B.08 Att 2 SOW_Conceptual Site Plan.pdf
PDF 622 KB Posted
- Solicitation number
- W912GB25RA003
- Issued by
-
Department of the Army European Command
About this file
The document is a conceptual site plan for a medical storage facility project in N'Djamena, Chad, prepared by the US Army Corps of Engineers. The site plan details the proposed layout for a new medical storage facility, including key elements such as demolition of an existing warehouse (260 m2), removal of a flagpole, site clearing and grading, construction of a new pre-manufactured warehouse, a concrete access ramp, loading/unloading dock with steps, and accompanying infrastructure. The plan shows the proposed location of the new facility in relation to existing site features like water taps, a diesel generator, electrical panel, and CONEX boxes to be relocated by the end user. The drawing is marked as an attachment to a solicitation and includes a note that drawings are for reference only, and the contractor must verify existing conditions and design to meet Statement of Work requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
ATT. #2
C O
N C
EP
TU
AL
S
IT
E
PL
AN
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
1 CONCEPTUAL SITE PLAN
SCALE IN METERS
0 10 20
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
N 'D
JA
M
EN
A
M
ED
IC
AL
ST
O
R
AG
E
FA
C
IL
IT
Y
C H
AD
NOTE:
DRAWINGS PROVIDED FOR REFERENCE ONLY. CONTRACTOR IS TO VERIFY ALL EXISTING
CONDITIONS AND PROVIDE A DESIGN THAT MEETS CODES AND REQUIREMENTS OF THE SOW.
4 EXISTING WATER TAPS
1 EXISTING MEDICAL STORAGE FACILITY TO BE DEMOLISHED
2 EXISTING DIESEL GENERATOR
3 EXISTING ELECTRICAL PANEL
NOTE
EXISTING CONEX BOXES TO BE RELOCATED BY END USER
6 PROPOSED NEW MEDICAL STORAGE FACILITY
PROPOSED CONCRETE RAMP
8 PROPOSED LOADING/UNLOADING DOCK
9 PROPOSED CONCRETE STEPS
| Sheets and Views |
| Conceptual Site Plan |
File details come from the government source that posted it. Updated .