B08_Att_05_Hazardous_Materials_Investigation_Report_South_Rim_WWTP.pdf

PDF 13 MB Posted

Attached to
GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation number
140P2026R0101
Issued by

About this file

This is a Hazardous Materials Investigation Report documenting the findings from an asbestos, lead-based paint, and PCB survey conducted at the Grand Canyon South Rim Wastewater Treatment Plant Complex in October 2023. The investigation was performed by CJSeto Support Services, LLC under Task Order 148045100, subcontracted by Jacobs Government Services Company (prime contractor 140P2023D0006) for the National Park Service. The facility, located in Grand Canyon National Park, Arizona, consists of three main buildings (Operations/Admin, Pretreatment, and Reclamation) plus seven storage sheds and six shipping containers. The complex, constructed in the mid-1970s with 1980s renovations, underwent complete building inspections of all reasonably accessible interior, exterior, and roof areas using Polarized Light Microscopy analysis for asbestos samples submitted to EMSL Analytical, Inc.

Key findings identified Asbestos Containing Materials (ACM) requiring abatement prior to demolition or renovation, including Transite panels in the Control Building containing 20% Chrysotile asbestos and black tar sealant over roof flashing containing 2.5% Chrysotile asbestos on multiple buildings. Materials that could not be sampled due to potential damage were assumed to contain asbestos pending rebut sampling. Inaccessible areas include attic spaces, wall cavities, the interior digester area, and electrical system components. The report notes that destructive investigation was not performed, and complete identification of all hazardous materials cannot be guaranteed until renovation or demolition activities commence. Detailed results, photographs, floor plans with sample locations, and analytical laboratory results are provided in attachments.

View the file

Other files

File Type Posted
Sol_140P2026R0101_Amd_0006.pdf PDF
B09_Amendment_06_GRCA257282_FinalCD_Addendum_06_0006.pdf PDF
B09_Amendment_06_SF_30_0006.pdf PDF
B09_Amendment_06_B08_Att_13_Solit_PSP_Vol_II_SubKPlan_0006.docx DOCX document
B09_Amendment_06_GRCA_25782_Site_Visit_Sign_in_Sheet_0006.jpeg JPEG file
B09_Amendment_06_Answers_to_Questions_0006.pdf PDF
B09_Amendment_05_Answers_to_Questions_0005.pdf PDF
Sol_140P2026R0101_Amd_0005.pdf PDF
B09_Amendment_05_GRCA_Final_Individual_Specs_0005.zip ZIP file
B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_04_0005.pdf PDF
B09_Amendment_05_GRCA257282_FinalCD_Addendum_05_0005.pdf PDF
B09_Amendment_05_SF_30_0005.pdf PDF
B09_Amendment_04_SF30_0004.pdf PDF
Sol_140P2026R0101_Amd_0004.pdf PDF
B09_Amendment_03_GRCA257282_FinalCD_Addendum_03_Compiled_wSeal_0003.pdf PDF
Sol_140P2026R0101_Amd_0003.pdf PDF
B09_Amendment_03_Answers_to_Questions_0003.pdf PDF
B09_Amendment_03_SF30_0003.pdf PDF
Sol_140P2026R0101_Amd_0002.pdf PDF
B09_Amendment_02_SF30_0002.pdf PDF
B09_Amendment_02_What_Evaluators_Will_Ask_for_Each_Factor_2_0002.pdf PDF
B09_Amendment_02_GRCA_257282_SR_WWTP_PreBid_Mtg_presentation_(8-11-26)_FINAL_0002.pdf PDF
B09_Amendment_02_GRCA_257282_Precon_SignIn_0002.pdf PDF
Sol_140P2026R0101_Amd_01.pdf PDF
B09_Amendment_01_GRCA257282_Access_Road_100P_Final_CD_DRAWINGS_01.pdf PDF
B09_Amendment_01_SF30_01.pdf PDF
B09_Amendment_01_RCA257282_Access_Road_100P_Final_CD_Specifications_01.pdf PDF
B09_Amendment_01_GRCA257282_CD_Specifications_June2025_01.pdf PDF
Sol_140P2026R0101.pdf PDF
B08_Att_11_Solit_PSP_Vol_II_Equals.pdf PDF
B08_Att_10_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Att_07_GRCA_257282_Price_Schedule.xlsx XLSX spreadsheet
B08_Att_01b_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part2.pdf PDF
B08_Att_03_GRCA257282_100P_FinalCD_Addendum_1.pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5_1.pdf PDF
B08_Att_12_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Att_08_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Att_09_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Att_01c_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part3.pdf PDF
B08_Att_04_GRCA257282_Geotechnical_Recommendation_TM_May2025.pdf PDF
B08_Att_01d_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part4.pdf PDF
B08_Att_01a_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part1.pdf PDF
B08_Att_06_Wage_Determination_(1).pdf PDF
B08_Att_01e_GRCA257282_CD_Drawings_and_Details_Combined_June2025_Part5.pdf PDF
B08_GRCA_257282_140P2026R0101_SF1442_and_Clauses_7-30-26.pdf PDF
B08_Att_13_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v2_Mar25.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hazardous Materials Investigation Report

Grand Canyon South Rim Wastewater Treatment Plant

Task Order #148045100

CJSeto Project #2910

November 2023

Hazardous Materials Investigation Report Task Orders: 148045100 Grand Canyon South Rim WWTP 11/2023 i

Table of Contents

Introduction:

Sampling and Inspection Methodology and Inspection Objectives

Asbestos Findings and Recommendations:

Lead-based Paint Findings and Recommendations:

PCBs and Other Hazardous Materials Findings

Attachments:

Attachment I – Tables I and II: Results Summary Spreadsheets

Attachment II – Inspection Photographs

Attachment III – Drawings: Floor Plans with Asbestos Sample Locations Identified

Attachment IV – Analytical Laboratory Results

Introduction:

The National Park Service entered into contract with Jacobs Government Services Company (Jacobs) under Contract 140P2023D0006 in connection with Projects D3167666 NPS GRCA SOUTH RIM WWTP REPL. Jacobs subcontracted the hazardous materials investigation services for the proposed improvements at the South Rim Wastewater Treatment Plant Complex (South Rim WWTP) to CJSeto Support Services, LLC (CJSeto) under Task Order 148045100.

The hazardous materials investigation at the Grand Canyon South Rim Wastewater Treatment Plant Complex (South Rim WWTP) was performed on October 16 - 18, 2023. The hazardous materials investigations were performed by CJSeto personnel:

• Asbestos inspection and sampling; lead-based paint survey and sampling; PCB, and other hazardous materials investigations was performed by Kathryn DeCosta (Indiana Asbestos Inspector License #19A007726, expiration: 10/19/2024; Indiana Lead Inspector License # IND001636, expiration 11/27/2024).

• Lead-based paint sampling and survey was assisted by Gene Conway.

The South Rim WWTP is located approximately 0.5-mile south of the intersection of Well Road and West Rim Drive, in Grand Canyon National Park, Coconino County, Arizona and consists of three main buildings: the Operations/Admin Building, Pretreatment Building, and Reclamation Building, including an attached pipe gallery connecting the Operations Building to the Pretreatment Building adjacent to the aeration tanks. Other adjacent structures including concrete sludge drying beds, aeration tanks, flow equalization basins, clarifiers, seven (7) storage sheds, and six (6) Connex-shipping containers were also included in the scope of this investigation. As-built and other historical drawings indicate that the South Rim WWTP facility was constructed in the mid-70s, with renovations and additions in the 1980s. Building materials appeared homogenous throughout all three main buildings.

The inspections and surveys at the South Rim WWTP were performed as complete building inspections/surveys to include all reasonably accessible interior, exterior, and roof areas of all buildings. Confined spaces such as the interior of tanks and pits were not inspected except visually where possible. This investigation should not be considered the definitive source for the identification of all hazardous materials present at the sites. Materials are often hidden inside pipe chases, inside walls, above ceilings, and are sometimes not discovered until building demolition or renovation is underway. Destructive investigation was not performed during this investigation. The following areas were noted as inaccessible during this investigation:

• Attic spaces under pitched roofs of the Pretreatment and Reclamation BLDGs

• Wall cavity present in the southeast corner of the water lab

• Inside digester area of Pretreatment building

• Exhaust piping inside restroom of Control BLDG may be lined with suspect materials

• Did not inspect electrical system of the building – based on apparent age, it is possible that ACM components such as molded electrical base and arc insulators are present inside fuse/panel boxes and suspect cloth/woven-type wire insulation may be present inside conduit.

Sampling and Inspection Methodology and Inspection Objectives

Asbestos:

Asbestos inspection methodology included a thorough inspection of all reasonably accessible areas within the project scope to cover any suspect building materials that could be disturbed during demolition or renovation activities. Each suspect material identified during the inspection was assigned a Homogeneous Area (HA) number. Bulk samples of any suspect materials observed were collected for laboratory analysis. Asbestos Containing Material (ACM) is defined as a material containing greater than one percent asbestos content. Materials that could not be sampled because sampling would have caused permanent damage to the integrity or functionality of the material or associated component were assumed to contain asbestos. Sampling of assumed ACM must be performed to rebut the assumption. Sample locations and identified ACM locations are illustrated on drawings included in Attachment III.

Bulk samples of suspect materials collected during the inspection were submitted to EMSL Analytical, Inc. (EMSL) in Indianapolis, IN and were analyzed for asbestos using Polarized Light Microscopy (PLM) method EPA600/R-93/116. EMSL is accredited by the United States Department of Commerce, National Institute of Standards and Technology (NVLAP) for Asbestos Fiber Analysis for Bulk and Airborne asbestos analysis. Samples with an initial PLM result of <10% asbestos were point counted. Gravimetric reduction preparation was used for materials with tightly bound matrixes.

This asbestos inspection was performed in accordance with the United States Environmental Protection Agency’s (USEPA) Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP) – 40 CFR 61 Subpart M. Where applicable, it was also performed in accordance with: Occupational Safety and Health Administration’s (OSHA) Construction Industry Asbestos Standard – 29 CFR1926.1101; and with USEPA’s Asbestos Hazard Emergency Response Act (AHERA) – 40 CFR 763 Subpart E. This inspection meets the definition of a “thorough inspection” set forth by NESHAP as required for commercial buildings prior to intentional burning, building demolition, or renovation. NESHAP requires these inspections regardless of the age of the building.

Lead-based Paint:

The lead-based paint sampling survey methodology included a thorough survey of all painted surfaces within the project scope. A paint chip sample was collected from each different painted surface identified during the survey and then submitted for laboratory analysis. The objective of the survey was to identify all lead-based paint surfaces within the survey scope. Paint was sampled representatively and only one paint sample was collected for multiple locations where the paint was applied and appeared to be homogeneous.

Lead-based paint is defined as paint, varnish, shellac, or other surface coating that contains lead equal to or greater than 5,000 parts per million (ppm).

Paint chip samples collected during the survey were submitted to EMSL and were analyzed for lead in paint using Flame Atomic Absorption (FLAA) method SW 846 7000B. EMSL is accredited by the American Industrial Hygiene Association (AIHA) for lead laboratory services under strict chain of custody protocol.

Bulk paint chips sample of some painted surfaces could not be collected because paint was too thinly applied to collect a sample. These surfaces include factory applied finishes such as powder coats. These surfaces were sampled using 3M Lead-check Swabs that indicate the presence of lead in paint >600 ppm.

The lead-based paint sampling survey was performed in accordance with USEPA’s Lead-based Paint Hazards – 40CFR 745 Subpart D, with OSHA’s Construction Industry Lead Standard – 29 CFR 1926.62, and with the United States Consumer Product Safety Commission 1 CFR 1303.

PCBs and Other Hazardous Materials:

The field investigation for PCBs and other hazardous materials focused on the storage and condition of hazardous materials, universal wastes, radioactive sources, ozone depleting substances, and suspect equipment that could contain PCBs.

Asbestos Findings and Recommendations:

Table I included in Attachment I provides an inspection results summary for asbestos. The table describes all suspect materials identified and sampled during the inspection; provides material locations, quantities, and conditions; and defines the appropriate NESHAP Category of each ACM material identified.

The following ACM may remain in/on the building during demolition/renovation as long as the following apply: the materials to which ACMs are adhered (concrete/wood/metal) are not recycled/reclaimed; the ACMs are removed intact and are declared and disposed of at a construction and demolition (C&D) or asbestos landfill; and the materials are not subjected to cutting, grinding, scraping, abrading, sanding, burning (torch cutting), drilling or any other action that may render the materials friable or create resultant dust that may become airborne: Local and state regulations may require stricter protocols.

• Black tar sealant over flashing around roof penetrations on Control BLDG, Pretreatment BLDG, and Storage BLDG #6 – contains 2.5% Chrysotile asbestos.

The following ACM must be removed (abated) by properly licensed abatement personnel prior to demolition or renovation activities and may not be subjected to cutting, grinding, scraping, abrading, sanding, burning (torch cutting), drilling or any other action that may render the materials friable.

• Transite panels in Control BLDG: exhaust pipe housing in SE corner of restroom (floor to ceiling) and lining the inside of the fume hood along the south wall of the main lab – contains 20% Chrysotile asbestos

The following material contains trace amounts of asbestos (<1.0%) as verified by point count analysis: Because the asbestos content of this material is point count verified below 1%, it is, by definition, not ACM and is therefore exempt under EPA NESHAP regulations for removal by licensed personnel prior to demolition or renovation. Although this material is not classified as ACM and removal would not be classified under OSHA’s definitions of Class I or II asbestos removal, it is not an asbestos-free materials and OSHA’s Construction Industry Standard requires certain provisions for workers disturbing these materials. These provisions are cited in 29 CFR 1926.1101(g)(1)(ii) and (iii) and include proper training, wet methods, dust control measures, and prompt cleanup and disposal of waste in leak tight containers. Employers must ensure that the OSHA Permissible Exposure Levels (PEL) set forth in 29 CFR 1926.1101 are not exceeded.

• Gray flexible sealant around doorframes and lower masonry walls of Operations, Pretreatment, and Reclamation BLDGs

The follow material is assumed ACM and should either be sampled by destructive methods to rebut the assumption, or removed prior to demolition or renovation activities if they could become disturbed during such activities:

• Flexible HVAC duct joints in Control BLDG: basement and south storage room HVAC ductwork; Pretreatment BLDG: HVAC ductwork in blower room;

Reclamation BLDG: on HVAC ductwork

The following materials observed during the inspection were designated as non-suspect for asbestos by the AHERA accredited asbestos inspector. These materials do not contain asbestos:

• Black rubber foam pipe insulation throughout the facility

• Pink fiberglass batt insulation inside walls and above ceilings in attic spaces throughout the facility

• ISO and foam board insulation panels on roof of digester under EPDM rubber membrane

• Metal fire-rated doors containing white Styrofoam insulation

Lead-based Paint Findings and Recommendations:

Table II included in Attachment I provides a survey sampling results summary for paint. The table describes all paint color schemes, locations, laboratory results in ppm, and paint conditions.

Four (4) painted surfaces were identified as lead-based paint.

Peeling and flaking paint should be removed by properly trained and licensed lead abatement contractors. Lead-safe practices should be employed during demolition or renovation activities to ensure that permissible exposure levels (PELs) set forth by OSHA are not exceeded.

Though not paint, leaded pipe fittings in older cast iron drain piping were observed in the Control Building basement below the restroom.

PCBs and Other Hazardous Materials Findings

• All lighting appeared to be newer style LED lights. Though not observed or suspected to be present at the complex, fluorescent light bulbs can contain mercury vapors, these bulbs are identified with a circled “Hg” symbol. In addition, fluorescent lights have internal components, such as ballasts that can contain PCBs. Light housings were not disassembled to determine if ballasts were present. Non-PCB light ballasts are identified with a “No PCBs” sticker. Ballasts without this identification should be assumed to contain PCBs and properly disposed of as Toxic Substances Control Act (TSCA) waste.

• Though not observed, flow measuring equipment such as venturi meters and pressure gauges could contain elemental mercury.

• Radioactive sources: A total of (6) self-luminous exit signs were observed in the Control, Pretreatment, and Reclamation buildings. The U.S. Nuclear Regulatory Commission (NRC) requires that these exit signs are disposed of at licensed low-level radioactive waste disposal facility, or transferred to a specific NRC licensee such as a manufacturer or distributor of tritium exit signs. These signs cannot be disposal of as regular waste.

No other radioactive sources were identified – no ionization smoke detectors, or any kind of smoke/heat detectors were observed at the site.

• The following equipment should be investigated for oils that could potentially contain PCBs:

Forever-Lite Tritium gas self-luminous exit sign in Control BLDG

- Large green pad-mounted transformer on the northeast side of the site. Unit was live and secured during the investigation and the age of the unit could not be determined. Unit should be checked for “No PCBs” labeling on the inside.

- Pre-1979 oil reservoirs inside various air compressors, blower motors, and pumps throughout Control, Pretreatment, and Reclamation buildings.

• The South Rim WWTP complex contains multiple locations of various hazardous materials storage including sodium bisulfate solution, chlorine compressed gas cylinders, aluminum chlorohydrate polymer, and flammables storage. Some of these present a concern based on the condition of the storage areas:

1) Caustic Magnesium Hydroxide storage and residue on floor of Pretreatment BLDG:

Magnesium hydroxide storage and residue on floor in Pretreatment BLDG

Pad mounted transformer on northeast side of site

2) Sodium bisulfate solution storage and severely corroded ferrous components in the basement of the Reclamation building.

Basement of Reclamation BLDG: corrosion on metal electrical conduit

Basement of Reclamation BLDG: corrosion on metal electrical conduit

3) Mouse droppings and possible Hantavirus hazard in Storage BLDG#3:

Basement of Reclamation BLDG: sodium bisulfate storage and secondary containment

Mouse dropping in Storage Building #3, floor in back room

4) Corroded copper in Storage BLDG #7 (Sodium bisulfate storage)

Corroded copper line in Storage BLDG #7

Hazardous Materials Investigation Report Task Orders: 148022028, 148022029 El Portal and Tuolumne Meadows WWTPs 10/28/2021

Attachment I

Attachment I:

Asbestos and Paint Results Summary

Tables

HA# Sample ID Material Description Material Location(s) Sample Result Material Quantity Condition NESHAP Category

1 CONHA1-001, CONHA1-002 2'x4' ceiling panel, white w/ small gouges and pinholes Control BLDG: suspended ceiling in reception and hallway lab None Detected N/A N/A N/A

2 CONHA2-001, CONHA2-002 12"x12" floor tile, white w/ gray flecks Control BLDG: floors in reception, hallway lab, water lab, main lab, and lab #2 None Detected N/A N/A N/A

3 CONHA3-001, CONHA3-002 12"x12" floor tile, white w/ large gray flecks Control BLDG: floor in restroom None Detected N/A N/A N/A

4 CONHA4-001, CONHA4-002 Tan floor tile mastic Control BLDG: under HA3 floor tiles in restroom None Detected N/A N/A N/A

5 CONHA5-001, CONHA5-002 Brown-tan cove base mastic Control BLDG: behind rubber cove base in reception, restroom, and all lab areas None Detected N/A N/A N/A

6 CONHA6-001, CONHA6-002 Tan floor tile mastic Control BLDG: under HA2 floor tiles in reception, hallway lab, water lab, main lab, and lab #2 None Detected N/A N/A N/A

CONHA7-001, PREHA7-002,

EXTHA7-003, EXTHA7-004,

EXTHA7-005, EXTHA7-006,

EXTHA7-007, ST7HA7-008,

ST4HA7-009

Concrete Various concrete pads, sidewalks, buildings, and structures throughout complex

None Detected N/A N/A N/A

8 CONHA8-001, CONHA8-002 2'x4' ceiling panel, white w/ large irregular gouges Control BLDG: suspended ceilings in water lab, main lab, and lab# 2 None Detected N/A N/A N/A

9 CONHA9-001 Transite panel

Control BLDG: Exhaust pipe housing in SE corner of restroom (floor to ceiling) and lining the inside of the hood along the south wall of the main lab

20% Chrysotile 66 Sq. Ft. Intact - no damage observed Cat. II, Non-friable

10 CONHA10-001, CONHA10-002,

CONHA10-003 Plaster (Base coat and skim coat) Control BLDG: ceiling above suspended ceiling in water lab None Detected N/A N/A N/A

11 CONHA11-001, CONHA11-001 Black laboratory counter top Control BLDG: laboratory counter tops in main lab and lab #2 None Detected N/A N/A N/A

12 CONHA12-001, CONHA12-002 White sink undercoating Control BLDG: on underside of stainless sink in hallway lab None Detected N/A N/A N/A

13 CONHA13-001, CONHA13-002,

CONHA13-003 5/8" drywall composite

Control BLDG: ceiling above suspended ceiling in main lab and lab #2; ceiling in office, electrical room, and south storage room, ; enclosed area in SE corner of water lab

None Detected N/A N/A N/A

14 CONHA14-001 2'x4' ceiling panel, white with gouges and pinholes Control BLDG: (2) replacement panels in suspended ceiling in lab #2 None Detected N/A N/A N/A

15 CONHA15-001 2'x4' ceiling panel, white with fissure and pinholes Control BLDG: (1) replacement panel in suspended ceiling in main lab None Detected N/A N/A N/A

16 CONHA16-001, PREHA16-002 Corrugated paper inside metal fire doors Inside metal fire-rated doors of Control BLDG, Pretreatment BLDG, and Reclamation BLDG None Detected N/A N/A N/A

17 CONHA17-001, RECHA17-002,

PREHA17-003 Red CMU block Interior and exterior CMU walls on Control BLDG, Pretreatment BLDG, and Reclamation BLDG None Detected N/A N/A N/A

Table #I: Asbestos Inspection Results Summary, South Rim Wastewater Treatment Plant Complex

18 CONHA18-001, RECHA18-002,

PREHA18-003 CMU mortar Interior and exterior CMU walls on Control BLDG, Pretreatment BLDG, and Reclamation BLDG None Detected N/A N/A N/A

19 CONHA19-001, CONHA19-002 Gray structural asphalt roofing shingles Roof of Control BLDG None Detected N/A N/A N/A

20 CONHA20-001, CONHA20-002 Black roofing felt Roof of Control BLDG, under shingles None Detected N/A N/A N/A

21 CONHA21-001, CONHA21-002 Black ice/water shield Roof of Control BLDG, under shingles and roofing felt None Detected N/A N/A N/A

22 CONHA22-001, CONHA22-002 Black fibrous expansion joint sheeting Around exterior of Control BLDG, between building and sidewalks None Detected N/A N/A N/A

23 CONHA23-001, CONHA23-002 Gray HVAC sealant Over sheet metal joints on HVAC ductwork n

Control BLDG: basement HVAC and HVAC in south storage room

None Detected N/A N/A N/A

24 CONHA24-001, PREHA24-002,

RECHA24-003 Black flange gasket

Inside piping flanges for various piping throughout Control BLDG, Pretreatment BLDG, Reclamation

BLDG, and Pipe Gallery None Detected N/A N/A N/A

25 PREHA25-001, RECHA25-002 Green-gray structural asphalt roofing shingle Roof of Pretreatment and Reclamation BLDGs None Detected N/A N/A N/A

26 PREHA26-001, PREHA26-002 Black roofing felt Roof of Pretreatment BLDG, under HA25 shingles None Detected N/A N/A N/A

27 PREHA27-001, ST6HA27-002 Black tar sealant Over flashing around roof penetrations on

Control BLDG, Pretreatment BLDG, Storage

BLDG #6

2.5% Chrysotile 4 sq. ft. Intact - 5% damaged from weathering Cat. I, Non-friable

28 PREHA28-001, RECHA28-002 Black felt sheeting Behind exterior wood siding on Control BLDG, Pretreatment BLDG, and Reclamation BLDG None Detected N/A N/A N/A

29 PREHA29-001, PREHA29-002 Large flat gasket Pretreatment BLDG, on Spencer blower units in blower room None Detected N/A N/A N/A

30 PREHA30-001, CONHA30-002,

RECHA30-003 Light gray flexible sealant

Around doorframes and inside vertical wall joints of lower masonry walls on Control BLDG, Pretreatment BLDG, and Reclamation BLDG

TRACE: 0.5 - 0.9%

Chrysotile 150 LF

Intact - 10% damaged from UV/weathering

(oxidized) N/A

31 RECHA31-001, RECHA31-002 Brown and red asphalt roofing shingles Reclamation BLDG, under HA25 shingles None Detected N/A N/A N/A

32 RECHA32-001, RECHA32-002 Black roofing felt Reclamation BLDG, under HA25 and HA31 shingles None Detected N/A N/A N/A

33 EXTHA33-001, EXTHA33-002,

EXTHA33-003, EXTHA33-004 Asphalt/blacktop Paved access roads and walkways throughout complex None Detected N/A N/A N/A

34 EXTHA34-001, EXTHA34-002 Thick yellow coating/liner Lining primary and secondary clarifiers and all five

(5) aeration tanks None Detected N/A N/A N/A

35 EXTHA35-001, EXTHA35-002 Textured anti-slip coating On metal catwalks over clarifiers and aeration tanks, concrete walkway above Pipe Gallery None Detected N/A N/A N/A

36 RECHA36-001, PREHA36-002 Mortar

In between masonry blocks on parapet wall above digester on Pretreatment BLDG; masonry block cap along lower exterior walls of Control BLDG, Pretreatment BLDG, and Reclamation BLDG

None Detected N/A N/A N/A

37 ST1HA37-001, ST1HA37-002 5/8" drywall composite (drywall, tape, and mud) Interior walls of Storage BLDG #1 None Detected N/A N/A N/A 38 ST1HA38-001, ST1HA38-002 Green 3-tab asphalt roofing shingle Roof of Storage BLDG #1 None Detected N/A N/A N/A

39 ST1HA39-001, ST3HA39-002,

ST5HA39-003 Black roofing felt Roof of Storage BLDGs #1 under HA 38 shingles, Storage BLDGs #3 and 5 under HA48 shingles None Detected N/A N/A N/A

40 ST2HA40-001, ST2HA40-002 Reddish brown structural asphalt roofing shingles Roof of Storage BLDG #2 None Detected N/A N/A N/A

41 ST2HA41-001, ST2HA41-002 Gray asphalt roofing shingles Roof of Storage BLDG #2, under HA40 shingles None Detected N/A N/A N/A

42 ST2HA42-001, ST6HA42-002 Thick black roofing felt Roof of Storage BLDG# 2 under HA40 and HA41 shingles; Storage BLDG# 6 under HA51 shingles None Detected N/A N/A N/A

43 ST2HA43-001, ST5HA43-002 Brown particle board siding Siding on Storage BLDGs #2, 3, 5, and 6 None Detected N/A N/A N/A

44 ST3HA44-001, ST3HA44-002 Linoleum, white squares pattern Storage BLDG #3, floor in main room None Detected N/A N/A N/A

45 ST3HA45-001, ST3HA45-002 Linoleum, white and green diamond pattern Storage BLDG #3, floor in back room None Detected N/A N/A N/A

46 ST3HA46-001, ST3HA46-002 Linoleum, white diamond pattern Storage BLDG #3, floor in back room (patched area) None Detected N/A N/A N/A

47 ST3HA47-001, ST3HA47-002 5/8" drywall composite (drywall, tape, and mud) Storage BLDG #3 interior walls and ceilings in all rooms None Detected N/A N/A N/A

48 ST3HA48-001, ST3HA48-002 Gray 3-tab asphalt roofing shingles Roof of Storage BLDGs #3 and 5 None Detected N/A N/A N/A

49 ST7HA49-001, ST7HA49-002 White flexible sealant Chemical Storage BLDG #7, interior and exterior around louvers and walls joints None Detected N/A N/A N/A

50 ST5HA50-001, ST5HA50-002 Brown asphalt roofing shingles Storage BLDG# 5, under HA48 roofing shingles None Detected N/A N/A N/A

51 ST6HA51-001, ST6HA51-002 Green structural asphalt roofing shingles Roof of Storage BLDG #6 None Detected N/A N/A N/A

52 N/A Flexible HVAC duct joints

Control BLDG: basement and south storage room HVAC ductwork; Pretreatment BLDG:

HVAC ductwork in blower room; Reclamation BLDG: on HVAC ductwork

Assumed ACM Five (5) duct joints Intact - no damage observed

Cat. II, Non-friable

Sample ID Paint Description Paint Location(s) Sample Result (ppm) Condition

CONLBP-1 Gray paint Control BLDG: concrete floor in basement, concrete stairwell <80 Intact

CONLBP-2 Tan over off-white paint Control BLDG: interior masonry walls in restroom, water lab, hallway lab and west wall of north office <180 Intact

CONLBP-3 Orange over blue paint Control BLDG: metal doorframes <190 Intact

CONLBP-4 Seafoam green paint Control BLDG: ceiling joists and decking above suspended ceilings in reception area, hallway lab, and water lab; concrete floor under floor tiles in reception area

22,000 Intact

CONLBP-5 Blue over off-white paint Control BLDG: metal doors and doorframes <200 Intact

CONLBP-6 Off-white paint Control BLDG: Interior masonry walls in reception, south storage room office, electrical room, main lab, lab #2; ceilings in office, electrical room and south storage room <86 Intact

CONLBP-7 Yellow over brown over green Control BLDG: metal handrail for basement stairwell 1,700 Intact CONLBP-8 Brown over red paint Control BLDG: exterior metal entry doors 730 Peeling

CONLBP-9 Royal blue paint On piping and pipe fittings and valves in Control BLDG, Pretreatment BLDG, and Reclamation BLDG 870 Intact

CONLBP-10 Cream over gray paint Control BLDG: basement walls and ceiling and underside of concrete stairwell; walls of stairwell <80 Peeling

CONLBP-11 Brown paint Exterior wood siding on Control BLDG, Pretreatment BLDG, and Reclamation BLDG <80 Peeling

CONLBP-12 Green paint Guttering and downspouts on Control BLDG, Pretreatment BLDG, and Reclamation BLDG

<600 ppm (Lead Check Swab)

Intact

CONLBP-13 Green over brown paint Exterior wood trim around doors, windows, and vents on Control BLDG, Pretreatment BLDG, and Reclamation BLDG <140 Peeling

CONLBP-14 Yellow paint Edges of concrete steps around outside of Control BLDG, on bollards, and guardrails above pipe gallery; Storage BLDG# 1 floor in front of flammables storage

<80 Flaking

PRELBP-1 Brown over black paint Waste digester sludge piping in Pretreatment BLD basement and through Pipe Gallery <80 Peeling

PRELBP-2 Tan over green paint Pretreatment BLDG: metal flashing and fascia on exterior around roof <80 Peeling

Table #II : Lead in Paint Results, South Rim WWTP Complex

PRELBP-3 Gray paint over red primer Pretreatment BLDG: Spencer blowers and metal bases in blower room 540 Intact

PRELBP-4 Green over black paint Pretreatment BLDG and Pipe Gallery: metal air supply (grit air, HP air, aeration basin air) piping 25,000 Intact

PRELBP-5 Off-white paint Pretreatment BLDG: walls in electrical room and blower room;

Reclamation BLDG: Upper CMU walls in filter and storage rooms, all walls in alum room

<80 Intact

PRELBP-6 Tan over black paint

Control BLDG: RAS/WAS piping in basement; Pretreatment BLDG:

Clar.1 and Clarifier 2. WAS piping in blower room and basement;

Pipe Gallery: WAS and WRP Sludge piping; Reclamation BLDG:

BW recycle and waste piping in basement

<80 Intact

PRELBP-7 Gray over black paint Pretreatment BLDG: on Grit piping in blower room and basement;

Pipe Gallery: aeration basin drain piping <80 Intact

PRELBP-8 Gray paint Pretreatment BDG: concrete floor in basement; Reclamation BLDG:

concrete floors in basement and main level <130 Intact

PRELBP-9 Brown paint Pretreatment BDG: exterior roll-up door and door frame <130 Intact PRELBP-10 Brown over yellow paint Pretreatment BDG: metal handrails on north dock <80 Peeling

RECLBP-1 Yellow paint Overhead railing for hoists in Pretreatment blower room and Reclamation building filter room 46,000 Intact

RECLBP-2 Pale green over black paint Reclamation BLDG: blind flange and piping on piping penetrating floor in filter room <80 Peeling

RECLBP-3 Light gray paint Reclamation BLDG: aluminum catwalk over filter pits, metal entry stair and stairwell to basement 290 Intact

RECLBP-4 Dark tan paint Reclamation BLDG: lower CMU walls in filter room, stairwell, and storage room <80 Intact

RECLBP-5 Brown over tan over black paint Reclamation BLDG: catwalk and railing over filter tanks on east exterior <80 Intact

RECLBP-6 Purple over green over black Reclamation BLDG: effluent and backwash supply piping in basement 2,000 Peeling

RECLBP-7 Dark green over tan paint Reclamation BLDG: secondary effluent piping in basement 140 Intact

RECLBP-8 Off-white paint HVAC ductwork in Control BLDG (storage room and basement), Pretreatment BLDG, and Reclamation BLDG (filter room) 110 Intact

RECLBP-9 Yellow paint On edges of raised concrete curbing/equipment pads on main level and basement, floor in storage/electrical room <80 Intact

RECLBP-10 Green over tan paint Reclamation BLDG: metal flashing and fascia on exterior around roof <87 Peeling

EXTLBP-1 Thick pale yellow paint Lining primary and secondary clarifiers and all five (5) aeration tanks <80 Intact

EXTLBP-2 Brown over green over tan Handrails for primary and secondary clarifiers, aeration tanks, and stair to the east of the Control BLDG <80 Intact

EXTLBP-3 Brown textured paint Catwalks and walkways above primary and secondary clarifiers, aeration tanks, and walkway above pipe gallery <80 Intact

EXTLBP-4 Teal green over black paint Piping by flow equalization basin and above aeration tanks 12,000 Peeling

EXTLBP-5 Green over brown over tan paint Handrail around flow equalization basin 150 Intact

EXTLBP-6 Green over gray paint Pumps and belt housing above filter pits by reclamation BLDG and above aeration tanks 1,200 Intact

EXTLBP-7 Brown over gray paint Three (3) Conex shipping containers on the southeast side of the site <80 Intact

EXTLBP-8 White paint One (1) portable chemical storage container on the southeast side of the site <80 Intact

EXTLBP-9 White paint Three (3) portable chemical storage containers on the southeast side of the site <110 Intact

ST1LBP-1 Cream paint Storage BLDG #1, interior walls (drywall) <80 Intact ST2LBP-1 Beige paint Storage BLDG #2, exterior walls <80 Peeling

ST2LBP-2 Brown paint Storage BLDG #2 wood railing and deck; wood railing and walkway on west side of site <80 Peeling

ST3LBP-1 White paint Storage BLDG #3, interior walls and ceiling (drywall) 350 Intact ST3LBP-2 Light blue paint Storage BLDG #3, interior wall of main room Insufficient paint Intact ST3LBP-3 Green over gray paint Exterior wood trim on Storage BLDGs #1, 3, 5, and 6 <80 Peeling

ST4LBP-1 Green paint Storage BLDG#4: structural metal supports on interior; Storage BLDG#7 concrete roof <360 Intact

ST4LBP-2 Gray paint Wood floors in Storage BLDGs #1, 5, and 6 <80 Intact ST5LBP-1 Brown over beige paint Exterior wood siding on Storage BLDGs #1, 3, 5, and 6 <110 Peeling ST7LBP-1 Reddish brown paint Exterior concrete walls of concrete Storage BLDG #7 <110 Flaking ST7LBP-2 Gray paint Interior concrete walls of Storage BLDG #7 <210 Intact

Attachment II

Attachment II:

Photographs

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA1 – (2'x4' ceiling panel, white w/ small gouges and pinholes)

Does not contain asbestos (Control BLDG: ceiling in reception)

HA2 – (12"x12" floor tile, white w/ gray flecks)

(Control BLDG: reception floor)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA3 – (12"x12" floor tile, white w/ large gray flecks)

(Control BLDG: restroom floor)

HA4 – (Tan floor tile mastic)

(Control BLDG: restroom floor)

HA5 – (Brown-tan cove base mastic)

(Control BLDG: restroom)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA6 – (Tan floor tile mastic)

(Control BLDG: reception floor under HA2 floor tiles)

HA7 – (Concrete)

(Pretreatment BLDG: Parapet wall above digester)

HA36 – (Mortar)

(Pretreatment BLDG: Parapet wall above digester)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

(Chemical Storage BLDG #7: concrete exterior walls)

(Pretreatment BLDG: blower room floor)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA8 – (2'x4' ceiling panel, white w/ large irregular gouges)

(Control BLDG: ceiling in main lab)

(Flow equalization basin)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA9 – (Transite panel) Contains asbestos (20% Chrysotile)

(Control BLDG: exhaust housing in restroom)

HA9 – (Transite panel) Contains asbestos (20% Chrysotile)

(Control BLDG: inside fume hood in main lab)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA10 – (Plaster)

(Control BLDG: ceiling in water lab above suspended ceiling)

HA11 – (Black laboratory counter top)

(Control BLDG: main lab)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA12 – (White sink undercoating)

(Control BLDG: hallway lab)

HA13 – (5/8” drywall composite)

(Control BLDG: main lab ceiling above suspended ceiling)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA14 – (2'x4' ceiling panel, white with gouges and pinholes)

(Control BLDG: lab #2 suspended ceiling)

HA15 – (2'x4' ceiling panel, white with fissure and pinholes)

(Control BLDG: main lab suspended ceiling)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA16 – (Corrugated paper inside metal fire doors)

(Control BLDG: inside door to water lab)

HA17 – (Red CMU block)

(Reclamation BLDG: exterior)

HA18 – (CMU mortar)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA22 – (Black fibrous expansion joint sheeting)

(Operations BLDG: west exterior)

HA19 – (Gray structural asphalt roofing shingles)

HA20 – (Black roofing felt) HA21 – (Black ice and water shield)

Does not contain asbestos (Control BLDG: roof, HAs 20 and 21 not shown, present under HA19 shingles)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA23 – (Gray HVAC sealant)

(Operations BLDG: basement HVAC ductwork)

HA24 – (Black flange gasket)

(Operations BLDG: basement pipe flange)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA27 – (Black tar sealant) Contains asbestos (2.5% Chrysotile)

(Pretreatment BLDG: roof around flashing for roof vent)

HA25 – (Green-gray structural asphalt roofing shingles)

(Pretreatment BLDG: roof)

HA26 – (Black roofing felt) (Pretreatment BLDG: roof under HA25 shingles)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA28 – (Black felt sheeting)

(Reclamation BLDG: under exterior wood siding)

HA29 – (Large flat gasket)

(Pretreatment BLDG: Spencer blower unit in blower room)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA30 – (Light gray flexible sealant) Contains TRACE asbestos (0.5 – 0.9% Chrysotile)

(Reclamation BLDG: lower exterior masonry walls)

HA31 – (Brown and red asphalt roofing shingles) (Reclamation BLDG: roof under HA25 shingles)

HA32 – (Black roofing felt) (Reclamation BLDG: roof under HA25 and HA31 shingles)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA33 – (Asphalt/blacktop)

(Access road within complex)

HA34 – (Thick yellow coating/liner)

(View of concrete edging on primary clarifier)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA34 – (Thick yellow coating/liner)

(View of inside of primary clarifier)

HA35 – (Textured anti-slip coating)

(View of walkway above Pipe Gallery/aeration tanks)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA36 – (Mortar)

(Control BLDG: lower exterior masonry wall)

HA37 – (5/8” drywall composite)

(Storage BLDG #1: interior walls)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA38 – (Green 3-tab shingles)

(Storage BLDG #1: roof)

HA39 – (Black roofing felt)

(Storage BLDG #1: roof, under HA38 shingles)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA40 – (Reddish brown structural asphalt roofing shingles)

(Storage BLDG #2: roof)

HA41 – (Gray asphalt roofing shingles)

(Storage BLDG #2: roof, under HA40 shingles)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA42 – (Thick black roofing felt)

(Storage BLDG #2: roof, under HA40 and HA41 shingles)

HA43 – (Brown particle board siding)

(Storage BLDG #2: exterior siding)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA44 – (Linoleum, white squares pattern)

(Storage BLDG #3: floor of main room)

HA45 – (Linoleum, white and green diamond pattern)

(Storage BLDG #3: floor of back room)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA46 – (Linoleum, white diamond pattern)

(Storage BLDG #3: floor of back room, patched area)

HA47 – (5/8” drywall composite)

(Storage BLDG #3: wall of main room)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA48 – (Gray 3-tab asphalt roofing shingles)

(Storage BLDG #3: roof)

HA49 – (White flexible sealant)

(Storage BLDG #7: interior)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA50 – (Brown asphalt roofing shingles)

(Storage BLDG #5: roof under HA48 shingles)

HA51 – (Green structural asphalt roofing shingles)

(Storage BLDG #6: roof)

Attachment II Asbestos Inspection Photographs – South Rim WWTP Complex

HA52 – (Flexible duct joints) Assumed to contain asbestos

(Control BLDG: south storage room HVAC ductwork)

Example photo of oven in lab in Control BLDG, lining and gaskets are suspect for asbestos

Attachment II Lead Survey Photographs – South Rim WWTP Complex

CONLBP-2

Does NOT contain lead-based paint

(Control BLDG: hallway lab)

CONLBP-1

(Basement floor of Control BLDG)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

CONLBP-3

(Control BLDG: reception)

CONLBP-4

Contains lead-based paint

(Control BLDG: reception above suspended ceiling)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

CONLBP-5

(Control BLDG: doorway into electrical room)

CONLBP-6

(Control BLDG: Electrical room)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

CONLBP-7

(Control BLDG: basement stairwell)

CONLBP-8

(Control BLDG: west exit door)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

CONLBP-9

(Control BLDG: basement)

CONLBP-10

(Control BLDG: basement ceiling)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

CONLBP-11

(Control BLDG: exterior wall)

CONLBP-13

(Control BLDG: exterior wall)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

CONLBP-12

(Control BLDG: guttering)

CONLBP-14

(Control BLDG: entry to south storage room)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

PRELBP-2

(Pretreatment BLDG: fascia trim on roof by digester)

PRELBP-1

(Pretreatment BLDG: “waste digester sludge” piping in basement)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

PRELBP-3

(Pretreatment BLDG: Spencer blowers in blower room)

PRELBP-4

(Pretreatment BLDG: blower room )

Attachment II Lead Survey Photographs – South Rim WWTP Complex

PRELBP-5

(Pretreatment BLDG: electrical room)

PRELBP-6

(Pipe Gallery)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

PRELBP-7

(Pretreatment BLDG: Blower room)

PRELBP-8

(Pretreatment BLDG: basement floor)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

PRELBP-9

(Pretreatment BLDG: exterior roll-up door)

PRELBP-10

(Pretreatment BLDG: Exterior metal handrails on dock)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

RECLBP-1

(Reclamation BLDG: railing for overhead hoist)

RECLBP-2

(Reclamation BLDG: Piping in filter room)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

RECLBP-3

(Reclamation BLDG: catwalk over filter pits)

RECLBP-4

(Reclamation BLDG: walls in filter room)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

RECLBP-5

(Reclamation BLDG: catwalk over tanks on north exterior)

RECLBP-6

(Reclamation BLDG: basement)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

RECLBP-7

(Reclamation BLDG: basement)

RECLBP-8

(Pretreatment BLDG: HVAC ductwork )

Attachment II Lead Survey Photographs – South Rim WWTP Complex

RECLBP-9

(Reclamation BLDG: basement equipment pads)

RECLBP-10

Attachment II Lead Survey Photographs – South Rim WWTP Complex

EXTLBP-1

(Primary clarifier)

EXTLBP-2

(Catwalk above secondary clarifier)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

EXTLBP-3

(Catwalk above secondary clarifier)

EXTLBP-4

(Piping by flow equalization basin)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

EXTLBP-5

(Handrail around flow equalization basin)

EXTLBP-6

(Pump housing above filter pits above filter pits by Reclamation BLDG)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

EXTLBP-7

(Conex shipping container)

EXTLBP-8

(Portable chemical storage container)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

EXTLBP-9

(Portable chemical storage containers)

ST1LBP-1

(Storage BLDG#1: interior walls)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

ST2LBP-1

(Exterior wall of Storage BLDG #2)

ST2LBP-2

(Deck/railing on Storage BLDG #2)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

ST3LBP-2

Insufficient paint

(Storage BLDG #3: interior wall)

ST3LBP-1

(Storage BLDG #3: interior walls/ceiling)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

ST3LBP-3

(Storage BLDG #3: exterior)

ST4LBP-1

(Storage BLDG #4: interior)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

ST4LBP-2

(Storage BLDG #6: interior floor)

ST5LBP-1

(Storage BLDG #6: exterior wall)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

ST7LBP-1

(Storage BLDG #7: exterior concrete wall)

ST7LBP-2

(Storage BLDG #7: interior wall/ceiling)

Attachment II Lead Survey Photographs – South Rim WWTP Complex

Leaded pipe fittings in Control BLDG basement

Attachment III

Attachment III:

Floor Plan Drawings with ACM and

Sample Locations Identified

Site Map: Grand Canyon South Rim Wastewater Treatment Plant

1 - Operations/Admin Building

2 - Pretreatment/Digester/Blower Building

3 - Pipe Gallery

4 - Reclamation Building

5 - Sludge drying beds

6 - Flow equalization basin

7 7 - Aeration tanks 1-5

8 - Clarifiers 1 and 2

9 - Storage Building #1

10 - Storage Building #2

11 - Storage Building #3

12 - Storage Building #4

13 - Storage Building #5

14 - Storage Building #6

15 - Storage Building #7

16 - Chemical storage containers #1-3

17 - Chemical storage container #4

18 - Conex storage container #1

18 19

19 - Conex storage container #2

20 - Conex storage container #3

21 - Portable toilet storage lot

Legend

Note: All sampling locations are approximate, building floor plan not to scale.

CONHA1-001

HA9 – Transite panels (20% Chrysotile)

CONHA1-002

CONHA2-001

CONHA6-001

CONHA2-002

CONHA6-002

Main Lab

South Storage Room

Lab #2

Restroom

Water Lab

Hallway lab

Reception

Electrical Room

Office

Down

Stariwell

CONHA3-002

CONHA4-002

CONHA3-001

CONHA4-001CONHA5-001

CONHA5-002

CONHA7-001

CONHA8-001

CONHA8-002

CONHA9-001

CONHA10-001

CONHA10-002

CONHA10-003

CONHA11-002

CONHA11-001

CONHA12-001

CONHA12-002

CONHA13-001

CONHA13-002

CONHA13-003

CONHA14-001

CONHA15-001

CONHA16-001

CONHA17-001

CONHA18-001

CONHA23-002

CONHA30-002

Legend

Contains Asbestos (ACM)

Contains Trace Asbestos

Does Not Contain Asbestos or Lead-based Paint

Contains Lead-based Paint

Asbestos and Lead Sample Locations – Control Building Main Level

CONLBP-2

CONLBP-3

CONLBP-4

CONLBP-5

CONLBP-6

CONLBP-8

CONLBP-11

CONLBP-13

CONLBP-12

CONLBP-14

HA52 – Black flexible duct joints (Assumed ACM)

CONHA23-001

HA52 – Black flexible duct joints (Assumed ACM)

CONHA24-001

Asbestos and Lead Sample Locations – Control Building Basement

Legend

Contains Asbestos (ACM)

Contains Trace Asbestos

CONLBP-7

CONLBP-9

CONLBP-10

PREHA7-002

(Parapet wall)

PREHA16-002

PREHA17-002

PREHA18-002

PREHA29-002

PREHA29-001

PREHA30-001

Digester (No Access)

Electrical Room

Blower Room

Pretreatment Room

Asbestos and Lead Sample Locations – Pretreatment Building Main Level

Legend

Contains Asbestos (ACM)

Contains Trace Asbestos

PREHA36-002

(Parapet wall)

PRELBP-3

PRELBP-4

PRELBP-5

PRELBP-6

PRELBP-7

PRELBP-9

Pretreatment Basement

Pipe Gallery

Note: All sampling locations are approximate, building floor plan not to scale.

PREHA24-002

Asbestos and Lead Sample Locations – Pretreatment Building Basement

Legend

Contains Asbestos (ACM)

Contains Trace Asbestos

PRELBP-1

PRELBP-8

RECHA36-001

Filter Room

Chlorine Room Filter PitFilter Pit

Filter Pit Filter Pit

Storage/Electrical Room

Treatment Room

RECHA17-002

RECHA18-002

RECHA30-003

Legend

Contains Asbestos (ACM)

Contains Trace Asbestos

Asbestos and Lead Sample Locations – Reclamation Building Main Level

RECLBP-1

RECLBP-2

RECLBP-3

RECLBP-4

RECLBP-8

RECHA24-003

Contains Asbestos (ACM)

Contains Trace Asbestos

Asbestos and Lead Sample Locations – Reclamation Building Basement

RECLBP-6

RECLBP-7

RECLBP-9

Note: All sampling locations are approximate.

EXTHA7-003

Legend

Contains Asbestos (ACM)

Contains Trace Asbestos

Sampling Locations for Suspect Asbestos Containing Materials (ACM) – Exterior and Site Wide

EXTHA7-004

EXTHA7-005

EXTHA7-006

EXTHA7-007

ST7HA7-008

ST4HA7-009

CONHA20-002

CONHA21-002

CONHA19-002

CONHA20-001

CONHA21-001

CONHA19-001

CONHA22-001

CONHA22-002

PREHA25-001

PREHA26-001

PREHA26-002

RECHA25-002

PREHA27-001

ST6HA27-002

PREHA28-001

RECHA28-002

Roof

RECHA31-002

RECHA31-001

RECHA32-002

RECHA32-001

Roof

Roof

EXTHA33-001

EXTHA33-002

EXTHA33-003

EXTHA33-004

EXTHA34-001

EXTHA34-002

EXTHA35-001

EXTHA35-002

PRELBP-2

PRELBP-10

RECLBP-5

RECLBP-10

EXTLBP-1

EXTLBP-3

EXTLBP-2

EXTLBP-4

EXTLBP-5

EXTLBP-6

EXTLBP-7

EXTLBP-8

EXTLBP-9

Contains Asbestos (ACM)

Contains Trace Asbestos

Asbestos and Lead Sample Locations – Storage Buildings #1, 2, and 3

Contains Asbestos (ACM)

Contains Trace Asbestos building floor plans not to scale.

Storage BLDG #1 Storage BLDG #2

Storage BLDG #3

Main Room

Back Room

ST1HA37-001

ST1HA37-002

ST1HA38-001

ST1HA38-002

Roof

ST1HA39-001

Roof

ST3HA39-002Roof

ST2HA40-002

ST2HA40-001

ST2HA41-001

ST2HA41-002

ST2HA42-001

ST2HA40-001

ST2HA43-001

ST3HA44-002

ST3HA44-001

ST3HA45-001

ST3HA45-002

ST3HA46-001

ST3HA46-002

ST3HA47-001

ST3HA47-002

ST3HA48-001

ST1LBP-1

ST2LBP-1

ST2LBP-2

ST3LBP-1

ST3LBP-2

ST3LBP-3

Storage BLDG #4

Storage BLDG #5

Note: All sampling locations are approximate, building floor plans not to scale.

Asbestos and Lead Sample Locations –Storage Buildings #4, 5, 6, and 7

Legend

Contains Asbestos (ACM)

Contains Trace Asbestos

Storage BLDG #6

Roof

ST5HA39-003

Roof

ST6HA42-002

ST5HA43-002

ST3HA48-002

Storage BLDG #7

ST7HA49-001

ST7HA49-002

ST5HA50-002

ST5HA50-001

ST6HA51-001

ST6HA51-002

ST6HA27-002

ST4LBP-1

ST4LBP-2

ST5LBP-1

ST7LBP-1

ST7LBP-2

Attachment IV

Attachment IV:

Analytical Laboratory Results

EMSL Analytical, Inc.

6340 CastlePlace Dr. Indianapolis, IN 46250

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162324743EMSL Order:

Customer ID: 32CJSS78A

Customer PO:

Project ID:

Attention: Phone:Kaylee DeCosta (930) 350-0400

Fax:CJ Seto Support Services LLC

Received Date:13980 E. CAPT WJ Nelson Dr 10/20/2023 10:10 AM

Analysis Date:Odon, IN 47562 10/27/2023

Collected Date:

Project: GC South Rim WWTP.2910.ASB

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous Non-Asbestos Asbestos

% Type

CONHA1-001

162324743-0001

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

60%

20%

Gray/White

Fibrous

Homogeneous

Control Building -

Sus. Ceiling -

Reception/Office -

2'x4' Ceiling Panel -

White with Small

Gouges and Pinholes

HA: 1

CONHA1-002

162324743-0002

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

60%

20%

Gray/White

Fibrous

Homogeneous

Control Building -

Sus. Ceiling --

Hallway Lab - 2'x4'

Ceiling Panel - White with Small Gouges and Pinholes

HA: 1

CONHA2-001

162324743-0003

None DetectedNon-fibrous (Other)100%Gray/White

Non-Fibrous

Homogeneous

Control Building -

Floor in

Reception/Office -

12"x12" Floor Tile -

White with Gray

Flecks

HA: 2

CONHA2-002

162324743-0004

None DetectedNon-fibrous (Other)100%Gray/White

Non-Fibrous

Homogeneous

Control Building -

Floor in Main Lab -

12"x12" Floor Tile -

White with Gray

Flecks

HA: 2

CONHA3-001

162324743-0005

None DetectedNon-fibrous (Other)100%Gray/White

Non-Fibrous

Homogeneous

Control Building -

Floor in Restroom -

12"x12" Floor Tile -

White with Large

Gray Flecks

HA: 3

CONHA3-002

162324743-0006

None DetectedNon-fibrous (Other)100%Gray/White

Non-Fibrous

Homogeneous

Control Building -

Floor in Restroom -

12"x12" Floor Tile -

White with Large

Gray Flecks

HA: 3

CONHA4-001

162324743-0007

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Control Building -

Floor in Restroom -

Under hA3 FT - Tan

Floor Tile Mastic

HA: 4

CONHA4-002

162324743-0008

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Control Building -

Floor in Restroom -

Under hA3 FT - Tan

Floor Tile Mastic

HA: 4

Initial report from: 10/27/2023 17:05:10

Page 1 of 11ASB_PLM_0008_0001 - 1.78 Printed: 10/27/2023 5:05 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162324743EMSL Order:

Customer ID: 32CJSS78A

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous Non-Asbestos Asbestos

% Type

CONHA5-001

162324743-0009

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Control Building -

Behind Rubber Cove

Base in Restroom -

Brown-tan Cove Base

Mastic

HA: 5

CONHA5-002

162324743-0010

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Control Building -

Behind Rubber Cove

Base in Main Lab -

Brown-tan Cove Base

Mastic

HA: 5

CONHA6-001

162324743-0011

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Control Building -

Floor in

Reception/Office -

Under HA2 FT - Tan

Floor Tile Mastic

HA: 6

CONHA6-002

162324743-0012

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Control Building -

Floor in Main Lab -

Under HA2 FT - Tan

Floor Tile Mastic

HA: 6

CONHA7-001

162324743-0013

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Control Building -

Concrete

HA: 7

PREHA7-002

162324743-0014

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Digester Building -

Parapet Wall Roof -

Concrete

HA: 7

EXTHA7-003

162324743-0015

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Cpncrete Pad -

Portable Toilet

Storage - Concrete

HA: 7

EXTHA7-004

162324743-0016

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Sludge Drying Beds -

Concrete

HA: 7

EXTHA7-005

162324743-0017

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Flow Equalization

Tank - Concrete

HA: 7

EXTHA7-006

162324743-0018

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fibrous

Homogeneous

Clarifier Tank -

Concrete

HA: 7

EXTHA7-007

162324743-0019

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Gray

Non-Fib…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .