This is a Bid Schedule for the Grand Teton National Park (GRTE) Mormon Row Phase IV landscape rehabilitation project (PMIS 228830). The schedule establishes seven Contract Line Items (CLINs) with lump sum pricing: two base items and five option items. Base CLINs include the Visitor Parking Area with traffic counter and loops (CLIN 1) and South Mormon Row Road Detached Trail Accessibility Improvements using RAP material (CLIN 2). Option CLINs include Trails, Pedestrian Bridges, Gravel, Concrete, and NPS Employee Parking (CLIN 3); Native Soil Trails (CLIN 4); South Mormon Row Road Detached Trail Accessibility Improvements using Porous Pavement (CLIN 5); Waysides, Wayfinding, Site Furnishings, Shade Shelter, and Fencing (CLIN 6); and Revegetation (CLIN 7).
The government will calculate total evaluated price as the sum of base items (CLINs 1 and 2) plus all options (CLINs 3-7), with a substitution provision that if CLIN 5 is exercised, CLIN 2 will be removed and replaced. For base bidding purposes, contractors must assume repair of 20% of the existing RAP trail in place, with the entire trail meeting US Access Board Accessibility Standards upon completion. The bid option requires removal and rehabilitation of the entire existing RAP trail using Filterpave material at a proposed width of 6 feet, also meeting accessibility standards. The Contracting Officer may unilaterally exercise options by written notice within 60 days after contract award. The project is subject to availability of funds per FAR 52.232-18.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P1426R0002 GRTE Mormon Row Phase IV - PMIS 228830 SECTION B – Bid Schedule
Proposal pricing shall be provided in accordance with Section L and is incorporated herein. The contractor must furnish an itemized breakdown. Contractor shall use the Bid Schedule below.
Contract Line Item Number (CLIN) & Option Number
| Contract Line Item Title |
| QTY |
| Unit of Measure |
| Unit Price |
| Total Price |
| CLIN 1 - BASE |
| Visitor Parking Area (including traffic counter and loops and empty conduit) |
| 1 |
| Lump Sum |
| $ |
| $ |
| CLIN 2 – BASE* |
| South Mormon Row Road Detached Trail Accessibility |
Improvements - RAP
| 1 |
| Lump Sum |
| $ |
| $ |
| CLIN 3 – Option A |
| Trails, Pedestrian Bridges and Gravel & Concrete NPS Employee Parking |
| 1 |
| Lump Sum |
| $ |
| $ |
| CLIN 4 – Option B |
| Native Soil Trails |
| 1 |
| Lump Sum |
| $ |
| $ |
| CLIN 5 – Option C* |
| South Mormon Row Road Detached Trail Accessibility Improvements – Porous Pavement |
| 1 |
| Lump Sum |
| $ |
| $ |
| CLIN 6 – Option D |
| Waysides, Wayfinding, Site Furnishings, Shade Shelter, Fencing |
| 1 |
| Lump Sum |
| $ |
| $ |
| CLIN 7 – Option E |
| Revegetation |
| 1 |
| Lump Sum |
| $ |
| $ |
TOTAL BASE & OPTION PRICE (CLINS 1 -7)
The Government will calculate total evaluated price as the sum of the base items (CLINs 1 & 2) plus all options (CLINs 3-7). If CLIN 5 is exercised, CLIN 2 will be removed and replaced by CLIN 5.
* If funding is available and CLIN 5 is exercised, CLIN 2 will not be performed. Reference Plan Sheet L3.7 which states, “BASE BID: 1. FOR BIDDING PURPOSES, ASSUME REPAIR OF 20% OF EX RAP TRAIL IN PLACE. CONTRACTOR TO STAKE LOCATIONS WITH CONTRACTING OFFICER. RE: DETAIL 2/L6.1.
2. ENTIRE TRAIL TO MEET US ACCESS BOARD ACCESSIBILITY STANDARDS UPON COMPLETION.
BID OPTION: 1. REMOVE AND REHABILITATE THE ENTIRE LENGTH OF EXISTING RAP TRAIL IN PLACE WITH FILTERPAVE TRAIL MATERIAL, RE: SPECIFICATION. STAKE CENTERLINE OF TRAIL FOR CONTRACTING OFFICER APPROVAL. PROPOSED TRAIL WIDTH TO BE 6'-0". RE: DETAIL 1/L6.1.
2. ENTIRE TRAIL TO MEET US ACCESS BOARD ACCESSIBILITY STANDARDS UPON COMPLETION.”
This project is currently subject to availability of funds. See FAR 52.232-18 for additional information.
SPECIAL CLAUSE: OPTION FOR ADDITIONAL SERVICES—SEPARATELY PRICED LINE ITEMS
The Government may require the delivery of the numbered line items identified in the Schedule as option items at the price stated in the Schedule. The Contracting Officer may unilaterally exercise the option by written notice to the Contractor within 60 days after contract award. Performance of added line item tasks shall be at the price negotiated in the contract Schedule. (End of clause) (End of Section B)
File details come from the government source that posted it. Updated .