B01 Att J05 IHS BLACKFEET HOUSING - specs - VOL. 1.pdf
PDF 2 MB Posted
- Attached to
- Blackfeet Apartment Complex, Browning MT Federal contract opportunity
- Solicitation number
- 22R00068
About this file
This document is a solicitation for a construction project to build an apartment complex on the Blackfeet reservation in Browning, Montana. The solicitation is issued by the Department of Health and Human Services Indian Health Service.
The project involves constructing an 18-unit apartment building. The solicitation seeks proposals for professional architectural and engineering design services. Responses are due by February 2, 2022. The design team will be responsible for tasks including site planning, structural design, mechanical and electrical engineering, and developing construction documents.
The selected firm must have experience designing similar housing projects. They will work under a task order with a not-to-exceed budget of $75,000. The period of performance is expected to last 10 months. Proposals should include examples of relevant past work, resumes, and licensing information.
The solicitation references additional attached documents providing the project scope, specifications, drawings, and other details. The Blackfeet Housing Authority will administer the resulting contract.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Health Facilities Group, LLC Planners and Architects 23 8 0 Mc G e e S t , S u i t e 31 0 Ka ns a s C i t y , M O 64 1 08 p h o n e : 8 1 6 . 2 49 .1 5 00
Health Facilities Group , LLC © 2020
Indian Health Service Division of Engineering Services Addendum 001 – Bid Set Specifications – Volume 1 Browning, Montana
Contract Number: HHSI102201800005I
Task Order Number: 75H70119F30002
HFG project no.: H IH BLAC 19100
Issue date: February 2, 2022
Professional Architect-Engineer (A-E) Services for
Design for Browning 18-Unit Apartment Building, Blackfeet Service Unit, Browning, Montana
PROJECT NO. H IH BLAC 19100
Health Facilities Group, LLC 2020
DESIGN TEAM
00 01 03 - 1
SECTION 00 01 03 - DESIGN TEAM
PART 1 GENERAL
1.1 ARCHITECTURAL: HEALTH FACILITIES GROUP, PLANNERS & ARCHITECTS
(A) 1300 E. 104TH ST., SUITE 225.
(B) KANSAS CITY, MO 64131
(C) (816) 249-1500.
1. PRIMARY CONTACT: ALL CORRESPONDENCE FROM THE CONTRACTOR TO THE ARCHITECT
WILL BE THROUGH THIS PARTY, UNLESS ALTERNATE ARRANGEMENTS ARE MUTUALLY AGREED
UPON AT PRECONSTRUCTION MEETING.
a. NAME: ANDREW RUTENBECK, AIA.
b. EMAIL: ANDREWR@HEALTHFACILITIESGROUP.COM.
1.2 DESIGN CONSULTANT: BLUE STAR INTEGRATIVE STUDIO INC.
(A) 1430 S. BOULDER AVE.
(B) TULSA, OK 74119
(C) (918) 359-5640
1. PRIMARY CONTACT:
a. NAME: SCOTT MOORE Y MEDINA
b. EMAIL: SCOTTMM@BSI.STUDIO.COM
1.3 CIVIL: PROFESSIONAL ENGINEERING CONSULTANTS
(A) 303 SOUTH TOPEKA
(B) WICHITA, KS 67202.
(C) TELEPHONE: (313) 206-1417.
1. PRIMARY CONTACT: .
a. NAME: DAR CRONK.
b. EMAIL: DAR.CRONK@PEC1.COM.
1.4 STRUCTURAL: PROFESSIONAL ENGINEERING CONSULTANTS
(A) 623 MASSACHUSETTS ST., SUITE 200.
(B) LAWRENCE, KS 66044.
DESIGN TEAM
00 01 03 - 2
(C) (785) 842-6464.
1. PRIMARY CONTACT: .
a. NAME: PAUL RADLEY.
b. EMAIL: PAUL.RADLEY@PEC1.COM.
1.5 MECHANICAL: FARRIS ENGINEERING
(A) 844 11TH AVE..
(B) SYDNEY, NE 69162.
(C) (308) 203-2222.
1. PRIMARY CONTACT: .
a. NAME: BEN SCHMITT.
b. EMAIL: BSCHMITT@FARRIS-USA.COM.
1.6 ELECTRICAL: FARRIS ENGINEERING
(A) 844 11TH AVE..
(B) SYDNEY, NE 69162.
(C) (308) 203-2222.
(D) PRIMARY CONTACT: .
1. NAME: ERICKA NIENHUESER.
2. EMAIL: ENIENHUESER@FARRIS-USA.COM.
END OF SECTION
TABLE OF CONTENTS
00 01 10 - 1
SECTION 00 01 10 - TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 03 - DESIGN TEAM
00 01 10 - TABLE OF CONTENTS
00 01 15 - LIST OF DRAWING SHEETS
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 00 00 - GENERAL REQUIREMENTS
DIVISION 03 -- CONCRETE
03 30 00 - CAST-IN-PLACE CONCRETE
03 54 13 - GYPSUM CEMENT UNDERLAYMENT
DIVISION 04 -- MASONRY
04 05 11 - MORTAR AND MASONRY GROUT
04 20 00 - UNIT MASONRY
04 43 13 - STONE MASONRY VENEER
04 72 00 - CAST STONE MASONRY
DIVISION 05 -- METALS
05 12 00 - STRUCTURAL STEEL FRAMING
05 12 13 - ARCHITECTURALLY-EXPOSED STRUCTURAL STEEL FRAMING
05 31 00 - STEEL DECKING
05 40 00 - COLD-FORMED METAL FRAMING
05 44 00 - COLD-FORMED METAL TRUSSES
05 51 00 - METAL STAIRS
05 52 13 - PIPE AND TUBE RAILINGS
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
06 10 00 - ROUGH CARPENTRY
TABLE OF CONTENTS
00 01 10 - 2
06 15 00 - WOOD DECKING
06 18 00 - GLUED-LAMINATED CONSTRUCTION
06 20 00 - FINISH CARPENTRY
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
07 11 13 - BITUMINOUS DAMPPROOFING
07 21 00 - THERMAL INSULATION
07 26 00 - VAPOR RETARDERS
07 27 26 - FLUID APPLIED MEMBRANE AIR BARRIER
07 41 13 - METAL ROOF PANELS
07 44 00 - FACED PANELS
07 46 46 - FIBER-CEMENT SIDING
07 61 00 - SHEET METAL ROOFING
07 62 00 - SHEET METAL FLASHING AND TRIM
07 71 23 - MANUFACTURED GUTTERS AND DOWNSPOUTS
07 84 00 - FIRESTOPPING
07 92 00 - JOINT SEALANTS
DIVISION 08 -- OPENINGS
08 11 13 - HOLLOW METAL DOORS AND FRAMES
08 14 16 - FLUSH WOOD DOORS
08 14 33 - STILE AND RAIL WOOD DOORS
08 31 00 - ACCESS DOORS AND PANELS
08 43 13 - ALUMINUM-FRAMED STOREFRONTS
08 51 13 - ALUMINUM WINDOWS
08 71 00 - DOOR HARDWARE
08 80 00 - GLAZING
DIVISION 09 -- FINISHES
09 21 16 - GYPSUM BOARD ASSEMBLIES
TABLE OF CONTENTS
00 01 10 - 3
09 22 16 - NON-STRUCTURAL METAL FRAMING
09 30 00 - TILING
09 65 00 - RESILIENT FLOORING
09 68 13 - TILE CARPETING
09 91 00 - PAINTING
DIVISION 10 -- SPECIALTIES
10 14 00 - SIGNAGE
10 28 00 - TOILET, BATH, AND LAUNDRY ACCESSORIES
10 31 00 - MANUFACTURED FIREPLACES
10 44 00 - FIRE PROTECTION SPECIALTIES
10 55 00 - POSTAL SPECIALTIES
DIVISION 11 -- EQUIPMENT
11 30 13 - RESIDENTIAL APPLIANCES
11 66 23 - GYMNASIUM EQUIPMENT
DIVISION 12 -- FURNISHINGS
12 24 00 - WINDOW SHADES
12 35 30 - RESIDENTIAL CASEWORK
12 46 00 - FURNITURE ACCESSORIES
12 48 13 - ENTRANCE FLOOR MATS & FRAMES
DIVISION 14 -- CONVEYING EQUIPMENT
14 20 10 - PASSENGER ELEVATORS
LIST OF DRAWING SHEETS
00 01 15 - 1
SECTION 00 01 15 - LIST OF DRAWING SHEETS
LIST OF DRAWING SHEETS
00 01 15 - 2
DRAWING NO. TITLE
TS TITLE SHEET
ABA ACCESSIBILITY STANDARDS
LS1.1 FIRST FLOOR LIFE SAFETY
LS1.2 SECOND FLOOR LIFE SAFETY
SP1.1 ARCHITECTURAL SITE PLAN
CIVIL SITE & LANDSCAPING
C0.1 CIVIL GENERAL NOTES
C1.1 EXISTING CONDITIONS - NORTH
C1.2 EXISTING CONDITIONS - SOUTH
CD1.1 DEMO PLAN
CS1.1 SITE PLAN
CS1.2 GEOMETRY PLAN
CG1.1 GRADING PLAN
CG1.2 GRADING PLAN
CG1.3 EROSION CONTROL PLAN
CG1.4 EROSION CONTROL PLAN
CG5.1 EROSION CONTROL DETAILS
CG5.2 WIRE OUTLET DETAILS
CP1.1 PAVING PLAN
CP1.2 JOINTING PLAN
CP5.1 PAVING DETAILS
LIST OF DRAWING SHEETS
00 01 15 - 3
CP5.2 PAVING DETAILS
CU1.1 OVERALL UTILITY PLAN
CU2.1 SANITARY SEWER DETAILS
CU3.1 WATERLINE PLAN
CU3.2 WATERLINE PLAN
CU5.1 SANITARY SEWER DETAILS
CU5.2 WATERLINE DETAILS
LP1.1 NORTH LANDSCAPE PLAN
LP1.2 SOUTH LANDSCAPE PLAN
LP5.1 PLANTING DETAILS AND NOTES
L11.1 IRRIGATION PLAN
LI5.1 IRRIGATION DETAILS
STRUCTURAL
S0.1 GENERAL NOTES
S0.2 GENERAL NOTES
S0.3 INSPECTION TABLES
S1.1 FOUNDATION PLAN
S1.3 FLOOR FRAMING PLAN
S2.1 ROOF PLATFORM PLAN
S2.2 ROOF FRAMING PLAN
S3.1 COLUMN SCHEDULE
S3.2 BRACE FRAME SCHEDULE AND FRAMING ELEVATIONS
S3.3 BRACE FRAME DETAILS
LIST OF DRAWING SHEETS
00 01 15 - 4
S3.4 CANOPY COLUMN LAYOUT
S4.1 TYPICAL FOUNDATION DETAILS
S4.2 FOUNDATION DETAILS
S5.1 TYPICAL FRAMING DETAILS
S5.2 FRAMING DETAILS
S5.3 FRAMING DETAILS
S5.4 FRAMING DETAILS
S5.5 FRAMING DETAILS
S6.1 LIGHT GAGE FRAMING DETAILS
S7.1 STAIR PLANS AND DETAILS
ARCHITECTURAL
A0.1 FIRST FLOOR PLAN - DIMENSIONS
A0.2 SECOND FLOOR PLAN - DIMENSIONS
A1.1 FIRST FLOOR PLAN
A1.2 SECOND FLOOR PLAN
A1.3 ENLARGED TYPICAL PLANS
A1.4 ENLARGED PLANS
A1.5 ENLARGED PLANS
A1.6 ENLARGED PLANS
A1.7 STAIR DETAILS
A1.8 STAIR DETAILS
A1.9 ELEVATOR DETAILS
A1.10 MAIN ENTRY
LIST OF DRAWING SHEETS
00 01 15 - 5
A1.11 PATIO
A2.1 ROOF PLAN
A2.2 ROOF DETAILS
A3.1 EXTERIOR ELEVATIONS
A3.2 EXTERIOR ELEVATIONS
A3.3 EXTERIOR ELEVATIONS
A4.1 BUILDING SECTIONS
A4.2 BUILDING SECTIONS
A4.3 BUILDING SECTIONS
A4.4 BUILDING SECTIONS
A4.5 BUILDING SECTIONS
A5.1 WALL SECTIONS
A5.2 WALL SECTIONS
A5.3 WALL SECTIONS
A5.4 WALL SECTIONS
A5.5 WALL SECTIONS
A5.6 WALL SECTIONS
A5.7 WALL SECTIONS
A5.8 SECTION DETAILS
A5.9 SECTION DETAILS
A6.1 DOOR & WINDOW INFORMATION
A6.2 DOOR & WINDOW DETAILS
A7.1 INTERIOR ELEVATIONS
A7.2 INTERIOR ELEVATIONS
LIST OF DRAWING SHEETS
00 01 15 - 6
A7.3 INTERIOR ELEVATIONS
A7.4 INTERIOR ELEVATIONS
A8.1 MILLWORK SECTION DETAILS
A9.1 FIRST FLOOR REFLECTED CEILING PLAN
A9.2 SECOND FLOOR REFLECTED CEILING PLAN
A9.3 CEILING DETAILS
A10.1 FIRST FLOOR FINISH PLAN
A10.2 SECOND FLOOR FINISH PLAN
A10.3 FINISH SCHEDULES
A11.1 FIRST FLOOR EQUIPMENT PLAN
A11.2 SECOND FLOOR EQUIPMENT PLAN
A11.3 ENLARGED EQUIPMENT PLAN
A12.1 FIRST FLOOR SIGNAGE PLAN
A12.2 SECOND FLOOR SIGNAGE PLAN
FIRE PROTECTION
FG0.1 FIRE SUPPRESSION GENERAL NOTES
FX1.1 FIRST FLOOR FIRE SUPPRESSION PLAN
FX1.2 SECOND FLOOR FIRE SUPPRESSION PLAN
F4.1 FIRE SUPPRESSION LARGE-SCALE PLANS
F4.2 FIRE PUMP LARGE-SCALE PLANS
F5.1 FIRE SUPPRESSION DETAILS
MECHANICAL
LIST OF DRAWING SHEETS
00 01 15 - 7
MG0.1 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES
MH1.1 FIRST FLOOR HVAC PLAN
MH1.2 SECOND FLOOR HVAC PLAN
MP1.1 FIRST FLOOR MECHANICAL PIPING PLAN
MP1.2 SECOND FLOOR MECHANICAL PIPING PLAN
M3.1 MECHANICAL SECTIONS
M3.2 MECHANICAL SECTIONS
M4.1 MECHANICAL LARGE-SCALE PLANS
M4.2 MECHANICAL LARGE-SCALE PLANS
M5.1 MECHANICAL DETAILS
M6.1 MECHANICAL PIPING ISOMETRICS
M7.1 MECHANICAL SCHEDULES
PLUMBING
PL1.0 FOUNDATION PLUMBING PLAN
PL1.1 FIRST FLOOR PLUMBING PLAN
PL1.2 SECOND FLOOR PLUMBING PLAN
P3.1 PLUMBING FIXTURES
P4.1 PLUMBING LARGE-SCALE PLANS
P4.2 PLUMBING LARGE-SCALE PLANS
P5.1 PLUMBING DETAILS
P6.1 PLUMBING DIAGRAMS - ONE BEDROOM APARTMENT
P6.2 PLUMBING RISER DIAGRAMS - TWO BEDROOM
APARTMENT
LIST OF DRAWING SHEETS
00 01 15 - 8
P6.3 PLUMBING RISER DIAGRAMS - FOUR BEDROOM
APARTMENT
P6.4 PLUMBING RISER DIAGRAMS - MECHANICAL ROOM,
RESTROOMS, LAUNDRY ROOM
P6.5 NATURAL GAS PIPING RISER DIAGRAM
P7.1 PLUMBING SCHEDULES
ELECTRICAL
EG0.1 ELECTRICAL SYMBOLS LEGEND AND GENERAL NOTES
ES1.1 ELECTRICAL SITE PLAN
EL1.1 FIRST FLOOR LIGHTING PLAN
EL1.2 SECOND FLOOR LIGHTING PLAN
EP1.1 FIRST FLOOR POWER PLAN
EP1.2 SECOND FLOOR POWER PLAN
EP2.1 ELECTRICAL ROOF PLAN
EY1.1 FIRST FLOOR SPECIAL SYSTEMS PLAN
EY1.2 SECOND FLOOR SPECIAL SYSTEMS PLAN
E4.1 ELECTRICAL LARGE-SCALE PLANS
E4.2 ELECTRICAL LARGE-SCALE PLANS
E5.1 ELECTRICAL DETAILS
E5.2 ELECTRICAL DETAILS
E5.3 ELECTRICAL DETAILS
E6.1 ELECTRICAL DIAGRAMS
E7.1 ELECTRICAL SCHEDULES
E7.2 ELECTRICAL SCHEDULES
LIST OF DRAWING SHEETS
00 01 15 - 9
Project No. H IH BLAC 19100
Health Facilities Group, LLC ©2019
GENERAL REQUIREMENTS
Page 01 00 00-1
SECTION 01 00 00 – GENERAL REQUIREMENTS
PART 1 - GENERAL
1.01 WORK BY OWNER
(A) THE OWNER RESERVES THE RIGHT TO AWARD SEPARATE CONTRACTS FOR SUPPLY AND INSTALLATION
OF CERTAIN EQUIPMENT AND FINISHES, WHICH MAY BE INSTALLED BY OTHERS DURING THE
CONSTRUCTION TIME FOR THIS CONTRACT.
(B) ITEMS NOTED "N.I.C." (NOT IN CONTRACT), OR "BY OTHERS", ARE NOT PART OF THIS CONTRACT.
1.02 CONTRACTOR USE OF PREMISES
(A) LIMIT USE OF PREMISES TO ALLOW:
1. OWNER OCCUPANCY.
2. WORK BY OTHERS AND WORK BY OWNER.
3. WORK BY GENERAL CONTRACTOR AND SUB-CONTRACTORS
1.04 INSPECTION AND TESTING ALLOWANCES
(A) N.A.
1.05 SCHEDULE OF VALUES
(A) SUBMIT SCHEDULE ON AIA FORM G703. CONTRACTOR'S STANDARD FORM OR ELECTRONIC MEDIA
PRINTOUT WILL BE CONSIDERED.
(B) SUBMIT SCHEDULE OF VALUES IN DUPLICATE WITHIN 10 DAYS AFTER DATE ESTABLISHED IN NOTICE TO
PROCEED.
1.06 APPLICATIONS FOR PAYMENT
(A) SUBMIT THREE COPIES OF EACH APPLICATION ON AIA FORM G702.
(B) CONTENT AND FORMAT: UTILIZE SCHEDULE OF VALUES FOR LISTING ITEMS IN APPLICATION FOR
PAYMENT.
(C) PAYMENT PERIOD: SEE "GENERAL CONDITIONS OF THE CONTRACT" AND "SUPPLEMENTARY
CONDITIONS"
1.07 CHANGE PROCEDURES
(A) CHANGE ORDER FORMS: AIA G701.
(B) CONSTRUCTION CHANGE DIRECTIVE FORMS: AIA G714.
1.08 ALTERNATES
GENERAL REQUIREMENTS
Page 01 00 00-2
(A) ALTERNATES QUOTED ON BID FORMS WILL BE REVIEWED AND ACCEPTED OR REJECTED AT THE
OWNER'S OPTION.
(B) COORDINATE RELATED WORK AND MODIFY SURROUNDING WORK AS REQUIRED.
(C) ALTERNATES ARE LISTED IN DOCUMENT-C OF THIS PROJECT MANUAL.
1.09 COORDINATION
(A) COORDINATE SCHEDULING, SUBMITTALS, AND WORK OF THE VARIOUS SECTIONS OF SPECIFICATIONS
TO ASSURE EFFICIENT AND ORDERLY SEQUENCE OF INSTALLATION OF INTERDEPENDENT
CONSTRUCTION ELEMENTS.
(B) VERIFY UTILITY REQUIREMENT CHARACTERISTICS OF OPERATING EQUIPMENT ARE COMPATIBLE WITH
BUILDING UTILITIES.
(C) COORDINATE SPACE REQUIREMENTS AND INSTALLATION OF MECHANICAL AND ELECTRICAL WORK
WHICH ARE INDICATED DIAGRAMMATICALLY ON DRAWINGS. FOLLOW ROUTING SHOWN FOR PIPES, DUCTS, AND CONDUIT, AS CLOSELY AS PRACTICABLE.
(D) IN FINISHED AREAS, CONCEAL PIPES, DUCTS, AND WIRING WITHIN THE CONSTRUCTION.
1.10 FIELD ENGINEERING
(A) GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BUILDING AND SITE LAYOUT WORK, INCLUDING ESTABLISHING FLOOR ELEVATIONS AS SHOWN. GENERAL CONTRACTOR SHALL
MAINTAIN AND PROTECT SURVEY CONTROL AND REFERENCE POINTS.
(B) GENERAL CONTRACTOR SHALL ESTABLISH AND MAINTAIN OTHER GRADES, LINES, LEVELS, AND
DIMENSIONS INDICATED THEREON, AND CERTIFY THAT ELEVATIONS AND LOCATIONS OF THE WORK
CONFORM WITH CONTRACT DOCUMENTS. GENERAL CONTRACTOR SHALL REPORT ANY
INCONSISTENCIES TO ARCHITECT AND RECEIVE HIS INSTRUCTIONS BEFORE COMMENCING WORK.
(C) OWNER WILL FURNISH EVIDENCE OF THE LOCATIONS OF PROPERTY LINES, EASEMENTS AND OTHER
RESTRICTIONS.
(D) GENERAL CONTRACTOR SHALL PROVIDE AND MAINTAIN WELL-BUILT BATTER BOARDS AT CORNERS
AND ESTABLISH AND SAFEGUARD BENCH MARKS IN AT LEAST TWO WIDELY SEPARATED PLACES. AS
WORK PROGRESSES, HE SHALL ALSO ESTABLISH BENCH MARKS AT EACH BUILDING LEVEL AND MARK
EXACT LOCATIONS OF PARTITIONS ON ROUGH FLOORS AS A GUIDE TO THE VARIOUS TRADES.
1.11 CUTTING AND PATCHING
(A) EMPLOY A SKILLED AND EXPERIENCED INSTALLER TO PERFORM CUTTING AND PATCHING OF NEW OR
PREVIOUSLY INSTALLED WORK; RESTORE WORK WITH NEW PRODUCTS.
(B) SUBMIT WRITTEN REQUEST IN ADVANCE OF CUTTING OR ALTERING STRUCTURAL OR BUILDING
ENCLOSURE ELEMENTS.
GENERAL REQUIREMENTS
Page 01 00 00-3
(C) FIT WORK TIGHT TO ADJACENT ELEMENTS. MAINTAIN INTEGRITY OF WALL, CEILING, OR FLOOR
CONSTRUCTION; COMPLETELY SEAL VOIDS.
(D) REFINISH SURFACES TO MATCH ADJACENT FINISHES.
1.12 CONFERENCES
(A) WHEN REQUIRED IN INDIVIDUAL SPECIFICATION SECTIONS, THE GENERAL CONTRACTOR SHALL
CONVENE A PRE-INSTALLATION CONFERENCE AT PROJECT SITE PRIOR TO COMMENCING WORK OF
THAT SECTION. GIVE ALL PARTIES REQUIRED TO ATTEND A MINIMUM 48 HOURS NOTICE.
1.15 PROGRESS MEETINGS
(A) GENERAL CONTRACTOR SHALL SCHEDULE AND ADMINISTER MEETINGS THROUGHOUT PROGRESS OF
THE WORK AT MAXIMUM MONTHLY INTERVALS.
(B) GENERAL CONTRACTOR SHALL PRESIDE AT MEETINGS, RECORD MINUTES, AND DISTRIBUTE COPIES
WITHIN SEVEN DAYS TO THOSE AFFECTED BY DECISIONS MADE.
1.16 SUBMITTAL PROCEDURES
(A) SUBMITTAL FORM TO IDENTIFY PROJECT, CONTRACTOR, SUBCONTRACTOR OR SUPPLIER; AND
PERTINENT CONTRACT DOCUMENT REFERENCES.
(B) APPLY CONTRACTOR'S STAMP, SIGNED OR INITIALED, CERTIFYING THAT REVIEW, VERIFICATION OF
PRODUCTS REQUIRED, CHECKING OF FIELD DIMENSIONS, ADJACENT CONSTRUCTION WORK, AND
COORDINATION OF INFORMATION IS IN ACCORDANCE WITH THE REQUIREMENTS OF THE WORK AND
CONTRACT DOCUMENTS.
(C) IDENTIFY VARIATIONS FROM CONTRACT DOCUMENTS, AND PRODUCT OR SYSTEM LIMITATIONS
WHICH MAY BE DETRIMENTAL TO SUCCESSFUL PERFORMANCE OF THE COMPLETED WORK.
(D) REVISE AND RESUBMIT SUBMITTALS AS REQUIRED; IDENTIFY ALL CHANGES MADE SINCE PREVIOUS
SUBMITTAL.
1.17 CONSTRUCTION PROGRESS SCHEDULES
(A) SUBMIT INITIAL PROGRESS SCHEDULE IN DUPLICATE WITHIN 15 DAYS AFTER DATE ESTABLISHED IN
NOTICE TO PROCEED FOR ARCHITECT/ENGINEER REVIEW.
(B) SUBMIT REVISED SCHEDULES WITH EACH MONTHLY APPLICATION FOR PAYMENT, IDENTIFYING
CHANGES SINCE PREVIOUS VERSION. INDICATE ESTIMATED PERCENTAGE OF COMPLETION FOR
EACH ITEM OF WORK AT EACH SUBMISSION.
(C) SUBMIT A HORIZONTAL BAR CHART WITH SEPARATE LINE FOR EACH MAJOR SECTION OF WORK OR
OPERATION, IDENTIFYING FIRST WORK DAY OF EACH WEEK.
1.18 PROPOSED PRODUCTS LIST
(A) WITHIN 10 DAYS AFTER DATE ESTABLISHED IN NOTICE TO PROCEED, SUBMIT COMPLETE LIST OF MAJOR
PRODUCTS PROPOSED FOR USE, WITH NAME OF MANUFACTURER, TRADE NAME, AND MODEL
NUMBER OF EACH PRODUCT.
GENERAL REQUIREMENTS
Page 01 00 00-4
(B) WITHIN 10 DAYS AFTER DATE ESTABLISHED IN NOTICE TO PROCEED, SUBMIT COMPLETE LIST OF ALL
PROPOSED SUBCONTRACTORS.
1.19 SHOP DRAWINGS
(A) LARGE SUBMITTALS – DRAWINGS, OR OTHER INFORMATION THAT REQUIRE A FORMAT LARGER THAN
8.5” X 11” (TO BE CLEARLY READABLE) OR MATERIAL AND EQUIPMENT SUBMITTALS CONTAINING
MORE THAN (10) PAGES (APPLICABLE TO ONE SPECIFICATION SECTION).
1. SUBMIT IN THE FORM OF ONE EDITABLE .PDF FILE, DELIVERED BY EMAIL, UPLOADED TO A
PROJECT WEBSITE LOCATION, OR AS OTHERWISE DIRECTED.
(B) SMALL SUBMITTALS – MATERIAL, EQUIPMENT, CATALOG AND OTHER 8.5” X 11” FORMAT SUBMITTALS
(10) SHEETS OR LESS FOR ANY ONE SPECIFICATION SECTION.
1. SUBMIT IN THE FORM OF ONE EDITABLE .PDF FILE, DELIVERED BY EMAIL, UPLOADED TO A
PROJECT WEBSITE LOCATION, OR AS OTHERWISE DIRECTED.
(C) AT THE ARCHITECT/ENGINEERS OPTION, REVIEW MARKS WILL BE INDICATED ON ONE OR BOTH OF THE
SUBMITTED FORMATS. ALL REVIEW MARKS SHOULD BE COLOR CODED TO REFLECT VARIOUS
REVIEWERS MARKS.
(D) ARCHITECT SHALL KEEP ONE COPY OF ALL SUBMITTALS. CONTRACTOR SHALL KEEP ONE COPY OF
ALL SUBMITTALS ON FILE TO BE GIVEN TO THE OWNER AT THE COMPLETION OF THE PROJECT.
(E) THE CONTRACTOR SHALL PROVIDE TO THE OWNER AND ARCHITECT A DIGITAL MEDIA COPY OF AN
INDEXED AND BOOKMARKED .PDF FORMAT FILE THAT INCLUDES ALL OF THE SUBMITTALS AT THE
CLOSE OUT OF THE PROJECT.
1.20 PRODUCT DATA
(A) SUBMIT THE NUMBER OF COPIES WHICH THE CONTRACTOR REQUIRES, PLUS TWO COPIES WHICH WILL
BE RETAINED BY THE ARCHITECT/ENGINEER.
(B) MARK EACH COPY TO IDENTIFY APPLICABLE PRODUCTS, MODELS, OPTIONS, AND OTHER DATA.
SUPPLEMENT MANUFACTURERS' STANDARD DATA TO PROVIDE INFORMATION UNIQUE TO THIS
PROJECT.
1.21 SAMPLES
(A) SUBMIT SAMPLES TO ILLUSTRATE FUNCTIONAL AND AESTHETIC CHARACTERISTICS OF THE PRODUCT.
(B) SUBMIT SAMPLES OF FINISHES FROM THE FULL RANGE OF MANUFACTURERS' STANDARD COLORS, OR
IN CUSTOM COLORS AS NOTED IN INDIVIDUAL SPECIFICATION SECTIONS, INCLUDING OPTIONAL
TEXTURES AND PATTERNS FOR ARCHITECT/ENGINEER'S SELECTION.
(C) WHERE APPROVAL OF ARCHITECT FOR MATERIALS OR EQUIPMENT IS REQUIRED, SECURE SUCH
APPROVAL BEFORE PROCUREMENT. WHERE COLORS AND/OR PATTERNS ARE TO BE SELECTED BY
ARCHITECT, REQUEST SUCH SELECTION IN AMPLE TIME FOR PROCUREMENT.
1.22 MANUFACTURERS' INSTRUCTIONS
GENERAL REQUIREMENTS
Page 01 00 00-5
(A) WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, SUBMIT MANUFACTURERS' PRINTED
INSTRUCTIONS FOR DELIVERY, STORAGE, ASSEMBLY, INSTALLATION, START-UP, ADJUSTING, AND
FINISHING, IN QUANTITIES SPECIFIED FOR PRODUCT DATA.
1.23 MANUFACTURER'S CERTIFICATES
(A) WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, SUBMIT MANUFACTURERS' CERTIFICATE TO
ARCHITECT/ENGINEER FOR REVIEW, IN QUANTITIES SPECIFIED FOR PRODUCT DATA.
(B) INDICATE MATERIAL OR PRODUCT CONFORMS TO OR EXCEEDS SPECIFIED REQUIREMENTS. SUBMIT
SUPPORTING REFERENCE DATA, AFFIDAVITS, AND CERTIFICATIONS AS APPROPRIATE.
1.24 CONSTRUCTION PHOTOGRAPHS
(A) THE CONTRACTOR SHALL PHOTOGRAPH WORK IN PROGRESS AT REGULAR INTERVALS TO
DOCUMENT THE OVERALL PROGRESS OF CONSTRCTION. PHOTOGRAPHS WILL BE UPLOADED TO A
PROJECT WEBSITE AND AVAILABLE FOR ACCESS BY THE OWNER AND ARCHITECT. .
1.25 QUALITY ASSURANCE/CONTROL OF INSTALLATION
(A) MONITOR QUALITY CONTROL OVER SUPPLIERS, MANUFACTURERS, PRODUCTS, SERVICES, SITE
CONDITIONS, AND WORKMANSHIP, TO PRODUCE WORK OF SPECIFIED QUALITY.
(B) COMPLY FULLY WITH MANUFACTURERS' INSTRUCTIONS.
(C) COMPLY WITH SPECIFIED STANDARDS AS A MINIMUM QUALITY FOR THE WORK EXCEPT WHEN MORE
STRINGENT TOLERANCES, CODES, OR SPECIFIED REQUIREMENTS INDICATE HIGHER STANDARDS OR
MORE PRECISE WORKMANSHIP.
1.26 REFERENCES
(A) CONFORM TO REFERENCE STANDARD BY DATE OF ISSUE CURRENT AS OF DATE OF CONTRACT
DOCUMENTS.
(B) SHOULD SPECIFIED REFERENCE STANDARD CONFLICT WITH CONTRACT DOCUMENTS, REQUEST
CLARIFICATION FROM ARCHITECT/ENGINEER BEFORE PROCEEDING.
(C) UNLESS NOTED OTHERWISE, THE RECOMMENDATIONS AND STANDARDS OF THE FOLLOWING
ORGANIZATIONS SHALL APPLY TO THIS PROJECT:
AA ALUMINUM ASSOCIATION
AAMA ARCHITECTURAL ALUMINUM MANUFACTURERS ASSOCIATION
AASHO AMERICAN ASSOCIATION OF STATE HIGHWAY & TRANSPORTATION OFFICIALS
ACI AMERICAN CONCRETE INSTITUTE
AFI AIR FILTER INSTITUTE
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS OF AMERICA
AIA AMERICAN INSTITUTE OF ARCHITECTS
AIA AMERICAN INSURANCE ASSOCIATION (FORMERLY NFFU)
AIEE AMERICAN INSTITUTE OF ELECTRICAL ENGINEERS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALS AMERICAN LUMBER STANDARDS
GENERAL REQUIREMENTS
Page 01 00 00-6
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE (FORMERLY USAS)
APA AMERICAN PLYWOOD ASSOCIATION
API AMERICAN PETROLEUM INSTITUTE
ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION AND
AIR-CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWI ARCHITECTURAL WOODWORK INSTITUTE
AWPA AMERICAN WOOD PRESERVER'S INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWWA AMERICAN WATER WORKS ASSOCIATION
CISPI CAST IRON SOIL PIPE INSTITUTE
CS COMMERCIAL STANDARD, U. S. DEPARTMENT OF COMMERCE
CGA COMPRESSED GAS ASSOCIATION
CSI CONSTRUCTION SPECIFICATION INSTITUTE
FGJA FLAT GLASS JOBBERS ASSOCIATION
FIA FACTORY INSURANCE ASSOCIATION
FM FACTORY MUTUAL ENGINEERING AND RESEARCH
FS FEDERAL SPECIFICATION
GA GYPSUM ASSOCIATION
IEEE INSTITUTE OF ELECTRIC AND ELECTRONICS ENGINEERS
IES ILLUMINATING ENGINEERING SOCIETY
IPC INTERNATIONAL PLUMBING CODE
MIA MARBLE INSTITUTE OF AMERICA
MLMA METAL LATH MANUFACTURERS ASSOCIATION
MS MILITARY SPECIFICATION
MSTD MILITARY STANDARD
NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL
MANUFACTURERS
NACE NATIONAL ASSOCIATION OF CORROSION ENGINEERS
NAFM NATIONAL ASSOCIATION OF FAN MANUFACTURERS
NBS NATIONAL BUREAU OF STANDARDS
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NHLA NATIONAL HARDWOOD LUMBER ASSOCIATION
NIOSH/OSHA NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH
NTMA NATIONAL TERRAZZO AND MOSAIC ASSOCIATION
NWMA NATIONAL WOODWORK MANUFACTURERS ASSOCIATION
PEI PORCELAIN ENAMEL INSTITUTE
RTI RESILIENT TILE INSTITUTE
SBI STEEL BOILER INSTITUTE
SCPI STRUCTURAL CLAY PRODUCTS INSTITUTE
SDI STEEL DECK INSTITUTE
SJI STEEL JOIST INSTITUTE
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SSPC STEEL STRUCTURE PAINTING COUNCIL
STI STEEL TANK INSTITUTE
TCA TILE COUNCIL OF AMERICA
UBC UNIFORM BUILDING CODE
GENERAL REQUIREMENTS
Page 01 00 00-7
UL UNDERWRITER'S LABORATORIES
UFC UNIFORM FIRE CODE
1.27 FIELD SAMPLES
(A) FOR EACH JOB-FINISHED MATERIAL, SUCH AS MASONRY, PLASTER, CONCRETE, PAINT OR OTHER
FINISHES, CONSTRUCT FIELD SAMPLES AT THE SITE FOR ARCHITECT'S REVIEW AND APPROVAL, AS
REQUIRED BY INDIVIDUAL SPECIFICATIONS SECTIONS.
(B) OBTAIN ARCHITECT'S APPROVAL BEFORE INSTALLING THE BALANCE OF SUCH WORK. WHEN THE
ARCHITECT'S APPROVAL REQUIRES ADDITIONAL PANELS OR SAMPLES, PROVIDE SAME AS NECESSARY
TO SECURE HIS APPROVAL.
(C) SAMPLE PANELS MAY BECOME PART OF FINAL BUILDING CONSTRUCTION, WITH PRIOR APPROVAL OF
ARCHITECT.
(D) ACCEPTABLE SAMPLE PANELS REPRESENT A MINIMUM QUALITY LEVEL FOR ALL SUBSEQUENT WORK.
1.28 INSPECTION AND TESTING LABORATORY SERVICES
(A) CONTRACTOR SHALL APPOINT, EMPLOY, AND PAY FOR SERVICES OF AN INDEPENDENT FIRM(S) TO
PERFORM INSPECTION AND TESTING, WHERE NOTED IN INDIVIDUAL SPECIFICATION SECTIONS.
(B) THE INDEPENDENT FIRM WILL PERFORM INSPECTIONS, TESTS, AND OTHER SERVICES AS REQUIRED OR
SPECIFIED HEREIN.
(C) COOPERATE WITH INDEPENDENT FIRM; FURNISH SAMPLES AS REQUESTED.
(D) RE-TESTING REQUIRED BECAUSE OF NON-CONFORMANCE TO SPECIFIED REQUIREMENTS WILL BE
CHARGED TO THE CONTRACTOR.
(E) SHOULD SUCH TEST OR VISUAL OBSERVATION INDICATE A FAILURE OF MATERIALS OR CONSTRUCTION
TO MEET REQUIREMENTS OF DRAWINGS AND/OR SPECIFICATIONS, RESPECTIVE CONTRACTOR SHALL
PAY FOR ADDITIONAL TESTS, AS DIRECTED BY THE ARCHITECT UNTIL COMPLIANCE HAS BEEN PROVEN, AND SHOULD SUCH WORK FAIL TO COMPLY, THIS CONTRACTOR SHALL REPLACE IT AT NO
ADDITIONAL COST TO THE OWNER.
(F) COPIES OF TESTING REPORTS SHALL BE SENT TO THE OWNER, THE ARCHITECT, THE MECHANICAL
ENGINEER AND THE CONTRACTOR OR OTHERWISE AS NOTED HEREIN.
1.29 MANUFACTURERS' FIELD SERVICES AND REPORTS
(A) WHEN SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS, REQUIRE MATERIAL OR PRODUCT
SUPPLIERS OR MANUFACTURERS TO PROVIDE QUALIFIED STAFF PERSONNEL TO OBSERVE SITE
CONDITIONS AND TO INITIATE INSTRUCTIONS WHEN NECESSARY.
(B) REPORT OBSERVATIONS AND SITE DECISIONS OR INSTRUCTIONS THAT ARE SUPPLEMENTAL OR
CONTRARY TO MANUFACTURERS' WRITTEN INSTRUCTIONS.
Page 01 00 00-8
1.30 TEMPORARY ELECTRICITY
(A) PROVIDE AND PAY FOR POWER SERVICE REQUIRED FROM SOURCE.
(B) PROVIDE POWER OUTLETS FOR CONSTRUCTION OPERATIONS, BRANCH WIRING, DISTRIBUTION BOXES, AND FLEXIBLE POWER CORDS AS REQUIRED.
1.31 TEMPORARY LIGHTING
(A) PROVIDE AND MAINTAIN TEMPORARY LIGHTING FOR CONSTRUCTION OPERATIONS, AND SECURITY
LIGHT(S) AROUND CONSTRUCTION AREA(S).
(B) PROVIDE BRANCH WIRING FROM POWER SOURCE TO DISTRIBUTION BOXES WITH LIGHTING
CONDUCTORS, PIGTAILS, AND LAMPS AS REQUIRED.
(C) PERMANENT BUILDING LIGHTING MAY BE UTILIZED DURING CONSTRUCTION. REPAIR, CLEAN, AND
REPLACE LAMPS AT END OF CONSTRUCTION AS REQUIRED, PRIOR TO SUBSTANTIAL COMPLETION
INSPECTION.
1.32 TEMPORARY HEAT AND COOLING
(A) THE GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY HEAT AND/OR COOLING AS REQUIRED TO
MAINTAIN SPECIFIED CONDITIONS FOR CONSTRUCTION OPERATIONS, OR TO PREVENT DAMAGE
FROM DAMPNESS AND COLD, OR TO DRY OUT WORK. DO NOT USE TEMPORARY EQUIPMENT WHICH
MIGHT DAMAGE BUILDING. MECHANICAL CONTRACTOR SHALL MAKE PERMANENT HEATING
SYSTEMS READY AND SUPPLY TEMPORARY HEAT FROM THESE AS SOON AS PERMANENT SYSTEMS ARE
COMPLETED.
(B) GENERAL CONTRACTOR SHALL PROVIDE AND PAY FOR OPERATION, MAINTENANCE, AND REGULAR
REPLACEMENT OF FILTERS AND WORN OR CONSUMED PARTS.
(C) MAINTAIN MINIMUM TEMPERATURES FOR INSTALLATION OF MATERIAL(S) AS SPECIFIED HEREIN, OR
OTHERWISE AS REQUIRED BY PRODUCT MANUFACTURER(S). CONTRACTOR SHALL REPAIR OR
REPLACE MATERIALS DAMAGED AS A RESULT OF EXPOSURE TO LOW TEMPERATURE; EITHER DURING
INITIAL APPLICATION OR INSTALLATION, CURING, OR SUBSEQUENT CONSTRUCTION ACTIVITY.
(D) PROVIDE QUALIFIED PERSONNEL TO OPERATE TEMPORARY AND PERMANENT EQUIPMENT.
1.33 TEMPORARY VENTILATION
(A) VENTILATE ENCLOSED AREAS AS REQUIRED TO ASSIST CURE OF MATERIALS, TO DISSIPATE HUMIDITY, AND TO PREVENT ACCUMULATION OF DUST, FUMES, VAPORS, AND GASES.
(B) GENERAL CONTRACTOR MAY UTILIZE PERMANENT H.V.A.C. SYSTEMS AS SOON AS THESE SYSTEMS
ARE AVAILABLE. EXTEND AND SUPPLEMENT EQUIPMENT WITH TEMPORARY FAN UNITS AS REQUIRED
TO MAINTAIN CLEAN AIR FOR CONSTRUCTION OPERATIONS.
1.34 TELEPHONE SERVICE
(A) PROVIDE, MAINTAIN, AND PAY FOR TEMPORARY TELEPHONE SERVICE AT THE CONTRACTOR'S FIELD
OFFICE FOR THE DURATION OF CONSTRUCTION, INCLUDING USE OF THE PHONE BY THE ARCHITECT
GENERAL REQUIREMENTS
Page 01 00 00-9
OR HIS REPRESENTATIVE, FOR CALLS TO THE ARCHITECT'S OFFICE, THE OWNER, PROJECT
ENGINEERING CONSULTANTS, SUPPLIERS, OR OTHERS, AS NECESSARY FOR THE PROPER AND
EXPEDIENT COMPLETION OF ALL DUTIES REQUIRED FOR ADMINISTRATION OF THIS PROJECT.
1.35 TEMPORARY WATER SERVICE
(A) PROVIDE, MAINTAIN AND PAY FOR SUITABLE QUALITY WATER SERVICE REQUIRED FOR
CONSTRUCTION ACTIVITIES. CONNECT TO EXISTING WATER SOURCE, AND MAKE ALL EXTENSIONS
NECESSARY FOR CONSTRUCTION OPERATIONS.
1.36 TEMPORARY SANITARY FACILITIES
(A) GENERAL CONTRACTOR SHALL PROVIDE PROPERLY SERVICED TOILET FACILITIES FOR USE OF ALL
WORKMEN.
(B) MAINTAIN IN CLEAN AND SANITARY CONDITION.
1.37 BARRIERS AND FENCING
(A) GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL INSTALL AND MAINTAIN ALL WARNINGS, BARRICADES, CONSTRUCTION FENCES, SIGNAL LIGHTS, AND ANY OTHER WARNING OR BARRICADE
AS REQUIRED TO WARN AND PROTECT THE PUBLIC FROM HAZARDS DUE TO HIS OPERATIONS.
(B) PROVIDE TEMPORARY SECURITY FENCING AROUND PERIMETER OF CONSTRUCTION AND MATERIAL
STORAGE AREA(S), INCLUDING LOCKABLE GATES. CONTRACTOR SHALL BE RESPONSIBLE FOR
MAINTAINING SECURITY FENCING IN GOOD REPAIR THROUGHOUT THE PROJECT, AND FOR LOCKING
JOB SITE AT NIGHT. VERIFY PLACEMENT OF SECURITY FENCING WITH ARCHITECT PRIOR TO
INSTALLATION. THE NUMBER AND SIZES OF GATES IN THE TEMPORARY SECURITY FENCE WILL BE AS
DETERMINED BY GENERAL CONTRACTOR REQUIREMENTS.
(C) ALL SUCH WARNING DEVICES AND BARRICADES SHALL BE INSTALLED IN COMPLIANCE WITH O.S.H.A.
AND U.B.C. REQUIREMENTS, AND ANY ADDITIONAL LOCAL ORDINANCES.
1.38 WATER CONTROL
(A) MAINTAIN EXCAVATIONS FREE OF WATER. PROVIDE, OPERATE, AND MAINTAIN PUMPING EQUIPMENT
AS REQUIRED. COSTS FOR ALL SUCH PUMPING SHALL BE PAID FOR BY GENERAL CONTRACTOR.
1.39 EXTERIOR ENCLOSURES
(A) PROVIDE TEMPORARY WEATHER-TIGHT CLOSURES TO EXTERIOR OPENINGS TO PERMIT ACCEPTABLE
WORKING CONDITIONS AND PROTECTION OF THE WORK.
(B) PROVIDE TEMPORARY ROOFING AS REQUIRED TO PROTECT INTERIOR BUILDING FINISHES AND
EQUIPMENT IF THERE IS A DELAY IN INSTALLING FINAL ROOF.
(C) COSTS FOR ALL SUCH TEMPORARY CLOSURES SHALL BE PAID FOR BY THE GENERAL CONTRACTOR
1.40 INFECTION CONTROL MEASURES
(A) THE OWNER WILL PREPARE AN INFECTION CONTROL RISK ASSESSMENT AT EACH MAJOR WORK AREA
AND WILL IMPOSE REQUIRMENTS ON THE PROJECT TO CONTROL THE SPREAD OF DUST AND
GENERAL REQUIREMENTS
Page 01 00 00-10
AIRBORNE PATHOGENS DISTURBED DURING CONSTRUCTION OPERATIONS AND TO PREVENT
MIGRATION OF SUCH INTO SENSITIVE AREAS OF THE FACILITY. THE CONTRACTOR SHALL BE PREPARED
TO ADDRESS THESE REQUIREMNTS, WHICH MAY INCLUDE THE FOLLOWING ELEMENTS:
1. PROVIDE STICKY TACK MATS AT ENTRANCES AND EXITS FROM CONSTRUCTION AREAS, AS
REQUIRED.
2. PROVIDE UNITS CAPABLE OF SUPPLYING NEGATIVE PRESSURE IN ACTIVE CONSTRUCTION
AREAS. IF UNITS RECIRCULATE AIR WITHIN THIS SPACE, THE UNITS WILL BE CAPABLE OF
FILTERING THE AIR UTILIZING HEPA FILTRATION.
3. CONTRACTOR WILL BE REQUIRED TO COVER ANY CONSTRUCTION DEBRIS AND WIPE DOWN
CARTS BEFORE TRAVELING THROUGH ANY PATIENT CARE AREA.
4. CONTRACTOR WILL BE REQUIRED TO SEAL ALL HOLES, PIPES AND CONDUIT AND OTHER
WALL PENETRATIONS, AS REQUIRED, AT BARRIERS BETWEEN CONSTRUCTION OPERATIONS
AND ADJACENT PATIENT CARE AREAS.
5. IF CONSTRUCTION AREAS ARE IN PROXIMITY TO HIGH RISK PATIENT POPULATIONS,
CONTRACTOR MAY BE REQUIRED TO BUILD ANTE ROOM FOR PERSONNEL TO PASS
THROUGH, SO THE PERSONNEL CAN BE VACUUMED USING A HEPA VACUUM PRIOR TO
LEAVING THE WORK SITE.
6. CONSTRUCTION PERSONNEL MAY BE REQUIRED TO WEAR STERILE PERSONAL PROTECTIVE
EQUIPMENT WHEN WORKING IN HIGH RISK PATIENT CARE AREAS.
7. CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE INFECTION CONTROL RISK ASSESSMENT
MATRIX ATTACHED AS AN APPENDIX TO THIS PROJECT MANUAL FOR ALL MEASURES THAT
MAY BE REQUIRED IN THIS PROJECT.
8. REFER TO MECHANICAL AND ELECTRICAL SPECIFICATIONS FOR INFORMATION REGARDING
SEALING AND CLEANING OF DUCTWORK AND OTHER OPERATIONAL MEASURES THAT MAY
BE REQUIRED.
1.41 PROTECTION OF INSTALLED WORK
(A) PROTECT INSTALLED WORK AND PROVIDE SPECIAL PROTECTION WHERE SPECIFIED IN INDIVIDUAL
SPECIFICATION SECTIONS.
(B) PROHIBIT TRAFFIC OR STORAGE UPON WATERPROOFED OR ROOFED SURFACES.
(C) KEEP PROPERLY COVERED ALL MATERIALS, CAVITIES, AND HOLES SUBJECT TO DAMAGE BY FALLING
MATERIALS.
(D) LOAD, TRANSPORT, UNLOAD, STORE AND ERECT MATERIALS IN A MANNER TO KEEP THEM FROM
INJURY.
(E) SUPPORT NO RUNWAYS, RAMPS OR CONSTRUCTION EQUIPMENT ON, NOR TRANSPORT OVER ANY
ITEMS OR ASSEMBLIES SUBJECT TO DISPLACEMENT, DISFIGUREMENT OR OTHER DAMAGE.
GENERAL REQUIREMENTS
Page 01 00 00-11
(F) PROTECT PREVIOUSLY PLACED WORK BY SUITABLE COVERINGS OR OTHER PROTECTIONS DURING
INSTALLATION OF SUBSEQUENT WORK.
(G) PROTECT WORK IN PLACE REQUIRING JOB FINISH UNTIL SUCH FINISHING HAS BEEN COMPLETED.
(H) WHERE FINISHED FLOORS ARE SUBJECT TO DAMAGE, SUITABLY COVER TRAFFIC AREAS UNTIL
BUILDING ACCEPTANCE.
(I) ONCE GLASS, MIRRORS AND OTHER SUCH DAMAGEABLE ITEMS HAVE BEEN INSTALLED, IDENTIFY
SAME WITH APPROPRIATE WARNING MARKING AND LEAVE ON UNTIL FINAL CLEANING.
1.42 SECURITY
(A) PROVIDE SECURITY AND FACILITIES TO PROTECT WORK AND OWNER'S OPERATIONS FROM
UNAUTHORIZED ENTRY, VANDALISM, OR THEFT.
1.43 ACCESS ROADS
(A) CONSTRUCT AND MAINTAIN TEMPORARY ROADS ACCESSING PUBLIC THOROUGHFARES TO SERVE
CONSTRUCTION AREA.
1.44 PARKING
(A) PROVIDE TEMPORARY PARKING AREAS TO ACCOMMODATE CONSTRUCTION PERSONNEL. VERIFY
LOCATION OF SUCH AREAS WITH OWNER PRIOR PROJECT START-UP.
(B) RETURN PARKING AREA(S) TO ORIGINAL CONDITION AT END OF PROJECT, INCLUDING REGRADING
AND RESEEDING OF GRASS IF REQUIRED.
1.45 PROGRESS CLEANING
(A) MAINTAIN AREAS FREE OF WASTE MATERIALS, DEBRIS, AND RUBBISH. MAINTAIN SITE IN A CLEAN AND
ORDERLY CONDITION.
1.46 PROJECT IDENTIFICATION
(A) PROVIDE AN 8 FT WIDE X 4 FT HIGH PROJECT SIGN OF EXTERIOR GRADE PLYWOOD AND WOOD
FRAME CONSTRUCTION, PAINTED, TO ARCHITECT/ENGINEER'S DESIGN AND COLORS.
(B) ERECT ON SITE AT LOCATION ESTABLISHED BY ARCHITECT/ENGINEER.
(C) MAINTAIN IN GOOD REPAIR THROUGHOUT CONSTRUCTION PERIOD.
1.47 FIELD OFFICES AND SHEDS
(A) THE GENERAL CONTRACTOR SHALL FURNISH AND MAINTAIN IN GOOD CONDITION DURING
PROGRESS OF WORK A FIELD OFFICE FACILITY FOR USE OF GENERAL CONTRACTOR AND THE
ARCHITECT. PROVIDE A TABLE OR OTHER FLAT SURFACE ON WHICH TO REVIEW PLANS AND
SPECIFICATIONS. THIS FACILITY WILL REMAIN PROPERTY OF THE GENERAL CONTRACTOR.
GENERAL REQUIREMENTS
Page 01 00 00-12
(B) THE FIELD OFFICE SHALL BE: WEATHER-TIGHT, WITH LIGHTING, ELECTRICAL OUTLETS, HEATING, COOLING AND/OR VENTILATING EQUIPMENT, AND EQUIPPED WITH STURDY FURNITURE AND
DRAWING DISPLAY TABLE.
1. PROVIDE SPACE FOR PROJECT MEETINGS, WITH TABLE AND CHAIRS TO ACCOMMODATE 6
PERSONS
(C) CONTRACTOR SHALL KEEP A COMPLETE SET OF DRAWINGS, GENERAL CONDITIONS OF THE
CONTRACT, SUPPLEMENTARY CONDITIONS, SPECIFICATIONS, ADDENDA, CHANGE ORDERS, SHOP
DRAWINGS, AND ANY SUPPLEMENTARY DRAWINGS OR OTHER WRITTEN INSTRUCTIONS PERTAINING
TO THE CONSTRUCTION OF THIS PROJECT AT THE FIELD OFFICE LOCATION, FOR USE BY ALL
WORKMEN, THE OWNER, AND THE ARCHITECT.
1.48 REMOVAL OF TEMPORARY UTILITIES, FACILITIES, AND CONTROLS
(A) REMOVE TEMPORARY ABOVE GRADE OR BURIED UTILITIES, EQUIPMENT, FACILITIES, MATERIALS, PRIOR
TO FINAL INSPECTION.
(B) REMOVE UNDERGROUND INSTALLATIONS TO A MINIMUM DEPTH OF 2 FT, OR AS OTHERWISE NOTED IN
INDIVIDUAL SPECIFICATION SECTIONS.
(C) CLEAN AND REPAIR DAMAGE CAUSED BY INSTALLATION OR USE OF TEMPORARY WORK.
(D) RESTORE EXISTING FACILITIES USED DURING CONSTRUCTION TO ORIGINAL CONDITION. RESTORE
PERMANENT FACILITIES USED DURING CONSTRUCTION TO SPECIFIED CONDITION.
1.49 PRODUCTS
(A) PRODUCTS: MEANS NEW MATERIAL, MACHINERY, COMPONENTS, EQUIPMENT, FIXTURES, AND
SYSTEMS FORMING THE WORK, BUT DOES NOT INCLUDE MACHINERY AND EQUIPMENT USED FOR
PREPARATION, FABRICATION, CONVEYING AND ERECTION OF THE WORK. PRODUCTS MAY ALSO
INCLUDE EXISTING MATERIALS OR COMPONENTS SPECIFICALLY IDENTIFIED FOR REUSE.
(B) DO NOT USE MATERIALS AND EQUIPMENT REMOVED FROM EXISTING PREMISES, EXCEPT AS
SPECIFICALLY IDENTIFIED OR ALLOWED BY THE CONTRACT DOCUMENTS.
(C) USE INTERCHANGEABLE COMPONENTS OF THE SAME MANUFACTURE FOR SIMILAR COMPONENTS.
(D) FURNISH MATERIALS AND EQUIPMENT THAT HAVE BEEN PROPERLY INSPECTED AND TESTED IN
ACCORDANCE WITH ACCEPTED INDUSTRIES STANDARDS.
1.50 TRANSPORTATION, HANDLING, STORAGE AND PROTECTION
(A) TRANSPORT, HANDLE, STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S
INSTRUCTIONS.
(B) CONTRACTORS AND SUBCONTRACTORS SHALL PROVIDE BUILDINGS, ENCLOSURES, OR TRAILERS TO
PROTECT MATERIALS AND EQUIPMENT WHICH WOULD BE DAMAGED BY EXPOSURE. FAILURE TO DO
SO WILL CAUSE MATERIALS OR EQUIPMENT NOT PROPERLY PROTECTED TO BE EXCLUDED FROM
PERIODIC PAYMENT.
GENERAL REQUIREMENTS
Page 01 00 00-13
(C) CHECK MATERIALS AND EQUIPMENT FOR IN-TRANSIT DAMAGE IN AMPLE TIME TO REPLACE ANY
DAMAGED MATERIALS PRIOR TO INSTALLATION TIME.
(D) STORE MATERIALS IN A MANNER TO PREVENT DETERIORATION, STAINING, SOILING AND INTRUSION OF
FOREIGN SUBSTANCES. KEEP MATERIALS SUBJECT TO DETERIORATION BY DAMPNESS INSIDE AND/OR
COVERED WITH MOISTURE PROOF TARPS AND RAISED OFF THE GROUND. ADEQUATELY PROTECT
THOSE MATERIALS SUBJECT TO DAMAGE BY FREEZING OR FROST.
(E) CONTRACTOR SHALL REMOVE FROM THE JOBSITE AND REPLACE WITH NEW ANY MATERIALS
DAMAGED BY IMPROPER STORING OR FAILURE TO PROPERLY PROTECT MATERIALS FROM THE
ELEMENTS, AT NO ADDITIONAL COST TO OWNER.
1.51 PRODUCT OPTIONS
(A) PRODUCTS SPECIFIED BY REFERENCE STANDARDS OR BY DESCRIPTION ONLY: ANY PRODUCT
MEETING THOSE STANDARDS OR DESCRIPTION.
(B) PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS: PRODUCTS OF
MANUFACTURERS NAMED AND MEETING SPECIFICATIONS, NO OPTIONS OR SUBSTITUTIONS
ALLOWED.
(C) PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS WITH A PROVISION FOR
SUBSTITUTIONS: SUBMIT A REQUEST FOR SUBSTITUTION FOR ANY MANUFACTURER NOT NAMED.
(D) IN GENERAL, THESE SPECIFICATIONS IDENTIFY THE REQUIRED MATERIALS AND EQUIPMENT BY NAMING
ONE OR MORE PRODUCTS BY MANUFACTURER'S BRAND, MODEL AND CATALOG NUMBER AND/OR
OTHER IDENTIFICATION, THE FIRST-NAMED HAVING BEEN USED AS THE BASIS FOR DESIGN AND OTHER
BRANDS CONSIDERED EQUIVALENT. CONTRACTORS MAY PROVIDE ANY BRANDS AT THEIR OPTION.
(E) WHERE MATERIAL OR EQUIPMENT ARE DESCRIBED, BUT NOT NAMED, CONTRACTORS SHALL PROVIDE
SUCH FIRST QUALITY ITEMS, FULLY ADEQUATE IN EVERY RESPECT FOR THE IMPLIED AND INTENDED
USAGE, SUCH ITEMS BEING SUBJECT TO THE ARCHITECT'S FINAL APPROVAL PRIOR TO PROCUREMENT.
1.52 SUBSTITUTIONS
(A) SEE SECTION 3.03 IN THE INSTRUCTIONS TO BIDDERS, DOCUMENT "B", AND IN OTHER DIVISION 00
DOCUMENTS FOR INFORMATION RELATIVE TO SUBSTITUTION.
1.53 STARTING SYSTEMS
(A) PROVIDE SEVEN DAYS NOTIFICATION PRIOR TO START-UP OF EACH ITEM, AS REQUIRED IN INDIVIDUAL
SPECIFICATION SECTIONS.
(B) ENSURE THAT EACH PIECE OF EQUIPMENT OR SYSTEM IS READY FOR OPERATION.
(C) EXECUTE START-UP UNDER SUPERVISION OF RESPONSIBLE PERSONS IN ACCORDANCE WITH
MANUFACTURERS' INSTRUCTIONS.
(D) SUBMIT A WRITTEN REPORT THAT EQUIPMENT OR SYSTEM HAS BEEN PROPERLY INSTALLED AND IS
FUNCTIONING CORRECTLY.
1.54 DEMONSTRATION AND INSTRUCTIONS
Page 01 00 00-14
(A) BEFORE BEING ELIGIBLE FOR FINAL PAYMENT, CONTRACTOR SHALL DEMONSTRATE OPERATION AND
MAINTENANCE OF ALL PIECES AND SYSTEMS OF EQUIPMENT INCLUDING: HEATING, VENTILATION
AND AIR CONDITIONING SYSTEMS, LIGHTING AND POWER SYSTEMS, INTERCOM AND FIRE ALARM
SYSTEMS, ELEVATOR, ETC., TO OWNER'S PERSONNEL PRIOR TO DATE OF FINAL INSPECTION.
(B) FOR EQUIPMENT OR SYSTEMS REQUIRING SEASONAL OPERATION, PERFORM DEMONSTRATION FOR
OTHER SEASON WITHIN SIX MONTHS, OR AS SOON AS TEMPERATURE OR OTHER ENVIRONMENTAL
CONDITIONS PERMIT.
(C) DEMONSTRATE START-UP, OPERATION, CONTROL, ADJUSTMENT, TROUBLE-SHOOTING, SERVICING, MAINTENANCE, AND SHUTDOWN OF EACH ITEM OF EQUIPMENT AT AGREED-UPON TIMES, AT
PROJECT LOCATION.
(D) ASSIST OWNER IN DETERMINING MAINTENANCE SCHEDULES FOR ALL EQUIPMENT REQUIRING
PERIODIC MAINTENANCE.
1.55 TESTING, ADJUSTING, AND BALANCING
(A) CONTRACTOR SHALL APPOINT AN INDEPENDENT FIRM TO PERFORM TESTING, ADJUSTING, AND
BALANCING FOR MECHANICAL SYSTEMS AS SPECIFIED IN DIVISION 15.
(B) REPORTS WILL BE SUBMITTED BY THE INDEPENDENT FIRM TO THE ARCHITECT/ENGINEER INDICATING
OBSERVATIONS AND RESULTS OF TESTS AND INDICATING COMPLIANCE OR NON-COMPLIANCE WITH
SPECIFIED REQUIREMENTS AND WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
(C) COOPERATE WITH INDEPENDENT FIRM; FURNISH ASSISTANCE AS REQUESTED.
(D) RE-TESTING REQUIRED BECAUSE OF NON-CONFORMANCE TO SPECIFIED REQUIREMENTS WILL BE
CHARGED TO THE CONTRACTOR.
1.56 CONTRACT CLOSEOUT PROCEDURES
(A) SUBMIT WRITTEN CERTIFICATION THAT CONTRACT DOCUMENTS HAVE BEEN REVIEWED, WORK HAS
BEEN INSPECTED, AND WORK IS COMPLETE IN ACCORDANCE WITH CONTRACT DOCUMENTS AND
READY FOR ARCHITECT/ENGINEER'S INSPECTION.
(B) SUBMIT COMPLETE DIGITAL SET OF "AS-BUILT" DRAWINGS AND SPECIFICATIONS, SHOWING ALL
DEVIATIONS FROM ORIGINAL CONTRACT DOCUMENTS.
(C) CONTRACTOR SHALL KEEP ON FILE A COPY OF ALL SHOP DRAWINGS TO BE GIVEN TO OWNER AT
COMPLETION OF THE PROJECT.
(D) SUBMIT A COPY OF ALL SUPPLIERS AND SUBCONTRACTORS WITH NAME, ADDRESS, AND PHONE
NUMBERS IF DIFFERENT FROM ORIGINAL LIST.
(E) SUBMIT TWO (2) COMPLETE MANUALS ON THE ELECTRICAL AND MECHANICAL SYSTEMS, INCLUDING
MAINTENANCE AND OPERATIONAL RECOMMENDATIONS.
(F) SUBMIT ONE (1) NOTARIZED ORIGINAL AND TWO (2) COPIES OF THE MANUFACTURER'S CERTIFICATES
OF WARRANTIES AND/OR GUARANTEES AS REQUIRED IN INDIVIDUAL SPECIFICATION SECTIONS.
GENERAL REQUIREMENTS
Page 01 00 00-15
(G) SUBMIT ONE (1) NOTARIZED ORIGINAL AND TWO (2) COPY OF THE CONTRACTOR'S AFFIDAVIT OF
RELEASE OF LIENS AIA DOCUMENT G706A, CONDITIONAL UPON RECEIPT OF FINAL PAYMENT.
(H) SUBMIT ONE (1) ORIGINAL AND TWO (2) COPIES OF THE CONSENT OF SURETY TO FINAL PAYMENT, AIA
DOCUMENT G707.
(I) SUBMIT ONE (1) NOTARIZED ORIGINAL AND TWO (2) COPIES OF FINAL APPLICATION FOR PAYMENT
IDENTIFYING TOTAL ADJUSTED CONTRACT SUM/PRICE, PREVIOUS PAYMENTS, AND AMOUNT
REMAINING DUE.
1.57 FINAL CLEANING
(A) EXECUTE FINAL CLEANING PRIOR TO FINAL INSPECTION.
(B) CLEAN INTERIOR AND EXTERIOR SURFACES EXPOSED TO VIEW. VACUUM CARPETED AND SOFT
SURFACES.
(C) CLEAN DEBRIS FROM SITE, ROOFS, GUTTERS, DOWNSPOUTS, AND DRAINAGE SYSTEMS.
(D) REPLACE FILTERS OF OPERATING EQUIPMENT.
(E) REMOVE WASTE AND SURPLUS MATERIALS, RUBBISH, AND CONSTRUCTION FACILITIES FROM THE SITE.
(F) TOUCH-UP IMPERFECTIONS IN ALL BUILDING FINISHES AFTER CONTRACTORS AND TRADESMEN HAVE
COMPLETED THEIR WORK.
(G) CLEAN SURFACES USING APPROPRIATE MATERIALS AND METHODS THAT WILL THOROUGHLY CLEAN
BUT NOT DAMAGE MATERIALS AND THEIR FINISHES. CHECK WITH MANUFACTURER OF PRODUCT IN
QUESTION TO DETERMINE CORRECT CLEANING PROCEDURE AND MATERIALS. THE OWNER WILL BE
RESPONSIBLE FOR APPLYING FINAL WAX AND SEALERS AS REQUIRED.
1.58 ADJUSTING
(A) ADJUST OPERATING PRODUCTS AND EQUIPMENT TO ENSURE SMOOTH AND UNHINDERED
OPERATION.
(B) ADJUST WINDOWS, DOORS, DRAWERS, HARDWARE, APPLIANCES, MOTORS, VALVES, CONTROLS
AND OTHER EQUIPMENT AS REQUIRED FOR PROPER OPERATION.
1.59 PROJECT RECORD DOCUMENTS
(A) MAINTAIN ON SITE, ONE SET OF CONTRACT DOCUMENTS TO BE UTILIZED FOR "AS-BUILT" RECORD
DOCUMENTS.
(B) RECORD ACTUAL REVISIONS TO THE WORK. RECORD INFORMATION CONCURRENT WITH
CONSTRUCTION PROGRESS.
(C) SPECIFICATIONS: LEGIBLY MARK AND RECORD AT EACH PRODUCT SECTION A DESCRIPTION OF
ACTUAL PRODUCTS INSTALLED.
(D) RECORD DOCUMENTS AND SHOP DRAWINGS: LEGIBLY MARK EACH ITEM TO RECORD ACTUAL
CONSTRUCTION.
Page 01 00 00-16
(E) SUBMIT DOCUMENTS TO ARCHITECT/ENGINEER WITH APPLICATION FOR FINAL APPLICATION FOR
PAYMENT.
1.60 OPERATION AND MAINTENANCE DATA
(A) BEFORE BEING ELIGIBLE FOR FINAL PAYMENT, GENERAL CONTRACTOR SHALL SECURE AND DELIVER
TO OWNER, THROUGH ARCHITECT, TWO (2) COPIES OF MANUFACTURER'S OPERATION INSTRUCTIONS
AND MANUALS FOR ALL EQUIPMENT SUBMIT TWO SETS PRIOR TO FINAL INSPECTION, BOUND IN 8-1/2
X 11 INCH TEXT PAGES, THREE D SIDE RING BINDERS WITH DURABLE PLASTIC COVERS.
(B) PREPARE BINDER COVER WITH PRINTED TITLE "OPERATION AND MAINTENANCE INSTRUCTIONS", AND
TITLE OF PROJECT.
(C) INTERNALLY SUBDIVIDE THE BINDER CONTENTS WITH PERMANENT PAGE DIVIDERS, LOGICALLY
ORGANIZED, WITH TABS CLEARLY PRINTED UNDER REINFORCED LAMINATED PLASTIC TABS.
(D) CONTENTS:
1. DIRECTORY, LISTING NAMES, ADDRESSES, AND TELEPHONE NUMBERS OF
ARCHITECT/ENGINEER, CONTRACTOR, SUBCONTRACTORS, AND MAJOR EQUIPMENT
SUPPLIERS.
2. OPERATION AND MAINTENANCE INSTRUCTIONS, ARRANGED BY SYSTEM, AND BY
SPECIFICATION SECTION.
3. PROJECT DOCUMENTS AND CERTIFICATES.
(E) SEE MECHANICAL AND ELECTRICAL SPECIFICATIONS, DIVISIONS 15 AND 16, FOR ADDITIONAL
REQUIREMENTS.
1.61 WARRANTIES
(A) BEFORE BEING ELIGIBLE FOR FINAL PAYMENT, THE GENERAL CONTRACTOR SHALL DELIVER TO OWNER
THROUGH THE ARCHITECT, ALL MANUFACTURER'S AND SPECIAL WARRANTIES SPECIFIED FOR
MATERIAL, EQUIPMENT AND INSTALLATIONS, AS REQUIRED BY INDIVIDUAL SPECIFICATION SECTIONS.
WARRANTIES SHALL BE NOTARIZED, AND FURNISHED IN DUPLICATE.
(B) EXECUTE AND ASSEMBLE DOCUMENTS FROM SUBCONTRACTORS, SUPPLIERS, AND MANUFACTURERS.
(C) SUBMIT PRIOR TO FINAL APPLICATION FOR PAYMENT.
1.62 SPARE PARTS AND MAINTENANCE MATERIALS
(A) PROVIDE PRODUCTS, SPARE PARTS, MAINTENANCE AND EXTRA MATERIALS IN QUANTITIES SPECIFIED
IN INDIVIDUAL SPECIFICATION SECTIONS.
(B) DELIVER TO PROJECT SITE AND PLACE IN LOCATION AS DIRECTED ARCHITECT; OBTAIN RECEIPT PRIOR
TO FINAL PAYMENT.
1.63 INSTALLATION OF MATERIALS
GENERAL REQUIREMENTS
Page 01 00 00-17
(A) FURNISH, APPLY, INSTALL, CONNECT, ERECT, CLEAN AND CONDITION MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT PER MANUFACTURER'S PRINTED DIRECTIONS WHICH MUST BE ON THE
JOB PRIOR TO AND DURING INSTALLATION OF MATERIALS AND EQUIPMENT.
(B) PROVIDE ALL ATTACHMENT DEVICES AND MATERIALS NECESSARY TO SECURE MATERIALS TOGETHER, OR OTHER MATERIALS AS REQUIRED TO SECURE WORK OF OTHER TRADES.
(C) MAKE ALLOWANCES FOR AMPLE EXPANSION AND CONTRACTION OF ALL BUILDING COMPONENTS
SUBJECT TO SAME, INCLUDING CONTROL AND/OR EXPANSION JOINTS IN: CONCRETE AND
MASONRY, PLYWOOD SHEATHING, METAL ROOFING AND GUTTERING, GYPSUM BOARD WALLS AND
CEILINGS, ALL BUILDING FINISHES, ALUMINUM "STORE-FRONT" AND GLAZING SYSTEMS, EXTERIOR
INSULATION AND FINISH SYSTEMS, BUILT-UP OR MEMBRANE ROOFING, OTHER MATERIALS OR AREAS
REQUIRING EXPANSION CONTROL AS INDICATED BY PLANS AND/OR SPECIFICATIONS OR AS
OTHERWISE REQUIRED BY PRODUCT MANUFACTURERS.
1. SEE PLANS FOR LOCATIONS OF MAJOR BUILDING EXPANSION JOINTS.
2. WHERE NO CONTROL JOINTS ARE INDICATED, VERIFY LOCATION OF JOINTS IN ALL
MATERIALS WITH ARCHITECT FOR PLACEMENT PRIOR TO INSTALLATION. INSTALL JOINTS THUS
LOCATED AT NO ADDITIONAL COST TO OWNER.
(D) EACH TRADE SHALL PROVIDE SLEEVES, RECESSES AND OPENINGS TO THEIR WORK AS REQUIRED TO
RECEIVE WORK OF OTHER TRADES. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATION
OF ALL SUCH OPENINGS, SLEEVES, RECESSES, ETC.
(E) MAKE FIELD CHECK OF ACTUAL BUILDING DIMENSIONS BEFORE FABRICATING PRODUCTS.
(F) WHERE PROPER FIT OF WORK DEPENDS ON CLOSE TOLERANCE OF MANUFACTURED PRODUCTS, FURNISH MANUFACTURER WITH NECESSARY TEMPLATES TO INSURE PROPER FIT OF ALL COMPONENTS.
(G) INSTALL MATERIALS ONLY WHEN CONDITIONS OF TEMPERATURE, MOISTURE, HUMIDITY, AND
CONDITION OF ADJACENT BUILDING COMPONENTS ARE CONDUCIVE TO ACHIEVING BEST
INSTALLATION RESULTS. VERIFY REQUIREMENTS WITH PRODUCT MANUFACTURER'S
(H) IN JOB ASSEMBLING, EACH TRADE SHALL PROPERLY CUT AND FIT TO MAKE ITS OWN ASSEMBLIES FIT
ACCURATELY INTO THE EXISTING WORK, AND AS NECESSARY FOR OTHER TRADES HAVING WORK
OCCURRING HEREIN. WHERE NECESSARY TO CUT INTO OTHER BUILDING COMPONENTS, DO SO
NEATLY AND ONLY IN A MANNER SO AS NOT TO DAMAGE BUILDING STRUCTURALLY. DO NOT CUT
STRUCTURAL COMPONENTS OR ASSEMBLIES WITHOUT PRIOR APPROVAL OF ARCHITECT AND
STRUCTURAL ENGINEER.
(I) WHERE CONSTRUCTION CONSISTS OF A SERIES OF COURSES OF UNITS, ASSEMBLE UNITS IN BEST
ACCEPTABLE MANNER TO PROVIDE A STRUCTURALLY SOUND INSTALLATION, WITH JOINTS OF
UNIFORM SIZE, WHICH IS TOTALLY WATERPROOF WHERE EXPOSED TO EXTERIOR. ACCURATELY PLUMB
AND LEVEL ALL COURSES AND VERIFY LEVELS FREQUENTLY WITH INSTRUMENT.
(J) HANDLE MATERIALS IN A MANNER SO AS TO PREVENT SCRATCHING, ABRADING, DISTORTION, CHIPPING, BREAKING, OR OTHER DISFIGUREMENT. UNLESS OTHERWISE SPECIFIED, FABRICATE AND
INSTALL MATERIALS TRUE TO LINE, PLUMB AND LEVEL. LEAVE FINISH SURFACES SMOOTH AND FLAT, OR OF SMOOTH CONTOUR WHERE INDICATED, FREE FROM WRINKLES, WARPS, SCRATCHES, DENTS
AND OTHER IMPERFECTIONS. PROVIDE QUALITY WORKMANSHIP NOT LESS THAN THE
COMMERCIALLY ACCEPTED STANDARDS OF THAT TRADE. WHERE OBVIOUSLY OF BEST PRACTICE,
GENERAL REQUIREMENTS
Page 01 00 00-18
FURNISH MATERIALS IN THE LONGEST PRACTICAL LENGTH AND LARGEST PRACTICAL SIZES TO AVOID
UNNECESSARY JOINTING. MAKE ALL JOINTS SECURE.
(K) CONSULT ARCHITECT FOR MOUNTING HEIGHT AND POSITION OF ANY UNIT NOT SPECIFICALLY
LOCATED.
(L) MIX NO MORE MATERIALS THAN CAN BE USED BEFORE MATERIAL BEGINS TO "SET". MIX NO PARTIALLY
"SET" BATCH WITH ANOTHER. CLEAN TOOLS AND APPLIANCES PRIOR TO MIXING MATERIALS THAT
CAN BE CONTAMINATED.
(M) CONDUCT WORK IN A MANNER SO AS TO AVOID DAMAGE TO PREVIOUSLY PLACED WORK.
(N) DO NOT DISTURB MATERIALS REQUIRING CURING TIME UNTIL APPROPRIATE TIME HAS TRANSPIRED.
(0) PROPERLY PREPARE ALL WORK TO RECEIVE SUBSEQUENT WORK OR FINISH. NOTIFY ARCHITECT IF ANY
WORK IS UNSATISFACTORY TO RECEIVE SUBSEQUENT WORK OR FINISH, AND RECEIVE HIS
INSTRUCTIONS BEFORE PROCEEDING. IF NO SPECIFIC INSTRUCTIONS ARE SPECIFIED HEREIN, FOLLOW
MANUFACTURER'S INSTRUCTIONS.
(P) SEAL EXTERIOR JOINTS BETWEEN MATERIAL(S) TO FORM A WATERPROOFED ENCLOSURE.
1.64 CLOSING IN WORK:
(A) GENERAL CONTRACTOR SHALL NOTIFY HIS SUBCONTRACTORS, OTHER CONTRACTORS, OWNER AND
ALL CONTRACTORS AND SUBCONTRACTORS UNDER THE OWNER WHEN HE IS READY FOR THEM TO
INSTALL THEIR PORTIONS OF THE WORK AND SEE THAT THEY COMPLY IN A TIMELY MANNER TO
ACHIEVE THE SCHEDULED COMPLETION DATE FOR THE ENTIRE PROJECT.
(B) NEITHER ENCLOSE NOR COVER ANY PIPING, WIRING, DUCTS, EQUIPMENT OR OTHER ITEMS UNTIL
PROPER TESTS AND INSPECTIONS HAVE BEEN MADE BY THE ARCHITECT AND/OR PROPER
AUTHORITIES.
(C) NOTIFY ARCHITECT WHEN SUBSEQUENTLY PLACED WORK WOULD PREVENT OBSERVATION OF
PREVIOUS WORK.
1.65 REPAIRS:
(A) UNLESS ARCHITECT GRANTS PERMISSION TO REPAIR ANY DEFECTIVE WORK, REMOVE FROM PROJECT
ANY WORK NOT IN ACCORDANCE WITH CONTRACT DOCUMENTS. PERMISSION TO REPAIR ANY
SUCH WORK SHALL NOT CONSTITUTE WAIVER OF ARCHITECT'S RIGHTS TO REQUIRE COMPLETE
REMOVAL OF DEFECTIVE WORK IF REPAIR OPERATION DOES NOT RESTORE QUALITY AND
APPEARANCE OF MEMBER OR SURFACE TO ARCHITECT'S ORIGINAL SPECIFICATIONS.
1.67 REPAIR OF RIGHT-OF-WAY AND PRIVATE PROPERTY
(A) CONTRACTOR SHALL, AS A CONDITION OF FINAL PAYMENT, RESTORE ALL RIGHT-OF-WAY AND
ADJACENT PRIVATE PROPERTY THAT HAS BEEN DISTURBED, DAMAGED, OR OTHERWISE AFFECTED BY
CONSTRUCTION TO A CONDITION EQUAL TO OR BETTER THAN EXISTED PRIOR TO THE
COMMENCEMENT OF CONSTRUCTION. SUCH RESTORATION SHALL INCLUDE BUT NOT BE LIMITED TO:
GENERAL REQUIREMENTS
Page 01 00 00-19
1. REMOVAL AND REPLACEMENT OF DAMAGED PAVING, SIDEWALKS, DRIVEWAYS, ETC.,
INCLUDING CURB AND GUTTER
2. REGRADING AND SEEDING OF AREAS WHERE GRASS WAS PLANTED AND GROWING PRIOR
TO CONSTRUCTION.
3. ADDITIONAL LANDSCAPING OR RESTORATION WORK AS REQUIRED TO RETURN AN AREA TO
ITS ORIGINAL CONDITION.
(B) CONTRACTOR SHALL HAVE NO RESPONSIBILITY TO ENSURE GROWTH OF SUCH SEEDED OR OTHER
LANDSCAPED AREA(S).
(C) THIS RESTORATION SHALL BE CONSIDERED PART OF THE CONTRACTOR'S WORK AND THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PERFORMANCE OF SUCH RESTORATION WORK IN THE
SAME MANNER AS IT WAS RESPONSIBLE FOR PERFORMANCE OF THE CONTRACT WORK.
1.68 MISCELLANEOUS REQUIREMENTS
(A) THE CONSTRUCTION SITE IS LIMITED TO THE AREAS INDICATED ON THE SITE PLAN.
(B) UTILITIES ARE NOTED ON THE DRAWINGS. CONTRACTOR SHALL PROVIDE ALL SERVICE LINES AS
SHOWN AND/OR NECESSARY. GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL BE
RESPONSIBLE FOR REPAIRING ANY NEW OR EXISTING UTILITIES WHICH ARE DAMAGED AS A RESULT OF
CONSTRUCTION ACTIVITIES.
(C) COSTS FOR TEMPORARY ELECTRICITY, GAS, WATER, TELEPHONE, AND ALL OTHER UTILITIES SHALL BE
PAID FOR BY THE GENERAL CONTRACTOR UNTIL PROJECT SUBSTANTIAL COMPLETION CERTIFICATE IS
ISSUED BY THE ARCHITECT.
(D) THE INTENT OF THESE SPECIFICATIONS IS TO ALLOW AMPLE OPPORTUNITY FOR THE CONTRACTORS TO
USE THEIR INGENUITY AND ABILITIES TO EXPEDITE THE WORK TO THEIR AND THE OWNER'S BEST
ADVANTAGE, AND TO PERMIT MAXIMUM COMPETITION IN BIDDING ON ESTABLISHED STANDARDS OF
MATERIALS AND EQUIPMENT AS DEFINED BY THE PLANS AND SPECIFICATIONS.
(E) CONTRACTOR AND SUB CONTRACTORS MUST RECOGNIZE THAT CERTAIN ITEMS CANNOT BE FULLY
ILLUSTRATED OR EXPLAINED WITHOUT FIELD OBSERVATION. THUS, BEFORE SUBMITTING HIS BID, HE
SHALL VISIT AND EXAMINE THE SITE IN EVERY DETAIL AND MAKE ALLOWANCE IN HIS BID FOR ALL
CONDITIONS THAT WILL AFFECT THE WORK INDICATED OR REASONABLY IMPLIED BY THE DRAWINGS
AND THESE SPECIFICATIONS.
(F) DO NOT SCALE ARCHITECTURAL, MECHANICAL OR ELECTRICAL DRAWINGS FOR DIMENSIONS.
ACCURATELY LAYOUT SUCH WORK FROM DIMENSIONS INDICATED ON ARCHITECTURAL DRAWINGS
UNLESS SUCH BE FOUND IN ERROR. CONSULT ARCHITECT FOR ANY INTERPRETATIONS CONCERNING
LOCATIONS OF EQUIPMENT.
(G) CONSULT DRAWINGS AND/OR SPECIFICATIONS FOR MISCELLANEOUS…