B01 Att J09 - Price Schedule Price Breakdown.pdf
PDF 286 KB Posted
- Attached to
- Blackfeet Apartment Complex, Browning MT Federal contract opportunity
- Solicitation number
- 22R00068
About this file
This document contains a price schedule template for a construction project solicitation from the Indian Health Service to build an apartment complex in Browning, Montana. The price schedule breaks estimated costs into 14 divisions of construction work with line items for materials, labor, and total costs for each section. These include site work, concrete, masonry, metals, woods and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying systems, fire protection, plumbing, mechanical, electrical, and low voltage work. Offerors are to fill out the template with their pricing and submit it with their proposal. The total proposed price should match the total on an included SF1442 form. The solicitation number for this opportunity is 22R00068 and responses are due as specified in the attached documentation.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B01 ATTACHMENT J07
Price Schedule / Price Breakdown
PRICE SCHEDULE / PRICE BREAKDOWN
All offerors shall fill out and submit a completed Pricing Sheet with their proposal. The pricing sheet is not contractually binding; however, it will be used in the analysis for price reasonableness
CLIN 0001:
Section# Section Title Materials Labor Total
1 PROJECT OVERHEAD $ $ $
2 EXISTING CONDITIONS $ $ $
3 CONCRETE $ $ $
4 MASONRY $ $ $
5 METALS $ $ $
6 WOODS/PLASTICS $ $ $
7 THERMAL/ MOISTURE PROTECT $ $ $
8 DOORS & WINDOWS $ $ $
9 FINISHES $ $ $
10 SPECIALTIES $ $ $
11 EQUIPMENT $ $ $
12 FURNISHINGS $ $ $
13 SPECIAL CONSTRUCTION $ $ $
14 CONVEYING SYSTEMS $ $ $
21 FIRE PROTECTION $ $ $
22 PLUMBING $ $ $
23 MECHANICAL $ $ $
26 ELECTRICAL $ $ $
27/28 LOW VOLTAGE $ $ $
31 SITE CONSTRUCTION $ $ $
Subtotal $ Profit % $ Bonds % $ TERO Fees % $ Taxes % $
Subtotal $
PROJECT TOTAL (sum of subtotals) $ _________________
This total should match block 17 of the SF1442
(end of attachment)