B.08.02 Appendix C - Past Performance Information Sheet.pdf

PDF 902 KB Posted

Attached to
RMMR Services for USAF Fuel Facilities Supported by DLA-Energy at Incirlik Air Base, Turkey
Solicitation number
W912GB21R0004
Issued by

About this file

This document contains a past performance information sheet template and solicitation for recurring maintenance and minor repair services at a U.S. Air Force fuel facility in Turkey. The solicitation is from the Department of the Army European Command for recurring maintenance and minor repair of fuel facilities at Incirlik Air Base, Turkey supported by the Defense Logistics Agency - Energy. Offerors are required to submit up to five past performance project examples describing their role, final costs, location, and completion dates. They must also provide detailed descriptions of the construction work performed rather than just a list of previous contracts. Responses are due by the date specified in the solicitation for recurring maintenance and minor repair services at the fuel facilities over the period of performance.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C

W912GB21R0004 TURKEY RMMR

PAST PERFORMANCE INFORMATION SHEET

PROJECT NO. _____, Page 1 Submit a maximum of five (5) projects.

Project Name:

Experience:

1. Indicate whether the work was performed as the prime contractor, a subcontractor, or as a partner of a Joint Venture. If work was performed as a subcontractor or JV partner, clearly describe what part of the work the firm for which the experience information is submitted performed (both in magnitude and description of the work performed).

2. The final cost of this project: $_________________________

3. The location the work was performed is: ___________________________________

4. The day, month, and year work was completed: _______________

5. Describe the nature of the work. Do not provide a listing of existing or previous contracts, but rather provide detailed information of the construction work.

(Continue typing if required to provide more information)

APPENDIX C

W912GB21R0004 TURKEY RMMR

PAST PERFORMANCE INFORMATION SHEET

PROJECT NO. _____ Page 2

File details come from the government source that posted it. Updated .