This document is a solicitation for a construction project to build an apartment complex on the Blackfeet reservation in Browning, Montana. The solicitation is issued by the Department of Health and Human Services Indian Health Service.

The project involves constructing an 18-unit apartment building. The solicitation seeks proposals for professional architectural and engineering design services. Responses are due by February 2, 2022. The design team will be responsible for tasks including site planning, structural design, mechanical and electrical engineering, and developing construction documents.

The selected firm must have experience designing similar housing projects. They will work under a task order with a not-to-exceed budget of $75,000. The period of performance is expected to last 10 months. Proposals should include examples of relevant past work, resumes, and licensing information.

The solicitation references additional attached documents providing the project scope, specifications, drawings, and other details. The Blackfeet Housing Authority will administer the resulting contract.

View the file

Other files for this federal contract opportunity

Other files attached to Blackfeet Apartment Complex, Browning MT, newest first.
File Type Posted
B01 Attachment J10 Pre-Proposal Inquiries revised.pdf PDF
B01 Att 5 IHS BLACKFEET Housing -Geo Rpt.pdf PDF
A00003 75H70122R00068 SF30.pdf PDF
1442 A0003 revised.pdf PDF
B01 Attachment J05A - I IH BLAC 19100 Blackfeet Housing_ARCH_BUL2.pdf PDF
B01 Attachment J05A - 06 18 00 USER - GLUED-LAMINATED CONSTRUCTION.pdf PDF
B01 Attachment J05A - 00 01 10 BSD - Table of Contents.pdf PDF
B01 Attachment J05A - 06 15 00 USER - WOOD DECKING.pdf PDF
B01 Attachment J10 Pre-Proposal Inquiries.pdf PDF
1442 A0002 REVISED.pdf PDF
A0002 75H70122R00068 SF30.pdf PDF
B01 Attachment J05A - IHS BLACKFEET HOUSING - narrative - bulletin 002.pdf PDF
B01 75H70122R00068 solicitation REVISED.pdf PDF
B01 Att J03 Wage Determination MT 20220034 05AUG22.pdf PDF
A0001 75H70122R00068 SF30.pdf PDF
B01 Att J04 IHS BLACKFEET HOUSING - drawings.pdf PDF
B01 75H70122R00068 Blackfeet Apartment Complex.pdf PDF
B01 Att J03 Wage determination MT 20220034 23Jun2022.pdf PDF
B01 Att J05 IHS BLACKFEET HOUSING - specs - VOL. 2.pdf PDF
B01 Att J09 - Price Schedule Price Breakdown.pdf PDF
B01 Att J06 - PPQ.pdf PDF
B01 Att J02 Subcontracting Plan.pdf PDF
B01 Att J05 IHS BLACKFEET HOUSING - Addendum changes.pdf PDF
B01 Att J05 IHS BLACKFEET HOUSING - Submittal Book.pdf PDF
B01 Att J01 Self Performed Calculation Sheet.pdf PDF
B01 Att J07 - Company Specialized Experience Form Construction.pdf PDF
B01 Att J08 - Key Personnel Resume Form.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Health Facilities Group, LLC Planners and Architects 23 8 0 Mc G e e S t , S u i t e 31 0 Ka ns a s C i t y , M O 64 1 08 p h o n e : 8 1 6 . 2 49 .1 5 00

Health Facilities Group , LLC © 2020

Indian Health Service Division of Engineering Services Addendum 001 – Bid Set Specifications – Volume 1 Browning, Montana

Contract Number: HHSI102201800005I

Task Order Number: 75H70119F30002

HFG project no.: H IH BLAC 19100

Issue date: February 2, 2022

Professional Architect-Engineer (A-E) Services for

Design for Browning 18-Unit Apartment Building, Blackfeet Service Unit, Browning, Montana

PROJECT NO. H IH BLAC 19100

Health Facilities Group, LLC 2020

DESIGN TEAM

00 01 03 - 1

SECTION 00 01 03 - DESIGN TEAM

PART 1 GENERAL

1.1 ARCHITECTURAL: HEALTH FACILITIES GROUP, PLANNERS & ARCHITECTS

(A) 1300 E. 104TH ST., SUITE 225.

(B) KANSAS CITY, MO 64131

(C) (816) 249-1500.

1. PRIMARY CONTACT: ALL CORRESPONDENCE FROM THE CONTRACTOR TO THE ARCHITECT

WILL BE THROUGH THIS PARTY, UNLESS ALTERNATE ARRANGEMENTS ARE MUTUALLY AGREED

UPON AT PRECONSTRUCTION MEETING.

a. NAME: ANDREW RUTENBECK, AIA.

b. EMAIL: ANDREWR@HEALTHFACILITIESGROUP.COM.

1.2 DESIGN CONSULTANT: BLUE STAR INTEGRATIVE STUDIO INC.

(A) 1430 S. BOULDER AVE.

(B) TULSA, OK 74119

(C) (918) 359-5640

1. PRIMARY CONTACT:

a. NAME: SCOTT MOORE Y MEDINA

b. EMAIL: SCOTTMM@BSI.STUDIO.COM

1.3 CIVIL: PROFESSIONAL ENGINEERING CONSULTANTS

(A) 303 SOUTH TOPEKA

(B) WICHITA, KS 67202.

(C) TELEPHONE: (313) 206-1417.

1. PRIMARY CONTACT: .

a. NAME: DAR CRONK.

b. EMAIL: DAR.CRONK@PEC1.COM.

1.4 STRUCTURAL: PROFESSIONAL ENGINEERING CONSULTANTS

(A) 623 MASSACHUSETTS ST., SUITE 200.

(B) LAWRENCE, KS 66044.

DESIGN TEAM

00 01 03 - 2

(C) (785) 842-6464.

1. PRIMARY CONTACT: .

a. NAME: PAUL RADLEY.

b. EMAIL: PAUL.RADLEY@PEC1.COM.

1.5 MECHANICAL: FARRIS ENGINEERING

(A) 844 11TH AVE..

(B) SYDNEY, NE 69162.

(C) (308) 203-2222.

1. PRIMARY CONTACT: .

a. NAME: BEN SCHMITT.

b. EMAIL: BSCHMITT@FARRIS-USA.COM.

1.6 ELECTRICAL: FARRIS ENGINEERING

(A) 844 11TH AVE..

(B) SYDNEY, NE 69162.

(C) (308) 203-2222.

(D) PRIMARY CONTACT: .

1. NAME: ERICKA NIENHUESER.

2. EMAIL: ENIENHUESER@FARRIS-USA.COM.

END OF SECTION

TABLE OF CONTENTS

00 01 10 - 1

SECTION 00 01 10 - TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 03 - DESIGN TEAM

00 01 10 - TABLE OF CONTENTS

00 01 15 - LIST OF DRAWING SHEETS

SPECIFICATIONS

DIVISION 01 -- GENERAL REQUIREMENTS

01 00 00 - GENERAL REQUIREMENTS

DIVISION 03 -- CONCRETE

03 30 00 - CAST-IN-PLACE CONCRETE

03 54 13 - GYPSUM CEMENT UNDERLAYMENT

DIVISION 04 -- MASONRY

04 05 11 - MORTAR AND MASONRY GROUT

04 20 00 - UNIT MASONRY

04 43 13 - STONE MASONRY VENEER

04 72 00 - CAST STONE MASONRY

DIVISION 05 -- METALS

05 12 00 - STRUCTURAL STEEL FRAMING

05 12 13 - ARCHITECTURALLY-EXPOSED STRUCTURAL STEEL FRAMING

05 31 00 - STEEL DECKING

05 40 00 - COLD-FORMED METAL FRAMING

05 44 00 - COLD-FORMED METAL TRUSSES

05 51 00 - METAL STAIRS

05 52 13 - PIPE AND TUBE RAILINGS

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

06 10 00 - ROUGH CARPENTRY

TABLE OF CONTENTS

00 01 10 - 2

06 15 00 - WOOD DECKING

06 18 00 - GLUED-LAMINATED CONSTRUCTION

06 20 00 - FINISH CARPENTRY

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

07 11 13 - BITUMINOUS DAMPPROOFING

07 21 00 - THERMAL INSULATION

07 26 00 - VAPOR RETARDERS

07 27 26 - FLUID APPLIED MEMBRANE AIR BARRIER

07 41 13 - METAL ROOF PANELS

07 44 00 - FACED PANELS

07 46 46 - FIBER-CEMENT SIDING

07 61 00 - SHEET METAL ROOFING

07 62 00 - SHEET METAL FLASHING AND TRIM

07 71 23 - MANUFACTURED GUTTERS AND DOWNSPOUTS

07 84 00 - FIRESTOPPING

07 92 00 - JOINT SEALANTS

DIVISION 08 -- OPENINGS

08 11 13 - HOLLOW METAL DOORS AND FRAMES

08 14 16 - FLUSH WOOD DOORS

08 14 33 - STILE AND RAIL WOOD DOORS

08 31 00 - ACCESS DOORS AND PANELS

08 43 13 - ALUMINUM-FRAMED STOREFRONTS

08 51 13 - ALUMINUM WINDOWS

08 71 00 - DOOR HARDWARE

08 80 00 - GLAZING

DIVISION 09 -- FINISHES

09 21 16 - GYPSUM BOARD ASSEMBLIES

TABLE OF CONTENTS

00 01 10 - 3

09 22 16 - NON-STRUCTURAL METAL FRAMING

09 30 00 - TILING

09 65 00 - RESILIENT FLOORING

09 68 13 - TILE CARPETING

09 91 00 - PAINTING

DIVISION 10 -- SPECIALTIES

10 14 00 - SIGNAGE

10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES

10 31 00 - MANUFACTURED FIREPLACES

10 44 00 - FIRE PROTECTION SPECIALTIES

10 55 00 - POSTAL SPECIALTIES

DIVISION 11 -- EQUIPMENT

11 30 13 - RESIDENTIAL APPLIANCES

11 66 23 - GYMNASIUM EQUIPMENT

DIVISION 12 -- FURNISHINGS

12 24 00 - WINDOW SHADES

12 35 30 - RESIDENTIAL CASEWORK

12 46 00 - FURNITURE ACCESSORIES

12 48 13 - ENTRANCE FLOOR MATS & FRAMES

DIVISION 14 -- CONVEYING EQUIPMENT

14 20 10 - PASSENGER ELEVATORS

LIST OF DRAWING SHEETS

00 01 15 - 1

SECTION 00 01 15 - LIST OF DRAWING SHEETS

LIST OF DRAWING SHEETS

00 01 15 - 2

DRAWING NO. TITLE

TS TITLE SHEET

ABA ACCESSIBILITY STANDARDS

LS1.1 FIRST FLOOR LIFE SAFETY

LS1.2 SECOND FLOOR LIFE SAFETY

SP1.1 ARCHITECTURAL SITE PLAN

CIVIL SITE & LANDSCAPING

C0.1 CIVIL GENERAL NOTES

C1.1 EXISTING CONDITIONS - NORTH

C1.2 EXISTING CONDITIONS - SOUTH

CD1.1 DEMO PLAN

CS1.1 SITE PLAN

CS1.2 GEOMETRY PLAN

CG1.1 GRADING PLAN

CG1.2 GRADING PLAN

CG1.3 EROSION CONTROL PLAN

CG1.4 EROSION CONTROL PLAN

CG5.1 EROSION CONTROL DETAILS

CG5.2 WIRE OUTLET DETAILS

CP1.1 PAVING PLAN

CP1.2 JOINTING PLAN

CP5.1 PAVING DETAILS

LIST OF DRAWING SHEETS

00 01 15 - 3

CP5.2 PAVING DETAILS

CU1.1 OVERALL UTILITY PLAN

CU2.1 SANITARY SEWER DETAILS

CU3.1 WATERLINE PLAN

CU3.2 WATERLINE PLAN

CU5.1 SANITARY SEWER DETAILS

CU5.2 WATERLINE DETAILS

LP1.1 NORTH LANDSCAPE PLAN

LP1.2 SOUTH LANDSCAPE PLAN

LP5.1 PLANTING DETAILS AND NOTES

L11.1 IRRIGATION PLAN

LI5.1 IRRIGATION DETAILS

STRUCTURAL

S0.1 GENERAL NOTES

S0.2 GENERAL NOTES

S0.3 INSPECTION TABLES

S1.1 FOUNDATION PLAN

S1.3 FLOOR FRAMING PLAN

S2.1 ROOF PLATFORM PLAN

S2.2 ROOF FRAMING PLAN

S3.1 COLUMN SCHEDULE

S3.2 BRACE FRAME SCHEDULE AND FRAMING ELEVATIONS

S3.3 BRACE FRAME DETAILS

LIST OF DRAWING SHEETS

00 01 15 - 4

S3.4 CANOPY COLUMN LAYOUT

S4.1 TYPICAL FOUNDATION DETAILS

S4.2 FOUNDATION DETAILS

S5.1 TYPICAL FRAMING DETAILS

S5.2 FRAMING DETAILS

S5.3 FRAMING DETAILS

S5.4 FRAMING DETAILS

S5.5 FRAMING DETAILS

S6.1 LIGHT GAGE FRAMING DETAILS

S7.1 STAIR PLANS AND DETAILS

ARCHITECTURAL

A0.1 FIRST FLOOR PLAN - DIMENSIONS

A0.2 SECOND FLOOR PLAN - DIMENSIONS

A1.1 FIRST FLOOR PLAN

A1.2 SECOND FLOOR PLAN

A1.3 ENLARGED TYPICAL PLANS

A1.4 ENLARGED PLANS

A1.5 ENLARGED PLANS

A1.6 ENLARGED PLANS

A1.7 STAIR DETAILS

A1.8 STAIR DETAILS

A1.9 ELEVATOR DETAILS

A1.10 MAIN ENTRY

LIST OF DRAWING SHEETS

00 01 15 - 5

A1.11 PATIO

A2.1 ROOF PLAN

A2.2 ROOF DETAILS

A3.1 EXTERIOR ELEVATIONS

A3.2 EXTERIOR ELEVATIONS

A3.3 EXTERIOR ELEVATIONS

A4.1 BUILDING SECTIONS

A4.2 BUILDING SECTIONS

A4.3 BUILDING SECTIONS

A4.4 BUILDING SECTIONS

A4.5 BUILDING SECTIONS

A5.1 WALL SECTIONS

A5.2 WALL SECTIONS

A5.3 WALL SECTIONS

A5.4 WALL SECTIONS

A5.5 WALL SECTIONS

A5.6 WALL SECTIONS

A5.7 WALL SECTIONS

A5.8 SECTION DETAILS

A5.9 SECTION DETAILS

A6.1 DOOR & WINDOW INFORMATION

A6.2 DOOR & WINDOW DETAILS

A7.1 INTERIOR ELEVATIONS

A7.2 INTERIOR ELEVATIONS

LIST OF DRAWING SHEETS

00 01 15 - 6

A7.3 INTERIOR ELEVATIONS

A7.4 INTERIOR ELEVATIONS

A8.1 MILLWORK SECTION DETAILS

A9.1 FIRST FLOOR REFLECTED CEILING PLAN

A9.2 SECOND FLOOR REFLECTED CEILING PLAN

A9.3 CEILING DETAILS

A10.1 FIRST FLOOR FINISH PLAN

A10.2 SECOND FLOOR FINISH PLAN

A10.3 FINISH SCHEDULES

A11.1 FIRST FLOOR EQUIPMENT PLAN

A11.2 SECOND FLOOR EQUIPMENT PLAN

A11.3 ENLARGED EQUIPMENT PLAN

A12.1 FIRST FLOOR SIGNAGE PLAN

A12.2 SECOND FLOOR SIGNAGE PLAN

FIRE PROTECTION

FG0.1 FIRE SUPPRESSION GENERAL NOTES

FX1.1 FIRST FLOOR FIRE SUPPRESSION PLAN

FX1.2 SECOND FLOOR FIRE SUPPRESSION PLAN

F4.1 FIRE SUPPRESSION LARGE-SCALE PLANS

F4.2 FIRE PUMP LARGE-SCALE PLANS

F5.1 FIRE SUPPRESSION DETAILS

MECHANICAL

LIST OF DRAWING SHEETS

00 01 15 - 7

MG0.1 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES

MH1.1 FIRST FLOOR HVAC PLAN

MH1.2 SECOND FLOOR HVAC PLAN

MP1.1 FIRST FLOOR MECHANICAL PIPING PLAN

MP1.2 SECOND FLOOR MECHANICAL PIPING PLAN

M3.1 MECHANICAL SECTIONS

M3.2 MECHANICAL SECTIONS

M4.1 MECHANICAL LARGE-SCALE PLANS

M4.2 MECHANICAL LARGE-SCALE PLANS

M5.1 MECHANICAL DETAILS

M6.1 MECHANICAL PIPING ISOMETRICS

M7.1 MECHANICAL SCHEDULES

PLUMBING

PL1.0 FOUNDATION PLUMBING PLAN

PL1.1 FIRST FLOOR PLUMBING PLAN

PL1.2 SECOND FLOOR PLUMBING PLAN

P3.1 PLUMBING FIXTURES

P4.1 PLUMBING LARGE-SCALE PLANS

P4.2 PLUMBING LARGE-SCALE PLANS

P5.1 PLUMBING DETAILS

P6.1 PLUMBING DIAGRAMS - ONE BEDROOM APARTMENT

P6.2 PLUMBING RISER DIAGRAMS - TWO BEDROOM

APARTMENT

LIST OF DRAWING SHEETS

00 01 15 - 8

P6.3 PLUMBING RISER DIAGRAMS - FOUR BEDROOM

APARTMENT

P6.4 PLUMBING RISER DIAGRAMS - MECHANICAL ROOM,

RESTROOMS, LAUNDRY ROOM

P6.5 NATURAL GAS PIPING RISER DIAGRAM

P7.1 PLUMBING SCHEDULES

ELECTRICAL

EG0.1 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES

ES1.1 ELECTRICAL SITE PLAN

EL1.1 FIRST FLOOR LIGHTING PLAN

EL1.2 SECOND FLOOR LIGHTING PLAN

EP1.1 FIRST FLOOR POWER PLAN

EP1.2 SECOND FLOOR POWER PLAN

EP2.1 ELECTRICAL ROOF PLAN

EY1.1 FIRST FLOOR SPECIAL SYSTEMS PLAN

EY1.2 SECOND FLOOR SPECIAL SYSTEMS PLAN

E4.1 ELECTRICAL LARGE-SCALE PLANS

E4.2 ELECTRICAL LARGE-SCALE PLANS

E5.1 ELECTRICAL DETAILS

E5.2 ELECTRICAL DETAILS

E5.3 ELECTRICAL DETAILS

E6.1 ELECTRICAL DIAGRAMS

E7.1 ELECTRICAL SCHEDULES

E7.2 ELECTRICAL SCHEDULES

LIST OF DRAWING SHEETS

00 01 15 - 9

Project No. H IH BLAC 19100

Health Facilities Group, LLC ©2019

GENERAL REQUIREMENTS

Page 01 00 00-1

SECTION 01 00 00 – GENERAL REQUIREMENTS

PART 1 - GENERAL

1.01 WORK BY OWNER

(A) THE OWNER RESERVES THE RIGHT TO AWARD SEPARATE CONTRACTS FOR SUPPLY AND INSTALLATION

OF CERTAIN EQUIPMENT AND FINISHES, WHICH MAY BE INSTALLED BY OTHERS DURING THE

CONSTRUCTION TIME FOR THIS CONTRACT.

(B) ITEMS NOTED "N.I.C." (NOT IN CONTRACT), OR "BY OTHERS", ARE NOT PART OF THIS CONTRACT.

1.02 CONTRACTOR USE OF PREMISES

(A) LIMIT USE OF PREMISES TO ALLOW:

1. OWNER OCCUPANCY.

2. WORK BY OTHERS AND WORK BY OWNER.

3. WORK BY GENERAL CONTRACTOR AND SUB-CONTRACTORS

1.04 INSPECTION AND TESTING ALLOWANCES

(A) N.A.

1.05 SCHEDULE OF VALUES

(A) SUBMIT SCHEDULE ON AIA FORM G703. CONTRACTOR'S STANDARD FORM OR ELECTRONIC MEDIA

PRINTOUT WILL BE CONSIDERED.

(B) SUBMIT SCHEDULE OF VALUES IN DUPLICATE WITHIN 10 DAYS AFTER DATE ESTABLISHED IN NOTICE TO

PROCEED.

1.06 APPLICATIONS FOR PAYMENT

(A) SUBMIT THREE COPIES OF EACH APPLICATION ON AIA FORM G702.

(B) CONTENT AND FORMAT: UTILIZE SCHEDULE OF VALUES FOR LISTING ITEMS IN APPLICATION FOR

PAYMENT.

(C) PAYMENT PERIOD: SEE "GENERAL CONDITIONS OF THE CONTRACT" AND "SUPPLEMENTARY

CONDITIONS"

1.07 CHANGE PROCEDURES

(A) CHANGE ORDER FORMS: AIA G701.

(B) CONSTRUCTION CHANGE DIRECTIVE FORMS: AIA G714.

1.08 ALTERNATES

GENERAL REQUIREMENTS

Page 01 00 00-2

(A) ALTERNATES QUOTED ON BID FORMS WILL BE REVIEWED AND ACCEPTED OR REJECTED AT THE

OWNER'S OPTION.

(B) COORDINATE RELATED WORK AND MODIFY SURROUNDING WORK AS REQUIRED.

(C) ALTERNATES ARE LISTED IN DOCUMENT-C OF THIS PROJECT MANUAL.

1.09 COORDINATION

(A) COORDINATE SCHEDULING, SUBMITTALS, AND WORK OF THE VARIOUS SECTIONS OF SPECIFICATIONS

TO ASSURE EFFICIENT AND ORDERLY SEQUENCE OF INSTALLATION OF INTERDEPENDENT

CONSTRUCTION ELEMENTS.

(B) VERIFY UTILITY REQUIREMENT CHARACTERISTICS OF OPERATING EQUIPMENT ARE COMPATIBLE WITH

BUILDING UTILITIES.

(C) COORDINATE SPACE REQUIREMENTS AND INSTALLATION OF MECHANICAL AND ELECTRICAL WORK

WHICH ARE INDICATED DIAGRAMMATICALLY ON DRAWINGS. FOLLOW ROUTING SHOWN FOR PIPES, DUCTS, AND CONDUIT, AS CLOSELY AS PRACTICABLE.

(D) IN FINISHED AREAS, CONCEAL PIPES, DUCTS, AND WIRING WITHIN THE CONSTRUCTION.

1.10 FIELD ENGINEERING

(A) GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BUILDING AND SITE LAYOUT WORK, INCLUDING ESTABLISHING FLOOR ELEVATIONS AS SHOWN. GENERAL CONTRACTOR SHALL

MAINTAIN AND PROTECT SURVEY CONTROL AND REFERENCE POINTS.

(B) GENERAL CONTRACTOR SHALL ESTABLISH AND MAINTAIN OTHER GRADES, LINES, LEVELS, AND

DIMENSIONS INDICATED THEREON, AND CERTIFY THAT ELEVATIONS AND LOCATIONS OF THE WORK

CONFORM WITH CONTRACT DOCUMENTS. GENERAL CONTRACTOR SHALL REPORT ANY

INCONSISTENCIES TO ARCHITECT AND RECEIVE HIS INSTRUCTIONS BEFORE COMMENCING WORK.

(C) OWNER WILL FURNISH EVIDENCE OF THE LOCATIONS OF PROPERTY LINES, EASEMENTS AND OTHER

RESTRICTIONS.

(D) GENERAL CONTRACTOR SHALL PROVIDE AND MAINTAIN WELL-BUILT BATTER BOARDS AT CORNERS

AND ESTABLISH AND SAFEGUARD BENCH MARKS IN AT LEAST TWO WIDELY SEPARATED PLACES. AS

WORK PROGRESSES, HE SHALL ALSO ESTABLISH BENCH MARKS AT EACH BUILDING LEVEL AND MARK

EXACT LOCATIONS OF PARTITIONS ON ROUGH FLOORS AS A GUIDE TO THE VARIOUS TRADES.

1.11 CUTTING AND PATCHING

(A) EMPLOY A SKILLED AND EXPERIENCED INSTALLER TO PERFORM CUTTING AND PATCHING OF NEW OR

PREVIOUSLY INSTALLED WORK; RESTORE WORK WITH NEW PRODUCTS.

(B) SUBMIT WRITTEN REQUEST IN ADVANCE OF CUTTING OR ALTERING STRUCTURAL OR BUILDING

ENCLOSURE ELEMENTS.

GENERAL REQUIREMENTS

Page 01 00 00-3

(C) FIT WORK TIGHT TO ADJACENT ELEMENTS. MAINTAIN INTEGRITY OF WALL, CEILING, OR FLOOR

CONSTRUCTION; COMPLETELY SEAL VOIDS.

(D) REFINISH SURFACES TO MATCH ADJACENT FINISHES.

1.12 CONFERENCES

(A) WHEN REQUIRED IN INDIVIDUAL SPECIFICATION SECTIONS, THE GENERAL CONTRACTOR SHALL

CONVENE A PRE-INSTALLATION CONFERENCE AT PROJECT SITE PRIOR TO COMMENCING WORK OF

THAT SECTION. GIVE ALL PARTIES REQUIRED TO ATTEND A MINIMUM 48 HOURS NOTICE.

1.15 PROGRESS MEETINGS

(A) GENERAL CONTRACTOR SHALL SCHEDULE AND ADMINISTER MEETINGS THROUGHOUT PROGRESS OF

THE WORK AT MAXIMUM MONTHLY INTERVALS.

(B) GENERAL CONTRACTOR SHALL PRESIDE AT MEETINGS, RECORD MINUTES, AND DISTRIBUTE COPIES

WITHIN SEVEN DAYS TO THOSE AFFECTED BY DECISIONS MADE.

1.16 SUBMITTAL PROCEDURES

(A) SUBMITTAL FORM TO IDENTIFY PROJECT, CONTRACTOR, SUBCONTRACTOR OR SUPPLIER; AND

PERTINENT CONTRACT DOCUMENT REFERENCES.

(B) APPLY CONTRACTOR'S STAMP, SIGNED OR INITIALED, CERTIFYING THAT REVIEW, VERIFICATION OF

PRODUCTS REQUIRED, CHECKING OF FIELD DIMENSIONS, ADJACENT CONSTRUCTION WORK, AND

COORDINATION OF INFORMATION IS IN ACCORDANCE WITH THE REQUIREMENTS OF THE WORK AND

CONTRACT DOCUMENTS.

(C) IDENTIFY VARIATIONS FROM CONTRACT DOCUMENTS, AND PRODUCT OR SYSTEM LIMITATIONS

WHICH MAY BE DETRIMENTAL TO SUCCESSFUL PERFORMANCE OF THE COMPLETED WORK.

(D) REVISE AND RESUBMIT SUBMITTALS AS REQUIRED; IDENTIFY ALL CHANGES MADE SINCE PREVIOUS

SUBMITTAL.

1.17 CONSTRUCTION PROGRESS SCHEDULES

(A) SUBMIT INITIAL PROGRESS SCHEDULE IN DUPLICATE WITHIN 15 DAYS AFTER DATE ESTABLISHED IN

NOTICE TO PROCEED FOR ARCHITECT/ENGINEER REVIEW.

(B) SUBMIT REVISED SCHEDULES WITH EACH MONTHLY APPLICATION FOR PAYMENT, IDENTIFYING

CHANGES SINCE PREVIOUS VERSION. INDICATE ESTIMATED PERCENTAGE OF COMPLETION FOR

EACH ITEM OF WORK AT EACH SUBMISSION.

(C) SUBMIT A HORIZONTAL BAR CHART WITH SEPARATE LINE FOR EACH MAJOR SECTION OF WORK OR

OPERATION, IDENTIFYING FIRST WORK DAY OF EACH WEEK.

1.18 PROPOSED PRODUCTS LIST

(A) WITHIN 10 DAYS AFTER DATE ESTABLISHED IN NOTICE TO PROCEED, SUBMIT COMPLETE LIST OF MAJOR

PRODUCTS PROPOSED FOR USE, WITH NAME OF MANUFACTURER, TRADE NAME, AND MODEL

NUMBER OF EACH PRODUCT.

GENERAL REQUIREMENTS

Page 01 00 00-4

(B) WITHIN 10 DAYS AFTER DATE ESTABLISHED IN NOTICE TO PROCEED, SUBMIT COMPLETE LIST OF ALL

PROPOSED SUBCONTRACTORS.

1.19 SHOP DRAWINGS

(A) LARGE SUBMITTALS – DRAWINGS, OR OTHER INFORMATION THAT REQUIRE A FORMAT LARGER THAN

8.5” X 11” (TO BE CLEARLY READABLE) OR MATERIAL AND EQUIPMENT SUBMITTALS CONTAINING

MORE THAN (10) PAGES (APPLICABLE TO ONE SPECIFICATION SECTION).

1. SUBMIT IN THE FORM OF ONE EDITABLE .PDF FILE, DELIVERED BY EMAIL, UPLOADED TO A

PROJECT WEBSITE LOCATION, OR AS OTHERWISE DIRECTED.

(B) SMALL SUBMITTALS – MATERIAL, EQUIPMENT, CATALOG AND OTHER 8.5” X 11” FORMAT SUBMITTALS

(10) SHEETS OR LESS FOR ANY ONE SPECIFICATION SECTION.

1. SUBMIT IN THE FORM OF ONE EDITABLE .PDF FILE, DELIVERED BY EMAIL, UPLOADED TO A

PROJECT WEBSITE LOCATION, OR AS OTHERWISE DIRECTED.

(C) AT THE ARCHITECT/ENGINEERS OPTION, REVIEW MARKS WILL BE INDICATED ON ONE OR BOTH OF THE

SUBMITTED FORMATS. ALL REVIEW MARKS SHOULD BE COLOR CODED TO REFLECT VARIOUS

REVIEWERS MARKS.

(D) ARCHITECT SHALL KEEP ONE COPY OF ALL SUBMITTALS. CONTRACTOR SHALL KEEP ONE COPY OF

ALL SUBMITTALS ON FILE TO BE GIVEN TO THE OWNER AT THE COMPLETION OF THE PROJECT.

(E) THE CONTRACTOR SHALL PROVIDE TO THE OWNER AND ARCHITECT A DIGITAL MEDIA COPY OF AN

INDEXED AND BOOKMARKED .PDF FORMAT FILE THAT INCLUDES ALL OF THE SUBMITTALS AT THE

CLOSE OUT OF THE PROJECT.

1.20 PRODUCT DATA

(A) SUBMIT THE NUMBER OF COPIES WHICH THE CONTRACTOR REQUIRES, PLUS TWO COPIES WHICH WILL

BE RETAINED BY THE ARCHITECT/ENGINEER.

(B) MARK EACH COPY TO IDENTIFY APPLICABLE PRODUCTS, MODELS, OPTIONS, AND OTHER DATA.

SUPPLEMENT MANUFACTURERS' STANDARD DATA TO PROVIDE INFORMATION UNIQUE TO THIS

PROJECT.

1.21 SAMPLES

(A) SUBMIT SAMPLES TO ILLUSTRATE FUNCTIONAL AND AESTHETIC CHARACTERISTICS OF THE PRODUCT.

(B) SUBMIT SAMPLES OF FINISHES FROM THE FULL RANGE OF MANUFACTURERS' STANDARD COLORS, OR

IN CUSTOM COLORS AS NOTED IN INDIVIDUAL SPECIFICATION SECTIONS, INCLUDING OPTIONAL

TEXTURES AND PATTERNS FOR ARCHITECT/ENGINEER'S SELECTION.

(C) WHERE APPROVAL OF ARCHITECT FOR MATERIALS OR EQUIPMENT IS REQUIRED, SECURE SUCH

APPROVAL BEFORE PROCUREMENT. WHERE COLORS AND/OR PATTERNS ARE TO BE SELECTED BY

ARCHITECT, REQUEST SUCH SELECTION IN AMPLE TIME FOR PROCUREMENT.

1.22 MANUFACTURERS' INSTRUCTIONS

GENERAL REQUIREMENTS

Page 01 00 00-5

(A) WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, SUBMIT MANUFACTURERS' PRINTED

INSTRUCTIONS FOR DELIVERY, STORAGE, ASSEMBLY, INSTALLATION, START-UP, ADJUSTING, AND

FINISHING, IN QUANTITIES SPECIFIED FOR PRODUCT DATA.

1.23 MANUFACTURER'S CERTIFICATES

(A) WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, SUBMIT MANUFACTURERS' CERTIFICATE TO

ARCHITECT/ENGINEER FOR REVIEW, IN QUANTITIES SPECIFIED FOR PRODUCT DATA.

(B) INDICATE MATERIAL OR PRODUCT CONFORMS TO OR EXCEEDS SPECIFIED REQUIREMENTS. SUBMIT

SUPPORTING REFERENCE DATA, AFFIDAVITS, AND CERTIFICATIONS AS APPROPRIATE.

1.24 CONSTRUCTION PHOTOGRAPHS

(A) THE CONTRACTOR SHALL PHOTOGRAPH WORK IN PROGRESS AT REGULAR INTERVALS TO

DOCUMENT THE OVERALL PROGRESS OF CONSTRCTION. PHOTOGRAPHS WILL BE UPLOADED TO A

PROJECT WEBSITE AND AVAILABLE FOR ACCESS BY THE OWNER AND ARCHITECT. .

1.25 QUALITY ASSURANCE/CONTROL OF INSTALLATION

(A) MONITOR QUALITY CONTROL OVER SUPPLIERS, MANUFACTURERS, PRODUCTS, SERVICES, SITE

CONDITIONS, AND WORKMANSHIP, TO PRODUCE WORK OF SPECIFIED QUALITY.

(B) COMPLY FULLY WITH MANUFACTURERS' INSTRUCTIONS.

(C) COMPLY WITH SPECIFIED STANDARDS AS A MINIMUM QUALITY FOR THE WORK EXCEPT WHEN MORE

STRINGENT TOLERANCES, CODES, OR SPECIFIED REQUIREMENTS INDICATE HIGHER STANDARDS OR

MORE PRECISE WORKMANSHIP.

1.26 REFERENCES

(A) CONFORM TO REFERENCE STANDARD BY DATE OF ISSUE CURRENT AS OF DATE OF CONTRACT

DOCUMENTS.

(B) SHOULD SPECIFIED REFERENCE STANDARD CONFLICT WITH CONTRACT DOCUMENTS, REQUEST

CLARIFICATION FROM ARCHITECT/ENGINEER BEFORE PROCEEDING.

(C) UNLESS NOTED OTHERWISE, THE RECOMMENDATIONS AND STANDARDS OF THE FOLLOWING

ORGANIZATIONS SHALL APPLY TO THIS PROJECT:

AA ALUMINUM ASSOCIATION

AAMA ARCHITECTURAL ALUMINUM MANUFACTURERS ASSOCIATION

AASHO AMERICAN ASSOCIATION OF STATE HIGHWAY & TRANSPORTATION OFFICIALS

ACI AMERICAN CONCRETE INSTITUTE

AFI AIR FILTER INSTITUTE

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL CONTRACTORS OF AMERICA

AIA AMERICAN INSTITUTE OF ARCHITECTS

AIA AMERICAN INSURANCE ASSOCIATION (FORMERLY NFFU)

AIEE AMERICAN INSTITUTE OF ELECTRICAL ENGINEERS

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AISI AMERICAN IRON AND STEEL INSTITUTE

ALS AMERICAN LUMBER STANDARDS

GENERAL REQUIREMENTS

Page 01 00 00-6

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE (FORMERLY USAS)

APA AMERICAN PLYWOOD ASSOCIATION

API AMERICAN PETROLEUM INSTITUTE

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION AND

AIR-CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AWI ARCHITECTURAL WOODWORK INSTITUTE

AWPA AMERICAN WOOD PRESERVER'S INSTITUTE

AWS AMERICAN WELDING SOCIETY

AWWA AMERICAN WATER WORKS ASSOCIATION

CISPI CAST IRON SOIL PIPE INSTITUTE

CS COMMERCIAL STANDARD, U. S. DEPARTMENT OF COMMERCE

CGA COMPRESSED GAS ASSOCIATION

CSI CONSTRUCTION SPECIFICATION INSTITUTE

FGJA FLAT GLASS JOBBERS ASSOCIATION

FIA FACTORY INSURANCE ASSOCIATION

FM FACTORY MUTUAL ENGINEERING AND RESEARCH

FS FEDERAL SPECIFICATION

GA GYPSUM ASSOCIATION

IEEE INSTITUTE OF ELECTRIC AND ELECTRONICS ENGINEERS

IES ILLUMINATING ENGINEERING SOCIETY

IPC INTERNATIONAL PLUMBING CODE

MIA MARBLE INSTITUTE OF AMERICA

MLMA METAL LATH MANUFACTURERS ASSOCIATION

MS MILITARY SPECIFICATION

MSTD MILITARY STANDARD

NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL

MANUFACTURERS

NACE NATIONAL ASSOCIATION OF CORROSION ENGINEERS

NAFM NATIONAL ASSOCIATION OF FAN MANUFACTURERS

NBS NATIONAL BUREAU OF STANDARDS

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NHLA NATIONAL HARDWOOD LUMBER ASSOCIATION

NIOSH/OSHA NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH

NTMA NATIONAL TERRAZZO AND MOSAIC ASSOCIATION

NWMA NATIONAL WOODWORK MANUFACTURERS ASSOCIATION

PEI PORCELAIN ENAMEL INSTITUTE

RTI RESILIENT TILE INSTITUTE

SBI STEEL BOILER INSTITUTE

SCPI STRUCTURAL CLAY PRODUCTS INSTITUTE

SDI STEEL DECK INSTITUTE

SJI STEEL JOIST INSTITUTE

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS

NATIONAL ASSOCIATION

SSPC STEEL STRUCTURE PAINTING COUNCIL

STI STEEL TANK INSTITUTE

TCA TILE COUNCIL OF AMERICA

UBC UNIFORM BUILDING CODE

GENERAL REQUIREMENTS

Page 01 00 00-7

UL UNDERWRITER'S LABORATORIES

UFC UNIFORM FIRE CODE

1.27 FIELD SAMPLES

(A) FOR EACH JOB-FINISHED MATERIAL, SUCH AS MASONRY, PLASTER, CONCRETE, PAINT OR OTHER

FINISHES, CONSTRUCT FIELD SAMPLES AT THE SITE FOR ARCHITECT'S REVIEW AND APPROVAL, AS

REQUIRED BY INDIVIDUAL SPECIFICATIONS SECTIONS.

(B) OBTAIN ARCHITECT'S APPROVAL BEFORE INSTALLING THE BALANCE OF SUCH WORK. WHEN THE

ARCHITECT'S APPROVAL REQUIRES ADDITIONAL PANELS OR SAMPLES, PROVIDE SAME AS NECESSARY

TO SECURE HIS APPROVAL.

(C) SAMPLE PANELS MAY BECOME PART OF FINAL BUILDING CONSTRUCTION, WITH PRIOR APPROVAL OF

ARCHITECT.

(D) ACCEPTABLE SAMPLE PANELS REPRESENT A MINIMUM QUALITY LEVEL FOR ALL SUBSEQUENT WORK.

1.28 INSPECTION AND TESTING LABORATORY SERVICES

(A) CONTRACTOR SHALL APPOINT, EMPLOY, AND PAY FOR SERVICES OF AN INDEPENDENT FIRM(S) TO

PERFORM INSPECTION AND TESTING, WHERE NOTED IN INDIVIDUAL SPECIFICATION SECTIONS.

(B) THE INDEPENDENT FIRM WILL PERFORM INSPECTIONS, TESTS, AND OTHER SERVICES AS REQUIRED OR

SPECIFIED HEREIN.

(C) COOPERATE WITH INDEPENDENT FIRM; FURNISH SAMPLES AS REQUESTED.

(D) RE-TESTING REQUIRED BECAUSE OF NON-CONFORMANCE TO SPECIFIED REQUIREMENTS WILL BE

CHARGED TO THE CONTRACTOR.

(E) SHOULD SUCH TEST OR VISUAL OBSERVATION INDICATE A FAILURE OF MATERIALS OR CONSTRUCTION

TO MEET REQUIREMENTS OF DRAWINGS AND/OR SPECIFICATIONS, RESPECTIVE CONTRACTOR SHALL

PAY FOR ADDITIONAL TESTS, AS DIRECTED BY THE ARCHITECT UNTIL COMPLIANCE HAS BEEN PROVEN, AND SHOULD SUCH WORK FAIL TO COMPLY, THIS CONTRACTOR SHALL REPLACE IT AT NO

ADDITIONAL COST TO THE OWNER.

(F) COPIES OF TESTING REPORTS SHALL BE SENT TO THE OWNER, THE ARCHITECT, THE MECHANICAL

ENGINEER AND THE CONTRACTOR OR OTHERWISE AS NOTED HEREIN.

1.29 MANUFACTURERS' FIELD SERVICES AND REPORTS

(A) WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, REQUIRE MATERIAL OR PRODUCT

SUPPLIERS OR MANUFACTURERS TO PROVIDE QUALIFIED STAFF PERSONNEL TO OBSERVE SITE

CONDITIONS AND TO INITIATE INSTRUCTIONS WHEN NECESSARY.

(B) REPORT OBSERVATIONS AND SITE DECISIONS OR INSTRUCTIONS THAT ARE SUPPLEMENTAL OR

CONTRARY TO MANUFACTURERS' WRITTEN INSTRUCTIONS.

Page 01 00 00-8

1.30 TEMPORARY ELECTRICITY

(A) PROVIDE AND PAY FOR POWER SERVICE REQUIRED FROM SOURCE.

(B) PROVIDE POWER OUTLETS FOR CONSTRUCTION OPERATIONS, BRANCH WIRING, DISTRIBUTION BOXES, AND FLEXIBLE POWER CORDS AS REQUIRED.

1.31 TEMPORARY LIGHTING

(A) PROVIDE AND MAINTAIN TEMPORARY LIGHTING FOR CONSTRUCTION OPERATIONS, AND SECURITY

LIGHT(S) AROUND CONSTRUCTION AREA(S).

(B) PROVIDE BRANCH WIRING FROM POWER SOURCE TO DISTRIBUTION BOXES WITH LIGHTING

CONDUCTORS, PIGTAILS, AND LAMPS AS REQUIRED.

(C) PERMANENT BUILDING LIGHTING MAY BE UTILIZED DURING CONSTRUCTION. REPAIR, CLEAN, AND

REPLACE LAMPS AT END OF CONSTRUCTION AS REQUIRED, PRIOR TO SUBSTANTIAL COMPLETION

INSPECTION.

1.32 TEMPORARY HEAT AND COOLING

(A) THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY HEAT AND/OR COOLING AS REQUIRED TO

MAINTAIN SPECIFIED CONDITIONS FOR CONSTRUCTION OPERATIONS, OR TO PREVENT DAMAGE

FROM DAMPNESS AND COLD, OR TO DRY OUT WORK. DO NOT USE TEMPORARY EQUIPMENT WHICH

MIGHT DAMAGE BUILDING. MECHANICAL CONTRACTOR SHALL MAKE PERMANENT HEATING

SYSTEMS READY AND SUPPLY TEMPORARY HEAT FROM THESE AS SOON AS PERMANENT SYSTEMS ARE

COMPLETED.

(B) GENERAL CONTRACTOR SHALL PROVIDE AND PAY FOR OPERATION, MAINTENANCE, AND REGULAR

REPLACEMENT OF FILTERS AND WORN OR CONSUMED PARTS.

(C) MAINTAIN MINIMUM TEMPERATURES FOR INSTALLATION OF MATERIAL(S) AS SPECIFIED HEREIN, OR

OTHERWISE AS REQUIRED BY PRODUCT MANUFACTURER(S). CONTRACTOR SHALL REPAIR OR

REPLACE MATERIALS DAMAGED AS A RESULT OF EXPOSURE TO LOW TEMPERATURE; EITHER DURING

INITIAL APPLICATION OR INSTALLATION, CURING, OR SUBSEQUENT CONSTRUCTION ACTIVITY.

(D) PROVIDE QUALIFIED PERSONNEL TO OPERATE TEMPORARY AND PERMANENT EQUIPMENT.

1.33 TEMPORARY VENTILATION

(A) VENTILATE ENCLOSED AREAS AS REQUIRED TO ASSIST CURE OF MATERIALS, TO DISSIPATE HUMIDITY, AND TO PREVENT ACCUMULATION OF DUST, FUMES, VAPORS, AND GASES.

(B) GENERAL CONTRACTOR MAY UTILIZE PERMANENT H.V.A.C. SYSTEMS AS SOON AS THESE SYSTEMS

ARE AVAILABLE. EXTEND AND SUPPLEMENT EQUIPMENT WITH TEMPORARY FAN UNITS AS REQUIRED

TO MAINTAIN CLEAN AIR FOR CONSTRUCTION OPERATIONS.

1.34 TELEPHONE SERVICE

(A) PROVIDE, MAINTAIN, AND PAY FOR TEMPORARY TELEPHONE SERVICE AT THE CONTRACTOR'S FIELD

OFFICE FOR THE DURATION OF CONSTRUCTION, INCLUDING USE OF THE PHONE BY THE ARCHITECT

GENERAL REQUIREMENTS

Page 01 00 00-9

OR HIS REPRESENTATIVE, FOR CALLS TO THE ARCHITECT'S OFFICE, THE OWNER, PROJECT

ENGINEERING CONSULTANTS, SUPPLIERS, OR OTHERS, AS NECESSARY FOR THE PROPER AND

EXPEDIENT COMPLETION OF ALL DUTIES REQUIRED FOR ADMINISTRATION OF THIS PROJECT.

1.35 TEMPORARY WATER SERVICE

(A) PROVIDE, MAINTAIN AND PAY FOR SUITABLE QUALITY WATER SERVICE REQUIRED FOR

CONSTRUCTION ACTIVITIES. CONNECT TO EXISTING WATER SOURCE, AND MAKE ALL EXTENSIONS

NECESSARY FOR CONSTRUCTION OPERATIONS.

1.36 TEMPORARY SANITARY FACILITIES

(A) GENERAL CONTRACTOR SHALL PROVIDE PROPERLY SERVICED TOILET FACILITIES FOR USE OF ALL

WORKMEN.

(B) MAINTAIN IN CLEAN AND SANITARY CONDITION.

1.37 BARRIERS AND FENCING

(A) GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL INSTALL AND MAINTAIN ALL WARNINGS, BARRICADES, CONSTRUCTION FENCES, SIGNAL LIGHTS, AND ANY OTHER WARNING OR BARRICADE

AS REQUIRED TO WARN AND PROTECT THE PUBLIC FROM HAZARDS DUE TO HIS OPERATIONS.

(B) PROVIDE TEMPORARY SECURITY FENCING AROUND PERIMETER OF CONSTRUCTION AND MATERIAL

STORAGE AREA(S), INCLUDING LOCKABLE GATES. CONTRACTOR SHALL BE RESPONSIBLE FOR

MAINTAINING SECURITY FENCING IN GOOD REPAIR THROUGHOUT THE PROJECT, AND FOR LOCKING

JOB SITE AT NIGHT. VERIFY PLACEMENT OF SECURITY FENCING WITH ARCHITECT PRIOR TO

INSTALLATION. THE NUMBER AND SIZES OF GATES IN THE TEMPORARY SECURITY FENCE WILL BE AS

DETERMINED BY GENERAL CONTRACTOR REQUIREMENTS.

(C) ALL SUCH WARNING DEVICES AND BARRICADES SHALL BE INSTALLED IN COMPLIANCE WITH O.S.H.A.

AND U.B.C. REQUIREMENTS, AND ANY ADDITIONAL LOCAL ORDINANCES.

1.38 WATER CONTROL

(A) MAINTAIN EXCAVATIONS FREE OF WATER. PROVIDE, OPERATE, AND MAINTAIN PUMPING EQUIPMENT

AS REQUIRED. COSTS FOR ALL SUCH PUMPING SHALL BE PAID FOR BY GENERAL CONTRACTOR.

1.39 EXTERIOR ENCLOSURES

(A) PROVIDE TEMPORARY WEATHER-TIGHT CLOSURES TO EXTERIOR OPENINGS TO PERMIT ACCEPTABLE

WORKING CONDITIONS AND PROTECTION OF THE WORK.

(B) PROVIDE TEMPORARY ROOFING AS REQUIRED TO PROTECT INTERIOR BUILDING FINISHES AND

EQUIPMENT IF THERE IS A DELAY IN INSTALLING FINAL ROOF.

(C) COSTS FOR ALL SUCH TEMPORARY CLOSURES SHALL BE PAID FOR BY THE GENERAL CONTRACTOR

1.40 INFECTION CONTROL MEASURES

(A) THE OWNER WILL PREPARE AN INFECTION CONTROL RISK ASSESSMENT AT EACH MAJOR WORK AREA

AND WILL IMPOSE REQUIRMENTS ON THE PROJECT TO CONTROL THE SPREAD OF DUST AND

GENERAL REQUIREMENTS

Page 01 00 00-10

AIRBORNE PATHOGENS DISTURBED DURING CONSTRUCTION OPERATIONS AND TO PREVENT

MIGRATION OF SUCH INTO SENSITIVE AREAS OF THE FACILITY. THE CONTRACTOR SHALL BE PREPARED

TO ADDRESS THESE REQUIREMNTS, WHICH MAY INCLUDE THE FOLLOWING ELEMENTS:

1. PROVIDE STICKY TACK MATS AT ENTRANCES AND EXITS FROM CONSTRUCTION AREAS, AS

REQUIRED.

2. PROVIDE UNITS CAPABLE OF SUPPLYING NEGATIVE PRESSURE IN ACTIVE CONSTRUCTION

AREAS. IF UNITS RECIRCULATE AIR WITHIN THIS SPACE, THE UNITS WILL BE CAPABLE OF

FILTERING THE AIR UTILIZING HEPA FILTRATION.

3. CONTRACTOR WILL BE REQUIRED TO COVER ANY CONSTRUCTION DEBRIS AND WIPE DOWN

CARTS BEFORE TRAVELING THROUGH ANY PATIENT CARE AREA.

4. CONTRACTOR WILL BE REQUIRED TO SEAL ALL HOLES, PIPES AND CONDUIT AND OTHER

WALL PENETRATIONS, AS REQUIRED, AT BARRIERS BETWEEN CONSTRUCTION OPERATIONS

AND ADJACENT PATIENT CARE AREAS.

5. IF CONSTRUCTION AREAS ARE IN PROXIMITY TO HIGH RISK PATIENT POPULATIONS,

CONTRACTOR MAY BE REQUIRED TO BUILD ANTE ROOM FOR PERSONNEL TO PASS

THROUGH, SO THE PERSONNEL CAN BE VACUUMED USING A HEPA VACUUM PRIOR TO

LEAVING THE WORK SITE.

6. CONSTRUCTION PERSONNEL MAY BE REQUIRED TO WEAR STERILE PERSONAL PROTECTIVE

EQUIPMENT WHEN WORKING IN HIGH RISK PATIENT CARE AREAS.

7. CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE INFECTION CONTROL RISK ASSESSMENT

MATRIX ATTACHED AS AN APPENDIX TO THIS PROJECT MANUAL FOR ALL MEASURES THAT

MAY BE REQUIRED IN THIS PROJECT.

8. REFER TO MECHANICAL AND ELECTRICAL SPECIFICATIONS FOR INFORMATION REGARDING

SEALING AND CLEANING OF DUCTWORK AND OTHER OPERATIONAL MEASURES THAT MAY

BE REQUIRED.

1.41 PROTECTION OF INSTALLED WORK

(A) PROTECT INSTALLED WORK AND PROVIDE SPECIAL PROTECTION WHERE SPECIFIED IN INDIVIDUAL

SPECIFICATION SECTIONS.

(B) PROHIBIT TRAFFIC OR STORAGE UPON WATERPROOFED OR ROOFED SURFACES.

(C) KEEP PROPERLY COVERED ALL MATERIALS, CAVITIES, AND HOLES SUBJECT TO DAMAGE BY FALLING

MATERIALS.

(D) LOAD, TRANSPORT, UNLOAD, STORE AND ERECT MATERIALS IN A MANNER TO KEEP THEM FROM

INJURY.

(E) SUPPORT NO RUNWAYS, RAMPS OR CONSTRUCTION EQUIPMENT ON, NOR TRANSPORT OVER ANY

ITEMS OR ASSEMBLIES SUBJECT TO DISPLACEMENT, DISFIGUREMENT OR OTHER DAMAGE.

GENERAL REQUIREMENTS

Page 01 00 00-11

(F) PROTECT PREVIOUSLY PLACED WORK BY SUITABLE COVERINGS OR OTHER PROTECTIONS DURING

INSTALLATION OF SUBSEQUENT WORK.

(G) PROTECT WORK IN PLACE REQUIRING JOB FINISH UNTIL SUCH FINISHING HAS BEEN COMPLETED.

(H) WHERE FINISHED FLOORS ARE SUBJECT TO DAMAGE, SUITABLY COVER TRAFFIC AREAS UNTIL

BUILDING ACCEPTANCE.

(I) ONCE GLASS, MIRRORS AND OTHER SUCH DAMAGEABLE ITEMS HAVE BEEN INSTALLED, IDENTIFY

SAME WITH APPROPRIATE WARNING MARKING AND LEAVE ON UNTIL FINAL CLEANING.

1.42 SECURITY

(A) PROVIDE SECURITY AND FACILITIES TO PROTECT WORK AND OWNER'S OPERATIONS FROM

UNAUTHORIZED ENTRY, VANDALISM, OR THEFT.

1.43 ACCESS ROADS

(A) CONSTRUCT AND MAINTAIN TEMPORARY ROADS ACCESSING PUBLIC THOROUGHFARES TO SERVE

CONSTRUCTION AREA.

1.44 PARKING

(A) PROVIDE TEMPORARY PARKING AREAS TO ACCOMMODATE CONSTRUCTION PERSONNEL. VERIFY

LOCATION OF SUCH AREAS WITH OWNER PRIOR PROJECT START-UP.

(B) RETURN PARKING AREA(S) TO ORIGINAL CONDITION AT END OF PROJECT, INCLUDING REGRADING

AND RESEEDING OF GRASS IF REQUIRED.

1.45 PROGRESS CLEANING

(A) MAINTAIN AREAS FREE OF WASTE MATERIALS, DEBRIS, AND RUBBISH. MAINTAIN SITE IN A CLEAN AND

ORDERLY CONDITION.

1.46 PROJECT IDENTIFICATION

(A) PROVIDE AN 8 FT WIDE X 4 FT HIGH PROJECT SIGN OF EXTERIOR GRADE PLYWOOD AND WOOD

FRAME CONSTRUCTION, PAINTED, TO ARCHITECT/ENGINEER'S DESIGN AND COLORS.

(B) ERECT ON SITE AT LOCATION ESTABLISHED BY ARCHITECT/ENGINEER.

(C) MAINTAIN IN GOOD REPAIR THROUGHOUT CONSTRUCTION PERIOD.

1.47 FIELD OFFICES AND SHEDS

(A) THE GENERAL CONTRACTOR SHALL FURNISH AND MAINTAIN IN GOOD CONDITION DURING

PROGRESS OF WORK A FIELD OFFICE FACILITY FOR USE OF GENERAL CONTRACTOR AND THE

ARCHITECT. PROVIDE A TABLE OR OTHER FLAT SURFACE ON WHICH TO REVIEW PLANS AND

SPECIFICATIONS. THIS FACILITY WILL REMAIN PROPERTY OF THE GENERAL CONTRACTOR.

GENERAL REQUIREMENTS

Page 01 00 00-12

(B) THE FIELD OFFICE SHALL BE: WEATHER-TIGHT, WITH LIGHTING, ELECTRICAL OUTLETS, HEATING, COOLING AND/OR VENTILATING EQUIPMENT, AND EQUIPPED WITH STURDY FURNITURE AND

DRAWING DISPLAY TABLE.

1. PROVIDE SPACE FOR PROJECT MEETINGS, WITH TABLE AND CHAIRS TO ACCOMMODATE 6

PERSONS

(C) CONTRACTOR SHALL KEEP A COMPLETE SET OF DRAWINGS, GENERAL CONDITIONS OF THE

CONTRACT, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS, ADDENDA, CHANGE ORDERS, SHOP

DRAWINGS, AND ANY SUPPLEMENTARY DRAWINGS OR OTHER WRITTEN INSTRUCTIONS PERTAINING

TO THE CONSTRUCTION OF THIS PROJECT AT THE FIELD OFFICE LOCATION, FOR USE BY ALL

WORKMEN, THE OWNER, AND THE ARCHITECT.

1.48 REMOVAL OF TEMPORARY UTILITIES, FACILITIES, AND CONTROLS

(A) REMOVE TEMPORARY ABOVE GRADE OR BURIED UTILITIES, EQUIPMENT, FACILITIES, MATERIALS, PRIOR

TO FINAL INSPECTION.

(B) REMOVE UNDERGROUND INSTALLATIONS TO A MINIMUM DEPTH OF 2 FT, OR AS OTHERWISE NOTED IN

INDIVIDUAL SPECIFICATION SECTIONS.

(C) CLEAN AND REPAIR DAMAGE CAUSED BY INSTALLATION OR USE OF TEMPORARY WORK.

(D) RESTORE EXISTING FACILITIES USED DURING CONSTRUCTION TO ORIGINAL CONDITION. RESTORE

PERMANENT FACILITIES USED DURING CONSTRUCTION TO SPECIFIED CONDITION.

1.49 PRODUCTS

(A) PRODUCTS: MEANS NEW MATERIAL, MACHINERY, COMPONENTS, EQUIPMENT, FIXTURES, AND

SYSTEMS FORMING THE WORK, BUT DOES NOT INCLUDE MACHINERY AND EQUIPMENT USED FOR

PREPARATION, FABRICATION, CONVEYING AND ERECTION OF THE WORK. PRODUCTS MAY ALSO

INCLUDE EXISTING MATERIALS OR COMPONENTS SPECIFICALLY IDENTIFIED FOR REUSE.

(B) DO NOT USE MATERIALS AND EQUIPMENT REMOVED FROM EXISTING PREMISES, EXCEPT AS

SPECIFICALLY IDENTIFIED OR ALLOWED BY THE CONTRACT DOCUMENTS.

(C) USE INTERCHANGEABLE COMPONENTS OF THE SAME MANUFACTURE FOR SIMILAR COMPONENTS.

(D) FURNISH MATERIALS AND EQUIPMENT THAT HAVE BEEN PROPERLY INSPECTED AND TESTED IN

ACCORDANCE WITH ACCEPTED INDUSTRIES STANDARDS.

1.50 TRANSPORTATION, HANDLING, STORAGE AND PROTECTION

(A) TRANSPORT, HANDLE, STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS.

(B) CONTRACTORS AND SUBCONTRACTORS SHALL PROVIDE BUILDINGS, ENCLOSURES, OR TRAILERS TO

PROTECT MATERIALS AND EQUIPMENT WHICH WOULD BE DAMAGED BY EXPOSURE. FAILURE TO DO

SO WILL CAUSE MATERIALS OR EQUIPMENT NOT PROPERLY PROTECTED TO BE EXCLUDED FROM

PERIODIC PAYMENT.

GENERAL REQUIREMENTS

Page 01 00 00-13

(C) CHECK MATERIALS AND EQUIPMENT FOR IN-TRANSIT DAMAGE IN AMPLE TIME TO REPLACE ANY

DAMAGED MATERIALS PRIOR TO INSTALLATION TIME.

(D) STORE MATERIALS IN A MANNER TO PREVENT DETERIORATION, STAINING, SOILING AND INTRUSION OF

FOREIGN SUBSTANCES. KEEP MATERIALS SUBJECT TO DETERIORATION BY DAMPNESS INSIDE AND/OR

COVERED WITH MOISTURE PROOF TARPS AND RAISED OFF THE GROUND. ADEQUATELY PROTECT

THOSE MATERIALS SUBJECT TO DAMAGE BY FREEZING OR FROST.

(E) CONTRACTOR SHALL REMOVE FROM THE JOBSITE AND REPLACE WITH NEW ANY MATERIALS

DAMAGED BY IMPROPER STORING OR FAILURE TO PROPERLY PROTECT MATERIALS FROM THE

ELEMENTS, AT NO ADDITIONAL COST TO OWNER.

1.51 PRODUCT OPTIONS

(A) PRODUCTS SPECIFIED BY REFERENCE STANDARDS OR BY DESCRIPTION ONLY: ANY PRODUCT

MEETING THOSE STANDARDS OR DESCRIPTION.

(B) PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS: PRODUCTS OF

MANUFACTURERS NAMED AND MEETING SPECIFICATIONS, NO OPTIONS OR SUBSTITUTIONS

ALLOWED.

(C) PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS WITH A PROVISION FOR

SUBSTITUTIONS: SUBMIT A REQUEST FOR SUBSTITUTION FOR ANY MANUFACTURER NOT NAMED.

(D) IN GENERAL, THESE SPECIFICATIONS IDENTIFY THE REQUIRED MATERIALS AND EQUIPMENT BY NAMING

ONE OR MORE PRODUCTS BY MANUFACTURER'S BRAND, MODEL AND CATALOG NUMBER AND/OR

OTHER IDENTIFICATION, THE FIRST-NAMED HAVING BEEN USED AS THE BASIS FOR DESIGN AND OTHER

BRANDS CONSIDERED EQUIVALENT. CONTRACTORS MAY PROVIDE ANY BRANDS AT THEIR OPTION.

(E) WHERE MATERIAL OR EQUIPMENT ARE DESCRIBED, BUT NOT NAMED, CONTRACTORS SHALL PROVIDE

SUCH FIRST QUALITY ITEMS, FULLY ADEQUATE IN EVERY RESPECT FOR THE IMPLIED AND INTENDED

USAGE, SUCH ITEMS BEING SUBJECT TO THE ARCHITECT'S FINAL APPROVAL PRIOR TO PROCUREMENT.

1.52 SUBSTITUTIONS

(A) SEE SECTION 3.03 IN THE INSTRUCTIONS TO BIDDERS, DOCUMENT "B", AND IN OTHER DIVISION 00

DOCUMENTS FOR INFORMATION RELATIVE TO SUBSTITUTION.

1.53 STARTING SYSTEMS

(A) PROVIDE SEVEN DAYS NOTIFICATION PRIOR TO START-UP OF EACH ITEM, AS REQUIRED IN INDIVIDUAL

SPECIFICATION SECTIONS.

(B) ENSURE THAT EACH PIECE OF EQUIPMENT OR SYSTEM IS READY FOR OPERATION.

(C) EXECUTE START-UP UNDER SUPERVISION OF RESPONSIBLE PERSONS IN ACCORDANCE WITH

MANUFACTURERS' INSTRUCTIONS.

(D) SUBMIT A WRITTEN REPORT THAT EQUIPMENT OR SYSTEM HAS BEEN PROPERLY INSTALLED AND IS

FUNCTIONING CORRECTLY.

1.54 DEMONSTRATION AND INSTRUCTIONS

Page 01 00 00-14

(A) BEFORE BEING ELIGIBLE FOR FINAL PAYMENT, CONTRACTOR SHALL DEMONSTRATE OPERATION AND

MAINTENANCE OF ALL PIECES AND SYSTEMS OF EQUIPMENT INCLUDING: HEATING, VENTILATION

AND AIR CONDITIONING SYSTEMS, LIGHTING AND POWER SYSTEMS, INTERCOM AND FIRE ALARM

SYSTEMS, ELEVATOR, ETC., TO OWNER'S PERSONNEL PRIOR TO DATE OF FINAL INSPECTION.

(B) FOR EQUIPMENT OR SYSTEMS REQUIRING SEASONAL OPERATION, PERFORM DEMONSTRATION FOR

OTHER SEASON WITHIN SIX MONTHS, OR AS SOON AS TEMPERATURE OR OTHER ENVIRONMENTAL

CONDITIONS PERMIT.

(C) DEMONSTRATE START-UP, OPERATION, CONTROL, ADJUSTMENT, TROUBLE-SHOOTING, SERVICING, MAINTENANCE, AND SHUTDOWN OF EACH ITEM OF EQUIPMENT AT AGREED-UPON TIMES, AT

PROJECT LOCATION.

(D) ASSIST OWNER IN DETERMINING MAINTENANCE SCHEDULES FOR ALL EQUIPMENT REQUIRING

PERIODIC MAINTENANCE.

1.55 TESTING, ADJUSTING, AND BALANCING

(A) CONTRACTOR SHALL APPOINT AN INDEPENDENT FIRM TO PERFORM TESTING, ADJUSTING, AND

BALANCING FOR MECHANICAL SYSTEMS AS SPECIFIED IN DIVISION 15.

(B) REPORTS WILL BE SUBMITTED BY THE INDEPENDENT FIRM TO THE ARCHITECT/ENGINEER INDICATING

OBSERVATIONS AND RESULTS OF TESTS AND INDICATING COMPLIANCE OR NON-COMPLIANCE WITH

SPECIFIED REQUIREMENTS AND WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.

(C) COOPERATE WITH INDEPENDENT FIRM; FURNISH ASSISTANCE AS REQUESTED.

(D) RE-TESTING REQUIRED BECAUSE OF NON-CONFORMANCE TO SPECIFIED REQUIREMENTS WILL BE

CHARGED TO THE CONTRACTOR.

1.56 CONTRACT CLOSEOUT PROCEDURES

(A) SUBMIT WRITTEN CERTIFICATION THAT CONTRACT DOCUMENTS HAVE BEEN REVIEWED, WORK HAS

BEEN INSPECTED, AND WORK IS COMPLETE IN ACCORDANCE WITH CONTRACT DOCUMENTS AND

READY FOR ARCHITECT/ENGINEER'S INSPECTION.

(B) SUBMIT COMPLETE DIGITAL SET OF "AS-BUILT" DRAWINGS AND SPECIFICATIONS, SHOWING ALL

DEVIATIONS FROM ORIGINAL CONTRACT DOCUMENTS.

(C) CONTRACTOR SHALL KEEP ON FILE A COPY OF ALL SHOP DRAWINGS TO BE GIVEN TO OWNER AT

COMPLETION OF THE PROJECT.

(D) SUBMIT A COPY OF ALL SUPPLIERS AND SUBCONTRACTORS WITH NAME, ADDRESS, AND PHONE

NUMBERS IF DIFFERENT FROM ORIGINAL LIST.

(E) SUBMIT TWO (2) COMPLETE MANUALS ON THE ELECTRICAL AND MECHANICAL SYSTEMS, INCLUDING

MAINTENANCE AND OPERATIONAL RECOMMENDATIONS.

(F) SUBMIT ONE (1) NOTARIZED ORIGINAL AND TWO (2) COPIES OF THE MANUFACTURER'S CERTIFICATES

OF WARRANTIES AND/OR GUARANTEES AS REQUIRED IN INDIVIDUAL SPECIFICATION SECTIONS.

GENERAL REQUIREMENTS

Page 01 00 00-15

(G) SUBMIT ONE (1) NOTARIZED ORIGINAL AND TWO (2) COPY OF THE CONTRACTOR'S AFFIDAVIT OF

RELEASE OF LIENS AIA DOCUMENT G706A, CONDITIONAL UPON RECEIPT OF FINAL PAYMENT.

(H) SUBMIT ONE (1) ORIGINAL AND TWO (2) COPIES OF THE CONSENT OF SURETY TO FINAL PAYMENT, AIA

DOCUMENT G707.

(I) SUBMIT ONE (1) NOTARIZED ORIGINAL AND TWO (2) COPIES OF FINAL APPLICATION FOR PAYMENT

IDENTIFYING TOTAL ADJUSTED CONTRACT SUM/PRICE, PREVIOUS PAYMENTS, AND AMOUNT

REMAINING DUE.

1.57 FINAL CLEANING

(A) EXECUTE FINAL CLEANING PRIOR TO FINAL INSPECTION.

(B) CLEAN INTERIOR AND EXTERIOR SURFACES EXPOSED TO VIEW. VACUUM CARPETED AND SOFT

SURFACES.

(C) CLEAN DEBRIS FROM SITE, ROOFS, GUTTERS, DOWNSPOUTS, AND DRAINAGE SYSTEMS.

(D) REPLACE FILTERS OF OPERATING EQUIPMENT.

(E) REMOVE WASTE AND SURPLUS MATERIALS, RUBBISH, AND CONSTRUCTION FACILITIES FROM THE SITE.

(F) TOUCH-UP IMPERFECTIONS IN ALL BUILDING FINISHES AFTER CONTRACTORS AND TRADESMEN HAVE

COMPLETED THEIR WORK.

(G) CLEAN SURFACES USING APPROPRIATE MATERIALS AND METHODS THAT WILL THOROUGHLY CLEAN

BUT NOT DAMAGE MATERIALS AND THEIR FINISHES. CHECK WITH MANUFACTURER OF PRODUCT IN

QUESTION TO DETERMINE CORRECT CLEANING PROCEDURE AND MATERIALS. THE OWNER WILL BE

RESPONSIBLE FOR APPLYING FINAL WAX AND SEALERS AS REQUIRED.

1.58 ADJUSTING

(A) ADJUST OPERATING PRODUCTS AND EQUIPMENT TO ENSURE SMOOTH AND UNHINDERED

OPERATION.

(B) ADJUST WINDOWS, DOORS, DRAWERS, HARDWARE, APPLIANCES, MOTORS, VALVES, CONTROLS

AND OTHER EQUIPMENT AS REQUIRED FOR PROPER OPERATION.

1.59 PROJECT RECORD DOCUMENTS

(A) MAINTAIN ON SITE, ONE SET OF CONTRACT DOCUMENTS TO BE UTILIZED FOR "AS-BUILT" RECORD

DOCUMENTS.

(B) RECORD ACTUAL REVISIONS TO THE WORK. RECORD INFORMATION CONCURRENT WITH

CONSTRUCTION PROGRESS.

(C) SPECIFICATIONS: LEGIBLY MARK AND RECORD AT EACH PRODUCT SECTION A DESCRIPTION OF

ACTUAL PRODUCTS INSTALLED.

(D) RECORD DOCUMENTS AND SHOP DRAWINGS: LEGIBLY MARK EACH ITEM TO RECORD ACTUAL

CONSTRUCTION.

Page 01 00 00-16

(E) SUBMIT DOCUMENTS TO ARCHITECT/ENGINEER WITH APPLICATION FOR FINAL APPLICATION FOR

PAYMENT.

1.60 OPERATION AND MAINTENANCE DATA

(A) BEFORE BEING ELIGIBLE FOR FINAL PAYMENT, GENERAL CONTRACTOR SHALL SECURE AND DELIVER

TO OWNER, THROUGH ARCHITECT, TWO (2) COPIES OF MANUFACTURER'S OPERATION INSTRUCTIONS

AND MANUALS FOR ALL EQUIPMENT SUBMIT TWO SETS PRIOR TO FINAL INSPECTION, BOUND IN 8-1/2

X 11 INCH TEXT PAGES, THREE D SIDE RING BINDERS WITH DURABLE PLASTIC COVERS.

(B) PREPARE BINDER COVER WITH PRINTED TITLE "OPERATION AND MAINTENANCE INSTRUCTIONS", AND

TITLE OF PROJECT.

(C) INTERNALLY SUBDIVIDE THE BINDER CONTENTS WITH PERMANENT PAGE DIVIDERS, LOGICALLY

ORGANIZED, WITH TABS CLEARLY PRINTED UNDER REINFORCED LAMINATED PLASTIC TABS.

(D) CONTENTS:

1. DIRECTORY, LISTING NAMES, ADDRESSES, AND TELEPHONE NUMBERS OF

ARCHITECT/ENGINEER, CONTRACTOR, SUBCONTRACTORS, AND MAJOR EQUIPMENT

SUPPLIERS.

2. OPERATION AND MAINTENANCE INSTRUCTIONS, ARRANGED BY SYSTEM, AND BY

SPECIFICATION SECTION.

3. PROJECT DOCUMENTS AND CERTIFICATES.

(E) SEE MECHANICAL AND ELECTRICAL SPECIFICATIONS, DIVISIONS 15 AND 16, FOR ADDITIONAL

REQUIREMENTS.

1.61 WARRANTIES

(A) BEFORE BEING ELIGIBLE FOR FINAL PAYMENT, THE GENERAL CONTRACTOR SHALL DELIVER TO OWNER

THROUGH THE ARCHITECT, ALL MANUFACTURER'S AND SPECIAL WARRANTIES SPECIFIED FOR

MATERIAL, EQUIPMENT AND INSTALLATIONS, AS REQUIRED BY INDIVIDUAL SPECIFICATION SECTIONS.

WARRANTIES SHALL BE NOTARIZED, AND FURNISHED IN DUPLICATE.

(B) EXECUTE AND ASSEMBLE DOCUMENTS FROM SUBCONTRACTORS, SUPPLIERS, AND MANUFACTURERS.

(C) SUBMIT PRIOR TO FINAL APPLICATION FOR PAYMENT.

1.62 SPARE PARTS AND MAINTENANCE MATERIALS

(A) PROVIDE PRODUCTS, SPARE PARTS, MAINTENANCE AND EXTRA MATERIALS IN QUANTITIES SPECIFIED

IN INDIVIDUAL SPECIFICATION SECTIONS.

(B) DELIVER TO PROJECT SITE AND PLACE IN LOCATION AS DIRECTED ARCHITECT; OBTAIN RECEIPT PRIOR

TO FINAL PAYMENT.

1.63 INSTALLATION OF MATERIALS

GENERAL REQUIREMENTS

Page 01 00 00-17

(A) FURNISH, APPLY, INSTALL, CONNECT, ERECT, CLEAN AND CONDITION MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT PER MANUFACTURER'S PRINTED DIRECTIONS WHICH MUST BE ON THE

JOB PRIOR TO AND DURING INSTALLATION OF MATERIALS AND EQUIPMENT.

(B) PROVIDE ALL ATTACHMENT DEVICES AND MATERIALS NECESSARY TO SECURE MATERIALS TOGETHER, OR OTHER MATERIALS AS REQUIRED TO SECURE WORK OF OTHER TRADES.

(C) MAKE ALLOWANCES FOR AMPLE EXPANSION AND CONTRACTION OF ALL BUILDING COMPONENTS

SUBJECT TO SAME, INCLUDING CONTROL AND/OR EXPANSION JOINTS IN: CONCRETE AND

MASONRY, PLYWOOD SHEATHING, METAL ROOFING AND GUTTERING, GYPSUM BOARD WALLS AND

CEILINGS, ALL BUILDING FINISHES, ALUMINUM "STORE-FRONT" AND GLAZING SYSTEMS, EXTERIOR

INSULATION AND FINISH SYSTEMS, BUILT-UP OR MEMBRANE ROOFING, OTHER MATERIALS OR AREAS

REQUIRING EXPANSION CONTROL AS INDICATED BY PLANS AND/OR SPECIFICATIONS OR AS

OTHERWISE REQUIRED BY PRODUCT MANUFACTURERS.

1. SEE PLANS FOR LOCATIONS OF MAJOR BUILDING EXPANSION JOINTS.

2. WHERE NO CONTROL JOINTS ARE INDICATED, VERIFY LOCATION OF JOINTS IN ALL

MATERIALS WITH ARCHITECT FOR PLACEMENT PRIOR TO INSTALLATION. INSTALL JOINTS THUS

LOCATED AT NO ADDITIONAL COST TO OWNER.

(D) EACH TRADE SHALL PROVIDE SLEEVES, RECESSES AND OPENINGS TO THEIR WORK AS REQUIRED TO

RECEIVE WORK OF OTHER TRADES. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION

OF ALL SUCH OPENINGS, SLEEVES, RECESSES, ETC.

(E) MAKE FIELD CHECK OF ACTUAL BUILDING DIMENSIONS BEFORE FABRICATING PRODUCTS.

(F) WHERE PROPER FIT OF WORK DEPENDS ON CLOSE TOLERANCE OF MANUFACTURED PRODUCTS, FURNISH MANUFACTURER WITH NECESSARY TEMPLATES TO INSURE PROPER FIT OF ALL COMPONENTS.

(G) INSTALL MATERIALS ONLY WHEN CONDITIONS OF TEMPERATURE, MOISTURE, HUMIDITY, AND

CONDITION OF ADJACENT BUILDING COMPONENTS ARE CONDUCIVE TO ACHIEVING BEST

INSTALLATION RESULTS. VERIFY REQUIREMENTS WITH PRODUCT MANUFACTURER'S

(H) IN JOB ASSEMBLING, EACH TRADE SHALL PROPERLY CUT AND FIT TO MAKE ITS OWN ASSEMBLIES FIT

ACCURATELY INTO THE EXISTING WORK, AND AS NECESSARY FOR OTHER TRADES HAVING WORK

OCCURRING HEREIN. WHERE NECESSARY TO CUT INTO OTHER BUILDING COMPONENTS, DO SO

NEATLY AND ONLY IN A MANNER SO AS NOT TO DAMAGE BUILDING STRUCTURALLY. DO NOT CUT

STRUCTURAL COMPONENTS OR ASSEMBLIES WITHOUT PRIOR APPROVAL OF ARCHITECT AND

STRUCTURAL ENGINEER.

(I) WHERE CONSTRUCTION CONSISTS OF A SERIES OF COURSES OF UNITS, ASSEMBLE UNITS IN BEST

ACCEPTABLE MANNER TO PROVIDE A STRUCTURALLY SOUND INSTALLATION, WITH JOINTS OF

UNIFORM SIZE, WHICH IS TOTALLY WATERPROOF WHERE EXPOSED TO EXTERIOR. ACCURATELY PLUMB

AND LEVEL ALL COURSES AND VERIFY LEVELS FREQUENTLY WITH INSTRUMENT.

(J) HANDLE MATERIALS IN A MANNER SO AS TO PREVENT SCRATCHING, ABRADING, DISTORTION, CHIPPING, BREAKING, OR OTHER DISFIGUREMENT. UNLESS OTHERWISE SPECIFIED, FABRICATE AND

INSTALL MATERIALS TRUE TO LINE, PLUMB AND LEVEL. LEAVE FINISH SURFACES SMOOTH AND FLAT, OR OF SMOOTH CONTOUR WHERE INDICATED, FREE FROM WRINKLES, WARPS, SCRATCHES, DENTS

AND OTHER IMPERFECTIONS. PROVIDE QUALITY WORKMANSHIP NOT LESS THAN THE

COMMERCIALLY ACCEPTED STANDARDS OF THAT TRADE. WHERE OBVIOUSLY OF BEST PRACTICE,

GENERAL REQUIREMENTS

Page 01 00 00-18

FURNISH MATERIALS IN THE LONGEST PRACTICAL LENGTH AND LARGEST PRACTICAL SIZES TO AVOID

UNNECESSARY JOINTING. MAKE ALL JOINTS SECURE.

(K) CONSULT ARCHITECT FOR MOUNTING HEIGHT AND POSITION OF ANY UNIT NOT SPECIFICALLY

LOCATED.

(L) MIX NO MORE MATERIALS THAN CAN BE USED BEFORE MATERIAL BEGINS TO "SET". MIX NO PARTIALLY

"SET" BATCH WITH ANOTHER. CLEAN TOOLS AND APPLIANCES PRIOR TO MIXING MATERIALS THAT

CAN BE CONTAMINATED.

(M) CONDUCT WORK IN A MANNER SO AS TO AVOID DAMAGE TO PREVIOUSLY PLACED WORK.

(N) DO NOT DISTURB MATERIALS REQUIRING CURING TIME UNTIL APPROPRIATE TIME HAS TRANSPIRED.

(0) PROPERLY PREPARE ALL WORK TO RECEIVE SUBSEQUENT WORK OR FINISH. NOTIFY ARCHITECT IF ANY

WORK IS UNSATISFACTORY TO RECEIVE SUBSEQUENT WORK OR FINISH, AND RECEIVE HIS

INSTRUCTIONS BEFORE PROCEEDING. IF NO SPECIFIC INSTRUCTIONS ARE SPECIFIED HEREIN, FOLLOW

MANUFACTURER'S INSTRUCTIONS.

(P) SEAL EXTERIOR JOINTS BETWEEN MATERIAL(S) TO FORM A WATERPROOFED ENCLOSURE.

1.64 CLOSING IN WORK:

(A) GENERAL CONTRACTOR SHALL NOTIFY HIS SUBCONTRACTORS, OTHER CONTRACTORS, OWNER AND

ALL CONTRACTORS AND SUBCONTRACTORS UNDER THE OWNER WHEN HE IS READY FOR THEM TO

INSTALL THEIR PORTIONS OF THE WORK AND SEE THAT THEY COMPLY IN A TIMELY MANNER TO

ACHIEVE THE SCHEDULED COMPLETION DATE FOR THE ENTIRE PROJECT.

(B) NEITHER ENCLOSE NOR COVER ANY PIPING, WIRING, DUCTS, EQUIPMENT OR OTHER ITEMS UNTIL

PROPER TESTS AND INSPECTIONS HAVE BEEN MADE BY THE ARCHITECT AND/OR PROPER

AUTHORITIES.

(C) NOTIFY ARCHITECT WHEN SUBSEQUENTLY PLACED WORK WOULD PREVENT OBSERVATION OF

PREVIOUS WORK.

1.65 REPAIRS:

(A) UNLESS ARCHITECT GRANTS PERMISSION TO REPAIR ANY DEFECTIVE WORK, REMOVE FROM PROJECT

ANY WORK NOT IN ACCORDANCE WITH CONTRACT DOCUMENTS. PERMISSION TO REPAIR ANY

SUCH WORK SHALL NOT CONSTITUTE WAIVER OF ARCHITECT'S RIGHTS TO REQUIRE COMPLETE

REMOVAL OF DEFECTIVE WORK IF REPAIR OPERATION DOES NOT RESTORE QUALITY AND

APPEARANCE OF MEMBER OR SURFACE TO ARCHITECT'S ORIGINAL SPECIFICATIONS.

1.67 REPAIR OF RIGHT-OF-WAY AND PRIVATE PROPERTY

(A) CONTRACTOR SHALL, AS A CONDITION OF FINAL PAYMENT, RESTORE ALL RIGHT-OF-WAY AND

ADJACENT PRIVATE PROPERTY THAT HAS BEEN DISTURBED, DAMAGED, OR OTHERWISE AFFECTED BY

CONSTRUCTION TO A CONDITION EQUAL TO OR BETTER THAN EXISTED PRIOR TO THE

COMMENCEMENT OF CONSTRUCTION. SUCH RESTORATION SHALL INCLUDE BUT NOT BE LIMITED TO:

GENERAL REQUIREMENTS

Page 01 00 00-19

1. REMOVAL AND REPLACEMENT OF DAMAGED PAVING, SIDEWALKS, DRIVEWAYS, ETC.,

INCLUDING CURB AND GUTTER

2. REGRADING AND SEEDING OF AREAS WHERE GRASS WAS PLANTED AND GROWING PRIOR

TO CONSTRUCTION.

3. ADDITIONAL LANDSCAPING OR RESTORATION WORK AS REQUIRED TO RETURN AN AREA TO

ITS ORIGINAL CONDITION.

(B) CONTRACTOR SHALL HAVE NO RESPONSIBILITY TO ENSURE GROWTH OF SUCH SEEDED OR OTHER

LANDSCAPED AREA(S).

(C) THIS RESTORATION SHALL BE CONSIDERED PART OF THE CONTRACTOR'S WORK AND THE

CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF SUCH RESTORATION WORK IN THE

SAME MANNER AS IT WAS RESPONSIBLE FOR PERFORMANCE OF THE CONTRACT WORK.

1.68 MISCELLANEOUS REQUIREMENTS

(A) THE CONSTRUCTION SITE IS LIMITED TO THE AREAS INDICATED ON THE SITE PLAN.

(B) UTILITIES ARE NOTED ON THE DRAWINGS. CONTRACTOR SHALL PROVIDE ALL SERVICE LINES AS

SHOWN AND/OR NECESSARY. GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL BE

RESPONSIBLE FOR REPAIRING ANY NEW OR EXISTING UTILITIES WHICH ARE DAMAGED AS A RESULT OF

CONSTRUCTION ACTIVITIES.

(C) COSTS FOR TEMPORARY ELECTRICITY, GAS, WATER, TELEPHONE, AND ALL OTHER UTILITIES SHALL BE

PAID FOR BY THE GENERAL CONTRACTOR UNTIL PROJECT SUBSTANTIAL COMPLETION CERTIFICATE IS

ISSUED BY THE ARCHITECT.

(D) THE INTENT OF THESE SPECIFICATIONS IS TO ALLOW AMPLE OPPORTUNITY FOR THE CONTRACTORS TO

USE THEIR INGENUITY AND ABILITIES TO EXPEDITE THE WORK TO THEIR AND THE OWNER'S BEST

ADVANTAGE, AND TO PERMIT MAXIMUM COMPETITION IN BIDDING ON ESTABLISHED STANDARDS OF

MATERIALS AND EQUIPMENT AS DEFINED BY THE PLANS AND SPECIFICATIONS.

(E) CONTRACTOR AND SUB CONTRACTORS MUST RECOGNIZE THAT CERTAIN ITEMS CANNOT BE FULLY

ILLUSTRATED OR EXPLAINED WITHOUT FIELD OBSERVATION. THUS, BEFORE SUBMITTING HIS BID, HE

SHALL VISIT AND EXAMINE THE SITE IN EVERY DETAIL AND MAKE ALLOWANCE IN HIS BID FOR ALL

CONDITIONS THAT WILL AFFECT THE WORK INDICATED OR REASONABLY IMPLIED BY THE DRAWINGS

AND THESE SPECIFICATIONS.

(F) DO NOT SCALE ARCHITECTURAL, MECHANICAL OR ELECTRICAL DRAWINGS FOR DIMENSIONS.

ACCURATELY LAYOUT SUCH WORK FROM DIMENSIONS INDICATED ON ARCHITECTURAL DRAWINGS

UNLESS SUCH BE FOUND IN ERROR. CONSULT ARCHITECT FOR ANY INTERPRETATIONS CONCERNING

LOCATIONS OF EQUIPMENT.

(G) CONSULT DRAWINGS AND/OR SPECIFICATIONS FOR MISCELLANEOUS…