A04 0040529788 SOW TUIN CCS.pdf
PDF 124 KB Posted
- Attached to
- Conduct a Multi-Park Collection Condition Survey Federal contract opportunity
- Solicitation number
- 140P5121Q0032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5121Q0032_Amd_0004.pdf | ||
| B08 140P5121Q0032 Attach 0009 TUAI CR NON-PAPER OBJECT_0003.xlsx | XLSX spreadsheet | |
| B08 140P5121Q0032 Attach 0006 PPQ TUIN CCS_0003.pdf | ||
| B08 140P5121Q0032 Attach 0010 SEMO CR NON-PAPER OBJECTS_0003.xlsx | XLSX spreadsheet | |
| B08 140P5121Q0032 Attach 0008 TUIN NH NON-PAPER OBJECTS_0003.xlsx | XLSX spreadsheet | |
| Sol_140P5121Q0032_Amd_0003.pdf | ||
| B08 140P5121Q0032 Attach 0007 TUIN CR NON-PAPER OBJECTS_0003.xlsx | XLSX spreadsheet | |
| Sol_140P5121Q0032_Amd_0002.pdf | ||
| Attachment 0005-Site Visit InformationCCS_0001.pdf | ||
| Sol_140P5121Q0032_Amd_0001.pdf | ||
| B08 140P5121Q0032 Attach 004 PPQ TUIN CCS.pdf | ||
| B08 140P5121Q0032 Attach 003 Price Schedule TUIN CCS.pdf | ||
| Sol_140P5121Q0032.pdf | ||
| B03 140P5121Q0032 WDOL WD TUIN CCS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Conduct a Multi-Park Collection Condition Survey for Tuskegee Institute
National Historic Site, Tuskegee Airmen National Historic Site and Selma to Montgomery National Historic Trail
Project Description The National Park Service (NPS) is seeking a contractor to conduct a multi-park collection condition survey for Tuskegee Institute National Historic Site, Tuskegee Airmen National Historic Site, and the Selma to Montgomery National Historic Trail. The conservator, or a team of conservators, will conduct the survey. The conservator will survey materials by type, format, review facilities, provide recommendations for preventative conservation, recommend treatment proposals, and provide budget estimates for conservation.
Background
Tuskegee Institute National Historic was established October 26, 1974. The site house the collections of Tuskegee Institute National Historic Site, Tuskegee Airmen National Historic Site, and the Selma to Montgomery National Historic Trail. Collections are located at the George W.
Carver Museum, The Oaks, family home of Booker T. Washington, Hanger I and II, and along the Selma to Montgomery Trail interpretive centers. In addition to the storage at the Tuskegee Institute Collections Management Center located on 1600 Boy Scout Circle, Tuskegee, Alabama.
These two parks and one trail artwork collections are cataloged and kept separate. The artwork includes the life and works of George Washington Carver, Booker T. Washington (Tuskegee’s first principal), Tuskegee Airmen and foot soldiers who participated in the Selma to Montgomery March. These extensive collections documents landscapes, embroidery, history of flight, and the life and legacy of Tuskegee Institute.
Scope of Work
The project will hire a conservator or a team of conservators that will identify baseline condition documentation for the collections, and in doing so supports preservation, planning, management, and interpretation of the parks cultural and natural resources. The collections are nationally significant and represent important historical events and figures such as: the march from Selma to Montgomery, the Tuskegee Airmen and their successes and struggles with the U.S. Armed Forces, Booker T. Washington, and George W. Carver. The proper care of these collections is essential to ensure that they are preserved for future generations. Artifacts are in the Tuskegee Institute National Historic Site Collection Management Center and carry out the required task for stabilizing and conserving of these artworks according to the scope of work. The conservator will also identify concerns or issues that would require additional conservation treatment in the future in a Conservation Treatment Report.
Preservation concerns with these materials include: incorrect storage environments, embrittlement, water damage, dirt, pest infestation (e.g. silverfish damage, mold growth), foxing, rust from metal fasteners, tapes and other adhesives, inappropriate storage materials, overcrowding, and damage from previous mishandling.
Performance Period
The work shall begin following the contract award, proceed in accordance with the schedule for submittals, and be completed no later than 300 calendar days after the awarding of this contract.
Work Coordination
The Contractor shall coordinate the site visit through this contact:
TUIN Park Contact
Robyn Harris Museum Specialist Tuskegee Institute National Historic Site Tuskegee Airmen National Historic Site Selma to Montgomery National Historic Site 1212 West Montgomery Road Tuskegee, AL 36088 Office: 334-724-6033 Work Cell: 334-421-2587
Project Schedule
Task Date Award Contract TBD Work Schedule and Park Orientation Meeting Within 14 calendar days of Contract Award On site evaluation Within 90 calendar days First draft Within 60 days of site visit Review/comments Within 30 days of receipt of draft NPS Review of Consultant Responses Within 10 working days of completion The final review and signature Within 30 days of receipt Final Acceptance Upon acceptance of project completion
Deliverables:
Conservation Treatment Report – Digital format is fine for review Final report on the conservation work: Paper Format: Two hard copies in 81/2” x 11 white bond paper, 11” x 17” paper shall be fan-folded Final submission shall be plastic comb bound with a cover page, numbered pages and paged dividers.
Use cover –stock for cover and back page.
Electronic format: Electronic information shall be forwarded in labeled USB format with Microsoft Word and Adobe PDF files described aboded.
Inclusion of photographs:
The document may include black and white or color photographs to be inserted into the text at a size of 4x6 inches or less.
They will be provided in digital format with a size of 4x6 at 150dpi.
All cover art will be provided in digital format in a size of 8.5x11 at 300 dpi.
The front cover may be a color or black and white photograph or artwork with title and standard NPS identifier.
Payment Schedule
Payment shall be made in three installments as follows:
A. Payment 1 – 50% upon concurrence with Conservation Treatment Plan and upon completion of 1/3 of artifacts conserved
B. Payment 2 – 75% upon completion of 2/3 of artifacts conserved C. Payment 3 – 100% upon completion of all artifacts conserved and a Conservation
Treatment Report provided to the park
Inspection and Acceptance
The Contracting Officer’s Technical Representative (COTR) is empowered to inspect and evaluate all work of this Contract for compliance with terms of this Scope of Work
Points of Contact:
Contracting Officer TBD, Contracting Officer East Major Acquisition Buying Office 100 Alabama Street SW 404-507- Atlanta, GA
TUIN/Contracting Officer’s Representative (COR):
Robyn Harris Museum Specialist Tuskegee Institute National Historic Site Tuskegee Airmen National Historic Site Selma to Montgomery National Historic Site 1212 West Montgomery Road Tuskegee, AL 36088 Office: 334-724-6033 Work Cell: 334-421-2587
File details come from the government source that posted it. Updated .