The document is a Past Performance Information Sheet for a U.S. Army Corps of Engineers design-build contract (W912GB25RA003) for a Medical Storage Facility in N'Djamena, Chad. The solicitation requires contractors to submit detailed past performance documentation, including project completion dates, final costs, project scope, construction type, and work performance role (prime, subcontractor, joint venture).

The project involves demolishing an existing 260 m2 warehouse, clearing and grading the site, and constructing a new pre-manufactured warehouse facility with specific requirements including a PV power system, concrete access ramp, loading dock, and climate control maintaining internal temperatures at or below 27 degrees Celsius. A mandatory pre-proposal site visit is scheduled for 25 April 2025, with registration required by 21 April 2025. Offerors must be SAM registered and submit both non-price and price proposals, with the project located at coordinates Latitude 125'57.49"N, Longitude 153'11.86"E in Chad.

View the file

Other files

File Type Posted
B.08 Solicitation - SF30 W912GB25RA0030001 Medical Storage Facility, Chad.pdf PDF
B.08 Solicitation - W912GB25RA0030001 Medical Storage Facility, Chad.pdf PDF
B.08 Att 2 SOW_Conceptual Site Plan.pdf PDF
B.08 Att 15 Price Schedule Medical Storage, Chad.docx DOCX document
A.02 SOW_Medical Storage Facility, Chad.pdf PDF
B.08 Att 6 SOW_Scope For Independent Structural Proofing.pdf PDF
B.08 Att 11 Bank Letter of Guarantee (BLG).docx DOCX document
B.08 Att 17 Commitment Letters.docx DOCX document
SSP Medical Storage Facility Chad.pdf PDF
B.08 Att 7 Full Spec Binder_Medical Storage, Chad.pdf PDF
B.08 Att 14 Past Performance Questionnaire PPQ.docx DOCX document
B.08 Solicitation - W912GB25RA003 Medical Storage Facility, Chad.pdf PDF
B.08 Att 13 Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx XLSX spreadsheet
B.08 Att 4 SOW_Structural Calculations Guideline.pdf PDF
B.08 Att 10 Bank Letter of Assurance (BLA).docx DOCX document
B.08 Att 3 SOW_ConcArchDwgs.pdf PDF
B.08 Att 1 SOW_Location Map.pdf PDF
B.08 Att 9 Price and Payment Procedures.docx DOCX document
B.08 Att 8 Period of Performance Clause Medical Storage, Chad.docx DOCX document
B.08 Att 16 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08 Att 5 SOW_Dedication Plaque.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 12 (amended 13 FEB2023) W912GB25RA003; IAF-25-0029 Medical Storage Facility, Chad

CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. W912GB25RA003; IAF-25-0029 Medical Storage Facility, Chad, Page 1

Project Name, Contract number, and Location:

Past Performance:

1. The day, month, and year work was completed: _______________

2. Is this project more than 75% complete? ____ Yes ____ No If “No” explain current percentage of completion, if yes and between 75-99% complete please explain how the percentage was calculated and what work remains.

3. The final cost of this project €_________________________

4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for this project:

o Design- Build or Design-Bid-Build o Scope of the project, to include purpose/use of facility.

o Size of the project, differentiate square footage of new construction versus renovation if project includes both.

o Type and percentage of work that was self-performed.

o Whether the project involved new construction, renovation, or both. Clearly delineate square meters for construction and renovation.

o Whether the project was completed for the United States DoD.

(Continue typing if required to provide more information)

ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. W912GB25RA003; IAF-25-0029 Medical Storage Facility, Chad Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 15% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror may take credit for the Key Subcontractor’s past performance if it was meaningful to this procurement. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

5. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:

File details come from the government source that posted it. Updated .