A06_DRAWINGS_AND_ATTACHMENTS.pdf
PDF 3 MB Posted
- Attached to
- White Sandy and Devils Elbow Water Filtration
- Solicitation number
- 140L3625Q0068
About this file
The provided file contains design drawings and water quality analysis reports for the White Sandy and Devil's Elbow Potable Water Filtration Project in Lewis and Clark County, Montana. The project, managed by the Bureau of Land Management's Butte Field Office, aims to improve water quality at two campground locations by installing water filtration systems. The project documents include a site reference map, vicinity map, and detailed pump room layout for the White Sandy campground, along with water quality test results from Energy Laboratories, Inc.
The water quality analysis reveals significant water chemistry challenges, including high total dissolved solids (2,270 mg/L), extreme hardness (1,680 mg/L or 98 grains/gallon), and elevated sulfate levels (1,530 mg/L). The water samples from the pumphouse were bacteriologically safe, with no total coliform or E. coli detected. The design drawings specify a 10 ft x 16 ft pump room with existing equipment like a washing machine and dryer that can be relocated to accommodate the new water filtration system. The project requires careful integration of filtration equipment within the existing infrastructure while addressing the complex water quality issues.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3625Q0068_Amd_0002.pdf | ||
| B09_Amendment_0002_Q_A_0002.pdf | ||
| Devil_s_Elbow_Well_Log_0002.pdf | ||
| White_Sandy_Well_Log_0002.pdf | ||
| Sol_140L3625Q0068_Amd_0001.pdf | ||
| B03_WD_MT20250040_Date_5_16_2025.pdf | ||
| B08_Past_Performance_Questionnaire.doc | DOC document | |
| BID_SCHEDULE.docx | DOCX document | |
| Sol_140L3625Q0068.pdf | ||
| A04_SOW_Devil_s_Elbow__White_Sandy_Water_Filtration.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
CANADA
UNITED STATES
SASKATC
H
EW
AN
ALBERTA
B R
ITIS
H
C O
LU
M
B
IA
N O
R T
H
D
A K
O T
A
S O
U T
H
D
A K
O T
A
WYOMING
ALT
MISSOULA
KALISPELL
GREAT FALLS
HAVRE
HELENA
BUTTE
BILLINGS
MILES CITY
LEWISTOWN
MONTANACHOTEAU
MALTA
GLASGOW
CHESTER
FT BENTON
STATE REFERENCE MAP
(N.T.S)
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
WHITE SANDY AND DEVIL'S ELBOW
POTABLE WATER FILTRATION PROJECT
LEWIS AND CLARK COUNTY
BUTTE FIELD OFFICE
VICINITY MAP
(N.T.S)
DIRECTIONS TO:
DEVIL'S ELBOW CAMPGROUND (46°42'03" N, 111°48'26" W):
FROM HELENA, DRIVE NORTHEAST ON YORK ROAD FOR 18 MILES. THE CAMPGROUND
IS MARKED BY SIGNS ON THE EAST SIDE OF THE ROAD.
WHITE SANDY RECREATION SITE (46°44'31" N, 111°53'17" W):
FROM HELENA, DRIVE NORTH ON I-15 TO EXIT 200. TURN EAST ON LINCOLN RD,
FOLLOW FOR 5 MILES. TURN LEFT ON HAUSER DAM ROAD, FOLLOW FOR 2.9 MILES TO
GREEN GATE. PASS THROUGH GREEN GATE AND DRIVE TO RECREATION SITE.
GENERAL ENGINEER'S NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY
CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS
SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE
CONTRACT DOCUMENTS.
2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND
REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.
3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL
PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.
4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR
INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.
CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE
CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY
THIS PLAN.
5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING
PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE
CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO
UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.
THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR BLUE STAKE
(1-800-424-5555, or 811) PRIOR TO ANY EXCAVATION.
6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL
EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW
CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN
ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE ENGINEER WITH
DISCREPANCY.
7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE
LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT
ENGINEER WITH ANY DISCREPANCIES.
8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.
9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO
WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH
EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.
\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG
C O
V E
R
S
H E
E T
CITY OF HELENA
PROJECT LOCATIONS
SHEET LIST TABLE
SHEET
NUMBER
SHEET TITLE
1 COVERSHEET G1
3 EXISTING WHITE SANDY PUMP ROOM LAYOUT C1
PROJECT SITE
PROJECT DESCRIPTION
THIS PROJECT ENTAILS WATER FILTRATION FOR POTABLE WATER AT DEVIL'S ELBOW
AND WHITE SANDY CAMPGROUNDS. EXISTING POOR WATER QUALITY NECESSITATES
FILTRATION. SEE ATTACHED STATEMENT OF WORK (SOW) AND WATER QUALITY
REPORTS FOR PERTINENT INFORMATION.
G1
W H
I T
E
S
A N
D Y
A
N
E V
I L S
L B
O W
B U
R E
U
O
F
L A
M
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
H
I
T E
R I O
R
(DESIGNED BY: SPC DRAWN BY: SPC CHECKED BY: APPROVED BY: )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
B
U T
T
E
F
I C
E
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
P O
T A
B L
E
W
A T
R
L T
R A
T I O
N
P
R O
J E
C
W W
W W
W
W W
W W
W
PRESSURE
TANK
PRESSURE
TANK
L O
P
B
O
O
O P
FROM IRRIGATION WELL
FROM POTABLE WELL
PRESSURE GAUGE
FLOW METER
SMOOTH
NOSE TEST
TAP
INSTALL NEW FLOW METER
FOR IRRIGATION LINES
PRESSURE GAUGE
DOOR
WASHING
MACHINE
DRYER
SHELF
PUMP ROOM INTERIOR WALLL
16 FT
C:\USERS\SCLANCY\DOI\WESTERN DISTRICT OFFICE - WZ-CLANCY\LAKE SITES WATER SYSTEMS\2025 RIVER FUND
WATER FILTRATION\DRAWING FILES\3.WHITE SANDY PUMP_ROOM_FILTRATION.DWG
E X
I S
T I N
G
W
H I T
E
S
A N
O
M
WHITE SANDY PUMP ROOM
NO SCALE
C2
CONSTRUCTION NOTES
1. PUMP ROOM DIMENSIONS ARE 10FT X 16 FT, AS
INDICATED ON THE DRAWING.
2. EXISTING WASHING MACHINE, DRYER, AND
SHELVING CAN BE REMOVED TO MAKE ROOM FOR
FILTRATION EQUIPMENT.
3. DESIGN AND INSTALL WATER FILTRATION SYSTEM
TO ACCOMODATE EXISTING PUMP ROOM LAYOUT,
IF POSSIBLE.
4. VENDOR/CONTRACTOR WILL APPROVE CHANGES
TO PUMP ROOM LAYOUT THROUGH CONTRACTING
OFFICER'S REPRESENTATIVE (COR), WHICH SHALL
BE BLM ENGINEER.
W H
I T
E
S
A N
V
I L
B
O W
B U
R E
L A
N
A G
E M
N E
T
I S
S U
E
D
A T
E
M A
R K
R E
V I S
I O
N D
A T
E A
P P
R O
V E
D
___ OF ___
SHEET
U S
D
E P
A R
T M
E N
T
O
F
T
T E
R I O
R
(DESIGNED BY: SPC DRAWN BY: SPC CHECKED BY: APPROVED BY: )
D I S
T R
I C
T
D E
S I G
N
O
F F
I C
E
I S
S U
R
B
U T
E
F
I C
E
W E
S T
E R
N
M
O N
T A
S
T R
I C
T
B U
T T
E
F
I E
F
I C
E
P O
T A
B L
E
W
A T
L T
R A
T I O
N
P
R O
J E
C
ANALYTICAL SUMMARY REPORT
The analyses presented in this report were performed by Energy Laboratories, Inc., 3161 E. Lyndale Ave., Helena, MT 59604, unless otherwise noted. Any exceptions or problems with the analyses are noted in the report package. Any issues encountered during sample receipt are documented in the Work Order Receipt Checklist.
The results as reported relate only to the item(s) submitted for testing. This report shall be used or copied only in its entirety. Energy Laboratories, Inc. is not responsible for the consequences arising from the use of a partial report.
Energy Laboratories, Inc. verifies the reported results for the analysis has been technically reviewed and approved for release.
If you have any questions regarding these test results, please contact your Project Manager.
Lab ID Client Sample ID Collect Date Receive Date Matrix Test
H24070746-001 Devils Elbow PWS 07/25/24 11:15 07/25/24 Aqueous Metals by ICP/ICPMS, Total Alkalinity to pH 4.5 Conductivity Hardness Anions by Ion Chromatography Nitrogen, Nitrate + Nitrite pH Metals Digestion by E200.2 Solids, Total Dissolved
HydroSolutions
Project Name: Lindsay Drilling Devil's Elbow
Work Order: H24070746
303 Clarke St
Helena, MT 59601-6224
August 09, 2024
Energy Laboratories Inc Helena MT received the following 1 sample for HydroSolutions on 7/25/2024 for analysis.
LABORATORY ANALYTICAL REPORT
Client: HydroSolutions
Project: Lindsay Drilling Devil's Elbow
Lab ID: H24070746-001
Client Sample ID: Devils Elbow PWS
Collection Date: 07/25/24 11:15
Matrix: Aqueous
Report Date: 08/09/24
DateReceived: 07/25/24
Prepared by Helena, MT Branch
Analyses Result Units Analysis Date / ByRL Method
MCL/
QCLQualifiers
PHYSICAL PROPERTIES
H 07/25/24 13:11 / eer0.1s.u.7.6pH A4500-H B
07/25/24 13:11 / eer°C16.0pH Measurement Temp A4500-H B
07/25/24 13:11 / eer5umhos/cm1730Conductivity @ 25 C A2510 B
07/25/24 13:45 / ctl20mg/L1340Solids, Total Dissolved TDS @ 180 C A2540 C
INORGANICS
07/26/24 16:44 / eer4mg/L360Alkalinity, Total as CaCO3 A2320 B
07/26/24 02:17 / eer1mg/L13Chloride E300.0
07/26/24 02:17 / eer1mg/L615Sulfate E300.0
07/29/24 20:00 / SRW1mg/L717Hardness as CaCO3 A2340 B
NUTRIENTS
08/07/24 19:07 / JAR0.01mg/L0.03Nitrogen, Nitrate+Nitrite as N E353.210
METALS, TOTAL
07/29/24 20:00 / slj1mg/L133Calcium E200.7
08/06/24 23:19 / dck0.02mg/L0.98Iron E200.8
07/29/24 20:00 / slj1mg/L94Magnesium E200.7
08/06/24 23:19 / dck0.001mg/L0.013Manganese E200.8
07/29/24 20:00 / slj1mg/L131Sodium E200.7
Report
Definitions:
RL - Analyte Reporting Limit MCL - Maximum Contaminant Level
QCL - Quality Control Limit ND - Not detected at the Reporting Limit (RL)
H - Analysis performed past the method holding time
ANALYTICAL SUMMARY REPORT
The analyses presented in this report were performed by Energy Laboratories, Inc., 3161 E. Lyndale Ave., Helena, MT 59604, unless otherwise noted. Any exceptions or problems with the analyses are noted in the report package. Any issues encountered during sample receipt are documented in the Work Order Receipt Checklist.
The results as reported relate only to the item(s) submitted for testing. This report shall be used or copied only in its entirety. Energy Laboratories, Inc. is not responsible for the consequences arising from the use of a partial report.
Energy Laboratories, Inc. verifies the reported results for the analysis has been technically reviewed and approved for release.
If you have any questions regarding these test results, please contact your Project Manager.
Lab ID Client Sample ID Collect Date Receive Date Matrix Test
H24060488-001 Pumphouse Potable (Site 1)
06/17/24 14:52 06/17/24 Drinking Water Metals by ICP/ICPMS, Dissolved Metals by ICP/ICPMS, Total Alkalinity to pH 4.5 Bacteria, Private Water Supply Conductivity Ferrous Iron by colorimetry Hardness Hardness as CaCO3, grains/gallon Anions by Ion Chromatography Iron, Ferric Langelier Index Nitrogen, Nitrate + Nitrite pH Metals Digestion by E200.2 Preparation, Dissolved Filtration
MCAWW
Sodium Adsorption Ratio Solids, Total Dissolved - Calculated
H24060488-002 Irrigation (Site 2) 06/17/24 15:19 06/17/24 Drinking Water Same As Above
Bureau of Land Management Butte
Project Name: White Sandy 04692
Work Order: H24060488
106 N Parkmont Butte, MT 59701-7222
July 08, 2024
Energy Laboratories Inc Helena MT received the following 2 samples for Bureau of Land Management Butte on 6/17/2024 for analysis.
Digitally signed by Wanda Johnson Date: 2024.07.09 08:22:39 -06:00
Project: White Sandy 04692 Client Sample ID: Pumphouse Potable (Site 1)
Collection Date: 06/17/24 14:52
Matrix: Drinking Water
Client: Bureau of Land Management Butte
Lab ID: H24060488-001D
Report Date: 07/08/24
Analyses Result QualifierSafe/Unsafe Analysis Date / ByMethod
Received Date: 06/17/24 16:30
LABORATORY ANALYTICAL REPORT
Units
Sampled By: Not Provided
Prepared by Helena, MT Branch
MICROBIOLOGICAL
AbsentColiform, Total A9223 BSAFE 06/17/24 16:39 / kmhper 100ml AbsentColiform, E-Coli A9223 B 06/17/24 16:39 / kmhper 100ml
Comments: The notation "SAFE" indicates that the water was bacteriologically SAFE when sampled.
The notation "UNSAFE" indicates that the water was bacteriologically UNSAFE when sampled.
Qualifiers:
Pumphouse Potable (Site 1)
FRDS Analyses Result QualUnits Analysis Date / ByRL Method
MCL/
QCL
LABORATORY ANALYTICAL REPORT
PWS #: MT0004692
Client Sample ID: Pumphouse Potable (Site 1)
Collection Date: 06/17/24 14:52
Matrix: Drinking Water
Client: Bureau of Land Management Butte Lab ID: H24060488-001 Report Date: 07/08/24
Date Received: 06/17/24
Compliance Sample:
Name: WHITE SANDY CAMPGROUND
Federal ID#: MT00945
Collector's Name: Not Provided Contact Phone #: (406) 227-3570
Facility ID:
SamplingPoint/Location: SP001 / Pumphouse Potable (S
DS001
Sample Type: SPNO
Project ID:White Sandy 04692
Prepared by Helena, MT Branch
PHYSICAL PROPERTIES
H 06/18/24 11:15 / SRW0.1s.u.7.11925 A4500-H BpH
06/18/24 11:15 / SRW°C14.21996 A4500-H BpH Measurement Temp 06/18/24 11:15 / SRW5umhos/cm25801064 A2510 BConductivity @ 25 C 07/03/24 16:45 / JCS0.31997 A2330 BLangelier Index 07/03/24 16:45 / JCS1mg/L22701930 A1030 ESolids, Total Dissolved - Calculated
If a sample temperature at the time of collection is not provided, the Langelier is calculated using a default temperature of 20 degrees C.
INORGANICS
06/18/24 10:05 / SRW4mg/L2101927 A2320 BAlkalinity, Total as CaCO3 06/18/24 10:05 / SRW4mg/L2501928 A2320 BBicarbonate as HCO3 06/18/24 10:05 / SRW4mg/LND1929 A2320 BCarbonate as CO3 06/19/24 23:32 / SRW1mg/L201017 E300.0Chloride 06/19/24 23:32 / SRW1mg/L15301055 E300.0Sulfate 06/19/24 23:32 / SRW0.1mg/L0.11025 E300.04Fluoride 07/01/24 11:24 / slj0.01unitless0.401047 CalculationSodium Adsorption Ratio (SAR) 07/01/24 11:24 / slj1mg/L16801918 A2340 BHardness as CaCO3 07/01/24 11:24 / sljgrains/gal981918 CalculationHardness as CaCO3 - Grains
NUTRIENTS
06/27/24 15:46 / JAR0.01mg/L0.011038 E353.210Nitrogen, Nitrate+Nitrite as N
FERROUS IRON BY COLORIMETRY
06/18/24 16:13 / dpw2mg/L21 A3500FeBIron, Ferrous
METALS, DISSOLVED
07/02/24 03:52 / slj0.02mg/LND E200.7Iron, Ferrous
METALS, TOTAL
06/28/24 17:15 / kjb1mg/L3351016 E200.7Calcium 06/28/24 17:15 / kjb0.02mg/L24.51028 E200.7Iron 07/01/24 11:28 / slj0.03mg/L3.58 CalculationIron, Ferric 06/28/24 17:15 / kjb1mg/L2041031 E200.7Magnesium 06/28/24 17:15 / kjb1mg/L71042 E200.7Potassium 06/28/24 17:15 / kjb1mg/L381052 E200.7Sodium
Report Definitions:
RL - Analyte Reporting Limit MCL - Maximum Contaminant Level QCL - Quality Control Limit ND - Not detected at the Reporting Limit (RL) H - Analysis performed past the method holding time
Pumphouse Potable (Site 1)
Client: Bureau of Land Management Butte Work Order: H24060488
QA/QC Summary Report
07/08/24Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Helena, MT Branch
Method: A2320 B Batch: R195837 Lab ID: MBLK 06/18/24 09:14Method Blank Run: PHSC_101-H_240618A Alkalinity, Total as CaCO3 2ND mg/L
Lab ID: LCS 06/18/24 09:18Laboratory Control Sample Run: PHSC_101-H_240618A Alkalinity, Total as CaCO3 101 90 1104.0610 mg/L
Lab ID: H24060323-002ADUP 06/18/24 09:36Sample Duplicate Run: PHSC_101-H_240618A3 Alkalinity, Total as CaCO3 104.0 1.1190 mg/L Bicarbonate as HCO3 104.0 1.1230 mg/L Carbonate as CO3 104.0ND mg/L
Qualifiers:
RL - Analyte Reporting Limit ND - Not detected at the Reporting Limit (RL)
| All-DRAWINGS.pdf |
| 1.COVERSHEET-G1.pdf |
| Sheets and Views |
| C1 |
| 3.WHITE SANDY PUMP_ROOM.pdf |
| Sheets and Views |
| Layout1 |
| IMG_20250612_152957_974.pdf |
| IMG_20250612_152956_524.pdf |
| WATER QUALITY REPORTS_DEVIL'S ELBOW_WHITE SANDY.pdf |
File details come from the government source that posted it. Updated .