B03_WD_MT20250040_Date_5_16_2025.pdf

PDF 2 MB Posted

Attached to
White Sandy and Devils Elbow Water Filtration
Solicitation number
140L3625Q0068
Issued by

About this file

This document is a U.S. Department of Labor Wage Determination for construction projects in Lewis and Clark County, Montana, effective 05/16/2025. The wage determination covers building construction projects (excluding single-family homes and apartments up to 4 stories) and specifies hourly rates and fringe benefits for various trade classifications, including Heat and Frost Insulators ($43.81/hour), Boilermakers ($38.75/hour), Bricklayers ($30.55/hour), Electricians ($36.50/hour), Elevator Mechanics ($67.61/hour), and multiple other trades.

The document details wage rates subject to the Davis-Bacon Act, with specific provisions for contracts entered into at different times. It includes travel zone definitions for laborers, with base pay adjusted based on distance from specified towns like Billings, Bozeman, Helena, and Great Falls. The wage determination also provides guidance on wage rate appeals process, explaining how interested parties can seek review or reconsideration of wage rates through the Wage and Hour Division of the U.S. Department of Labor.

View the file

Other files

File Type Posted
Sol_140L3625Q0068_Amd_0002.pdf PDF
B09_Amendment_0002_Q_A_0002.pdf PDF
Devil_s_Elbow_Well_Log_0002.pdf PDF
White_Sandy_Well_Log_0002.pdf PDF
Sol_140L3625Q0068_Amd_0001.pdf PDF
A06_DRAWINGS_AND_ATTACHMENTS.pdf PDF
B08_Past_Performance_Questionnaire.doc DOC document
BID_SCHEDULE.docx DOCX document
Sol_140L3625Q0068.pdf PDF
A04_SOW_Devil_s_Elbow__White_Sandy_Water_Filtration.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .