B-SOW 1April26.pdf
PDF 320 KB Posted
- Attached to
- B Department Operations Support
- Solicitation number
- N0017827R3103
About this file
Statement of Work Summary
This Statement of Work outlines technical and support services required by the Naval Surface Warfare Center, Dahlgren Division (NSWCDD) Electromagnetic and Sensor Systems Department (B Department) for operations supporting the U.S. Navy, Marine Corps, and Missile Defense Agency. The contractor shall provide services across the entire acquisition lifecycle from concept exploration through sustainment of Navy and Marine Corps systems.
The primary work areas include: Information Technology, Program Financial Management, Technical Writing/Editing, Operations Support, Configuration Management, Program Analysis, Facilities Operations, Property Management, Procurement Support, and Electronics Technician Support. Services are to be delivered at NSWCDD, test facilities, contractor facilities, and in the field. Key deliverables include program budget plans, laboratory control and maintenance, network system development, technical documentation, test procedures and reports, configuration management plans, and facilities/property management support. The contractor must respond to urgent requirements within 60 minutes of notification. Government-furnished office space will be provided for 16 personnel and lab space for 14-16 personnel depending on the contract period. Core work hours are 0900-1500 Monday through Friday, with extended hours available optionally. Personnel must maintain current SECRET security clearances (minimum), complete mandatory cybersecurity and privacy training, and comply with NSWCDD safety, environmental, and security protocols. The contractor is responsible for providing most IT resources, travel, and approved materials and equipment purchases, with specific approval thresholds and procedures outlined for purchases exceeding $3,000. All deliverables remain government property unless otherwise specified in Contract Data Requirements Lists.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 03 - QASP_29 Jul 2026.pdf | ||
| 01 - SOW_12 Aug 2026.pdf | ||
| 08 - Cost Proposal Spreadsheet_13 Aug 2026.xlsx | XLSX spreadsheet | |
| DRAFT Solicitation - N0017827R3103.pdf | ||
| 06 - Labor Category Qualifications_12 Aug 2026.pdf | ||
| 12 - Mission Essential Contractor Services.docx | DOCX document | |
| Draft Solicitation - Industry Notice.docx | DOCX document | |
| 11 - Wage Determinations.pdf | ||
| 02 - DD254_27 May 2026 (draft for industry).pdf | ||
| 09 - GFI_20 July 2026.pdf | ||
| 04 - GFP_8 Jun 2026.pdf | ||
| 05 - COR Appointment Letter.pdf | ||
| 10 - Past Performance References.docx | DOCX document | |
| Exhibit A - CDRLS_8 Jun 2026.pdf | ||
| Exhibit B - Contractor Acquired Property.xlsx | XLSX spreadsheet | |
| 07 - Staffing Plan_13 Aug 2026.xlsx | XLSX spreadsheet | |
| H.1-B Dept OPS Support_LCAT_1April26.pdf | ||
| M.1- Advance_notice_B Operations Support_4-1-26.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 BACKGROUND
The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) Electromagnetic and Sensor Systems Department (B) provides products and services for efforts related to Sensor Systems in support of the US Navy, US Marine Corp and the Missile Defense Agency. B Department provides Systems expertise across the entire acquisition lifecycle from concept exploration through sustainment of Navy and Marine Corps Systems.
Contractor support is required for Operations support services such as configuration management, systems administration, program and financial analysis, information technology, technical writing, facilities operations, property management, procurement, and test support.
C.2 SCOPE
B Department has a requirement for technical and support services in the general Work Areas of: Information Technology, Program Financial Management, Technical Writing/Editing, Operations Support, Configuration Management, Program Analysis, Facilities Operations, Property Management, Procurement Support and electronics Technician Support. These services shall be provided in support of existing, near-term, and out-year projects, programs, technology developments, technology insertions, prototyping and technology demonstrations, fielding and sustainment, and related acquisition efforts. The Contractor shall provide technical support services at NSWCDD, test facilities, Contractor facilities, and in the field.
C.2.1 APPLICABLE DOCUMENTS
The following documents are applicable to this SOW. The most current versions of these documents are accessible through the internet or will be provided to the Contractor upon request.
Other Department of Defense Specifications/Standards/Other Applicable Documents may become applicable throughout the life of the Task Order and may be added to the Task Order via modification.
The Contractor shall ensure compliance with the most current versions of these documents throughout the life of the Task Order:
Number Document Name SAE AS5553 SAE Aerospace Standard 5553 NISPOM – 32 Code of Federal Regulation Part
National Industrial Security Program Operating Manual (NISPOM)
NSWCDDINST
5510.4B
NSWCDD Command Security Manual
SEAD-3 Security Executive Agent Directive 3 – Reporting Requirements for Personnel with Access to Classified Information or Who Hold a Sensitive Position
SEAD-3
Implementation Memo
Implementation of Security Executive Agent Directive 3, Reporting Requirements for Personnel with Access to Classified Information or Who Hold a Sensitive Position
DODI 5200.48 Controlled Unclassified Information SECNAVINST 5210.8F Department of Navy Records Management Program
Number Document Name
NSWCDDINST
5100.1F
Occupational Safety and Health Program
NAVADMIN 216/15 Cyber Hygiene Authorization to use Personal Wearable Fitness Devices
NAVSEA S0420-AA-
RAD-010 – REV 2A
Radiological Affairs Support Program (RASP) Manual
DODI 8510.01 Risk Management Framework for DOD Systems CJCSI 6211.02D Defense Information Systems Network (DISN) Responsibilities
DODM 1000.13 Department of Defense Identification (ID) Cards
NAVSEAINST 4200.19
(series)
Planning, Use and Control of Services Contracting
COMUSFLTFORCOM/
COMPACFLT 6320.3B
Medical Screening for U.S. Government Civilian Employees, Contractor Employees, Guests and Visitors Prior to Embarking Fleet Units
DoDD 5000.01 The Defense Acquisition System Cyberspace Workforce Management
DoDM 8140.03 CYBERSPACE WORKFORCE QUALIFICATION AND
MANAGEMENT PROGRAM
DoDI 5000.02 Operation of the Defense Acquisition System Cybersecurity DoDI 8500.02 Cybersecurity MIL-STD-3046 Configuration Management MIL-STD-31000C Technical Data Packages
C.3 REQUIREMENTS
The following paragraphs describe each of the support elements required in detail. During the performance of this Task Order, the Contractor shall respond to urgent requirements within 60 minutes of notification of the urgent requirement.
C.3.1 PROGRAM BUDGET PLAN DEVELOPMENT AND MONITORING
C.3.1.1 The Contractor shall perform program and financial analysis required to accomplish the technical objectives of Sensor System projects.
C.3.1.2 The Contractor shall assist in the maintenance of budgetary, financial, and scheduling status of the various Tasks and Task areas within Sensor System projects.
C.3.1.3 The Contractor shall provide financial and programmatic assistance for the development of budget planning estimates for Task Planning Sheets, cost estimates for Rough Order of Magnitude (ROMs), and impact statements due to reduced allocations.
C.3.1.4 The Contractor shall track expenditures and expenditure rates, identify variances, and provide cost projections.
C.3.1.5 The Contractor shall develop financial summaries, reports, and graphs for project reviews, presentations, and data calls to project Sponsors, project Leads, and the Department (CDRL A009, A00A, A00B).
C.3.1.6 The Contractor shall use the applicable DoD and NSWCDD Systems and Databases to report on, analyze, budget, forecast, track, and solve problems for the Government's financial accounts. (A00A)
C.3.1.7 The Contractor shall provide financial analysis support to the organizations' divisions, branches, program managers, group leaders, and Business Office in accordance with applicable Department processing timelines. The Contractor shall provide financial management and cost analysis of projects within the organization. The Contractor shall process incoming and outgoing funding for NSWCDD in accordance with applicable Department processing timelines. The Contractor shall recommend the allocation of financial resources. The Contractor shall provide funds status inputs to the Government. (A00A)
C.3.1.8 The Contractor shall generate, update, and maintain program, project, and budget estimates, tracking budget execution by appropriation and funding type, addressing budget issues, and providing data for budget data calls in accordance with applicable Department processing timelines. (A00A)
C.3.1.9 The Contractor shall use the Integrated Budget, Planning & Execution (IBPES) application to report on, analyze, budget, forecast, track, and solve problems for the Government’s financial accounts. (A00A)
C.3.2 LABORATORY CONTROL
C.3.2.1 The Contractor shall perform all aspects of laboratory control and maintenance of designated Sensor System laboratories.
C.3.2.2 The Contractor shall follow all maintenance standards and procedures for all lab equipment.
C.3.2.3 The Contractor shall analyze repair practices and develop procedural instructions for use by others on methods and steps to repair equipment (CDRL A009, A00C).
C.3.2.4 The Contractor shall design and analyze circuits, determining design feasibility, evaluate equipment performance under varying environmental conditions, and collect performance data to achieve performance and cost objectives.
C.3.2.5 The Contractor shall enforce Government access and use policies and procedures for designated laboratories.
C.3.2.6 The Contractor shall run reports on up-to-date inventory of the equipment and instrumentation housed in the laboratory via an online database and assist individuals in locating equipment and parts upon request.
C.3.2.7 The Contractor shall perform periodic inventories no less than annually of classified materials.
C.3.2.8 The Contractor shall attend Laboratory meetings. The Contractor shall provide agendas, minutes, action items and their responses, and status of assigned items (CDRL A003, A009, A00A).
C.3.2.9 The Contractor shall assist with establishing and maintaining standard operating procedures for laboratory operations and instruct users of the laboratory on these procedures (CDRL A00C).
C.3.2.10 The Contractor shall maintain standards and procedures for use by others.
C.3.3 INFORMATION TECHNOLOGY (IT)
C.3.3.1 The Contractor shall develop, maintain, and enhance network systems supporting the Electromagnetic and Sensor Systems Department. Examples include workstations, servers, and printers.
C.3.3.2 The Contractor shall perform requirements analysis for existing/proposed network systems supporting the Electromagnetic and Sensor Systems Department to determine feasibility.
C.3.3.3 The Contractor shall prepare security access rules and system constraints for systems supporting the Electromagnetic and Sensor Systems Department.
C.3.3.4 The Contractor shall assist the Government to compile application specifications and recommendations for selected activities such as data management, configuration management, program management, and security
(CDRL A009).
C.3.3.5 The Contractor shall install software applications.
C.3.3.6 The Contractor shall support Assessment & Authorization (A&A) activities by performing vulnerability scans and Security Technical Implementation Guidance (STIG) assessments and submitting those results and associated reports to the appropriate online repositories.
C.3.3.7 The Contractor shall comply with hardware and software system standards and procedures.
C.3.3.8 The Contractor shall develop, document, and test computer programs and system configurations to optimize the analysis of network data (CDRL A009, A00D, A00E).
C.3.3.9 The Contractor shall create build disk(s) that can be delivered to the fleet in order to update system software (CDRL A009).
C.3.3.10 The Contractor shall ensure the appropriate operational security posture is maintained for all information systems.
C.3.3.11 The Contractor shall participate in Electromagnetic and Sensor Systems Department’s Configuration Control Board (CCB) processes.
C.3.3.12 The Contractor shall actively maintain a cloud-based storage array. Maintenance shall include configuring permissions, working with corporate on new storage needs for programs, and identifying future needs.
C.3.3.13 The Contractor shall operate and maintain cloud-based services to include Virtual Machines in Microsoft Azure, Amazon Web Services, or hybrid environments.
C.3.3.14 The Contractor shall respond to Incident and Request tickets from the command’s OneStop portal and resolve issues within the associated Service Level Agreement (SLA) period for each.
C.3.4 TECHNICAL EDITING
C.3.4.1 The Contractor shall provide technical editing and associated word and graphics processing using Microsoft (MS) Office tools and MS Access database, MS Publisher, MS Project and Dynamic Object-Oriented Requirements System (DOORS) in the preparation of technical presentations, technical reports, technical notes, miscellaneous publications, and other document types (CDRL A009, A00A, A00C).
C.3.4.2 The Contractor shall compile project status reports from individual team inputs (CDRL A00B).
C.3.4.3 The Contractor shall collaborate with project engineers to generate specifications, abstracts, technical reports, whitepapers, and technical briefing materials in NSWCDD, Sponsor, Conference, or DoD required formats (CDRL A009, A00A).
C.3.4.4 The Contractor shall provide formal documentation of project meeting minutes and project decisions
(CDRL A003).
C.3.4.5 The Contractor shall develop promotional materials and flyers for projects and the Division (CDRL A00A).
C.3.4.6 The Contractor shall provide conference planning to include attending meetings, preparing agendas, providing minutes, and tracking the status of action items (CDRL A003).
C.3.5 OPERATION SUPPORT
C.3.5.1 The Contractor shall coordinate shipboard installations of radar equipment.
C.3.5.2 The Contractor shall support activities requiring adherence to the Navy Modernization Process to include meeting major milestones required for successful Regional Maintenance and Modernization Coordination Office (RMMCO) check-in and check outs to support the installation, modification and removal of equipment that is installed aboard Navy Vessels and land Based Test Sites.
C.3.5.3 The Contractor shall coordinate with various RMMCO Offices located throughout the Navy including but not limited to Bahrain, Guam, Mid-Atlantic, Mid Pacific, Northeast, Northwest, Sasebo, Southeast, Southwest, and Yokosuka.
C.3.5.4 The Contractor shall maintain and update program calendars and schedules. Examples include planned test events, reviews, technical meetings, and computer program deliveries.
C.3.5.5 The Contractor shall coordinate the movement of materials to including preparation of documents to facilitate the shipment and receipt of materials and media to support system installs and removals at NSWCDD laboratories and test sites, at external test sites, and at field activities and operational units.
C.3.5.6 The Contractor shall assist in the preparation of documentation required to support the purchase of materials and equipment.
C.3.5.7 The Contractor shall maintain a space-by-space map of each test site, laboratory, and software factory laboratory clearly indicating the infrastructure and working capacity for each assigned to B Department.
C.3.5.8 The Contractor shall plan and coordinate laboratory and test site renovations to include furniture build-outs and project transitions.
C.3.5.9 The Contractor shall coordinate the installation or move of phone lines.
C.3.5.10 The Contractor shall schedule IT services, riggers, security, and furniture designer/installers for site renovations.
C.3.5.11 The Contractor shall track the progress of each renovation.
C.3.5.12 The Contractor shall coordinate and submit requests for necessary laboratory and test site maintenance for all spaces assigned to B Department (CDRL A009).
C.3.5.13 The Contractor shall assist in the monitoring and reporting on the condition of B40 test site and laboratory spaces and the safety thereof (CDRL A009).
C.3.5.14 The Contractor shall assist in the preparation of site specific safety plans for B40 test facilities including the Radar Integration Test Site and Building 994 (CDRL A009).
C.3.5.15 The Contractor shall comply with International Traffic in Arms Regulations (ITAR) and Export Administration Regulations (EAR).
C.3.6 TEST SUPPORT
C.3.6.1 The Contractor shall develop sensor system test procedures (CDRL A00D).
C.3.6.2 The Contractor shall develop and coordinate the overall test schedule with the test site and in alignment with program objectives.
C.3.6.3 The Contractor shall maintain a database of all problems identified according to the programs incident report recording guidelines.
C.3.6.4 The Contractor shall maintain a database of all Reliability, Availability, and Maintainability (RAM) information according to the programs recording guidelines.
C.3.6.5 The Contractor shall observe and support all test events at NSWCDD and remote test sites to include shipboard and land-based testing.
C.3.6.6 The Contractor shall draft test reports (CDRL A009).
C.3.7 PROGRAM ANALYSIS SUPPORT
C.3.7.1 The Contractor shall provide project management support to assigned technical efforts, recommend program plans, work areas, work breakdown structures, staffing plans, financial documentation, quality assurance plans and procedures, configuration management plans, point papers, status reports, situation reports, operations and user manuals, technical drawings/diagrams, training materials, meeting minutes, and written and electronic documentation that state planned, current and future operations. (A00A, A00C)
C.3.7.2 The Contractor shall coordinate Government inputs, generate and deliver program weekly reports, monthly reports, program review presentations, and program status updates and highlights. The Contractor shall generate, update and maintain project action items relative to Integrated Product Teams (IPTs) and Working Groups (WGs). The Contractor shall document meeting minutes assigned by the designated IPT and
WG. (A00A, A00C)
C.3.7.3 The Contractor shall generate weekly status reports, update monthly reporting presentations in Project List & Technical Excellence Metrics (PTEM) Tool, and respond to administrative data calls. (CDRL A00A, A00B).
C.3.7.4 The Contactor shall attend meetings and generate attendee's lists, meeting minutes, and action items.
The Contractor shall serve as the single point of collection for team information, questions, and action items generated during meetings. The Contractor shall track meeting action items and maintain records reflecting both open and closed action items. The Contactor shall edit documentation during meetings. The Contractor shall contact open action item Point of Contacts (POCs) for status updates and document any updates prior to recurring meetings. (A00A, A00C, A003)
C.3.7.5 The Contractor shall coordinate meetings and schedule Classified Video TeleConferences (CVTC).
C.3.7.6 The Contractor shall produce and deliver agendas, minutes, action items, and/or reports in support of meetings and requests. The Contractor shall develop and deliver metric reporting on change board activity
(CDRL A003, A00C, A009).
C.3.8 CONFIGURATION MANAGEMENT (CM)
C.3.8.1 The Contractor shall support the development of a CM program for each program. The Contractor shall coordinate with interfacing program CM and Systems of Systems (SoSs) organizations to manage SoSs issues associated with each of the CM key functions. The Contractor shall participate in Enterprise CM Integrated Product Team (IPT) to assist in developing and documenting processes to improve CM.
C.3.8.2 The Contractor shall implement continuous improvement initiatives to ensure effective execution of the CM program through assessments of Tasks, processes, procedures and utilization of tools. The Contractor shall participate in Government rapid improvement events and assist in identifying areas of improvement and documenting revised processes.
C.3.8.3 The Contractor shall generate and/or update for Government review, CM Plans and processes, updates to specifications and user documentation (e.g., Version Description Documents, Revision Description Documents), Charters, user’s guides and Standard Operating Procedures (SOPs) that describe how CM is accomplished and demonstrate consistency between product definition, product configuration, and CM records.
The Contractor shall review Program Management plans and technical documentation and provide CM assessments. The Contractor shall develop/modify CM Plans in support of the program plan and integrated master schedule (CDRL A009, A00C, A00E).
C.3.8.4 The Contractor shall provide support in establishing configuration identification nomenclature for hardware and software, including firmware, and interfaces. The Contractor shall track configuration items to the level necessary to fully support systems engineering, logistics, interface management, and planning functions.
The Contractor shall compile system breakdown information and establish configurations for each baseline prior to initialization. The Contractor shall conduct analyses of all configuration items to verify and validate associated nomenclature and part numbers.
C.3.8.5 The Contractor shall establish and maintain an Integrated Master Schedule (IMS) for software and hardware baselines throughout the entire life cycle. The baseline will be initiated when the first notional configuration is identified and maintained for the life cycle of the configuration item. The baseline shall provide historical records of the evolution, as well as the current configuration; identify the change documents associated with each baseline; maintain data related to the applicability, approval status and impact of each change. Baseline definitions will be provided to managers as input to technical decisions and at key program milestones (CDRL A009, A00A).
C.3.8.6 The Contractor shall draft, review, and edit change proposals, work instructions, and Standard Operating Procedures (SOP) for Government review and finalization (CRDL A00C).
C.3.8.7 The Contractor shall perform a review of each change and analyze proposed changes for classification of change and impacts to identification/re-identification of affected hardware and software. This assessment shall include accuracy of nomenclature, determination of impact to next higher assembly, an evaluation for interchangeability, identification of relationships, Configuration Item/Configuration Data Item (CI/CDI) impact, and provide an overall assessment of compliance with CM criteria.
C.3.8.8 The Contractor shall execute CM processes to support Configuration Control Boards (CCBs), and Local Configuration Control Board (LCCB) at the local, system, system of systems and enterprise level, including identification of change authority and integration of the change process with external processes. The Contractor shall document these processes as a Standard Operating Procedure for review and acceptance (CDRL A00C).
C.3.8.9 The Contractor shall provide CM support for System and Software Review Board (SRB), Change Review Board (CRB), Local Configuration Control Board (LCCB), Software Change Control Board (SCCB), Joint Problem Review Board (JPRB), Interface Control Working Group (ICWG) meetings, Technical Review Team (TRT)/Navy Review Team (NRT), Ship Test Configuration Review Board (STCRB), Combat System Working Group (CSWG) Board, other working groups, review boards, and change boards by distributing change packages, developing and distributing agendas, minutes and action items, and preparing final packages for Chairman’s signature (CDRL A009, A003).
C.3.8.10 The Contractor shall utilize the CM database of the program. Examples include but are not limited to VIEWNet, CMPRO, Navy Data Environment (NDE), Project Forge, MS Project, SharePoint, Rational Team Concert, JIRA, Classified ACCESS and Classified VIEWNet.
C.3.8.11 The Contractor shall produce and deliver agendas, minutes, action items, and/or reports in support of meetings and requests. The Contractor shall develop and deliver metric reporting on change board activity
(CDRL A003, A00C, A009).
C.3.8.12 The Contractor shall utilize Dynamic Object-Oriented Requirements System (DOORS) to research and export data into Microsoft Office Suite software to include Word and Excel.
C.3.9 FACILITIES OPERATIONS AND PROPERTY MANAGEMENT SUPPORT
C.3.9.1 The Contractor shall assist the Government Facilities Manager with facilities and infrastructure duties to include planning, Infrastructure Board planning and reporting, Facilities Tactical Group inspections and follow-through, Capital Improvement Program planning, and Basic Facilities Requirements (BFRs), and perform the duties of a Secondary Building Custodian.
C.3.9.2 The Contractor shall ensure proper operation of designated facility support equipment; maintain inventories for equipment, parts, supplies, containers, hardware items; and track hardware problems and change control activities and perform minor/emergency repairs as needed.
C.3.9.3 The Contractor shall monitor and report on non-explosive related safety compliance and deficiencies in the areas of Occupational Safety and Health (OSH) and Environmental Management in Research, Development, Testing & Evaluation (RDT&E) Labs and Range.
C.3.9.4 The Contractor shall process telecommunications requests for land lines, cell phones and air cards. The contractor shall process work requests and service tickets and track them to completion/resolution.
C.3.9.5 The Contractor shall schedule and prepare designated facilities for special events, demonstrations, inspections, and in-process reviews (IPRs).
C.3.9.6 The Contractor shall update applicable Government database(s) and produce reports to track the status of; Defense Reutilization and Marketing Office (DRMO), Operating Materials & Supplies (OM&S), Hazard Materials (HAZMAT), and other categories of Government property to include defined General Equipment
(GE).
C.3.9.7 The Contractor shall deliver hardware and materials using Government-owned vehicles for delivery and transport purposes. All drivers must present proof of a valid state driver's license prior to operating a Government vehicle. A valid state driver's license shall be accepted as proper authority for operation of vehicles up to and including 10,000 pounds gross vehicle weight and carrying less than 15 passengers. Proof of liability insurance is required.
C.3.9.8 The Contractor shall provide Government certified forklift operators and Government certified crane operators per NSWCDDINST 11262.1B. The Government will provide the Contractor with the forklift and crane when required.
C.3.9.9 The contractor shall support government custodians in ensuring audit readiness and compliance in designated identified spaces. This includes, but is not limited to, the identification and removal of unserviceable or obsolete equipment for Defense Reutilization and Marketing Office (DRMO), the contractor shall assist in induction of Operating Materials and Supplies (OM&S) and associated paperwork to the Warfare Center Warehouse Operation, the contractor shall assist in the identification and notification of assets located which meet the general equipment (GE) criteria, but are found to be without an asset tag.
C.3.9.10 The contractor shall properly prepare for disposal and document all forms of media, to include, but not limited to CDs, Disk Drives, Zip Drives, Hard Drives, RAM sticks, and various forms of memory or circuit cards. The contractor shall ensure proper storage of this equipment until such time as it is destroyed.
C.3.9.11 The contractor shall maintain seating charts for B Department.
C.3.9.12 The contractor shall serve as the safety point of contract for B Department labs and be responsible for setup to meet requirements and provide monthly checks to ensure safety compliance.
C.3.10 REQUIREMENTS AND PROCUREMENT INPUT SUPPORT
C.3.10.1 The Contractor shall prepare procurement packages in accordance with NSWCDD Acquisition Best Practices, working with the Technical Requirements Holder and interfacing with the Technical Liaison Office in preparing procurement packages. The Contractor shall develop all documentation for Government review and submission.
C.3.10.2 The Contractor shall assist with market research by obtaining quotes and researching previous procurement history if needed.
C.3.10.3 The Contractor shall input data into the Government tracking system, initiate technical screenings, and obtain required approvals such as ITPR, Safety, etc.
C.3.10.4 The Contractor shall track requirement deliveries and provide logistical support for all materials delivered. The Contractor shall ensure the physical pickup and delivery for all material requirements. The Contractor shall receive and organize information of deliveries from these actions in accordance with applicable Department processing timelines. The Contractor shall populate and maintain acquisition database repositories to enable execution and tracking of actions throughout their respective life cycles.
C.4 Task Order Management
The Contractor shall provide sufficient supervision to ensure all personnel work instructions and schedules originate with the Contractor rather than with the Government technical office. This supervision shall ensure that the Contractor’s personnel are not assigned work instructions and schedules outside this SOW. Any perceived conflicts with the SOW shall be directed to the Contracting Officer and Contracting Officer’s Representative (COR).
C.4.1 Progress Report
The Contractor shall submit a Contracting Officer’s Management Report. The Contractor shall maintain and provide a list of all personnel assigned to the Task Order. The Contractor shall provide copies of invoices received from Sub-contractors and consultants as well as evidence of its review to ensure that all invoiced costs represent services that have been performed and deliverable items. In accordance with G-232-H005 and FAR 52.216-7, Allowable Cost and Payment, the Contractor shall provide the COR supporting documentation, including receipts, for all travel and material purchases with each invoice submission. (CDRL A001)
C.4.2 In Progress Reviews (IPRs)
The Contractor shall host both formal and informal In Progress Reviews (IPRs) of work being performed. IPRs may be conducted at the overall Task Order level or for specific projects/work areas. Reviews will be scheduled by the Government. An initial formal IPR is planned within 90 days of the Task Order award date and will follow the agenda agreed to by the COR. Subsequent formal IPRs shall be held approximately every six (6) months thereafter unless waived by the Government. The IPRs shall be conducted at a location mutually agreed upon by the Contractor and the Government. At the time the review is scheduled, the Government will communicate the specific purpose of the review and advise the Contractor as to the desired content of the presentation. (CDRL A002)
C.4.3 Task Prioritization Meetings
C.4.3.1 The Contractor shall participate in periodic Task Prioritization Meetings with the COR and Subject Matter Experts (SMEs). The purpose of these meetings is to convey the Government’s technical program schedules and priorities and to identify corresponding task priorities for this Task Order. The Contractor shall document meeting minutes of the meetings. (CDRL A003)
C.4.3.2 The Contractor shall hold informal monthly meetings with B Department to discuss ongoing and financial status for each program. (CDRL A004)
C.4.4 Telework
In accordance with H-216-H002 Level of Effort -- Alternate I (NAVSEA) teleworking at an alternative worksite is permitted. Telework is also dependent upon the type of work being performed. Telework is also dependent upon the type of work being performed. With concurrence from the Government SME and COR, teleworking at an approved alternative worksite is permitted for personnel who are performing tasks related to work classified below SECRET. Personnel performing work classified as SECRET or above are not eligible to telework. Work locations for telework must be conducive to performing the contracted work with reliable internet connectivity, adequate workspace free from distractions, and availability of necessary equipment (if not government-furnished).
Unless the Contracting Officer determines that alternative worksite arrangements are detrimental to contract performance, the Contractor may perform up to 30% of the hours at an alternative worksite, provided the Contractor has a company-approved alternative worksite plan. The primary worksite is the traditional “main office” worksite. An alternative worksite means an employee’s residence or a telecommuting center. A telecommuting center is a geographically convenient office setting as an alternative to an employee’s main office. The Government reserves the right to review the Contractor’s alternative worksite plan.
In the event performance becomes unacceptable, the Contractor will be prohibited from counting the hours performed at the alternative worksite in fulfilling the total level of effort obligations of the contract. Regardless of work location, all contract terms and conditions, including security requirements and labor laws, remain in effect. The Government shall not incur any additional cost nor provide additional equipment for contract performance as a result of the Contractor’s election to implement an alternative worksite plan.
C.5 SKILLS AND TRAINING
C.5.1 The Contractor shall provide capable personnel with qualifications, experience levels, security clearances, and necessary licenses, certifications, and training required by Federal, State, and Local laws and regulations.
Information assurance functions require certifications specified in DOD Manual (DoDM) 8140.03 Cyberspace Workforce Qualification and Management Program.
C.5.2 Per the requirements set forth in DODM 8140.03 as a condition of meeting requirements, personnel performing Information Assurance (IA) functions outlined in the manual will be tracked for compliance, designated in writing from the Local Command Authority as Cyberspace Workforce (CWF), shall already be in possession of an approved commercial certification for their environment at time of performance start, and shall satisfy both preparatory and sustaining DOD IA training and certification requirements as outlined in DODM
8140.03. Additionally, personnel with Privileged Access must sign acknowledging duties on a "Privileged Access Agreement", be able to maintain the appropriate investigation type, sign a System Authorization Access Request-Navy (SAAR-N) with “privileged” indicated, complete applicable Operating System/Computer Environment (OS/CE) training to Navy’s standards, and maintain a valid commercial certification that meets outlined designations. Failure to maintain all requirements at the appropriate level may result in the removal of elevated access and removal from tasks being performed. Non-privileged Information Assurance Workforce (IAWF) members may be removed from tasks being performed. In both situations, access will be returned once the failure(s) are corrected.
C.5.3 Training necessary to ensure that personnel performing under this Task Order maintain the knowledge and skills to successfully perform the required functions is the responsibility of the Contractor. Training necessary to maintain professional certification is the responsibility of the Contractor. The Contractor shall provide training opportunities to maintain Contractor capabilities and/skills to coincide with changing technology environments. All costs for DODM 8140.03 certification shall be borne by the Contractor for new employees on this Task Order.
C.5.4 Training on non-commercial and department-specific tools and procedures will be provided by the Government.
C.5.5 Notwithstanding the above, it is understood that the Government may require services requiring knowledge and skills of a newly emergent technology. The Contracting Officer may, on a case-by-case basis, authorize the expenditure of Government funds for the training of Contractor personnel. Advance approval is required. The Contractor is encouraged to suggest a cost-sharing arrangement that addresses registration, tuition, travel, and labor costs.
C.5.6 The Contractor shall complete all mandatory training as prescribed by the Government. These training requirements are accessed through Government web-based training (WBT), classroom training, or combination of both.
C.5.7 Mandatory Training Completion Log - The Contractor shall submit a CWF report (CDRL A005). The CWF report shall address required CWF training including annual continuous learning training requirements.
The Contractor shall also submit Mandatory Training Completion Log (CDRL A006). The Mandatory Training Completion Log shall address all mandatory training completed as directed by the COR.
C.6 OTHER DIRECT COSTS
During the performance of this Task Order the Contractor will have to travel and procure material and consumables to perform the tasking of the SOW.
C.6.1 Travel
The Contractor shall be required to travel in performance of this Task Order. The numbers of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be requested of and authorized in advance by the COR by email. All requests shall show the appropriate Task Order number, the number of people traveling, the number of days for the trip, the reason for the travel, an estimated cost (with G&A separate), and any high cost or unusual costs expected. The Contractor is not authorized to perform any travel that is not in conjunction with this effort. All travel shall be conducted in accordance with Federal Acquisition Regulation (FAR) 31.205-46 Travel Costs. Locations will be determined by the Government and are subject to change.
Representative travel locations may include: Washington, DC; Moorestown, NJ; Norfolk, VA; Wallops Island, VA; San Diego, CA; Corona, CA; Pearl Harbor, HI; Everett, WA; Dam Neck, VA; Mayport, FL; Port Hueneme, CA; Fredericksburg, VA.
The Contractor shall submit trip reports following any travel under this effort. (CDRL A007)
In accordance with G-232-H005 and FAR 52.216-7, the Contractor shall provide the COR supporting documentation, including receipts for travel with each invoice submission.
C.6.2 Direct Charge of Materials
(a) During the performance of this Task Order it may be necessary for the Contractor to procure materials to respond to the mission requirements listed in the SOW. This Task Order is issued under a services contract and the procurement of materials of any kind that are not directly related to and necessary for performance may be determined to be unallowable costs pursuant to Class Deviation 2026-O0032 RFO Part 31. Any material provided by the Contractor is subject to the requirements of the FAR, DFARS, and the applicable Department of Navy regulations and instructions. Charges related to materials costs may include general and administrative (G&A) expenses but shall not include fee or profit.
(b) The materials listed in paragraph (e) below shall be the only ones approved for purchase under this Task Order. The numbers of, and types of, material purchases shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the COR. Splitting purchase requirements to defeat purchasing thresholds shall not be approved. If the Contractor (or Sub-contractor) possesses a Defense Contract Management Agency (DCMA) approved purchasing system, individual item purchases greater than $3,000 but less than $10,000 shall be approved by the COR; individual item purchases equal to or over $10,000 shall not be executed until the COR reviews the requested purchase and approval is obtained from the
Contracting Officer. If the Contractor does not possess an approved purchasing system, individual item purchases less than $3,000 shall be approved by the COR. For purchase of materials equal to or over $3,000 shall not be executed until the COR reviews the requested purchase and approval is obtained from the Contracting Officer. No purchases of any amount shall be executed by a Sub-contractor if they do not have a Defense Contract Audit Agency (DCAA) approved accounting system.
(c) Information Technology (IT) Resources shall not be purchased unless DOD and Navy purchasing procedures (including Information Technology Procurement Request (ITPR) approval) have been satisfied and approvals obtained. IT Resources include personal computers (PCs), laptops, printers, software, servers, hubs, routers, phones, fax machines, and any related maintenance, telecommunications, training, or other support services. All IT Resource Other Direct Cost (ODC) purchases require COR approval regardless of the dollar value associated with the purchase.
(d) The costs of general-purpose business expenses required for the conduct of normal business operations will not be considered allowable direct costs in the performance of the Task Order - unless supported by DCMA as a procedure of the Contractor's accounting procedures. General purpose business expenses include the costs for items such as telephones (including cell phones) and telephone charges, copy machines, word processing equipment, personal computers, and other office equipment and supplies.
(e) The materials and equipment contained in the following list are authorized for purchase once the Contractor has complied with approval requirements stated in paragraph (b) above and paragraph (f) below:
• Command and control modules
• Arbitrary waveform and frequency generator amplifiers
• Discrete and integrated circuits cards
• Electrical input signal and frequency analyzer
• Digital and analog oscillography
• Equipment for integration, validation and verification testing
• Solid-state and wired interface connectors and cables
• Discrete device component
• Aerial radio frequency systems
• Hardened cabinets, shelving, brackets and fasteners
• Waveguide conduits and associated components
• Mechanical and electrical tools and sets
• Regulated and unregulated electrical energy transmission systems
• Faraday cage insulated cables and connectors
• Scaled thermographic sensing devices
• Laboratory equipment for environmental monitoring and safety
• Material alloy constructs and assemblages
• Radio frequency components and horns
Materials not fitting the descriptions listed in this section may not be purchased unless mutually agreed to by both the Government and Contractor and subsequently added to the contract by Task Order modification.
(f) Procedure for obtaining COR and/or Contracting Officer approval, the Contractor shall submit a request for purchase of materials to the COR through email. The COR will review the request, if it is in accordance with paragraph (b) above and requires Contracting Officer approval, the COR will submit the request via the Contract Specialist to the Contracting Officer for review and approval. Minimum requirements for a written request for purchase are as follows:
(1) Description of the material to be purchased;
(2) Quantity;
(3) Unit and total cost;
(4) Delivery/freight charges;
(5) Any associated service charges such as assembly, configuration, packing, etc.;
(6) An explanation of the need for the material;
(7) Copy of the competitive quotes received from potential suppliers;
(8) The basis for the selection of the selected supplier;
(9) Explanation of the determination of price reasonableness regarding the selected supplier costs;
(10) If the procurement is sole sourced to a particular supplier or manufacturer, include the rationale for limiting the procurement to that supplier or manufacturer;
(11) ITPR request date, and if granted, approval date and tracking number (if applicable);
Once the COR and/or Contracting Officer have reviewed the request, the Government will notify the Contractor of the outcome. Issues or details may be discussed with the Contract Specialist acting on behalf of the Contracting Officer until a final Government determination is made as to whether to approve, modify, or reject the purchase.
(g) The Contractor is required to possess and maintain an adequate property management system. The system must track all materials/ODCs associated with this Task Order. Upon completion of the Task Order Period of Performance, all material associated with this Task Order that were purchased by the Contractor and not depleted or previously delivered to the Government during the performance of this Task Order shall become the property of the Federal Government. The Contractor shall transfer all materials, not depleted or previously delivered to the Government, to the COR by way of a Material Inspection and Receiving Report (DD Form
250) in accordance with DFARS PGI 245.402-71.
C.6.3 Counterfeit Parts and Materiel
(a) The following minimum processes shall be implemented and flowed down by the Contractor to all Sub-contractors in order to minimize the risk of use of counterfeit parts.
(b) The Contractor shall establish processes to minimize the risk of procuring and using counterfeit parts and materiel. The Contractor shall document these processes and provide those documented processes to Government representatives upon request. The Contractor shall ensure that all requirements are flowed down to Sub-contractors and suppliers at all tiers.
(c) At a minimum, these processes shall ensure that:
• Materiel that is either in production or currently available shall be purchased from an original manufacturer, aftermarket manufacturer, or other authorized supplier.
• Materiel that is neither in production nor currently available may be purchased from suppliers, including unauthorized suppliers, that meet appropriate counterfeit avoidance criteria documented in industry anti-counterfeit standards. The Contractor shall notify the KO and COR when critical or high-risk materiel is procured from an unauthorized source. The Contractor shall provide this notification before materiel is installed so mitigation actions can be taken.
• The Contractor shall maximize the use of authentic, originally designed and/or qualified parts.
• The Contractor shall assess potential suppliers to minimize the risk of receiving counterfeit parts or materiel.
• The Contractor shall have purchasing procedures which confirm whether a selected supplier is authorized (as defined in SAE AS5553) for each purchase.
• The Contractor shall define minimum inspection and test requirements for parts being procured and shall ensure that in-house, third-party, and/or supplier inspection and test procedures and facilities comply with the requirements of this section. These minimum inspection and test requirements shall specify appropriate test methods to detect potential counterfeit parts and material.
• The Contractor shall require a certificate of conformance (as defined in SAE AS5553) and supply chain traceability for all electronic part purchases.
• The Contractor shall use government or industry services such as Government-Industry Data Exchange Program (GIDEP) and other commercially available services to identify part or supplier quality or authenticity problems.
• The Contractor shall maintain critical or high-risk materiel traceability that enables tracking through the supply chain to the original manufacturer if purchased from an authorized source or to the unauthorized source at a minimum if purchased from an unauthorized source.
(d) The Contractor shall immediately notify the COR of the occurrence of a suspect or confirmed counterfeit part or materiel. Contractor shall notify the COR of all actions taken to identify, contain, and impound all product from the lot, within 7 working days of confirmation of the counterfeit status. The Contractor shall initiate and submit an ALERT to GIDEP within 60 days of knowledge of the counterfeit part or materiel.
(e) Suspect counterfeit parts and materiel shall be impounded with all other items from the same lot. The Contractor shall identify and locate all potential users or hardware items with the suspect part or materiel and contain the product which has this suspect part or materiel, pending confirmation of the part or materiel’s authenticity. The Original Equipment Manufacturer (OEM) may be involved at this point to verify authenticity.
Confirmed counterfeit materiel shall be contained and provided to investigative agencies for ongoing investigation or prosecution. The counterfeit product shall not be scrapped or otherwise disposed of without approval from investigative authorities or the Contracting Officer. Confirmed counterfeit product shall be disposed of in a way which would not allow its resale or reuse.
(f) Counterfeit parts are defined in SAE AS5553. Counterfeit parts may be electronic or mechanical in nature.
Counterfeit electronic parts may typically be used parts which have been refurbished and represented as new.
Commonly counterfeited electronic parts include parts such as microcontrollers or specially screened devices, or common parts, which have several pin-compatible versions from multiple manufacturers, such as memory devices and operational amplifiers. Counterfeit mechanical parts are typically improperly made, marked, or treated products. Examples are improper anodization or heat treatments (or falsified data), mismarked parts sold as higher grade steel, or used/fake parts such as valves or circuit breakers.
C.6.4 CONTRACTOR ACQUIRED PROPERTY
(a) Contractor Acquired Property (CAP) may be procured by the Contractor as tasking demands.
(b) The Contractor shall provide the following to the COR prior to delivery: CLIN, Item Description, Type Designation, NSN, PIN, Quantity, Unit of Measure, Serial Number (UII), Original Unit Acquisition Cost, and the date placed in service by the Contractor.
(c) All Contractor Acquired Property shall be delivered to Building 125, Central Receiving with a DD Form 1149. The DD Form 1149 shall include the following:
• Dollar Value
• Purchase Request Number
• Item Description
• Serial Number
• Model Number
• Quantity
• Task Order Number
• Technical Point of Contact
• Assigned Unique Serialized Identification Number
• All Delivered items for which the Government’s unit acquisition cost is $5,000.00 or more shall have an
IUID tag and the corresponding information uploaded into iRAPT (Invoicing, Receipt, Acceptance and Property Transfer)
C.7 GOVERNMENT FURNISHED SPACE/GOVERNMENT FURNISHED
PROPERTY/GOVERNMENT FURNISHED INFORMATION
C.7.1 Government Furnished Space
(a) Government furnished office space will be provided for the following labor categories and number of personnel. This office space will be the primary work location for these positions.
Government Furnished Office Space Labor Category BY OY1 OY2 OY3 OY4 Senior System Administrator 1.0 1.0 1.0 1.0 1.0 Facilities Operations Specialist 3.0 3.0 3.0 3.0 3.0 Operations Support Specialist 1.0 1.0 1.0 1.0 1.0 Configuration Management Specialist 4.0 4.0 4.0 4.0 4.0 Property Technician 1.0 1.0 1.0 1.0 1.0 Procurement Specialist 2.0 2.0 2.0 2.0 2.0 Systems Administrator 3.0 3.0 3.0 3.0 3.0 Technical Writer II 1.0 1.0 1.0 1.0 1.0
Totals 16.0 16.0 16.0 16.0 16.0
(b) Access to government lab space will be provided. Lab space does not constitute office space. Government furnished lab space will be provided for the following labor categories and number of personnel. No separate office space will be provided.
Government Lab Space Labor Category BY OY1 OY2 OY3 OY4 Operations Support Specialist 3.0 3.0 4.0 4.0 4.0 Operations Support Specialist (Wallops) 1.0 1.0 1.0 1.0 1.0 Configuration Management Specialist 6.0 8.0 6.0 6.0 6.0 Systems Administrator 3.0 3.0 3.0 3.0 3.0 Electronics Technician 1.0 1.0 1.0 1.0 1.0
Totals 14.0 16.0 15.0 15.0 15.0
(c) Hot seats will be provided at NSWCDD as needed to support meetings and collaboration with the Government.
(d) Government Furnished Property (GFP) (hardware, software, firmware) will be provided to support access to NMCI/other Government computer resources as required during performance of this Task Order.
C.7.1.2 OTHER LOCATIONS OF PERFORMANCE
The Government will require support at Wallops Flight Facility in Wallops, VA.
C.7.1.3 NON-STANDARD EVENTS SUPPORT
(a) The normal hours of work at NSWCDD are from 0700 to 1730, Monday through Friday with a flextime concept of 40 hours per week.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .