B08 140P5121Q0032 Attach 004 PPQ TUIN CCS.pdf
PDF 175 KB Posted
- Attached to
- Conduct a Multi-Park Collection Condition Survey Federal contract opportunity
- Solicitation number
- 140P5121Q0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5121Q0032_Amd_0004.pdf | ||
| B08 140P5121Q0032 Attach 0009 TUAI CR NON-PAPER OBJECT_0003.xlsx | XLSX spreadsheet | |
| B08 140P5121Q0032 Attach 0006 PPQ TUIN CCS_0003.pdf | ||
| Sol_140P5121Q0032_Amd_0003.pdf | ||
| B08 140P5121Q0032 Attach 0010 SEMO CR NON-PAPER OBJECTS_0003.xlsx | XLSX spreadsheet | |
| B08 140P5121Q0032 Attach 0008 TUIN NH NON-PAPER OBJECTS_0003.xlsx | XLSX spreadsheet | |
| B08 140P5121Q0032 Attach 0007 TUIN CR NON-PAPER OBJECTS_0003.xlsx | XLSX spreadsheet | |
| Sol_140P5121Q0032_Amd_0002.pdf | ||
| Sol_140P5121Q0032_Amd_0001.pdf | ||
| Attachment 0005-Site Visit InformationCCS_0001.pdf | ||
| B08 140P5121Q0032 Attach 003 Price Schedule TUIN CCS.pdf | ||
| Sol_140P5121Q0032.pdf | ||
| B03 140P5121Q0032 WDOL WD TUIN CCS.pdf | ||
| A04 0040529788 SOW TUIN CCS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 140P5121Q0032
PAST PERFORMANCE QUESTIONNAIRE
Solicitation#140P5121Q0032 Please complete this Questionnaire and Submit with your Quote
We are currently in the process of preparing our proposal for the National Park Service, Interior Region 2 South Atlantic Gulf, Solicitation Number: 140P5121Q0032 to Conduct a multi-park collection condition survey for Tuskegee Institute National Historic Site, Tuskegee Airmen National Historic Site, and the Selma to Montgomery National Historic Trail for Tuskegee Institute National Historic Site, Tuskegee Airmen National Historic Site, and the Selma to Montgomery National Historic Trail. As part of our quote, we have listed you as a reference on our performance for this type of service with your agency under the previous/current contract listed below. Your input on our performance is therefore requested.
Please complete this Questionnaire and submit with your quote
Questionnaire is due to prior to the closing of RFQ #140P5121Q0032.
Alternate POC name:
Alternate POC phone number:
Alternate POC e-mail address:
Thank you.
NAME OF OFFEROR:
Phone: ________________________ Fax: _____________________
E-Mail: _______________________
I. Current or Historical Contract Information
CONTRACT REFERENCED:
1. Contract or Identifying Number:
2. Contract Value:
3. Period of Performance:
4. Brief description of items provided:
5. Name of Person Completing Questionnaire:
Agency/Company:
Title: Phone:
E-mail:
mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20edward_dingle@nps.gov mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20Contracting%20Officer,%20e-mail:%20edward_dingle@nps.gov
II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.
Evaluation Definitions –
The following definitions should be used in the assessment of Contractor performance.
EXCEPTIONAL
Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.
VERY GOOD
Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.
SATISFACTORY
Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.
MARGINAL
Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.
UNSATISFACTORY
Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.
NOT APPLICABLE (N/A) Performance information not recent or relevant as defined in the Solicitation. Unable to provide assessment.
Past Performance Evaluation
Question 1. Performance
What is your assessment of the Contractor’s ability to meet your requirements?
Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A
Performance
Comments, if any.
Questions 2 and 3. Timeliness
What is your assessment of the Contractor’s ability to provide products in a timely manner?
Timeliness
Ability to Resolve Timeliness Problems
Question 4. Quality of Work
What is your assessment of the Contractor’s ability to meet requirements of tasks and the overall quality of the work?
Quality of Shipments
Question 5. Overall Rating of Contractor’s performance
What is your overall rating of Contractor’s performance (requirements, schedule, and price) on contract being assessed?
Exceptional Very Good Satisfactory Marginal Unsatisfactory
General Comments:
| PAST PERFORMANCE QUESTIONNAIRE |
| I. Current or Historical Contract Information CONTRACT REFERENCED: |
| II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed. |
| Past Performance Evaluation Question 1. Performance |
| Questions 2 and 3. Timeliness |
| Question 4. Quality of Work |
| Question 5. Overall Rating of Contractor’s performance |
| General Comments: |
File details come from the government source that posted it. Updated .