This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the White Sandy and Devils Elbow Water Filtration Project (Solicitation Number 140L3625Q0068). The amendment addresses four key questions from potential contractors:
The project involves two water systems (White Sandy and Devil's Elbow) with a budget range of $50-$100K. Both systems have a maximum flow rate of 10 GPM, with Devil's Elbow potentially accommodating 5-6 GPM. BLM's specific water quality filtration criteria include: Total Dissolved Solids (TDS) < 600 PPM, Sulfate < 250 PPM, Iron < 3 PPM, and Hardness < 120 PPM. The agency prefers instantaneous filtration over storage tank solutions, with the primary goal of addressing water quality concerns related to high TDS, sulfate, and iron levels that could impact human health.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3625Q0068_Amd_0002.pdf | ||
| Devil_s_Elbow_Well_Log_0002.pdf | ||
| White_Sandy_Well_Log_0002.pdf | ||
| B09_Amendment_0002_Q_A_0002.pdf | ||
| Sol_140L3625Q0068.pdf | ||
| BID_SCHEDULE.docx | DOCX document | |
| B03_WD_MT20250040_Date_5_16_2025.pdf | ||
| B08_Past_Performance_Questionnaire.doc | DOC document | |
| A04_SOW_Devil_s_Elbow__White_Sandy_Water_Filtration.pdf | ||
| A06_DRAWINGS_AND_ATTACHMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3625Q0068 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT-STATE OFC(MT935)
06/25/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/25/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This Amendment addresses questions received.
Q1. The Solicitation says $50-$100K for both project. Does that included both water systems? Will bids be accepted or evaluated if they are over $100K?
a. Yes, both water systems (Devil's Elbow and White Sandy) are included in the project.
b. All price bids will be evaluated.
Q2. What is the designed maximum flow rate for each system?
a. White Sandy - Maximum of 10 GPM
b. Devil's Elbow - Maximum of 10 GPM but could accommodate as low as 5-6 GPM.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Chad Clapp
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L3625Q0068/0001
Q3. What specific criteria are we (BLM ) wanting to hit with the filtration performance?
a. BLM specifically wants to address the water quality concerns of high TDS, high sulfate and high iron (White Sandy). These are known to cause adverse impacts to human health if consumed in high quantities in drinking water. However, there is no MCL denoted within the State of
Montana. The specific criteria BLM hopes to achieve at each site are as follows:
b. TDS < 600 PPM (mg/L)
c. Sulfate < 250 PPM (mg/L)
d. Iron < 3 PPM (mg/L)
e. Hardness < 120 PPM (mg/L)
Q4. Would storage (tank) be a possibility or is instantaneous filtration preferred?
a. Instantaneous filtration is preferred.