B.08 Att 9 Price and Payment Procedures.docx
DOCX document 33 KB Posted
- Solicitation number
- W912GB25RA003
- Issued by
-
Department of the Army European Command
About this file
The document is a Price and Payment Procedures file for a design-build contract for a medical storage facility in N'Djamena, Chad. The contract includes base and option items with specific payment terms for each work phase: Base Item 0001 covers facility design, Base Item 0002 involves existing warehouse demolition, and Base Item 0003 encompasses new medical storage facility construction. Optional items include design (Option 0001) and construction (Option 0002) of a photovoltaic system. Payment will be made on a job basis for each item, with compensation covering labor, materials, equipment, quality control, environmental protection, safety requirements, and associated testing and reporting. Each payment item is intended to provide full compensation for the specified work elements, including necessary demolition and site preparation tasks.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
01/21
PART 1 GENERAL
PAYMENT TYPES
The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the base item (Base Item 0001).
Single Job Payment Items
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
SCHEDULE OF ITEMS: BASE ITEMS
Base Item 0001: Design of New Medical Storage Facility
Unit of Measure: Job.
Payment will be made for costs associated with the design of a new medical storage facility, as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0002: Demolition of Existing Warehouse Facility
Unit of Measure: Job.
Payment will be made for costs associated with the demolition of the existing storage warehouse facility, as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
Base Item 0003: Construction of New Medical Storage Facility
Unit of Measure: Job.
Payment will be made for costs associated with the procurement and construction of a new medical storage facility, as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
SCHEDULE OF ITEMS: OPTION ITEMS
Option 0001, Base Item 0004: Design of Photovoltaic System
Unit of Measure: Job.
Payment will be made for costs associated with the design of a photovoltaic system for the new medical storage facility, as indicated in SECTION 01 10 10. This work shall include all applicable site prep, demolition, and removals work to support the work elements contained in this item.
Option 0002, Base Item 0004: Construction of Photovoltaic System
Unit of Measure: Job.
Payment will be made for costs associated with the procurement and construction of a new photovoltaic system for the new medical storage facility, as indicated in SECTION 01 10 10, with the exceptions of the bid option items listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section - V7 Aug 2020 SECTION 01 22 00 Page 3