This document is a Statement of Work (SOW) for a design-build project to construct a medical storage facility in N'Djamena, Chad for the US Army Corps of Engineers Europe District. The project, with Project Number 84731 for Fiscal Year 2025, involves demolishing an existing 260 m2 warehouse, clearing and grading the site, and constructing a new pre-manufactured warehouse facility with specific requirements including a concrete access ramp, loading/unloading dock, PV power system, and cooling systems to maintain an internal temperature of 27°C or lower.

The SOW provides comprehensive technical specifications across six primary sections: General, Civil and Geotechnical, Architectural, Structural, Electrical & Communications, and Mechanical. Key project elements include designing a single-story prefabricated metal building, installing metal panel walls, a steel frame standing seam metal roof, providing electrical and communication infrastructure, implementing cooling systems with heat pumps, and ensuring compliance with host nation and international building codes. The facility will be located at coordinates 12°5'57.49"N, 15°3'11.86"E, and the project requires detailed design submittals, performance testing, and operational documentation in both English and the local language.

View the file

Other files

File Type Posted
B.08 Solicitation - SF30 W912GB25RA0030001 Medical Storage Facility, Chad.pdf PDF
B.08 Solicitation - W912GB25RA0030001 Medical Storage Facility, Chad.pdf PDF
B.08 Att 12 Past Performance Information Sheet_Rev 13 Feb 2023.docx DOCX document
B.08 Att 2 SOW_Conceptual Site Plan.pdf PDF
B.08 Att 15 Price Schedule Medical Storage, Chad.docx DOCX document
B.08 Att 6 SOW_Scope For Independent Structural Proofing.pdf PDF
B.08 Att 11 Bank Letter of Guarantee (BLG).docx DOCX document
B.08 Att 17 Commitment Letters.docx DOCX document
SSP Medical Storage Facility Chad.pdf PDF
B.08 Att 7 Full Spec Binder_Medical Storage, Chad.pdf PDF
B.08 Att 14 Past Performance Questionnaire PPQ.docx DOCX document
B.08 Solicitation - W912GB25RA003 Medical Storage Facility, Chad.pdf PDF
B.08 Att 13 Past Performance Overview Sheet_Rev 19 Jan 2023.xlsx XLSX spreadsheet
B.08 Att 4 SOW_Structural Calculations Guideline.pdf PDF
B.08 Att 10 Bank Letter of Assurance (BLA).docx DOCX document
B.08 Att 3 SOW_ConcArchDwgs.pdf PDF
B.08 Att 1 SOW_Location Map.pdf PDF
B.08 Att 9 Price and Payment Procedures.docx DOCX document
B.08 Att 8 Period of Performance Clause Medical Storage, Chad.docx DOCX document
B.08 Att 16 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
B.08 Att 5 SOW_Dedication Plaque.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers Europe District

APO AE 09049

ar199

Statement of Work Project Number:

Proj. No.: 84731 Fiscal Year: 2025

Medical Storage Facility N’Djamena, Chad

Prepared by:

Design Branch

Engineering Division

26FEB2025

01 10 10 Statement of Work Medical Storage Facility – N’Djamena, Chad

26-Feb-25 Page 2 of 41

SECTION 01 10 10

STATEMENT OF WORK

SECTION TABLE OF CONTENTS:

1 GENERAL

2 CIVIL AND GEOTECHNICAL

3 ARCHITECTURAL

4 STRUCTURAL

5 ELECTRICAL & COMMUNICATIONS

6 MECHANICAL

ATTACHMENTS

Attachment # 1 Location Map Attachment # 2 Conceptual Site Plan Attachment # 3 Conceptual Architectural Drawings Attachment # 4 Structural Calculations Guideline Attachment # 5 Dedication Plaque Attachment # 6 Scope for Independent Structural Proofing

1.0 GENERAL

1.1 PROJECT DESCRIPTION

The Request for Proposal (RFP) provides parameters for a design-build project for construction of a medical storage facility in N’Djamena, Chad; Latitude 12°5'57.49"N, Longitude 15°3'11.86"E (Refer to the attached Location Map.)

The project includes the following general items of work, detailed requirements are contained elsewhere in this Statement of Work:

a. Demolish existing warehouse facility. Existing facility size is 20.00 x

13.00 meter (260.00 m2).

b. Remove existing flagpole in front of the existing warehouse.

c. Clear, grub, and grade the site.

d. Design and construct (1) new pre-manufactured warehouse facility.

e. Provide a concrete access ramp

f. Provide concrete loading/unloading dock with steps

g. Design and construct complete PV power system.

h. Provide and install adequate cooling systems to the facility.

i. Design and construct adequate climate control to maintain internal facility temperature no greater than 27-degree-C.

1.2 GENERAL REQUIREMENTS

The Contractor must deliver fully functional, turnkey type facilities (without mobile furniture) as described in this document. The work includes - but is not limited to - design, demolition, fabrication, delivery, installation, construction, and site work.

The facility in this project must be complete and usable to meet codes and technical and functional requirements per this Statement of Work (SOW). The proposal price must include all design, calculations, approvals, certificates, fees, labor, material, equipment, direct overhead, indirect overhead, general and administrative expenses (G&A) and general conditions to complete this project as described in the SOW.

These design and product requirements are minimum requisites. Compliance with the provisions of this section by subcontractors is the responsibility of the Contractor.

26-Feb-25 Page 3 of 41

1.2.1 BASE ITEMS AND OPTIONAL ITEMS

This Statement of Work addresses the technical requirements necessary to complete all work associated with this project. For information and requirements regarding the allocation of pricing between elements of the work, refer to Specification Section 01 22 00 PRICE AND PAYMENT PROCEDURES. The Schedule of Items identifies the breakdown between the individual base items and optional items for all work identified in this Statement of Work, associated drawings, and attachments. All work as described in these documents is included in either the Base or Optional Items. Consider all items not specifically identified in the Optional Items as part of the Base Items.

1.3 FUNCTIONAL AREAS

Refer to the attached drawings for a depiction of the required functional areas and spatial adjacencies for the site and new facilities/structures.

1.4 SUBMITTALS

Designer of Record approval is required for submittals with a “DA” designation.

Government approval is required for submittals with a “G” or “GA” designation.

Submittals having an “FIO” designation are for Contractor Quality Control approval. Submit the following to the Contracting Officer (KO) in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-05 Design Data

65% Pre-Final Design; DA/GA

95% Final Design; DA/GA

100% Corrected Final Design; DA/GA

SD-06 Test Reports

Test Results and Reports; FIO

1.4.1 DESIGN SUBMITTALS

Provide a complete design package at each milestone, as described in RFP Section 01 33 16-DESIGN AFTER AWARD. The milestones for this project are indicated above in Section 1.4 SUBMITTALS. The specific requirements of each milestone are described in each discipline-specific section of this Specification.

1.4.2 TEST REPORTS

Provide all test results and reports identified in this SOW to the Government as a submittal in accordance with RFP Section 01 33 00-SUBMITTAL PROCEDURES. Submittals will be considered for information only (FIO) submittals unless specifically identified as a submittal requiring government approval. Coordinate with the KO after award for the specific items to be included in the submittal register.

1.5 MATERIALS AND EQUIPMENT

Materials and products used must be durable, heavy duty, industry standard. The equipment must be the manufacturer’s standard quality and must be compatible with all other equipment and materials within the system or assembly. Equipment and materials must include all connections and accessories necessary to ensure operability and correct installation according to manufacturer’s requirements.

Provide a nameplate secured to each major piece of equipment. Each nameplate must have the manufacturer’s name, address, contact information, type or style, model or serial number, and catalog number. The definition of a “major piece of equipment” is at the discretion of the KO.

26-Feb-25 Page 4 of 41

1.5.1 LIFE-SPAN

The facility and the installed equipment must be permanent construction with an expected lifespan of more than 25 years.

1.5.2 MAINTAINABILITY

Provide low maintenance materials and systems appropriate for the project climate and location.

1.5.3 OPERABILITY

Systems (including but not limited to architectural, electrical, communications, and mechanical systems) must be simple to operate and easy to maintain.

1.5.4 STANDARDIZATION

Provide standardized materials, products, equipment, and systems to minimize the requirements for replacement parts, storage facilities, and service requirements.

1.6 DESIGN DIMENSIONS

Develop the design using the metric system.

1.7 DESIGN CRITERIA

Project design, site facilities, utility systems and material standards must be in accordance with Host Nation building codes (current versions as of the date of RFP, unless otherwise indicated). In the absence of Host Nation building codes, use the International Building Code (IBC) and the codes, technical standards, and regulations referenced in this RFP.

While this RFP references various source standards and specifications, all design documents must meet Host Nation codes and requirements. It is the designer's responsibility to demonstrate that the Host Nation standard is equal to the cited standard or specifications being supplanted. Apply the more restrictive standards when conflicts arise between the requirements of this RFP and any referenced or other applicable codes, standards or regulations. If equivalency cannot be met, use the more stringent requirement and quote both codes verbatim in correspondence to the KO.

The designer is responsible to determine the required material and execution standards where specific standards are not indicated.

Provide an electronic copy of the local Host Nation standards and building codes in their original language as related to facility design and construction.

1.8 SPECIAL CONSTRUCTION REQUIREMENTS

1.8.1 DEMOLITION

The Contractor is responsible for all required demolition as indicated in this scope.

1.8.1.1 ABATEMENT AND DISPOSAL

All demolished materials, including hazardous materials identified below, must be abated and disposed of in accordance with local laws, codes and regulations. The Contractor is responsible for all required testing before, during and after demolitions as well as for all required compliance with safety standards. Divert a minimum of 60% of the nonhazardous construction and demolition waste material from landfills.

1.8.1.2 LOCATION OF HAZARDOUS MATERIAL

The Contractor is responsible to survey the site and determine if hazardous materials exist. If hazardous materials are found to exist, immediately notify the KO and provide the results of the relevant sampling and testing. Provide the

26-Feb-25 Page 5 of 41 hazardous material report no later than 30 days after Notice to Proceed (NTP) for information and approval.

END OF SECTION

26-Feb-25 Page 6 of 41

2.0 CIVIL AND GEOTECHNICAL

Provide and perform civil engineering design and construction services as required to provide a complete, accessible, functional and usable project. The Contractor is required to extensively coordinate civil design and construction work with the scope of the other disciplines described in this SOW.

2.1 SCOPE SUMMARY

Civil works for this project include, but are not limited to, site survey, geotechnical investigation, site layout, demolition, earthwork, and landscaping.

Refer to the bid schedule for which of these are base bid or optional.

2.2 EXISTING CONDITIONS

2.2.1 TOPOGRAPHY

There is no known topographic survey for the project site. The existing site contains buildings, utilities, fences, and vegetation as shown on the attached Conceptual Site Plan. The site generally flat. The existing information shown on Attachment #2 - Conceptual Site Plan was compiled from Google Earth, and site photos.

2.2.2 UTILITIES

There is no storm system at the site.

There is domestic water supply on-site. There are two known water locations, one located near the main CPA building, and one located directly south of the existing warehouse.

There is no sanitary system at the site.

Power is available on site. Refer to the other sections of this SOW for details of electrical utilities.

Contractor must verify all utility locations (surface and subsurface) in the field prior to the first design submittal.

2.2.3 GEOTECHNICAL

There is no geotechnical information available for the project site.

The Contractor must perform a Geotechnical Investigation and submit a Geotechnical Report as part of the Design Analysis. Refer to other sections of this SOW for the requirements of the Geotechnical Investigations and Report.

2.2.4 ENVIRONMENTAL

There are no known environmental protection areas or archeological preservation areas on the project site.

There is no prior knowledge of any hazardous or contaminated materials in the site’s soil.

2.2.5 EXISTING CONDITIONS INVESTIGATION

Prior to bid, investigate the general and local conditions which can affect the work and/or its cost, including but not limited to:

a. Weather, or similar physical conditions at the site.

b. Surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site and due diligence research of as-built drawings, geotechnical reports, environmental reports, and publicly available information on the site.

c. Mobilization and staging constraints.

2.3 DESIGN SUBMITTALS

26-Feb-25 Page 7 of 41

Provide civil design submittals in accordance with RFP Section 01 33 16-DESIGN AFTER AWARD and in compliance with SOW Section 1.0 – GENERAL.

65% Design Submittal:

a. Pre-Final Design Analysis of civil features.

b. Pre-Final Site Survey (include in the Design Analysis).

c. Pre-Final Geotechnical Report (include in the Design Analysis).

d. Pre-Final Existing Conditions Plan.

e. Pre-Final Demolition Plan.

f. Pre-Final Site Layout Plans - Indicate existing and proposed Civil features.

Include other disciplines’ features (faded back) that affect the Civil Design (buildings, utilities, etc.).

g. Pre-Final Grading Profiles, Cross Sections, and Details. Include spot grades and slopes in Grading Plan. Include erosion control design.

h. Preliminary Landscape Plan and Details

i. Preliminary Civil Specifications

95% Design Submittal:

Update all items from the 65% Design Submittal to 95% (Final) Design. Incorporate all 65% design comments.

100% Submittal:

The 100% Submittal provides a complete and final set of contract documents ready for construction. Update all Final submittals from 95% to a corrected Final submittal. Address all previous government review comments before submitting.

As Built Drawing Submittal:

In addition to the as-built requirements discussed in RFP Section 01 78 00- CLOSEOUT SUBMITTALS, provide a topographical survey of the site per requirements of SOW Section 2.6-SITE SURVEY. Include existing utility lines or structures (both modified and unmodified) encountered in the construction footprint that were not located on the original Site Survey.

2.3.1 DESIGN ANALYSIS

Submit a Design Analysis in accordance with RFP Section 01 33 16-DESIGN AFTER AWARD. Provide a Design Analysis for all Civil features that documents significant design choices and substantiates design compliance with contract requirements, applicable codes, and standards. Documentation includes narrative, calculations, photographs, sketches, and catalog cut sheets. Reference all applicable regulations, standards, and criteria for the design. Reference sources are subject to Government approval. Provide design assumptions. For design choices, discuss alternative systems considered, and provide rationale for the selected alternative.

The Design Analysis includes but is not limited to:

a. Discussion of Site Layout constraints and design decisions, including but not limited to, land use, orientation of features on-site, setbacks from site features, minimizing earthwork and tree removal, and future expansion.

b. Discussion of Demolition constraints and design decisions. Include discussion on how access will be provided during construction, and how each utility will be maintained and operated during construction.

c. Discussion of Earthwork and Site Grading constraints and design decisions.

Provide cut and fill calculations. Provide slope stability calculations for slopes steeper than 2H:1V or slopes supporting proposed structures. Include pertinent geotechnical information that affects earthwork.

d. Discussion of Landscaping constraints and design decisions.

e. Site Survey as an appendix.

f. Geotechnical Investigation and Report as an appendix.

26-Feb-25 Page 8 of 41

2.3.2 DESIGN DRAWINGS

Provide Civil design drawings of sufficient detail to address the requirements of each design submittal. Civil drawings include plans, profiles, cross sections, and details of Civil features for the project. Civil drawings also include temporary construction plans/methods that affect the design and construction of the project.

These temporary plans include mobilization, traffic control, erosion control, dewatering, shoring, construction sequence, etc. Design drawings include all necessary information (labeling, dimensioning, legend, details, notes, etc.) to allow for complete understanding and constructability of all proposed features.

Provide comprehensible differentiation between features that are proposed, existing, future, or proposed to be demolished by use of appropriate choice of line styles, line weights, and/or colors. Reference USACE A/E/C Graphics Standard for graphic requirements.

2.3.3 SPECIFICATIONS

Provide Civil specifications of sufficient detail to address the requirements of each design submittal. Specifications, when combined with the design drawings, allow for complete understanding and constructability of all proposed Civil features.

2.4 DESIGN CRITERIA

Provide civil design in accordance with Host Nation codes. In the absence of Host Nation codes, use the latest release of the International Building Code (IBC) and the following codes and technical standards:

a. Uniform Facility Criteria (UFC) 3-201-01, Civil Engineering

b. UFC 3-220-01, Geotechnical Engineering

c. USACE A/E/C Graphics Standard (ERDC/ITL TR-12-1)

2.5 GEOTECHNICAL INVESTIGATION AND REPORT

Perform a geotechnical investigation and assessment of the project site to determine the subsurface conditions and geotechnical parameters for foundation, grading, and utility design. Perform the necessary amount of testing, borings and test pits at depths suitable for the project improvements. Include geotechnical investigation in areas where borrow material will be used. The Geotechnical work must be performed under the supervision of a professional geotechnical engineer registered with the jurisdiction having authority, and the report must be signed by the Geotechnical Engineer. In the absence of Host Nation codes, perform the geotechnical investigation and report per UFC 3-220-01, Geotechnical Engineering and IBC.

Coordinate testing locations with the KO to avoid impact to existing utilities and facility operations. Utility locates, permits, and vegetation clearing is the Contractor’s responsibility. Repair disturbed areas with compacted soil in non-paved areas. The repaired area must be flush with the adjacent surface. Following restoration, stake, and flag each of the hole locations with boring identification numbers. Provide a map indicating the borehole and test pit locations.

2.5.1 REPORT

Include, as a minimum, the following information:

a. Description of field work completed, and equipment used; names, signatures and stamps of licensed professionals involved; name of drilling company.

b. A description of site subsurface conditions, regional geology, and seismic conditions at the site.

c. Site map of borehole and test pit locations.

d. High resolution color digital photographs of each borehole and test pit location.

26-Feb-25 Page 9 of 41

e. Test pit logs with classification of all subsurface materials. The logs must distinguish fill materials from native materials, include all in-situ test results, and include groundwater depth information, if groundwater is encountered. Distinguish between bedrock and rock boulders.

f. Reports of all the field and laboratory testing.

g. Recommendations for allowable bearing capacity, expected settlement, type of foundation, minimum footing and grade beam dimensions, lateral earth pressure parameters, and minimum depth of foundation for footing and grade beams.

h. Recommendations for preparation, placement, and compaction of onsite soils, borrow material, soil replacement, soil amendment/treatment, structural fill, topsoil, and trench backfill. Include dewatering and temporary retaining structure needs.

i. Soil Resistivity.

j. Calculations to support conclusions and recommendations.

2.5.2 DESIGN DRAWINGS AND SPECIFICATIONS

On the design drawings and/or specifications, include geotechnical information that affect the design of the project, including but is not limited to, boring locations, boring logs, groundwater and frost depths, and any details that convey requirements for site preparation.

2.6 SITE SURVEY

Conduct and provide a topographic survey from a licensed surveyor that includes all existing site information needed to design and construct the project. Survey must be conducted prior to the first design submittal. Include x, y, and z coordinates to the nearest 0.005 meters, dimensions, material, and basic characteristics of all features within the project site limits, as well as all features outside of the project site limits that will affect the design and construction of the project. Research record drawings to obtain utility and pavement information that is not visible from the surface. Provide notes indicating the sources and any limitations or assumptions of the data. Provide a copy of the survey in CAD, in addition to the paper/electronic requirements of the Design Analysis. Locate and show on the topographic survey the following information:

a. Property boundary, public right of way, and easements. Include the address numbers, street names, and easement records.

b. Survey monuments. Include description.

c. Spot elevations covering the entire survey limits showing high points, low points, grade changes, and at sufficient intervals to represent the general character of the terrain.

d. Contours in intervals of 0.25 meters.

e. Buildings and other miscellaneous structures. Provide finish floor elevation.

f. Utility lines and structures. Include rim elevations and invert elevations for utility structures; identification of lines as underground or aboveground;

pipe sizes and materials.

g. Fences. Include height, material, direction of outrigger, gate locations and types.

h. Signs. Include sign text.

i. Trees/Woods: In wooded areas that trees are to be protected, locate outside drip line of wooded area, include general density and type of trees. For wooded areas with proposed tree removal, identify trees per Host Nation permitting requirements. Where selective clearing will be proposed, locate trees over 150-millimeter diameter at chest height, and include tree species, diameter at chest height, and dripline diameter.

j. Geotechnical boring locations.

k. Locate environmentally sensitive areas (determined and marked by others).

l. North arrow and scale of drawing.

m. Legend depicting the symbols and abbreviations used on the drawing.

26-Feb-25 Page 10 of 41

n. Horizontal and vertical coordinate systems, date of survey, licensed surveyor name and license number.

Site information provided to the Contractor by the Government is not to be considered accurate Site Survey information. Utility field locates and as-built research are the responsibility of the Contractor.

Upon completion of construction, update the original survey with an As-built survey of the site as constructed, including underground utility locations and depths. Submit the As-built survey to the KO for approval.

Reference UFC 3-201-01, Civil Engineering, Section 2-2.2-SURVEYING for survey requirements. Use the Universal Transverse Mercator (UTM) coordinate system. The vertical coordinate system must be based on sea level.

2.7 SITE LAYOUT

Locate the proposed building and other improvements as indicated on the attached Conceptual Site Plan. Amend the site layout as determined by the site-specific constraints, the owner’s preferences, accessibility, future expansion, and opportunities that are identified and evaluated as part of the Contractor’s scope of work. Locate the proposed building a minimum of 3 meters away from existing buildings. Locate the proposed building outside the dripline of existing trees.

Align the proposed building on the same axis as adjacent buildings.

The Contractor is responsible for all aspects of the project whether they are shown on the conceptual plan or not.

2.8 DEMOLITION

Remove existing storage facility, vegetation, and any other features to construct the proposed improvements. Remove trees with driplines within the footprint of the proposed improvements. All contaminated soils discovered require special testing and disposal per Host Nation requirements.

2.8.1 CONSTRUCTION LIMITS

Do not disturb the project site beyond necessary for installation of proposed construction. Do not disturb any areas past the site’s property line. Show demolition work and limits of disturbance in the drawings. Stake-out the limits of disturbance on-site with temporary fencing before beginning construction.

2.8.2 ITEMS TO REMAIN IN PLACE WITHIN CONSTRUCTION LIMITS

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as required by the KO. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the KO prior to performing said work.

2.8.3 TREES

Unless otherwise noted on the attached Conceptual Site plan, protect trees which might be damaged during construction, with a 1.8-meter-high fence around the dripline of the tree(s), which is assumed to be the extent of the tree’s roots.

Trees are defined as larger than 150mm diameter at 1.3 meters above existing grade. Mitigate for tree removal per Host Nation requirements.

2.8.4 UTILITIES

Any existing utilities encountered that are impacted by this project must be protected, or relocated if protection is not feasible. Remove existing and abandoned utilities under or within 3.0 m of the foundation of any proposed

26-Feb-25 Page 11 of 41 facility or building foundation. Reroute existing utilities to remain in accordance with SOW Section 2.10-UTILITIES.

2.8.5 DUST, DEBRIS, AND EROSION CONTROL

Prevent the spread of dust, debris, and erosion from the project site. Install erosion control measures before beginning construction. Sweep pavements as often as necessary to control the spread of debris. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, flooding, erosion, or pollution. Remove dust, dirt, and debris from work areas daily. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

2.8.6 ADDITIONAL REQUIREMENTS

Reference RFP Section 00 74 01-SPECIAL CONDITIONS, and 01 30 00-GENERAL REQUIREMENTS for additional demolition, protection, and permitting requirements.

2.9 EARTHWORK

Perform all earth work necessary for the installation of the proposed improvements.

2.9.1 PLANS AND SPECIFICATIONS

Define earthwork requirements in the plans and specifications. Include requirements for satisfactory material, borrow material, structural fill, topsoil, soil compaction (for subgrades of structures, and landscaped areas), and engineered support systems. The earthwork requirements must not conflict with the recommendations in the Contractor-provided Geotechnical Report.

2.9.2 CONTAMINATED SOIL

Inspect and test all soil according to Host Nation requirements. If hazardous materials are discovered, cease excavation, secure the area, and notify the KO for further guidance.

2.9.3 TOPSOIL

Remove and save topsoil (approximately first 20 centimeters of excavation).

Separate out subsoil, brush, litter, weeds, roots, stones larger than 25 mm in diameter, and other materials that would interfere with planting and maintenance operations. When restoring the site to finish grade, place topsoil back in excavated areas that do not include proposed paving or structures.

2.9.4 SATISFACTORY MATERIAL

Excavated material (below topsoil), if satisfactory for reuse per the Contractor’s Geotechnical Engineer, may be used on the project site where fill is required.

Unsatisfactory material, and surplus excavated material not required for fill, must be disposed of offsite, and is the responsibility of the Contractor. Borrow material may be required for construction from sources off site. Borrow materials are to be free of hazardous materials and contaminants. Any soil brought in from off-site sources must be certified clean.

2.9.5 BACKFILL COMPACTION

In the absence of Host Nation requirements and geotechnical recommendations, fill and backfill must be placed in layers of 20 centimeters loose thickness and compacted to a minimum 95% of the maximum dry density as determined by Host Nation test method equivalent to ASTM D-1557 (Modified Proctor test). Provide density tests on all lifts at a frequency of 1 test per 40 square meters for foundations.

Round up to nearest whole number (i.e. a 25 square meter foundation requires one test). The location of all tests must be selected by the Contractor’s geotechnical engineer, and copies of all test results must be furnished to the KO. All structure foundation excavations must be inspected and approved by the Contractor’s Geotechnical Engineer prior to placing concrete. Repair earthwork

26-Feb-25 Page 12 of 41 areas as recommended by the Contractor’s Geotechnical Engineer and approved by the

KO.

2.9.6 ENGINEERED SOIL SUPPORT SYSTEMS

Provide engineered soil support systems as required for the construction of the proposed improvements. The Contractor is responsible for all dewatering necessary for earthwork.

2.9.7 SITE GRADING

Provide site grading that directs storm water runoff away from buildings and structures by grading as follows:

a. Finished grades of earth/grass/gravel surfaces adjacent to buildings and structures must slope away from all exterior edges with a minimum slope of 5% for the first 2 meters.

b. Finished grades must not create stagnating water or ponding anywhere on the project site, nor create ponding on adjacent properties. Provide storm improvements if ponding is unavoidable.

c. In accordance with requirements of UFC 3-201-01, Chapter 2-8 Grading

d. Set finished floor elevations a minimum of 15 centimeters above finished grade at the perimeter of the building.

e. Set building finish floor elevations at a minimum of 30 centimeters above the local 100-year flood level.

Site grading around the building must meet Host Nation accessibility guidelines.

2.10 PAVEMENT

a. Portland cement concrete (PCC) ramp at the entrance of the building. Minimum thickness of concrete is 150mm. Minimum thickness of granular base is 100mm.

Provide thicker base if required to protect weak subgrade soils or to reduce frost penetration into the subgrade. Provide medium broom finish on PCC concrete. Reference SOW Section 4.0 - STRUCTURAL for other concrete requirements.

b. Provide concrete loading/unloading dock in front of the building adjacent to the concrete ramp as shown on the attached Conceptual Site Plan. Provide concrete steps leading to the dock at both ends.

2.11 LANDSCAPING

Provide 15 centimeters of compacted gravel with a maximum particle size of 3 centimeters in areas that do not have pavement or a building within the limits of disturbance. Refer to 2.9 EARTHWORK section for minimum compaction requirements.

26-Feb-25 Page 13 of 41

3.0 ARCHITECTURAL

3.1 PROJECT DESCRIPTION

Provide and perform architectural design and construction services to provide a complete, accessible, functional, and usable medical storage facility in N’Djamena, Chad.

Provide a new single-story, prefabricated metal building that will serve as medical storage.

Extensive coordination is required between the architectural work and the work of other disciplines described in this SOW.

3.1.1 DESIGN

Provide a design and construction package that uses the space allocations, functional adjacencies, design details, and features given or referenced in this RFP. The design must incorporate all referenced codes and regulations. The Contractor is responsible for creating additional details as required to complete a full design. All details must conform to the requirements of this RFP and are subject to the approval of the KO. A schematic design has been attached for reference. The schematic plans are provided for diagrammatic purposes only and do not necessarily represent an approved floor plan or design. The Contractor is responsible for providing a design that meets all requirements of the User and the codes and criteria referenced in this Statement or Work.

3.1.2 DESIGN SUBMITTALS

Provide all architectural submittals after contract award in accordance with RFP Section 01 33 16-DESIGN AFTER AWARD and 01 33 00-SUBMITTAL PROCEDURES. Prepare and submit the documents listed below at the submittals indicated.

3.1.2.1 65% DESIGN SUBMISSION

Include the following drawings and reports as applicable to the project:

a. Code Summary – Provide a tabular code compliance summary indicating Host Nation and/or IBC life safety requirements for all new facilities.

b. Life Safety Plans – Provide plans depicting smoke/fire resistance ratings, egress routes, dead-end corridors, exits, and other aspects of life safety pertaining to the design.

c. Floor Plans – Provide all floor plans, indicating room names, areas, and basic dimensions, scale 1:50.

d. Ceiling Plans – Provide reflected ceiling plans for all rooms, indicating ceiling materials and fixtures, scale 1:50.

e. Building Elevations – Provide all building elevations indicating all exterior materials.

f. Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.

g. Building Section – Indicate heights of critical building elements.

h. Wall Section - Provide a typical interior and exterior wall section for each building – describe wall materials.

i. Pre-Final Design Analysis – Provide a narrative explaining the design and indicating how the design and materials meet the requirements of this SOW.

j. Pre-Final Specifications – Provide detailed explanations of requirements for all performed work or provide product specific manufacturer information (brochures, technical information, cut sheets) for all materials and products to be provided/installed.

3.1.2.2 95% DESIGN SUBMISSION

The 95% Submittal provides a complete and final set of contract documents essentially ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include the following drawings and reports as applicable to the project:

26-Feb-25 Page 14 of 41

a. All documents from the 65% submittal updated to incorporate 65% review comments.

b. Floor Plans – Provide all floor plans, indicating room names, areas, and dimensions, scale 1:50.

c. Building Elevations – Provide all building elevations indicating all exterior materials.

d. Roof Plan – Provide a plan of all roof areas, indicating direction of slope and method of drainage.

e. Building Section – Indicate heights.

f. Wall Sections – Provide sufficient wall section(s) to indicate all materials and different conditions.

g. Section and Plan Details – Provide details of critical building intersections.

h. Door Schedule – Provide a schedule of all doors, indicating sizes, hardware, and operation.

i. Stair Section and Details.

j. Finish Schedule – Indicate all proposed finishes.

k. Final Design Analysis – Provide a finalized narrative describing all work to be performed on the project and how it meets the functional and code requirements of the project. Provide product specific manufacturer information (brochures, technical information, cut sheets) for all materials and products to be provided/installed.

l. Final Specifications – Provide line items and detailed descriptions of all work to be performed.

3.1.2.3 100% DESIGN SUBMISSION

The 100% Submittal provides a complete and final set of contract documents ready for construction by the D/B Contractor. All previous government review comments must have been addressed. Include all drawings, specifications and calculations from the 95% Submittal updated to incorporate all previous review comments.

3.2 TECHNICAL CRITERIA AND STANDARDS

Design and construct the project in accordance with the requirements outlined in Section 1.7 DESIGN CRITERIA.

3.2.1 LIFE SAFETY REQUIREMENTS

The Design must meet all Host Nation and local Fire Suppression System codes and requirements. All new structures must have exits and means of egress that comply with current Host Nation codes and standards. In the absence of Host Nation codes and standards, for individual concerns of Life Safety the Contractor must follow the International Building Code (IBC).

3.2.2 HANDICAPPED ACCESSIBILITY REQUIREMENTS

All facilities must meet applicable Host Nation handicapped accessibility requirements.

3.3 GENERAL SCOPE OF WORK

Design the architectural elements of this facility to withstand all site-specific environmental conditions such as wide seasonal temperature swings, local wind, rain, snow and earthquake conditions. All architectural features must be appropriately braced for anticipated seismic activity. The Contractor may propose alternate building materials to meet the facility’s requirements, but final selection of materials is subject to the approval of the KO. Consider economics not only in the initial acquisition, but also in the future maintenance of the materials, when selecting materials and building systems to be incorporated into the project. When requested, the Contractor must provide documentation demonstrating that a chosen alternative material is life cycle cost effective.

3.4 DETAILED SCOPE OF WORK

26-Feb-25 Page 15 of 41

The Contractor is responsible for the following specific tasks required for the construction of this facility.

3.4.1 DEMOLITION

Demolition work includes, but is not limited to, the following items:

a. Demolition of existing warehouse facility. See Civil Section for details.

3.4.2 BUILDING SYSTEM AND MATERIALS

The intent of this RFP is to allow the Contractor the maximum flexibility to design and construct this facility in an economical manner without sacrificing good engineering practices, quality materials and systems. The Government requires low or no maintenance finish materials to the greatest extent possible. Provide a design informed by the modular size of selected materials. Building materials as described herein are minimum requirements and may require revision based on code compliance and criteria.

3.4.2.1 FIRE PROTECTION RATINGS OF INTERIOR FINISHES

All interior finishes must conform to Host Nation fire protection standards/requirements or equivalent US standards/requirements.

3.4.2.2 ACOUSTICAL DESIGN

Doors, walls, floors, and ceilings must meet the minimum sound protection per Host Nation requirements.

3.4.2.3 THERMAL INSULATION

Provide thermal insulation in accordance with Host Nation and local requirements.

Thermal insulation must be provided to meet minimum requirements in Section 3.4.3

EXTERIOR CONSTRUCTION WORK.

3.4.2.4 CORROSION PREVENTION

All exterior materials and finishes must be appropriate for continuous exterior exposure. All materials susceptible to UV degradation must contain UV inhibitors.

Provide corrosion resistant coatings on all materials susceptible to corrosion.

Coatings must be applied in the factory prior to delivery to the maximum extent practicable. Physically separate dissimilar metals with non-conductive hardware.

Do not install aluminum in direct contact with concrete. Treat all wood with preservatives where it is contact with concrete or exposed to the exterior. Cover all exterior wood with metal flashing or exterior grade paint. Do not install wood in contact with soil.

3.4.3 EXTERIOR CONSTRUCTION WORK

Provide the following exterior architectural systems.

3.4.3.1 EXTERIOR WALLS

Design and construct new exterior walls in accordance with (IAW) the requirements of this SOW. Refer to Section 4.0 STRUCTURAL. Exterior walls must have smoke/fire resistance ratings as required by Host Nation, and local fire and life safety codes. Provide exterior wall finishes appropriate for the wall structure as required below.

3.4.3.1.1 STEM WALLS

Provide fluid-applied monolithic membrane waterproofing on all concrete and masonry walls below grade. Waterproofing must be low VOC. Apply liquid proof coating with fabric reinforcement corner strips in accordance with manufacturer guidelines. Provide continuous rigid board insulation and drainage membrane. All materials below grade must be appropriate for direct contact with soil.

3.4.3.1.1 INSULATED METAL SANDWICH PANELS

26-Feb-25 Page 16 of 41

Provide exterior insulated metal sandwich panels consisting of two steel face layers with an integral foam insulation layer of 10 cm minimum thickness. Panel profile must be flat. Steel face layers must have a minimum thickness of 0.7 mm.

Sandwich panels must have concealed fasteners that limit thermal bridging. Provide all required flashing, fasteners, and sealing materials. Sandwich panels must have factory applied finish. Submit material and colors samples for approval.

3.4.3.2 EXTERIOR DOORS

Provide new exterior doors as indicated on attached drawings.

3.4.3.2.1 EXTERIOR WAREHOUSE DOUBLE DOORS

Provide new factory finished, insulated aluminum or steel exterior doors and frames to include new exit / escape doors. All main entry doors must be half glazed. Provide all necessary hardware for all doors including panic hardware locking mechanisms. All hardware must be heavy-duty metal and have a brushed chrome finish. Mount all door frames flush with surrounding walls and seal all seams. Exterior doors must include a commercially manufactured threshold with a vinyl or silicone rubber weather stripping insert in the face of the stop. Weather stripping must be held in an extruded non-ferrous metal housing. All doors must have heavy-duty closers. Size closers in accordance with the specific door application and size, and with manufacturer's recommendations. Coordinate key system with the KO and end user. Door size must be 2.20 m high and 2.00 m wide.

Each door must have the following hardware as a minimum:

a. Three hinges on each leaf.

b. One floor or wall mounted doorstopper, as appropriate.

c. Lever latch handles.

d. Fully mortised lockset compatible with existing keying system.

e. Fully adjustable hydraulic door closer (mounted on building interior) with hold open function.

f. Door coordinator on all door pairs.

g. Panic push bar in compliance with Host Nation criteria on each leaf, as required.

h. Weather seals and gasketing.

3.4.3.4 ROOFING

Roof design and materials must comply with Host Nation requirements.

3.4.3.4.1 ROOF CONSTRUCTION AND ROOF COVERING

Provide new roof structure, roof lathing and new insulated sandwich panel metal roofing with minimum 10 cm thermal insulation between the panels. Provide a roof slope greater than 15% and in accordance with roofing manufacturer installation requirements and proofing certificates. Provide roof-mounted fall protection anchors as required by HN occupational safety requirements. Metal roofing must be factory finished steel or aluminum panel with a minimum thickness of 0.70 mm.

Roofing must have concealed fasteners. Provide new vapor barrier and thermal insulation. Roof and wall insulation must be continuous to eliminate thermal breaks. Provide ventilation layer as required to avoid condensation. Provide all required flashings, fasteners, and sealing materials. Install as required by the manufacturer. Metal roofs must have 20-year warranty. Submit material and color samples for approval.

3.4.3.4.2 EAVES, OVERHANGS, AND SOFFITS

Provide roof overhangs a minimum of 500 mm from the face of exterior walls.

Enclose all eaves and overhangs with factory finished metal soffits.

3.4.3.4.3 ROOF GUTTERS, DOWNSPOUTS AND FLASHING

Provide new pre-finished galvanized steel roof gutters, downspouts and flashing.

PVC gutters and downspouts are not acceptable. Size gutters and downspouts for

26-Feb-25 Page 17 of 41 roof drainage area and 10-year storm rainfall intensity. Submit gutter and downspout sizing calculations in the Design Analysis. Coordinate storm drainage connections with the requirements of Section 2.0 CIVIL AND GEOTECHNICAL. Submit material and color samples for approval.

3.4.3.5 EXTERIOR METAL

All new exterior metal must be finished with an architectural coating. Provide exterior metal elements with a factory applied finish to the greatest extent practicable. For all new metal elements that have not been provided with a factory applied finish, are showing evidence of corrosion, or have failing coatings, clean and paint the metal in the field. Scrape and clean all surfaces to remove rust and dirt before painting. Paint system must be one coat of rust inhibitive primer and two coats of an alkyd-base finish paint. Submit paint samples and colors for review and approval.

3.4.4 INTERIOR CONSTRUCTION WORK

Provide the following interior architectural systems.

3.4.4.1 INTERIOR WALLS

3.4.4.2 INTERIOR WALL FINISHES

All interior areas of exterior insulated metal sandwich panel walls must be factory finished. Steel face layers must have a minimum thickness of 0.7 mm.

Provide all required flashing, fasteners, and sealing materials. Sandwich panels must have factory applied finish. Submit material and colors samples for approval.

3.4.4.3 CEILINGS

Provide new ceilings as described below. Install ceilings to provide a clear room height in accordance with US, HN, and local building codes, but not less than 4.00 m above finished floor surface in any room. Do not use combustible materials for ceiling construction. Submit data sheets, color, and pattern of all ceiling finishes for review and approval.

3.4.4.3.1 SUSPENDED ACOUSTIC CEILINGS

Provide new suspended acoustic ceilings for medical storage room #101. Acoustic tile ceilings must be level and flat. Provide and install all required components for a suspended acoustic tile ceiling system including mounting and supports of light fixtures. Integrate all light fixtures and mechanical grilles in the ceiling grid.

3.4.4.4 FLOOR SLABS

Provide floor slabs in accordance with the requirements of Section 4.0 STRUCTURAL and the following.

3.4.4.4.1 UNDER-SLAB INSULATION

Provide continuous insulation under structural slabs. Insulation must be appropriate for continuous contact with soil.

3.4.4.4.2 HORIZONTAL WATERPROOFING AGAINST MOISTURE FROM OUTSIDE

Apply waterproofing on all ground floor slabs in the building. Apply liquid proof coating with fabric reinforcement corner strips in accordance with manufacturer guidelines. Apply on floors before installing new screed. Provide photographic documentation to the KO showing the application of the waterproofing material.

3.4.4.4.3 SCREED AND FLOOR SLABS

Provide bonded cement screed in all rooms / areas.

3.4.4.5 FLOOR FINISHES

Provide new interior floor finishes as described below. Submit data sheets, color, and pattern of all floor finishes for review and approval.

26-Feb-25 Page 18 of 41

3.4.4.5.1 CONCRETE FLOOR SEALER

Provide low VOC, clear epoxy concrete sealer on all exposed concrete floors.

Concrete sealer must be appropriate for high-traffic areas and have high oil and chemical resistance. Apply epoxy concrete sealer in accordance with manufacturer instructions. Test concrete for appropriate moisture content prior to application.

3.4.4.6 MISCELLANEOUS ACCESSORIES

Provide the following miscellaneous accessories in sizes and quantities as described below. Ensure all mounting surfaces have the appropriate structure for the weight and expected use of each accessory.

3.4.4.6.1 FIRE EXTINGUISHERS

Provide fire extinguishers in accordance with Host Nation code. Install fire extinguishers on wall-mounted brackets as required by HN code. Label cabinets in the local language.

3.4.4.6.2 METAL STORAGE SHELVING

Provide industrial steel shelving as shown on attached floor plan. Shelving must be, at a minimum, 2000 mm high. Each shelving unit must have five horizontal shelf racks supported on all sides between four metal posts. Each shelf must be capable of supporting 500 kg. Mechanically fasten shelving units to structural floor slabs and to adjacent shelving.

3.4.5 SIGNAGE

Provide all signage in accordance with Host Nation standards.

3.4.5.1 EXTERIOR SIGNAGE

Provide exterior signage as described below. Construct all exterior signs from corrosion resistant materials appropriate for continuous exposure to the elements.

3.4.5.2.1 EXTERIOR DEDICATION PLAQUE

Provide a dedication plaque approximately 600 mm wide x 450 mm high fabricated from powder coated aluminum with permanent printed 18 mm high, “Arial“ font letters as indicated below. Adhesive applied images or text are not acceptable.

Provide the emblem of the United States Africa Command between two flag emblems, one flag of the United States of America and one of the Republic of Chad. Plaque location and mounting height to be directed by the KO.

The exterior dedication plaque must have text similar to the following in both English and French: “The Construction of N’Djamena Medical Storage Facility was accomplished as a partnership between the people of the United States of America and the people of the Republic of Chad, with support from the United States Africa Command and the Office of Security Cooperation, U.S. Embassy in Chad and Chadian Ministry of Health.” Provide the year of project completion below the text.

Coordinate the final dedication plaque verbiage and graphics with the KO prior to procuring the sign.

See attached dedication plaque template for reference.

3.4.6 FINAL CLEAN-UP

Clean the entirety of the facility, including the roof. Follow the building material and cleaning agent manufacturer's instructions. Provide all devices and tools required for the performance of the work to include all necessary additional scaffolding and ladders. Remove all temporary protective coatings left in place during construction. Liquid cleaners must not contain any volatile organic content.

26-Feb-25 Page 19 of 41

26-Feb-25 Page 20 of 41

4.0 STRUCTURAL

4.1 GENERAL

The Contractor must provide and perform structural engineering design and construction services as required to provide a complete, accessible, functional and usable project.

The primary structural effort of this project includes

a. The design and construction of a new pre-engineered metal building (PEB) with a reinforced concrete foundation and metal panel walls supporting a steel framed, standing seam metal roof. The building should include dead loads for PV Panels with anchorage calculations and sub frame design. The building should include a concrete apron for loading/unloading.

b. Other elements must include but are not limited to foundations, superstructure (i.e. walls, columns and beams), roof framing, lateral load stability and diaphragm design, framing and connection of any architectural features, and support of mechanical and electrical equipment.

The Contractor must have as part of his design team a licensed structural engineer per Host Nations standards. If work is being performed in a country that does not have licensed structural engineers, then engineering degrees along with extensive structural design experience can be submitted to the KO for qualification verification and approval. The structural engineer’s licensure or qualifications must be submitted to the KO in the design quality control plan prior to the start of design. The Contractor’s structural engineer must be responsible for the design of any part of the building structural systems.

The structural design of the foundation, superstructure and any other structural aspects must be in accordance with the design criteria listed in this document.

The superstructure of the project building and the foundation must be constructed from locally available materials.

4.2 APPLICABLE DESIGN CRITERIA

All Design, Safety in…