, Nevada, and includes multiple internal cc recipients from various branches of the environmental and regulatory agencies.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .