B05 Amendment No. A00003.pdf

PDF 250 KB Posted

Attached to
LED Lighting Replacement at Pine Ridge Hospital
Solicitation number
75H70126R00029
Issued by

About this file

This is a Standard Form 30 (SF30) Amendment of Solicitation for a LED Lighting Replacement project at Pine Ridge Hospital issued by the Indian Health Service (IHS) Division of Engineering Services (DES) in Dallas, Texas.

Amendment Details and Changes: Amendment number A00003, effective July 1, 2026, modifies solicitation 75H70126R00029 dated July 1, 2026. The amendment addresses prospective offerors' questions through revised and replaced attachments: J01a (APP_A_Construction_Drawings_Revised), J01e (APP_E_Original_Building_Lighting_Plans_Revised), and J04 (Price Breakdown dated July 2026), as well as a newly added attachment J01f (APP_F_Panel_Locations). The proposal submission deadline remains unchanged at July 31, 2026 at 2:00 PM Central Time. Offerors must acknowledge receipt of this amendment by referencing the amendment number and date on their cover letter or by submitting a signed copy of the SF30. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.

View the file

Other files

File Type Posted
B05 Amendment No. A00004.pdf PDF
B05 Attachment A3-5 J01f - APP_F_Panel_Locations.pdf PDF
B05 Attachment A3-3 J01e - APP_E_Original_Building_Lighting_Plans_Revised.pdf PDF
B05 Attachment A3-4 J04 - Price Breakdown dated July 2026.xlsx XLSX spreadsheet
B05 Attachment A3-2 J01a - APP_A_Construction_Drawings_Revised.pdf PDF
B05 Attachment A3-1 Pre-Proposal Inquiries.pdf PDF
B05 Amendment No. A00002.pdf PDF
B05 Attachment A2-1 Pre-Proposal Inquiries.pdf PDF
B05 Amendment No. A00001.pdf PDF
B01 Attachment J01a - Appendix A_Construction_Drawings.pdf PDF
B01 Attachment J01d - Appendix D_Atrium_Light_Fixture.pdf PDF
B01 Attachment J01b- Appendix B_Light_Fixture_Devices.pdf PDF
B01 Attachment J06 - Past Performance Questionnaire.docx DOCX document
B01 Attachment J01c- Appendix C_Lighting_Control_Devices.pdf PDF
B01 RFP 75H70126R00029.pdf PDF
B01 Attachment J07 - IHS IEE Representation Form.pdf PDF
B01 Attachment J05 - Company Specialized Experience Construction Form.docx DOCX document
B01 Attachment J04 - Price Breakdown dated May 2026.xlsx XLSX spreadsheet
B01 Attachment J03 - Self Performed Calculation Sheet (Construction).docx DOCX document
B01 Attachment J02 - Wage Determination SD20260017 dated 05-18-2026.pdf PDF
B01 Attachment J01e - Appendix E_Original_Building_Lighting_Plans.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

A00003

LED Lighting Replacement at Pine Ridge Hospital See Summary of Changes

Indian Health Service (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 840 Dallas, TX 75202

See Item 6

75H70126R00029

GP24PR800H07

1 2

07/21/2026

07/01/2026

SF30 CONTINUATION OF BLOCK NARRATIVE Page 2 of 2

SUMMARY OF CHANGES

The solicitation is hereby amended to address the following:

1. Answer questions from prospective offerors (See B05 Attachment A3-1 Pre-proposal

Inquiries)

a. Attachments J01a, J01e, and J04 are revised and replaced:

i. J01a - APP_A_Construction_Drawings_Revised (B05 Attachment A3-2)

ii. J01e - APP_E_Original_Building_Lighting_Plans_Revised (B05 Attachment

A3-3)

iii. J04 - Price Breakdown dated July 2026 (B05 Attachment A3-4)

b. Attachment J01f is added:

i. J01f - APP_F_Panel_Locations (B05 Attachment A3-5)

The proposal due date remains the same, July 31, 2026 at 2:00 PM CT.

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and date on their cover letter in their offer or by submitting a signed copy of the SF30.

All other terms and conditions remain unchanged.

END OF SUMMARY OF CHANGES

File details come from the government source that posted it. Updated .