B01 Attachment J01e - Appendix E_Original_Building_Lighting_Plans.pdf
PDF 8 MB Posted
- Attached to
- LED Lighting Replacement at Pine Ridge Hospital
- Solicitation number
- 75H70126R00029
About this file
This document is a comprehensive set of electrical lighting fixture schedules, symbols, and detailed installation plans for the Pine Ridge Comprehensive Health Care Facility project, prepared by Wyatt/Rhodes Architects for the Department of Health and Human Services.
The document encompasses multiple components: a lighting fixture schedule detailing fixture types, manufacturers, catalog numbers, lamp specifications, wattage, mounting details, and acceptable manufacturers; an electrical symbol legend defining standard symbols used throughout the lighting plans; general notes addressing installation requirements, circuit specifications, and compliance standards; and detailed lighting plans for multiple areas and levels of the facility. The lighting plans include upper-level floor plans for Areas A, B, C, and D, and lower-level floor plans for Areas G, H, and J, with options showing both Phase I and Phase II/Phase III configurations for certain areas. Installation details provided include wiring diagrams for dark rooms, lighting control diagrams, television rough-in details, and communication rough-in details. The fixture schedule lists numerous lighting fixture types with specifications including recessed fixtures, surface-mounted fixtures, emergency lighting, and specialized fixtures for healthcare environments. All plans incorporate keyed notes and general notes to ensure proper installation and compliance with facility requirements and electrical codes.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APP_F_E0.1-General_Notes_Lighting_Fixtures_&_Symbols
| E2.2 - Area A - Upper Level - Lighting Plan |
| E2.3 - Area B - Upper Level - Lighting Plan |
| E2.4 - Area C - Upper Level - Lighting Plan |
| E2.5 - Area D - Upper Level - Lighting Plan |
| E2.8 - Area G - Lower Level - Lighting Plan |
| E2.9 - Area H - Lower Level - Lighting Plan |
| J-Wing |
| E1.01 LIGHTING PLANS UPPER LEVEL AREAS A, B, AND C |
| E1.02 LIGHTING PLAN LOWER LEVEL AREA J |
| E1.03 LIGHTING PLAN UPPER LEVEL AREA J |
| E1.05 LIGHTING FIXTURE SCHEDULE AND DETAILS |
File details come from the government source that posted it. Updated .