B-4866 Naples VDG Plans.pdf
PDF 26 MB Posted
- Attached to
- R-7278 Naples Seawall Vista Del Golfo Tiebacks
- Solicitation number
- PW-26-763
- Issued by
- Los Angeles County, California
About this file
This is a construction project plan document for the City of Long Beach Department of Public Works for the Naples Vista del Golfo (VDG) Tieback Cap Repair project located at 11-31 Vista del Golfo, Long Beach, California 90803. The project encompasses seawall tieback installation, pile cap repair, and associated waterfront structure improvements along approximately 379 linear feet of seawall. Primary work items include fabrication and installation of 71 tieback anchors with grouting, repair of existing pile cap cracks (55 linear feet), spall repairs (231 square feet), post pocket repairs (37 full repairs and 7 waterside repairs), placement of lightweight cellular concrete (56 cubic yards), grout anchor installation (58 cubic yards), removal and reinstallation of existing floating docks and gangways, access platform modifications, painting of seawall caps (330 linear feet), and site restoration. The work is divided into three additional bid items for concrete cap repair and painting from 1-7, 33-47, and 55-97 Vista del Golfo. Construction shall conform to the 2022 California Building Code, 2015 Standard Specifications for Public Works Construction (SSPWC Greenbook), and Title 18 of the Long Beach Municipal Code, with design by Tetra Tech, Inc.
The contractor is responsible for all mobilization, demobilization, materials, labor, equipment, and supervision required for complete project performance. Tieback anchor design loads are specified at 29 kips with lock-off loads of 22 kips, utilizing IBO/Titan Grade 75 high-strength steel rods and class I corrosion protection. Concrete repair materials include Sikacrete 211 SCC Plus, Sikatop 122 Plus, Sikatop 123 Plus, Sika Armatec 110 Epocem, and Sika Thorocoat 400, with Rust Oleum Marine Coatings for metal protection. All miscellaneous steel components must conform to ASTM standards and be hot-dip galvanized. The contractor must submit shop drawings and calculations stamped by a California-licensed professional engineer for tieback anchor systems and concrete cap form systems prior to fabrication. Environmental best management practices are required including containment booms, daily debris removal, spill prevention measures, eelgrass habitat avoidance, and preservation of existing landscaping. The contractor shall obtain all required permits and maintain public access throughout construction while providing adequate liability insurance and indemnification to the City of Long Beach.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
SITE
TI
TL
E
SH
EE
T
CITY OF LONG BEACH
PUBLIC WORKS
411 WEST OCEAN BLVD.
LONG BEACH, CA 90802
PROJECT DIRECTORY 1
CITY OF LONG BEACH
11-31 VISTA DEL GOLFO, LONG BEACH CA 90803
2VICINITY MAP
ACI AMERICAN CONCRETE INSTITUTE
ACQ ALKALINE COPPER QUATERNARY
ADA AMERICAN WITH DISABILITY ACT
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APWA AMERICAN PUBLIC WORKS ASSOCIATION
AWPI AMERICAN WOOD PRESERVERS INSTITUTE
BC BACK OF CURB
BMPS BEST MANAGEMENT PRACTICES
CF CUBIC FEET
CLB CITY OF LONG BEACH
CLR CLEAR
CONC CONCRETE
CONT CONTINUOUS
COR CORRECTED
DIA DIAMETER
DTL DETAIL
DW DOMESTIC WATER
(E) EXISTING
EL ELEVATION
FS FINISHED SURFACE
FW FIRE WATER
GA GALVANIZED
GHPS GOOD HOUSEKEEPING PRACTICES
GS GROUND SHOT
HDG HOT DIPPED GALVANIZED
IBO INJECTION BORE
LB POUNDS
LF LINEAR FEET
LW LIGHTWEIGHT
MAX MAXIMUM
MIN MINIMUM
MISC. MISCELLANEOUS
MLLW MEAN LOWER LOW WATER
(N) NEW
N.T.S. NOT TO SCALE
O.C. ON CENTER
PCC PORTLAND CEMENT CONCRETE
P.I.P. PROTECT IN PLACE
PP POST POCKET
R RADIUS
SEC SECTION
SF SQUARE FEET
SHT SHEET
SPAC SPACING
SSPWC STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
STD STANDARD
TB TIEBACK
TC TOP OF CURB
TW TOP OF WALL
TYP TYPICAL
W/ WITH
W/C WATER/CEMENT RATIO
VDG VISTA DEL GOLFO
ABBREVIATIONS
7SITE MAP/ STAGING AREA SCALE: N.T.S.
STAGING AREA
(FINAL LOCATION TO
BE DETERMINED BY
ENGINEER)
DESIGN CRITERIA
THE FOLLOWING DESIGN PARAMETERS HAVE BEEN USED IN THE DESIGN OF
THE STRUCTURAL SYSTEMS REPRESENTED IN THESE DRAWINGS.
A. CODE OF RECORD:: 2022 CBC
AUTHORITY HAVING JURISDICTION: CITY OF LONG BEACH
B. RISK CATEGORY: II
C. SEISMIC DESIGN PARAMETERS:
· SEISMIC SITE CLASS: D
· SEISMIC IMPORTANCE FACTOR: 1.0
· SEISMIC DESIGN CATEGORY: II
ASTM DESIGNATIONS, ICC REPORT REFERENCES, AND ALL STANDARDS
AND REFERENCED DOCUMENTS SHALL REFER TO THE LATEST EDITIONS
AND/OR AMENDMENTS AS ADOPTED BY THE CODE OF RECORD.
TETRA TECH, INC.
17885 VON KARMAN AVE SUITE 500
IRVINE, CA 92614
(949) 809-5000 www.tetratech.com
NAPLES VDG TIEBACK CAP REPAIR
SUBMITTAL ITEMS
1. CONSTRUCTION SCHEDULE
2. SCHEDULE OF VALUES
3. DOCK RELOCATION AND STORAGE PLAN
4. TIEBACK GROUTING PROCEDURES
5. VOID GROUTING PROCEDURES
6. TIEBACK TESTING PROCEDURES
7. TIEBACK ANCHOR GROUT
8. LIGHTWEIGHT CELLULAR CONCRETE
9. SIKACRETE 211 SCC PLUS OR APPROVED EQUAL
10. SIKATOP 122 PLUS OR APPROVED EQUAL
11. SIKATOP 123 PLUS OR APPROVED EQUAL
12. SIKA ARMATEC 110 EPOCEM OR APPROVED EQUAL
13. RUST OLEUM MARINE COATINGS - PRIMER FOR METAL
14. RUST OLEUM MARINE COATINGS -TOPSIDE PAINT
15. BMPS UTILITIES BY CONTRACTOR
16. DOCK MODIFICATION PLANS
SHOP DRAWINGS
CONTRACTOR TO SUBMIT SHOP DRAWINGS AND CALCULATIONS STAMPED BY A
PROFESSIONAL ENGINEER LICENSED IN THE STATE OF CALIFORNIA FOR THE
FOLLOWING:
1. TIEBACK ANCHOR SYSTEM
2. CONCRETE CAP FORM SYSTEM
DETAIL
A-A
SECTION NO.
SHT. SHOWN
ON
DETAIL NO.
SHT. SHOWN
ON
SHT. TAKEN
FROM
S-1
6NOTES
S-1
5APPLICABLE CODES
2025 EDITION OF THE CALIFORNIA BUILDING CODE
2015 SSPWC GREENBOOK
TITLE 18 OF THE LONG BEACH MUNICIPAL CODE
SECTION
SHEET INDEX
PROJECT DESCRIPTION
DEPARTMENT OF PUBLIC WORKS
A
PP
R O
VA
LS
W O
C
EA
N B
LV
D
LO
N G
B
EA
C H
C A
C
IT
Y
O F
LO
N
G B
EA
C
H
D
EP
A R
TM
EN
T O
F
PU
B
LI
C W
O R
K S
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
V
IS
TA
D
EL
G O
LF
O
, L O
N G
B
EA
C H
C A
DOCK AND GANGWAY
STORAGE LOCATION
(FINAL LOCATION TO
BE DETERMINED BY
ENGINEER AND CITY
OF LONG BEACH )
CONSTRUCTION NOTES
DWG REF. SHT # TITLE
T-1 1 TITLE SHEET
G-1 2 GENERAL NOTES
G-2 3 PEDESTRIAN ROUTING AND SIGNAGE PLAN
D-1 4 DEMOLITION PLAN
D-2 5 ACCESS PLATFORM REMOVE AND REPLACE (1)
D-3 6 ACCESS PLATFORM REMOVE AND REPLACE (2)
D-4 7 LANDSCAPING DEMOLITION (1)
D-5 8 LANDSCAPING DEMOLITION (2)
C-1 9 DOCK STORAGE PLAN
C-2 10 SURVEY PLAN
C-3 11 CIVIL LAYOUT
C-4 12 STRUCTURAL DETAILS - TIEBACK
C-5 13 11 VDG PILE CAP REPAIR PLAN AND PROFILE
C-6 14 15 VDG PILE CAP REPAIR PLAN AND PROFILE
C-7 15 19 VDG PILE CAP REPAIR PLAN AND PROFILE
C-8 16 23 VDG PILE CAP REPAIR PLAN AND PROFILE
C-9 17 25 VDG PILE CAP REPAIR PLAN AND PROFILE
C-10 18 27 VDG PILE CAP REPAIR PLAN AND PROFILE
C-11 19 29 VDG PILE CAP REPAIR PLAN AND PROFILE
C-12 20 31 VDG PILE CAP REPAIR PLAN AND PROFILE
C-13 21 PILE CAP REPAIR DETAILS (1)
C-14 22 PILE CAP REPAIR DETAILS (2)
C-15 23 PRODUCT DETAILS - SIKATOP 123 PLUS
C-16 24 PRODUCT DETAILS - SIKATOP 122 PLUS
C-17 25 PRODUCT DETAILS - SIKA CRETE 211 PLUS
C-18 26 PRODUCT DETAILS - SIKA ARMATEC 110 EPOCEM
C-19 27 PRODUCT DETAILS - SIKAFLEX 2C NS EZ MIX+
C-20 28 PRODUCT DETAILS - SIKAFLEX 429 PRIMER
C-21 29 PRODUCT DETAILS - SIKA THOROCOAT 400
C-22 30 PRODUCT DETAILS - RUST OLEUM - MARINE
COATINGS - PRIMER
C-23 31 PRODUCT DETAILS - RUST OLEUM - MARINE
COATINGS - PAINT
C-24 32 PRODUCT DETAILS - RUST OLEUM - STOPS RUST
THE WORK TO BE PERFORMED INCLUDES:
· CONTRACTOR MOBILIZATION AND DEMOBILIZATION
· BEST MANAGEMENT PRACTICES
· TEMPORARY FENCING AND PEDESTRIAN SIGNAGE
· REMOVE, STORE, AND REINSTALL EXISTING PRIVATE FLOATING DOCKS
AND GANGWAYS
· MODIFY DOCKS TO AVOID CONFLICT WITH ANCHOR RODS
· FABRICATE AND INSTALL TIEBACK
· REPAIR EXISTING HANDRAIL POST POCKETS
· REPAIR EXISTING PILE CAP CRACKS
· REPAIR EXISTING PILE CAP SPALLING
· REPAIR MISSING PILE CAP ON WATER SIDE
· PAINT PILE CAP
· JOB-SITE CLEAN-UP
· ALL MISCELLANEOUS ITEMS REQUIRED FOR A COMPLETE AND
THOROUGH INSTALLATION
· PLACE LIGHTWEIGHT CELLULAR CONCRETE
VISTA
DEL G
OLF
O
VISTA
D
EL G
OLF
O
1 7 11
PROJECT LIMITS
PILE CAP SPALL REPAIR, PER DETAIL 5 AND 6 ON SHT. C-13
(231 SF)
POST POCKET (PP) FULL REPAIR PER, DETAIL 1 AND 2 ON SHT.
C-13 (37 EA)
POST POCKET (PP) WATERSIDE REPAIR, PER DETAIL 1 AND 2
ON SHT. C-13 (7 EA)
PILE CAP CRACK REPAIR, PER DETAIL 4 ON SHT. C-13
(55 LF)
GRIND AND PATCH HORIZONTAL CONCRETE JOINT, PER
DETAIL 8 AND 9 ON SHT. C-13 (330 LF)
RESEAL EXPANSION JOINT, PER DETAIL 7 ON SHT. C-13
(12 EA)
DEMOLITION NOTES
1 PROTECT IN PLACE
REMOVE, STORE, AND REPLACE EXISTING
DOCKS AND GANGWAYS, SEE SHEET C-1
INSTALL TIEBACK PER SHEET C-4 (71 EA)1
SA
VO
NA
W
AL
K
CORSO DI NAPOLI
2 REPAIR PILE CAP PER CIVIL PLANS
GROUT ANCHOR FULL LENGTH (58 CY)2
PLACE LIGHTWEIGHT CELLULAR CONCRETE (56 CY)3
ADDITIVE ITEMS
PAINT SEAWALL CAP, PER DETAIL 10 ON SHT. C-13
(330 LF)
ADDITIONAL BID ITEM
1 TO 7 VISTA DEL GOLFO
ADDITIONAL BID ITEM
33 TO 47 VISTA DEL GOLFO
ADDITIONAL BID ITEM
55 TO 97 VISTA DEL GOLFO
4REFERENCE LEGEND
CONCRETE CAP REPAIR AND PAINTING FROM 1 TO 7
VISTA DEL GOLFO (83 LF)
A1
CONCRETE CAP REPAIR AND PAINTING FROM 33 TO 47
VISTA DEL GOLFO (170 LF)
A2
CONCRETE CAP REPAIR AND PAINTING FROM 55 TO 97
VISTA DEL GOLFO (379 LF)
A3
G
EN
ER
A
L N
O
TE
S
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
GENERAL NOTES
1. SEAWALL TIEBACK SHALL BE CONSTRUCTED IN ACCORDANCE WITH CURRENT CITY OF LONG BEACH PLANS AND
SPECIFICATIONS FOR CONSTRUCTION OF WATERFRONT STRUCTURES IN THE LONG BEACH MARINA AREA, WITH
EXCEPTIONS ALLOWED AS APPROVED BY THE ENGINEER.
2. THE CONTRACTOR SHALL FURNISH ALL TOOLS, EQUIPMENT, MATERIALS, AND SUPPLIES AND SHALL PERFORM ALL LABOR, SUPERVISION, FABRICATION, ASSEMBLY, AND INSTALLATION HEREIN.
3. THE CONTRACTOR SHALL PROVIDE BARRICADES, WARNING LIGHTS, AND NECESSARY SAFETY MEASURES TO ASSURE
PUBLIC SAFETY DURING CONSTRUCTION.
4. CONTRACTOR SHALL STRICTLY ENFORCE ALL APPLICABLE SAFETY LAWS (I.E. OSHA, CAL-OSHA) AND MAINTAIN SITE
SAFETY.
5. COPIES OF ALL PERMITS ARE AVAILABLE FROM THE CITY AND SHALL BE AVAILABLE FOR REFERENCE ON-SITE AT ALL
TIMES.
6. CONTRACTOR SHALL SUBMIT FOR APPROVAL PLANS FOR TEMPORARY FENCING AS REQUIRED. STAGING AREA SHALL BE CLEARED OF DEBRIS AND EQUIPMENT AND RESTORED TO THE ORIGINAL CONDITIONS UPON COMPLETION OF PROJECT.
7. CONTRACTOR SHALL EXAMINE THE JOBSITE BEFORE PREPARING SHOP DRAWINGS TO VERIFY ALL PHYSICAL CONDITIONS, SURROUNDINGS, DIMENSIONS AND DISTANCES.
8. THE CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT FROM DAMAGE ALL UNDERGROUND UTILITIES. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY AND ALL DAMAGES TO EXISTING STRUCTURES AND UTILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF EXISTING UTILITIES AND NOTIFY THE APPROPRIATE UTILITY COMPANIES AND UNDERGROUND SERVICE ALERT SUFFICIENTLY IN ADVANCE OF BEGINNING WORK.
ANY UTILITIES EXPOSED OR DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
9. THE CONTRACTOR SHALL EXERCISE EXTREME CARE IN WORKING NEAR EXISTING GANGWAY ABUTMENTS. THE EXISTING ABUTMENT SHALL BE PROTECTED-IN-PLACE. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO THE EXISTING ABUTMENT
CAUSED BY OR DURING THE PERFORMANCE OF WORK AT NO ADDITIONAL COST TO CLB.
10. THE CONTRACTOR SHALL COMPLY WITH ALL PERMITS FOR THE WORK. THE CONTRACTOR SHALL COMPLY WITH ALL STATE, COUNTY, AND CITY LAWS AND ORDINANCES RELATING TO SAFETY, CHARACTER OF WORK, EQUIPMENT AND LABOR PERSONNEL. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL CITY ORDINANCES, PROVISIONS OF ALL
APPLICABLE LOCAL AND REGIONAL GUIDELINES AND STANDARDS.
11. CONSTRUCTION SHALL CONFORM WITH THE 2022 EDITION OF THE CALIFORNIA BUILDING CODE, AMERICANS WITH DISABILITIES ACT (ADA), THE STATE OF CALIFORNIA DEPARTMENT OF BOATING AND WATERWAYS “LAYOUT & DESIGN GUIDELINES FOR MARINA FACILITIES” LATEST EDITION, 2024 EDITION OF STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (SSPWC GREENBOOK) AND ALL LOCAL AND STATE CODES AND ORDINANCES WHERE APPLICABLE.
12. THE CONTRACTOR SHALL MAINTAIN PUBLIC ACCESS TO ALL PROPERTY ADJACENT TO THE WORK AREA THROUGHOUT THE
PERIOD OF CONSTRUCTION.
13. THE CONTRACTOR SHALL KEEP DEBRIS, CONCRETE RUBBLE, AND OTHER MATERIALS FROM FALLING INTO THE WATER. IF, IN THE OPINION OF CLB, THE CONTRACTOR IS NOT IN COMPLIANCE, CONTAINMENT BOOMS SHALL BE PROVIDED BY THE CONTRACTOR. NO CONSTRUCTION MATERIALS, EQUIPMENT, DEBRIS, OR WASTE SHALL BE PLACED OR STORED WHERE IT MAY BE SUBJECT TO WAVE, WIND, OR RAIN EROSION AND DISPERSION. NON-BUOYANT DEBRIS DISCHARGED INTO COASTAL WATERS SHALL BE RECOVERED BY DIVERS AS SOON AS POSSIBLE AFTER LOSS BUT NO LATER THAN THE END
OF EACH DAY.
14. STAGING AREA SHALL BE CLEARED OF DEBRIS AND EQUIPMENT UPON COMPLETION OF PROJECT. THE CONTRACTOR SHALL REMOVE AND DISPOSE, USING AN APPROVED LEGAL METHOD, ALL SURPLUS MATERIALS AND DEBRIS FROM THE SITE. THE SURPLUS MATERIALS BELONG TO THE CONTRACTOR. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A NEAT
AND ORDERLY CONDITION AT ALL TIMES.
15. THE CONTRACTOR ASSUMES SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS AT ALL TIMES. THE CONTRACTOR SHALL PROVIDE ADEQUATE LIABILITY INSURANCE TO DEFEND, INDEMNIFY AND HOLD HARMLESS CLB FROM
ANY CLAIMS AND DAMAGES THAT MAY ARISE FROM THIS CONSTRUCTION.
16. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND DISTANCES AT THE SITE.
17. THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING ALL REQUIRED INSPECTIONS. THE PRESENCE OR ABSENCE OF A CITY OR OTHER INSPECTOR WILL NOT RELIEVE THE CONTRACTOR OF FULL RESPONSIBILITY FOR THE PROPER
PERFORMANCE OF WORK.
18. DUE TO THE SCALE OF THE DRAWINGS IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS, SLEEVES, ETC. THE CONTRACTOR SHALL INVESTIGATE THE FINISHED CONDITIONS AND PLAN WORK ACCORDINGLY, FURNISHING SUCH
FITTINGS, ETC., AS MAY BE REQUIRED TO MEET SUCH CONDITIONS.
19. ALL MATERIALS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE NOTED. ANY AND ALL CONSTRUCTION MATERIAL SHALL BE REMOVED FROM THE SITE WITHIN 10 DAYS OF COMPLETION OF CONSTRUCTION.
20. MACHINERY OR CONSTRUCTION MATERIALS NOT ESSENTIAL FOR PROJECT IMPROVEMENTS SHALL NOT BE ALLOWED IN
THE INTERTIDAL ZONE AT ANY TIME.
21. ANY OFF-SITE IMPROVEMENTS FOUND TO BE DAMAGED SHALL BE REPLACED TO THE SATISFACTION OF THE CITY
ENGINEER.
22. SHOP DRAWINGS MUST BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD PRIOR TO FABRICATION.
CONTRACTOR SHALL OBTAIN THIS APPROVAL.
MATERIALS:
1. MISCELLANEOUS METAL: ALL MISCELLANEOUS STEEL ITEMS SHALL CONFORM TO ASTM A36; FABRICATE IN ACCORDANCE
WITH AISC AND HDG AFTER FABRICATION IN ACCORDANCE WITH ASTM A123. ALL SCREWS, BOLTS, NUTS, AND LOCK WASHERS SHALL CONFORM TO ASTM A307 AND BE HDG IN ACCORDANCE WITH A153 UNLESS OTHERWISE NOTED. FLAT
WASHERS SHALL COMPLY WITH ANSI B27.2; AND BE HDG IN ACCORDANCE WITH ASTM A153.
2. STRUCTURAL STEEL SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) SPECIFICATION FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS. STEEL MEMBERS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A36 FOR SHAPES, PLATES, AND BARS, AND SHALL BE HDG IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A123.
3. ALL BOLTS SHALL BE MILD STEEL A307 BOLTS, SIZE AS INDICATED ON THE DRAWINGS. CARRIAGE BOLTS SHALL BE USED WHERE LOCATED ON THE EXPOSED FACE OF THE STRUCTURE. HEX HEAD BOLTS WITH WASHERS MAY BE SUBSTITUTED FOR CARRIAGE BOLTS AT NON-EXPOSED LOCATIONS. FASTENERS, NUTS, BOLTS, AND WASHERS SHALL BE HOT-DIPPED
GALVANIZED IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A153.
4. ALL MISCELLANEOUS STEEL PLATES SHALL CONFORM TO THE REQUIREMENTS OF ASTM A36 AND SHALL BE HDG IN
ACCORDANCE WITH THE REQUIREMENTS OF ASTM A123.
5. PROVIDE GROUT AS SHOWN ON THE DRAWINGS AND SPECIFICATIONS.
6. TIEBACK ANCHOR TENDONS
A. ANCHOR RODS SHALL BE IBO/TITAN 30
16 HIGH STRENGTH STEEL RODS.
B. ULTIMATE STRENGTH FULT = 49.5 KIPS
C. YIELD STRENGTH Fy = 40.5 KIPS
D. DESIGN LOAD = 29 KIPS
E. LOCK OFF LOAD = 22 KIPS
F. AT NO TIME DURING STRESSING AND REMOVAL OF JACKS SHALL PERSONS STAND IN LINE WITH THE ROD OR BEND
OVER ALREADY STRESSED ROD, SHOULD A ROD BREAK, SUCH BREAKAGE IS EXPLOSIVE AND CAN RESULT IN
SEVERE INJURY, OR DEATH
G. TEST ANCHOR PER POST TENSIONING INSTITUTE MANUAL.
12. GROUT MIX / NEAT CEMENT DESIGN
A. 1 SACK (94 LB) CEMENT TYPE I OR II CONFORMING TO ASTM C15 MIXED WITH 4.5-5 GALS. POTABLE WATER (W/C =
0.40 TO 0.45 BY WEIGHT) IN ACCORDANCE WITH THE POST TENSIONING INSTITUTE MANUAL.
13. CEMENT SLURRY BATCH
A. 1 SACK (94 LB) CEMENT TYPE I OR II CONFORMING TO ASTM C15 MIXED WITH 9-10 GALS. POTABLE WATER IN
ACCORDANCE WITH THE POST TENSIONING INSTITUTE MANUAL.
14. BATCHING AND GROUTING PROCEDURE.
A. THE MIX WILL BE BATCHED ON SITE, USING AN AIR DRIVEN MIXER UNIT, DISCHARGING INTO A HOLDING
TANK/AGITATOR UNIT OR DIRECTLY INTO THE PUMP.
B. THE GROUT WILL BE PUMPED BY AN AIR DRIVEN HENDERSON PISTON PUMP GROUT, PRESSURES WILL BE
MONITORED BY A DIAPHRAGM PROTECTED PRESSURE GAUGE AT THE OUTLET OF THE PUMP.
1. FILL MIXING UNIT WITH SPECIFIED WATER
2. ADD 1 SACK OF CEMENT
3. AGITATE THOROUGHLY UNTIL HOMOGENOUS MIX IS ACHIEVED
4. DISCHARGE GROUT INTO HOLDING TANK. AGITATE SLOWLY TO PREVENT SEGREGATION. PUMP GROUT INTO
BORE HOLE AS PER ABOVE ANCHOR INSTALLATION PROCEDURE
15. WALER / STRUT AND ROD CAP SPECIFICATION TO BE SUBMITTED BY CONTRACTOR
16. PILE CAP REPAIR PRODUCTS
A. SIKACRETE 211 OR APPROVED EQUAL
B. SIKATOP 122 OR APPROVED EQUAL
C. SIKATOP 123 OR APPROVED EQUAL
D. SIKA ARMATEC 110 OR APPROVED EQUAL
E. SIKAFLEX 2C NS EZ MIX+
F. SIKAFLEX 429 PRIMER
MARINE BEST MANAGEMENT PRACTICES
1. CONSTRUCTION RESPONSIBILITIES AND DEBRIS REMOVAL.
M. SPILL PREVENTION AND CONTROL MEASURES SHALL BE IMPLEMENTED TO ENSURE THE PROPER HANDLING AND STORAGE OF PETROLEUM PRODUCTS AND OTHER CONSTRUCTION MATERIALS. MEASURES SHALL INCLUDE A DESIGNATED FUELING AND VEHICLE MAINTENANCE AREA WITH APPROPRIATE BERMS AND PROTECTION TO PREVENT ANY SPILLAGE OF GASOLINE OR RELATED PETROLEUM PRODUCTS OR CONTACT WITH RUNOFF. THE AREA SHALL BE LOCATED AS FAR AWAY FROM THE RECEIVING WATERS AND STORM DRAIN INLETS AS POSSIBLE;
N. BEST MANAGEMENT PRACTICES (BMPS) AND GOOD HOUSEKEEPING PRACTICES (GHPS) DESIGNED TO PREVENT SPILLAGE AND/OR RUNOFF OF DEMOLITION OR CONSTRUCTION-RELATED MATERIALS, AND TO CONTAIN SEDIMENT OR CONTAMINANTS ASSOCIATED WITH DEMOLITION OR CONSTRUCTION ACTIVITY, SHALL BE
IMPLEMENTED PRIOR TO THE ON-SET OF SUCH ACTIVITY; AND
O. ALL BMPS SHALL BE MAINTAINED IN A FUNCTIONAL CONDITION THROUGHOUT THE DURATION OF CONSTRUCTION
ACTIVITY.
3. BEST MANAGEMENT PRACTICES (BMP) PROGRAM. THE PERMITTEE AGREES THAT THE DOCKING AND LAUNCHING OF BOAT(S) AT THE PUBLIC LAUNCH RAMP SHALL BE MANAGED IN A MANNER THAT PROTECTS WATER QUALITY PURSUANT TO THE
IMPLEMENTATION OF THE FOLLOWING BEST MANAGEMENT PRACTICES (BMPS):
A. BOAT CLEANING AND MAINTENANCE MEASURES:
i. IN-WATER TOP-SIDE AND BOTTOM-SIDE BOAT CLEANING SHALL MINIMIZE THE DISCHARGE OF SOAPS, PAINTS, AND DEBRIS;
ii. IN-THE-WATER HULL SCRAPING OR ANY PROCESS THAT OCCURS UNDER WATER THAT RESULTS IN THE
REMOVAL OF PAINT FROM BOAT HULLS SHALL BE PROHIBITED. ONLY DETERGENTS AND CLEANING COMPONENTS THAT ARE DESIGNATED BY THE MANUFACTURER AS PHOSPHATE-FREE AND BIODEGRADABLE
SHALL BE USED, AND THE AMOUNTS USED MINIMIZED.
B. SOLID AND LIQUID WASTE MANAGEMENT MEASURES:
i. ALL TRASH, RECYCLABLES, AND HAZARDOUS WASTES OR POTENTIAL WATER CONTAMINANTS, INCLUDING
OLD GASOLINE OR GASOLINE WITH WATER, ABSORBENT MATERIALS, OILY RAGS, LEAD ACID BATTERIES, ANTI-FREEZE, WASTE DIESEL, KEROSENE AND MINERAL SPIRITS SHALL NOT AT ANY TIME BE DISPOSED OF IN THE WATER OR GUTTER BUT, RATHER BE DISPOSED OF IN A MANNER CONSISTENT WITH STATE AND/OR
FEDERAL REGULATIONS.
C. PETROLEUM CONTROL MANAGEMENT MEASURES:
i. BOATERS WILL PRACTICE PREVENTIVE ENGINE MAINTENANCE AND WILL USE OIL ABSORBENTS IN THE BILGE
AND UNDER THE ENGINE TO PREVENT OIL AND FUEL DISCHARGES. OIL ABSORBENT MATERIALS SHALL BE EXAMINED AT LEAST ONCE A YEAR AND REPLACED AS NECESSARY. USED OIL ABSORBENTS ARE HAZARDOUS WASTE IN CALIFORNIA. USED OIL ABSORBENTS MUST THEREFORE BE DISPOSED IN ACCORDANCE WITH HAZARDOUS WASTE DISPOSAL REGULATIONS. THE BOATERS SHALL REGULARLY INSPECT AND MAINTAIN ENGINES, SEALS, GASKETS, LINES AND HOSES IN ORDER TO PREVENT OIL AND FUEL SPILLS. THE USE OF
SOAPS THAT CAN BE DISCHARGED BY BILGE PUMPS IS PROHIBITED;
ii. IF THE BILGE NEEDS MORE EXTENSIVE CLEANING (E.G., DUE TO SPILLS OF ENGINE FUELS, LUBRICANTS OR OTHER LIQUID MATERIALS), THE BOATERS WILL USE A BILGE PUMP-OUT FACILITY OR STEAM CLEANING SERVICES THAT RECOVER AND PROPERLY DISPOSE OR RECYCLE ALL CONTAMINATED LIQUIDS; AND BILGE CLEANERS WHICH CONTAIN DETERGENTS OR EMULSIFIERS WILL NOT BE USED FOR BILGE CLEANING
SINCE THEY MAY BE DISCHARGED TO SURFACE WATERS BY THE BILGE PUMPS.
GEOTECHNICAL DESIGN
1. GEOTECHNICAL ENGINEERING MEMORANDUM "VISTA DEL GOLFO SEAWALL TIE-BACK REPAIR 11 TO 31 VISTA DEL GOLFO, LONG BEACH, CALIFORNIA" DATED MAY 13, 2025, TETRA TECH PROJECT TET 25-0283 HAS BEEN INCLUDED IN THE SPECIFICATION FOR THIS PROJECT. CONTRACTOR SHALL COMPLY WITH RECOMMENDATIONS CONTAINED IN THE REPORT.
2. THE CONTRACTOR'S MEANS AND METHODS MUST ACCOUNT FOR SOIL CONDITIONS DESCRIBED IN THE GEOTECHNICAL ENGINEERING MEMORANDUM. DRILL HOLES MUST BE STABILIZED WITH CASING OR BY ANOTHER APPROVED METHOD.
https://usa.sika.com/dam/dms/us01/1/sc-cpd-Sikacrete211SCCPlus-us.pdf https://usa.sika.com/dam/dms/us01/2/sc-cpd-SikaTop122PLUS-us.pdf https://usa.sika.com/dam/dms/us01/4/sc-cpd-SikaTop123PLUS-us.pdf https://usa.sika.com/dam/dms/us01/0/sc-cpd-SikaArmatec110-srp-us.pdf and https://usa.sika.com/dam/dms/us01/d/sc-cpd-SikaArmatec110-bonding-us.pdf https://usa.sika.com/dam/dms/us01/7/sikaflex_-2c_ns_ezmix.pdf https://usa.sika.com/dam/dms/us01/x/sikaflex_primer-429.pdf
A. NO DEMOLITION OR CONSTRUCTION MATERIALS, EQUIPMENT, DEBRIS, OR WASTE SHALL BE PLACED OR STORED WHERE IT MAY ENTER SENSITIVE HABITAT, RECEIVING WATERS OR A STORM DRAIN, OR BE SUBJECT TO WAVE, WIND, RAIN OR TIDAL EROSION AND DISPERSION;
B. ANY AND ALL DEBRIS RESULTING FROM DEMOLITION OR CONSTRUCTION ACTIVITIES, AND ANY REMAINING
CONSTRUCTION MATERIAL, SHALL BE REMOVED AT THE END OF EACH DAY;
C. DEMOLITION OR CONSTRUCTION DEBRIS AND SEDIMENT SHALL BE REMOVED FROM WORK AREAS AT THE END OF EACH DAY THAT DEMOLITION OR CONSTRUCTION OCCURS TO PREVENT THE ACCUMULATION OF SEDIMENT AND
OTHER DEBRIS THAT MAY BE DISCHARGED INTO COASTAL WATERS;
D. MACHINERY OR CONSTRUCTION MATERIALS NOT ESSENTIAL FOR PROJECT IMPROVEMENTS WILL NOT BE
ALLOWED AT ANY TIME IN THE INTERTIDAL ZONE;
E. IF TURBID CONDITIONS ARE GENERATED DURING CONSTRUCTION A SILT CURTAIN WILL BE UTILIZED TO CONTROL
TURBIDITY;
F. FLOATING BOOMS WILL BE USED TO CONTAIN DEBRIS DISCHARGED INTO COASTAL WATERS AND ANY DEBRIS DISCHARGED WILL BE REMOVED AS SOON AS POSSIBLE BUT NO LATER THAN THE END OF EACH DAY;
G. NON BUOYANT DEBRIS DISCHARGED INTO COASTAL WATERS WILL BE RECOVERED BY DIVERS AS SOON AS
POSSIBLE AFTER LOSS;
H. ALL TRASH AND DEBRIS SHALL BE DISPOSED IN THE PROPER TRASH AND RECYCLING RECEPTACLES AT THE END
OF EVERY CONSTRUCTION DAY;
I. THE APPLICANT SHALL PROVIDE ADEQUATE DISPOSAL FACILITIES FOR SOLID WASTE, INCLUDING EXCESS
CONCRETE, PRODUCED DURING DEMOLITION OR CONSTRUCTION;
J. ALL STOCK PILES AND CONSTRUCTION MATERIALS SHALL BE COVERED, ENCLOSED ON ALL SIDES, SHALL BE LOCATED AS FAR AWAY AS POSSIBLE FROM DRAIN INLETS AND ANY WATERWAY, AND SHALL NOT BE STORED IN
CONTACT WITH THE SOIL;
K. MACHINERY AND EQUIPMENT SHALL BE MAINTAINED AND WASHED IN CONFINED AREAS SPECIFICALLY DESIGNED TO CONTROL RUNOFF. THINNERS OR SOLVENTS SHALL NOT BE DISCHARGED INTO SANITARY OR STORM SEWER
SYSTEMS;
L. THE DISCHARGE OF ANY HAZARDOUS MATERIALS INTO ANY RECEIVING WATERS SHALL BE PROHIBITED;
2. EELGRASS AVOIDANCE:
A. CONTRACTOR TO AVOID DIRECT EELGRASS IMPACTS BY LOCATING BARGES AND VESSELS AND ALL ANCHORING
OUTSIDE OF EELGRASS HABITAT.
B. CONTRACTOR TO AVOID SCOURING OF EELGRASS AND POTENTIAL EELGRASS HABITAT BY ANCHOR CHAIN DESIGNS, LOCATIONS OF BARGE AND VESSEL MOORINGS OUTSIDE OF EELGRASS HABITAT.
SEQUENCE OF WORK
THE CONTRACTOR SHALL FOLLOW THE FOLLOWING PROJECT PHASING:
1. DISCONNECT GANGWAY AND PLATFORM AND RELOCATE DOCK
2. DRILL ANCHOR HOLES
3. INSTALL ANCHORS AND BEARING BRACKETS - HAND TIGHTEN ANCHOR NUT
4. INSTALL LOW DENSITY CONCRETE
5. ANCHOR STRESSING AND LOCK OFF
6. CONCRETE PILE CAP REPAIRS
7. CONTRACTOR TO START TIE-BACK INSTALLATION ON WEST END, STATION 11+63, SEE SHEET C-3
8. REINSTALL DOCK, GANGWAY, AND PLATFORM. DOCKS SHALL BE MODIFIED AS REQUIRED TO
CLEAR THE PROJECTION OF THE TIEBACK FACE PLATE.
9. RECONNECT UTILITIES
STRUCTURAL LOADING
THE LIVE LOADS USED IN THE DESIGN OF THIS STRUCTURE ARE IN ACCORDANCE WITH THE "PLANS AND SPECIFICATIONS NO.
R-4563 FOR THE CONSTRUCTION OF WATERFRONT STRUCTURES IN THE LONG BEACH MARINA AREA" AS FOLLOWS:
ULTIMATE BOND STRENGTH FOR PRESSURE GROUTED ANCHOR = 12 PSI
BOND LENGTH = 26 FT
DOCK MODIFICATIONS
1. MODIFY DOCK PILE GUIDE LOCATIONS TO ALLOW DOCK TO PASS THE NEW TIEBACK ANCHOR
HEADS BY A MINIMUM OF 4".
2. CONTRACTOR TO SUBMIT A MODIFICATION PLAN FOR EACH DOCK TO THE CITY FOR APPROVAL.
3. CONTRACTOR TO ATTEND PRE-CONSTRUCTION SITE WALK WITH CITY TO DOCUMENT THE
CLEARANCE BETWEEN EACH DOCK AND THE PILE CAP AND TO IDENTIFY WHAT DOCKS WILL
REQUIRE MODIFICATIONS.
4. CONTRACTOR TO MATCH DOCK DECKING.
5. CONTRACTOR TO USE LIKE SIZED NON-INCISED PRESSURE TREATED DOUGLAS-FIR TIMBER FOR
FRAMING, BLOCKING, AND WHALER BOARDS.
6. CONTRACTOR TO USE HOT DIPPED GALVANIZED HARDWARE AND BRACKETS.
PROJECT AREA
PEDESTRIAN DETOUR ROUTE
RIGHT OF WAY
3 BEGIN
3 END
PE
D
ES
TR
IA
N
R O
U
TI
N G
A N
D S
IG
N
A G
E
PL
A N
PEDESTRIAN ROUTING AND SIGNAGE PLAN
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
0 5050
SCALE: 1" = 100'
PEDESTRIAN ROUTING NOTES:
1. CONTRACTOR IS TO SUBMITT FINAL PEDESTRIAN ROUTING AND SIGNAGE PLANS.
2. PEDESTRIAN PLAN IS TO BE COMPLIANT WITH CURRENT AMERICAN WITH DISABILITY ACT (ADA STANDARDS)
3. SIGNAGE IS TO BE PLACED ON LOOSE A-FRAME ON THE SIDEWALK VISTA
DEL G
OLF
O
VISTA
D
EL G
OLF
O
S
AV
O
NA
W
AL
K
E LI
DO LN
IONIA WALK
E LI
DO LN
GIR
ALD
A W
ALK
GIR
ALD
A W
ALK
PUBLIC WORKS
CONSTRUCTION
CONSTRUCTION UNDERWAY
EST COMPLETE: TDB
PROJECT INFO:
3'
3'
VISTA DEL GOLFO
SEAWALL AND PILE CAP REPAIR
562 570 6383
DETAIL 1 - CONSTRUCTION UNDERWAY SIGN
SCALE: N.T.S.
NOTES:
· BASED ON CITY OF LONG BEACH STANDARD PLAN NO.136
DETAIL 2 - DETOUR SIGN
SCALE: N.T.S.
NOTES:
· CAL TRANS SIGN M4-9 (CALIFORNIA MUTCD TEMPORARY
TRAFFIC CONTROL SIGNS)
2'
2'
DETOUR AND PEDESTRIAN ROUTING NOTES
1 INSTALL CONSTRUCTION UNDERWAY SIGN PER DETAIL 1 (2 EA)
2 INSTALL DETAIL SIGN PER DETAIL 2 (4 EA)
SCALE: 1" = 100'
LEGEND
PEDESTRIAN PATH
RIGHT OF WAY
PROJECT AREA
CONSTRUCTION FENCING NOTES:
1. CONSTRUCTION FENCING IS TO BE AT THE ENDS OF THE CONSTRUCTION SITE ON THE SIDEWALK, FENCING IS
TO BE ON THE BACK OF SIDEWALK RESTRICTING HOMEOWNER SIDEWALK ACCESS.
2. CONSTRUCTION GRAPHIC SCREENS SHOULD BE USED AT ENDS AND ALONG ALL CONSTRUCTION FENCING
3 INSTALL CONSTRUCTION FENCING AND SCREENS (~350 LF)
7/11 VISTA DEL GOLFO PROPERTY LINE
31/33 VISTA DEL
GOLFO PROPERTY LINE
5 VDG 7 VDG
11 VDG
15 VDG
19 VDG
23 VDG
25 VDG
27 VDG
29 VDG
31 VDG
33 VDG
PROJECT LIMITS
2 BEGIN
2 END
GUARD RAIL
AND POSTS
(TYP)
SEAWALL (TYP)
1 PCC PILES (TYP)
DOCK (TYP)
RIGHT OF WAY LINE
(TYP)
PCC SIDEWALK
(TYP)
RESIDENCE
(TYP)
LANDING
SEE DETAIL 1 AND 2
THIS SHEET (TYP)
PLANTER WALL
(TYP)
1 LANDSCAPED PLANTER (TYP)
PROPERTY LINE (TYP)
D
EM
O
LI
TI
O
N P
LA
N
0 1010
SCALE: 1" = 20'
DEMOLITION PLAN
DEMOLITION
1 PROTECT IN PLACE
REMOVE, STORE, AND REPLACE EXISTING
DOCKS AND GANGWAYS (11 VDG TO 31 VDG),
SEE SHEET C-1
DEMOLITION NOTES
1. PROTECT IN PLACE ALL EXISTING STRUCTURES
INCLUDING EXISTING SEAWALL AND PILES
2. REMOVE, STORE, AND REPLACE EXISTING FLOATING
DOCKS, AND GANGWAY PER DETAILS ON SHEET D-2
AND D-3
3. CONTRACTOR SHALL SCHEDULE AND COORDINATE
CONSTRUCTION AND DEMOLITION/REMOVAL WITH THE
CITY
4. INSTALL 6' TEMPORARY SCREENED SECURITY FENCE
AROUND CONTRACTOR STAGING AREA. CONTRACTOR IS
RESPONSIBLE FOR SECURITY OF STAGING AREA.
CONTRACTOR TO USE TYPICAL BLUE SCREEN PANELS.
STAGING AREA AND PROJECT SITE TO BE RESTORED TO
EXISTING OR BETTER CONDITION AFTER CONSTRUCTION.
5. ELECTRICAL UTILITIES ARE TO BE DISCONNECTED AND
RECONNECTED BY THE CONTRACTOR. LOCATION OF
ELECTRICAL UTILITIES ARE TO BE DETERMINED BY
CONTRACTOR
6. WATER UTILITIES ARE TO BE DISCONNECTED AND
RECONNECTED BY THE CONTRACTOR. LOCATION OF
WATER UTILITIES ARE TO BE DETERMINED BY
CONTRACTOR
7. SEE SHEETS D-2, D-3, AND C-28 FOR ACCESS PLATFORM
REMOVAL AND REPLACEMENT
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
2 REPAIR PILE CAP PER CIVIL PLANS
SCALE: 1" = 20'
A C
C
ES
S
PL
A
TF
O R
M R
EM
O
VE
A
N D
R
EP
LA
C
E (1
11 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. CUT 3" X 3" "L" BRACKETS WITH TORCH
4. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
5. RECONNECT AND WELD 3" X 3" "L" BRACKETS
6. GRIND, PRIME, AND PAINT BRACKETS (COLOR WHITE) PER SHEET C-22 AND C-23
7. REINSTALL DECKING
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
ELECTRICAL UTILITY
1. CONFIRM, BLOCK OUT, TAG OUT POWER SUPPLY
2. BREAK ELECTRICAL CONDUIT BELOW 90° COUPLING
3. REMOVE JUNCTION BOX, MOUNTING SCREWS AND CABLE STRAPS
4. RELOCATE CONDUIT AND CONDUCTOR TO ALLOW FOR CAP REPAIR
5. RELOCATE ALL ELECTRICAL COMPONENTS TO ORIGINAL LOCATIONS
6. RECONNECT ELECTRICAL LINE AT 90° COUPLING
7. REINSTALL JUNCTION BOX AND CABLE STRAPS
8. TURN ON POWER SUPPLY
CUT "L" BRACKET
CUT ELECTRICAL
CONDUIT AND 12"
WATER LINE
JUNCTION BOX
MOUNTING SCREWS
AND STRAPS
0.5" WATER UTILITY COPPER LINE
1. CONFIRM WATER LINE IS TURNED OFF AT MAIN VALVE
2. CUT WATERLINE BELOW 90° COUPLING
3. REMOVE TO ALLOW FOR CAP REPAIR
4. RELOCATE WATER LINE TO ALLOW FOR CAP REPAIR
5. RELOCATE WATER LINE COMPONENTS TO ORIGINAL LOCATIONS
6. RECONNECT WATER LINE WITH NEWLY SOUTTERED COUPLING
7. TURN WATER LINE ON
CUT COPPER
DISCHARGE
LINES
WATER UTILITY COPPER DISCHARGE LINE
1. CUT DISCHARGE LINE BELOW 90° COUPLING
2. REMOVE TO ALLOW FOR CAP REPAIR
3. RELOCATE DISCHARGE LINE TO ALLOW FOR CAP REPAIR
4. RELOCATE DISCHARGE LINE COMPONENTS TO ORIGINAL LOCATIONS
5. RECONNECT DISCHARGE LINE WITH NEWLY SOUTTERED COUPLING
15 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. CUT 3" X 3" "L" BRACKETS WITH TORCH
4. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
5. RECONNECT AND WELD 3" X 3" "L" BRACKETS
6. GRIND, PRIME, AND PAINT BRACKETS (COLOR GRAY) PER SHEET C-22 AND C-23
7. REINSTALL DECKING
TIMBER SUPPORT
CUT "L" BRACKET
19 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. CUT 2" X 2" PIPES WITH TORCH
4. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
5. RECONNECT AND WELD 2" X 2" PIPES
6. GRIND AND SPRAY GALVANIZING SPRAY PER SHEET C-24
7. REINSTALL DECKING
23 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. CUT 3" X 3" SUPPORT BRACKETS WITH TORCH
4. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
5. RECONNECT AND WELD 3" X 3" SUPPORT BRACKETS
6. GRIND, PRIME, AND PAINT BRACKETS (COLOR WHITE) PER SHEET C-22 AND C-23
7. REINSTALL DECKING
CUT SUPPORT
BRACKET
25 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. CUT 4" X 6" SUPPORT BRACKETS WITH TORCH
4. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
5. RECONNECT AND WELD 4" X 6" SUPPORT BRACKETS
6. GRIND AND SPRAY GALVANIZING SPRAY PER SHEET C-24
7. REINSTALL DECKING
CUT SUPPORT
BRACKET
0.5" WATER UTILITY COPPER LINE
1. CONFIRM WATER LINE IS TURNED OFF AT MAIN VALVE
2. CUT WATERLINE BELOW 90° COUPLING
3. REMOVE TO ALLOW FOR CAP REPAIR
4. RELOCATE WATER LINE TO ALLOW FOR CAP REPAIR
5. RELOCATE WATER LINE COMPONENTS TO ORIGINAL LOCATIONS
6. RECONNECT WATER LINE WITH NEWLY SOUTTERED COUPLING
7. TURN WATER LINE ON
WATER UTILITY COPPER DISCHARGE LINE
1. CUT DISCHARGE LINE BELOW 90° COUPLING
2. REMOVE TO ALLOW FOR CAP REPAIR
3. RELOCATE DISCHARGE LINE TO ALLOW FOR CAP REPAIR
4. RELOCATE DISCHARGE LINE COMPONENTS TO ORIGINAL LOCATIONS
5. RECONNECT DISCHARGE LINE WITH NEWLY SOUTTERED COUPLING
MOUNTING SCREWS
AND STRAPS
CUT COPPER
DISCHARGE AND
2" WATER LINE
CUT SUPPORT PIPES
C
C
ES
S
PL
A
TF
O R
M R
EM
O
VE
A
N D
R
EP
LA
C
E (2
27 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. CUT 2" DIAMETER SUPPORT PIPES WITH TORCH
4. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
5. RECONNECT AND WELD 2" DIAMETER SUPPORT PIPES
6. GRIND, PRIME, AND PAINT PIPES (COLOR WHITE) PER SHEETS C-22 AND C-23
7. REINSTALL DECKING
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
ELECTRICAL UTILITY
1. CONFIRM, BLOCK OUT, TAG OUT POWER SUPPLY
2. UNPLUG EXTENSION CORD
3. BREAK ELECTRICAL CONDUIT COUPLING
4. REMOVE JUNCTION BOX, MOUNTING SCREWS AND CABLE STRAPS
5. RELOCATE CONDUIT AND CONDUCTOR TO ALLOW FOR CAP REPAIR
6. RELOCATE ALL ELECTRICAL COMPONENTS TO ORIGINAL LOCATIONS
7. RECONNECT ELECTRICAL LINE AT COUPLING
8. REINSTALL JUNCTION BOX AND CABLE STRAPS
9. PLUG IN EXTENSION CORD
10.TURN ON POWER SUPPLY
CUT 2" DIAMETER
SUPPORT PIPES
CUT ELECTRICAL
CONDUIT
MOUNTING SCREWS
AND STRAPS
0.5" WATER UTILITY COPPER LINE
1. CONFIRM WATER LINE IS TURNED OFF AT MAIN VALVE
2. CUT WATERLINE BELOW 90° COUPLING
3. REMOVE TO ALLOW FOR CAP REPAIR
4. RELOCATE WATER LINE TO ALLOW FOR CAP REPAIR
5. RELOCATE WATER LINE COMPONENTS TO ORIGINAL LOCATIONS
6. RECONNECT WATER LINE WITH NEWLY SOUTTERED COUPLING
7. TURN WATER LINE ON
29 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. CUT 2" X 2" SUPPORT PIPES WITH TORCH
4. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
5. RECONNECT AND WELD 2" X 2" SUPPORT PIPES WITH TORCH
6. GRIND AND SPRAY GALVANIZING SPRAY PER SHEET C-24
7. REINSTALL DECKING
CUT 2" X 2"
SUPPORT PIPES
31 VISTA DEL GOLFO
ACCESS PLATFORM
1. UNLATCH AND PLACE GANGWAY ON DOCK
2. REMOVE DECKING AS NEEDED
3. REMOVE TIMER SUPPORT
4. CUT 3" X 3" "L" BRACKETS WITH TORCH
5. REMOVE ACCESS PLATFORM FOR CONSTRUCTION
6. RECONNECT AND WELD 3" X 3" "L" BRACKETS
7. GRIND, PRIME, AND PAINT BRACKETS (COLOR WHITE) PER SHEETS C-22 AND C-23
8. REINSTALL DECKING
CUT 12" WATER
LINE
EXTENSION CORD
MOUNTING SCREWS
AND STRAPS
ELECTRICAL UTILITY
1. CONFIRM, BLOCK OUT, TAG OUT POWER SUPPLY
2. BREAK ELECTRICAL CONDUIT COUPLING
3. REMOVE JUNCTION BOX, MOUNTING SCREWS AND CABLE STRAPS
4. RELOCATE CONDUIT AND CONDUCTOR TO ALLOW FOR CAP REPAIR
5. RELOCATE ALL ELECTRICAL COMPONENTS TO ORIGINAL LOCATIONS
6. RECONNECT ELECTRICAL LINE AT COUPLING
7. REINSTALL JUNCTION BOX AND CABLE STRAPS
8. TURN ON POWER SUPPLY
CUT ELECTRICAL
CONDUIT
CUT 12" WATER
LINE
0.5" WATER UTILITY COPPER LINE
1. CONFIRM WATER LINE IS TURNED OFF AT MAIN VALVE
2. CUT WATERLINE BELOW 90° COUPLING
3. REMOVE TO ALLOW FOR CAP REPAIR
4. RELOCATE WATER LINE TO ALLOW FOR CAP REPAIR
5. RELOCATE WATER LINE COMPONENTS TO ORIGINAL LOCATIONS
6. RECONNECT WATER LINE WITH NEWLY SOUTTERED COUPLING
7. TURN WATER LINE ON
CUT 12" WATER
LINE
CUT 3" X 3" "L"
BRACKETS
CUT 3" X 3" "L"
BRACKETS
MOUNTING SCREWS
AND STRAPS
ELECTRICAL UTILITY
1. CONFIRM, BLOCK OUT, TAG OUT POWER SUPPLY
2. BREAK ELECTRICAL CONDUIT COUPLING
3. REMOVE JUNCTION BOX, MOUNTING SCREWS AND CABLE STRAPS
4. RELOCATE CONDUIT AND CONDUCTOR TO ALLOW FOR CAP REPAIR
5. RELOCATE ALL ELECTRICAL COMPONENTS TO ORIGINAL LOCATIONS
6. RECONNECT ELECTRICAL LINE AT COUPLING
7. REINSTALL JUNCTION BOX AND CABLE STRAPS
8. TURN ON POWER SUPPLY
CUT ELECTRICAL
CONDUIT
LA
N
D
SC
A
PI
N G
D
EM
O
LI
TI
O
N (1
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
11 VISTA DEL GOLFO
APPROXIMATE IMPACT
FOR WALL PAINTING
15 VISTA DEL GOLFO
19 VISTA DEL GOLFO
NOTES:
CONTRACTOR TO PAINT PILE CAP 3" BELOW ADJACENT GRADE AT LANDSCAPING
PER DETAIL 10 ON SHEET C-13. CONTRACTOR SHALL EXCAVATE AND BACKFILL
EXISTING SOIL AND LANDSCAPING BY HAND AND SHALL MAKE ALL EFFORTS TO
PRESERVE EXISTING LANDSCAPING AND IRRIGATION WITHIN THE IMPACTED
AREA.
19 VISTA DEL GOLFO
APPROXIMATE IMPACT
FOR WALL PAINTING
APPROXIMATE IMPACT
FOR WALL PAINTING APPROXIMATE IMPACT
FOR WALL PAINTING
NOTES:
CONTRACTOR TO PAINT PILE CAP 3" BELOW ADJACENT GRADE AT LANDSCAPING
PER DETAIL 10 ON SHEET C-13. CONTRACTOR SHALL EXCAVATE AND BACKFILL
EXISTING SOIL AND LANDSCAPING BY HAND AND SHALL MAKE ALL EFFORTS TO
PRESERVE EXISTING LANDSCAPING AND IRRIGATION WITHIN THE IMPACTED
AREA.
NOTES:
CONTRACTOR TO PAINT PILE CAP 3" BELOW ADJACENT GRADE AT LANDSCAPING
PER DETAIL 10 ON SHEET C-13. CONTRACTOR SHALL EXCAVATE AND BACKFILL
EXISTING SOIL AND LANDSCAPING BY HAND AND SHALL MAKE ALL EFFORTS TO
PRESERVE EXISTING LANDSCAPING AND IRRIGATION WITHIN THE IMPACTED
AREA.
NOTES:
CONTRACTOR TO PAINT PILE CAP 3" BELOW ADJACENT GRADE AT LANDSCAPING
PER DETAIL 10 ON SHEET C-13. CONTRACTOR SHALL EXCAVATE AND BACKFILL
EXISTING SOIL AND LANDSCAPING BY HAND AND SHALL MAKE ALL EFFORTS TO
PRESERVE EXISTING LANDSCAPING AND IRRIGATION WITHIN THE IMPACTED
AREA.
LA
D
SC
A
PI
N G
D
EM
O
LI
TI
O
N (2
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
25 VISTA DEL GOLFO
APPROXIMATE IMPACT
FOR WALL PAINTING
27 VISTA DEL GOLFO
OWNER TO MOVE STATUE
OUTSIDE OF 6 INCHES OF
BACK OF PILE CAP
29 VISTA DEL GOLFO 31 VISTA DEL GOLFO
APPROXIMATE IMPACT
FOR WALL PAINTING
APPROXIMATE IMPACT
FOR WALL PAINTING
APPROXIMATE IMPACT
FOR WALL PAINTING
NOTES:
CONTRACTOR TO PAINT PILE CAP 3" BELOW ADJACENT GRADE AT LANDSCAPING
PER DETAIL 10 ON SHEET C-13. CONTRACTOR SHALL EXCAVATE AND BACKFILL
EXISTING SOIL AND LANDSCAPING BY HAND AND SHALL MAKE ALL EFFORTS TO
PRESERVE EXISTING LANDSCAPING AND IRRIGATION WITHIN THE IMPACTED
AREA.
NOTES:
CONTRACTOR TO PAINT PILE CAP 3" BELOW ADJACENT GRADE AT LANDSCAPING
PER DETAIL 10 ON SHEET C-13. CONTRACTOR SHALL EXCAVATE AND BACKFILL
EXISTING SOIL AND LANDSCAPING BY HAND AND SHALL MAKE ALL EFFORTS TO
PRESERVE EXISTING LANDSCAPING AND IRRIGATION WITHIN THE IMPACTED
AREA.
NOTES:
CONTRACTOR TO PAINT PILE CAP 3" BELOW ADJACENT GRADE AT LANDSCAPING
PER DETAIL 10 ON SHEET C-13. CONTRACTOR SHALL EXCAVATE AND BACKFILL
EXISTING SOIL AND LANDSCAPING BY HAND AND SHALL MAKE ALL EFFORTS TO
PRESERVE EXISTING LANDSCAPING AND IRRIGATION WITHIN THE IMPACTED
AREA.
NOTES:
CONCRETE LANDSCAPING AREA IS TO REMAIN IN PLACE.
DOCK STORAGE AREA TO
BE DETERMINED BY
CONTRACTOR IN FIELD
(~6,000 SF)
xx
75'
80'
CONTRACTOR TO SECTION OFF
WATERSIDE CONSTRUCTION WITH
ROPE AND BUOYS
D O
C K
S
TO
R A
G E
PL
A
N
0 2525
SCALE: 1" = 50'
50DOCK STORAGE PLAN
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
STORAGE NOTES:
1. EXISTING BOATS SHALL BE MOVED AND TEMPORARILY STORED IN THE LONG BEACH MARINA PRIOR TO CONSTRUCTION.
PRIVATE PROPERTY OWNER IS RESPONSIBLE TO MOVE BOATS TO TEMPORARY DOCKING LOCATION PROVIDED BY THE
CITY OF LONG BEACH.
2. EXISTING BOAT DOCKS SHALL BE TEMPORARILY STORED IN A DESIGNATED STORAGE LOCATION AND SHALL NOT BE USED
FOR CONSTRUCTION ACTIVITIES
3. SHUT OFF AND DISCONNECT ELECTRICAL SERVICE TO PRIVATE DOCKS PRIOR TO REMOVAL. COORDINATION WITH HOMEOWNERS MAY BE REQUIRED. RECONNECT ELECTRICAL SERVICE UPON REINSTALLATION OF DOCK.
4. SHUT OFF AND DISCONNECT WATER SERVICE TO PRIVATE DOCKS. COORDINATION WITH HOMEOWNERS MAY BE
REQUIRED. RECONNECT WATER SERVICE UPON REINSTALLATION OF DOCK.
5. APPROXIMATELY 6,000 TO 7,000 SF OF SPACE IS NEED FOR DOCK RELOCATION. THE DEPARTMENT OF PARKS, RECREATION, AND MARINE HAVE BEEN NOTIFIED OF PROJECT AND HAVE STATED EXTRA SPACE FOR DOCKS IS AVAILABLE
AND WILL BE PROVIDED AS NEEDED.
6. CONTRACTOR IS TO PROVIDE SAFETY LIGHTING AND SIGNAGE FOR DOCK STORAGE LOCATIONS. CONTRACTOR IS TO PLACE YELLOW BUOYS (4 MIN.) WITH FLASHING YELLOW LIGHTS (4 MIN.) AROUND THE DOCKS, IN ADDITION TO YELLOW
FLASHING LIGHTS ON THE DOCK.
7. ALL DOCKS SHOULD BE RELOCATED AT ONCE IN ORDER TO AVOID PHASED WORK.
MARINE BEST MANAGEMENT PRACTICES
SEE SHEET G-1 FOR MARINE BEST MANAGEMENT PRACTICES
xx xx
-1 0.0
-1 4.
-1 3.0
-1 2.0
-1 1.0
-9 .00
-8 .00
-9.
-8.
-7.
-6.
-10.000
-9.
-8.
-7.
-6.
-7 .00
-1 0.0
-9 .00
-8 .00
-7 .00
-6 .00
-5 .00
5 VDG 7 VDG
11 VDG
15 VDG
19 VDG
23 VDG
25 VDG
27 VDG
29 VDG
31 VDG
33 VDG
35 VDG
7/
V
IS
TA
D
EL
G
OLF
O P
RO
PE
RT
Y
LI
NE
/3
V
IS
TA
D
EL
G
OLF
O P
RO
PE
RT
Y
LI
NE
PR
OJE
CT
L
IM
IT
S
PR
OJE
CT
L
IM
IT
S
SU
R
VE
Y
PL
A
N
0 1010
SCALE: 1" = 20'
SURVEY PLAN
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
SURVEY NOTES
BASIS OF BEARING
THE BASIS OF BEARING FOR THIS SURVEY IS THE CALIFORNIA
COORDINATE SYSTEM, ZONE 5, NAD 83 EPOCH 2017.50
BENCHMARK
CITY OF LONG BEACH 218 S
SAVONA WALK @ CORSO DI NAPOLI
BRASS DISC IN SEAWALL 15.4' E / CL / SAVONA WLK
EL = 5.665'
MLLW ADJUSTED EL = 8.465'
GENERAL NOTES
SITE MONITORING CONTROL VALUES ESTABLISHED ON AUGUST
22ND, 2024
ADJUSTMENT FROM NAD 83 TO MLLW DATUM (+2.8')
MEAN LOWER LOW WATER SURFACE (MLLW) = 0.0'
CONTRACTOR SHALL VERIFY LOCATION OF DOCK GUIDE PILINGS
AND ACCESS PLATFORMS AND SHALL CONTACT ENGINEER OF
RECORD IF LOCATIONS VARIES FROM RECORD SURVEY.
EXISTING GUARDRAIL
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
LEGEND
EXISTING CONCRETE LIMITS
EXISTING PLANTER LIMITS
EXISTING DOCKS
EXISTING DOCK PILES
7/11 VISTA DEL GOLFO PROPERTY LINE
31/33 VISTA DEL GOLFO PROPERTY LINE
1 VDG
5 VDG
7 VDG
11 VDG
15 VDG
19 VDG
23 VDG
25 VDG 27 VDG 29 VDG
31 VDG
33 VDG
35 VDG
BASE BID PROJECT SCOPE
EN
D
LAST
EXISTING
TIEBACK
PROPOSED TIEBACK (TYP.)
PROJECT LIMITS
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
33'-8"
TYP.
22'-0"
TYP.
C-
3/ C-
BE
GIN
BEGIN PILE CAP REPAIR
END PILE CAP REPAIR
10+00
11+00
12+00
13+00 14+00 15+00
10+50
11+50
12+50
13+50 14+50
15+50
RIGHT OF WAY
RIGHT OF WAY
TB
EXISTING DOCK GUIDE PILES (TYP.)
ST
AT
IO
N
+6
ST
AT
IO
N
4+
.5
C
IV
IL
L
A
YO
U T
0 1010
SCALE: 1" = 20'
CONSTRUCTION NOTES
INSTALL TIEBACK PER SHEET C-41
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
NOTE:
CONTRACTOR IS TO VERIFY LOCATION OF DOCK GUIDE PILINGS AND ACCESS PLATFORMS AND IS TO
CONTACT ENGINEER OF RECORD IF LOCATIONS VARIES FROM RECORD SURVEY.
SCALE: 1" = 20'
CIVIL PLAN
GROUT ANCHOR FULL LENGTH PER SHEET C-42
PLACE LIGHTWEIGHT CELLULAR CONCRETE3
DOCK RE-INSTALLATION NOTES:
DOCKS SHALL BE MODIFIED AS REQUIRED TO CLEAR THE
PROJECTION OF THE TIEBACK FACE PLATE. CONTRACTOR SHALL
SUBMIT DOCK MODIFICATION DETAILS TO ENGINEER AND CITY OF
LONG BEACH FOR REVIEW.
NOTES:
1. FILL GAP BETWEEN SOIL AND BACK OF WALL WITH LIGHTWEIGHT CELLULAR
CONCRETE PER SPECIFICATIONS.
2. PROVIDE STRESSING STEEL WITH PTI CLASS I CORROSION PROTECTION
3. ANCHOR PRESTRESS LOADS:
DESIGN LOAD: 29 KIPS
LOCK-OFF LOAD: 22 KIPS
4. CONTRACTOR TO DETERMINE REQUIRED ANCHOR BONDED ZONE LENGTH
AND GROUTING PRESSURE BASED ON THE IN SITU MATERIAL PROPERTIES
AND THE ANCHOR LOADS. REFER TO THE GEOTECHNICAL ENGINEERING
MEMORANDUM IN THE SPECIFICATIONS.
38'-10"
-6.2'
MUDLINE
12' - 10" TYP.
UNBONDED ANCHOR
STRESSING LENGTH
SLEEVED IN PVC PIPE
26'-0" MIN.
BOND LENGTH
GROUT FULL
LENGTH
TIEBACK ANCHOR
SEE DETAIL 230°
ELEV. +3.5'
ELEV. +7.5'
ELEV. +9.0'
MLLW +0.0'
ELEV. -18'
STESSING ANCHORAGE
AND BEARING
15'-0"
RIGHT OF WAY
GROUT BULB
ELEV. +9.0'
ELEV. +7.5'
ELEV. +7.0' (±)
EXIST. GRADE
CENTRALIZER
ELEV. +3.5'
6" Ø MAX HOLE IN SHEET PILE
(CORE DRILLED)
30°
℄ 5" CORED HOLE
PVC PIPE SLEEVE AT FREE LENGTH
GROUT TUBE
STRESSING STEEL #7
GRADE 75 ALL-THREAD
BAR
CL OF HOLE
IN BRACKET
LIGHTWEIGHT CELLULAR CONCRETE3
ELEV. -6.2' (±)
MUDLINE MLLW
0'-11"
0'-9"
0'-1.5"
1' -4
0'
-8
2' -8
.5
0-5"
GROUT-FILLED
TUBE AT BONDED
LENGTH
FREELENGTH
BONDLENGTH
0'-5" 0'-8"
4"
3/16
1/2"
4"
1/8
1/4
NOTES:
ALL STEEL COMPONENTS OF THIS ASSEMBLY
SHALL BE HOT DIP GALVANIZED AND COATED
WITH 16 MILS OF AMERLOC 400 AFTER
GALVANIZING EXCEPT BOLTS, ALL BOLTS SHALL
BE TYPE 316 STAINLESS STEEL BOLTS AND
WASHERS IF APPLICABLE.
5"
8"
4"
TOP OF NEW PILE CAP 9' ±
TOP OF OLD PILE CAP 7.67' ±
BOTTOM OF PILE CAP 6' ±
BOTTOM OF PILE -18' ±
MUDLINE -6.2' ±
TOP OF HANDRAIL 12' ±
EXISTING CONCRETE SHEET PILES
2'-4" ± WIDE, TYP.
MLLW 0.0'
ELEV. +3.5' ±
CONTRACTOR TO
VERIFY DIMENSION 4'-8" 4'-8" 4'-8" 4'-8" @ ℄ OF EVERYOTHER SHEET PILE
EXISTING EXPANSION
JOINT (TYP)
USE STEEL SHIM WHERE
GAP BETWEEN STEEL
AND CONCRETE PILE IS
GREATER THAN 1/2"
LAST EXISTING TIE BACK
AS OCCURS IN FIELD
(VERIFIED IN FIELD BY
CONTRACTOR)
2'-4"
3'-8"
1'-10" 1'-10"
3" 1'-0" 3"1'-0"
1' -1
4" 4"
5"
1/ 2"
1/
2" ℄ OF SOIL ANCHOR
CONNECTION3/16" 1/2" TYP
4" ITW RAMSET/REDHEAD "TRUBOLT"
GALVANIZED WEDGE ANCHORS OR
EQUIVALENT W/ 2 - 1/2" EMBEDMENT
ELEVATION
PLAN
1/ 2"1"
4"
3'-8"
1" 1"8" 8" 8" 8" 8" 1/2" 1/2" 1/2" 1/2"
A
- 1/2" PL TYP
SECTION A-A
NOTES:
THIS WELDMENT SHALL BE HOT DIP GALVANIZED
AND COATED WITH 16 MILS OF AMERLOC 400
AFTER GALVANIZING.
1/2" 1/2"
1/2"
1/4" 1/2"
3/16
TYP.
UNO
5" SCH 80 PIPE
CNTR ON HOLE
1/4
3 4"
1" CHAMFER
AT STIFF PL
CORNERS, TYP
CL 4 12" Ø HOLE
8"
5"
8"
1'-2" 1'-2"
2'-4"
4" 7" 7 "7.5" 2.5"
℄ OF SHEET PILE PANEL
EXISTING SHEET PILE
REBAR (TYP)
℄ OF 5"Ø CORE, CONTRACTOR
SHALL AVOID CUTTING
EXISTING VERTICAL REBAR
NOTES:
IF REBAR IS ENCOUNTERED CONTRACTOR IS TO
STOP WORK AND NOTIFY THE ENGINEER OF
RECORD
DETAIL 3 KEYNOTES:
1. CORE 6" Ø HOLE IN EXISTING CONCRETE
SHEET PILE
2. PRE-ASSEMBLED TIEBACK ANCHOR w/
CLASS I CORROSION PROTECTION. SEE
DETAILS 1 AND 2.
3. GROUT TUBE
4. GROUT ANCHOR FULL LENGTH. SEE
SPECIFICATION SECTION 31 50 00.
5. 1.65" PVC PIPE SLEEVE AROUND ANCHOR IN
FREE STRESSING LENGTH. FILL WITH
GREASE.
6. ASTM A53 OR ASTM A500 STEEL
TRUMPET/DUCT COLLAR. SIZE BY ANCHOR
MANUFACTURER.
7. 5" Ø SCHEDULE 80 STEEL PIPE STANDOFF
8. 6" X 6" X 1 1/4" BEARING PL FOR ANCHOR
NUT WITH 1" HOLE
9. ANCHOR CAP. 4" Ø SCHEDULE 40 STEEL
PIPE w/ 1/4" END PLATE. FILL w/ GREASE.
10. 6" X 6" X 3/16" PL WITH 3" Ø HOLE. COAT
SURFACE BETWEEN 3/16" PL AND BEARING
PL WITH ELASTO-THANE METAL PRIMER
AND ELASTO-THANE 230 JOINT SEALER.
SECURE TO w/ (4) 3/8" MACHINE SCREWS.
DRILL AND TAP BEARING PL.FOR SCREWS.
11. POUR MASTERFLOW 928 GROUT BY MASTER
BUILDERS WHEREVER GAP BETWEEN STEEL
AND EXISTING CONCRETE IS 1/8" OR MORE.
TAPE BOTTOM AND SIDES TO CONTAIN
GROUT. WHERE GAP IS GREATER THAN 1/2"
USE STEEL SHIMS IN ADDITION TO GROUT.
SEAL WITH SILICON SEALANT ALL AROUND
ASSEMBLY. SEE SPECIFICATION SECTION 07
92 13.
GROUT
GREASE
1.65" PVC SLEEVE
STRESSING STEEL
#7 TIEBACK ROD
GROUT TUBE
EXTERIOR GROUT
INTERIOR GROUT
(FACTORY INSTALLED)
1.65" PVC SLEEVE
STRESSING STEEL
#7 TIEBACK ROD
GROUT TUBE
SECTION AT BONDED ZONE
SECTION AT FREE-STRESSING ZONE
5"
TIEBACK ROD
5" DIAM
TIEBACK ROD
GROUT BULB
ST
R
U C
TU
R
A L
D
ET
A
IL
S
- T
IE
B
A C
K
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
SECTION: TIEBACK
SCALE: 1" = 5'
DETAIL: TIEBACK
SCALE: 1" = 1'
DETAIL: CONNECTION ASSEMBLY
SCALE: 1" = 6"
ELEVATION: WATERSIDE OF SEAWALL
SCALE: 1" = 5'
DETAIL: WALER
SCALE: 1" = 1'
EXISTING SHEET PILE PANEL SECTION
SCALE: 1" = 1'
C-3 C-4
C-3
C-3
C-3
C-3
C-3
C-4
C-4
C-4
C-4
C-4
TIEBACK SECTIONS
SCALE: N.T.S
C-4 C-4
12+0711+63
HANDRAIL
TOP OF PILE CAP
BOTTOM OF PILE CAP
SHEET PILE
ENDS 24' BELOW BOTTOM OF PILE CAP ± EL -18.0'
GATE
LAST EXISTING TIE BACK
6TYP
4 5
EXPANSION JOINT 9
12+00
MLLW ± EL -0.0'
PCC SHEET PILES
2'-4" ± TYP
-18 -18
12+00ST
A.
=1 1+
.9
ST
A.
=1 1+
.8
ST
A.
=1 1+
.8
ST
A.
=1 1+
.8
ST
A.
=1 1+
.9
ST
A.
=1 1+
.8
ST
A.
=1 2+
.3
ST
A.
=1 2+
.8
PP
W
AT
ER
PP
W
AT
ER
PP
F
U
LL
PP
W
AT
ER
(3
D
IS
C H
AR
G
E
PI
PE
S
W
AT
ER
EL
EC
TR
IC
AL
11 VDG
SIDEWALK LIMIT
PRIVATE PLANTER LIMIT
PILE CAP LIMIT
EX
PA
N
SI
O N
J O
IN
T
RIGHT OF WAY
PROPERTY LINE
PROPERTY LINE
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
V
IS
TA
D
EL
G O
LF
O
P
IL
E C
A P
R
EP
A
IR
P
LA
N A
N D
P R
O
FI
LE
PROFILE - 11 VISTA DEL GOLFO
0 1.51.5
SCALE: 1" = 3'
CONSTRUCTION NOTES
PILE CAP SPALL REPAIR, PER DETAIL 5 AND 6 ON SHT. C-13
POST POCKET (PP) FULL REPAIR PER, DETAIL 1 AND 2 ON SHT.
C-13
POST POCKET (PP) WATERSIDE REPAIR, PER DETAIL 1 AND 2
ON SHT. C-13
PILE CAP CRACK REPAIR, PER DETAIL 4 ON SHT. C-13
GRIND AND PATCH HORIZONTAL CONCRETE JOINT, PER
DETAIL 8 AND 9 ON SHT. C-136
RESEAL EXPANSION JOINT, PER DETAIL 7 ON SHT. C-139
PROFILE LEGEND
POST POCKET DAMAGE
SPALL DAMAGE
NOTE: CONTRACTOR SHALL VERIFY ALL QUANTITIES SHOWN
ON PLAN AND SHALL NOTIFY ENGINEER OF RECORD OF ANY
DISCREPANCIES PRIOR TO BEGINNING WORK
HORIZONTAL SCALE: 1" = 3'
VERTICAL SCALE: 1" = 1.5'
PLAN LEGEND
WALL
CONCRETE EDGE
HANDRAIL AND HANDRAIL POST
MAJOR CONTOUR
MINOR CONTOUR
RIGHT OF WAY
PLAN - 11 VISTA DEL GOLFO
SCALE: 1" = 3'
PAINT SEAWALL CAP, PER DETAIL 10 ON SHT. C-1310
12+49.1512+07
HANDRAIL
TOP OF PILE CAP
BOTTOM OF PILE CAP
GATE
6TYP
4 4 4 4 4 4 4
12+25
SHEET PILE
ENDS 24' BELOW BOTTOM OF PILE CAP ± EL -18.0'
MLLW ± EL 0.0'
PCC SHEET PILES
2'-4" ± TYP
-18 -18
ST
A.
=1 2+
.8
ST
A.
=1 2+
.8
ST
A.
=1 2+
.8
ST
A.
=1 2+
.8
ST
A.
=1 2+
.7
ST
A.
=1 2+
.8
ST
A.
=1 2+
.2
ST
A.
=1 2+
.8
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
WATER LINE
ELECTRICAL LINE
15 VDG
SIDEWALK LIMIT
PRIVATE PLANTER LIMIT
PILE CAP LIMIT
RIGHT OF WAY
PROPERTY LINE
PROPERTY LINE
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
PROFILE - 15 VISTA DEL GOLFO
0 1.51.5
SCALE: 1" = 3'
HORIZONTAL SCALE: 1" = 3'
VERTICAL SCALE: 1" = 1.5'
V
IS
TA
D
EL
G O
LF
O
P
IL
E C
A P
R
EP
A
IR
P
LA
N A
N D
P R
O
FI
LE
PLAN - 15 VISTA DEL GOLFO
SCALE: 1" = 3'
CONSTRUCTION NOTES
POST POCKET (PP) FULL REPAIR PER, DETAIL 1 AND 2 ON SHT.
C-134
GRIND AND PATCH HORIZONTAL CONCRETE JOINT, PER
DETAIL 8 AND 9 ON SHT. C-136
PROFILE LEGEND
POST POCKET DAMAGE
SPALL DAMAGE
NOTE: CONTRACTOR SHALL VERIFY ALL QUANTITIES SHOWN
ON PLAN AND SHALL NOTIFY ENGINEER OF RECORD OF ANY
DISCREPANCIES PRIOR TO BEGINNING WORK
PLAN LEGEND
WALL
CONCRETE EDGE
HANDRAIL AND HANDRAIL POST
MAJOR CONTOUR
MINOR CONTOUR
RIGHT OF WAY
12+89.2712+49.15
HANDRAIL
TOP OF PILE CAP
BOTTOM OF PILE CAP
GATE
6TYP
8 7
4 4 4 4
4 EXPANSION JOINT 9
12+75
SHEET PILE
ENDS 24' BELOW BOTTOM OF PILE CAP ± EL -18.0'
MLLW ± EL 0.0'
PCC SHEET PILES
2'-4" ± TYP
-18 -18
ST
A.
=1 2+
.1
ST
A.
=1 2+
.7
ST
A.
=1 2+
.7
ST
A.
=1 2+
.7
ST
A.
=1 2+
.7
ST
A.
=1 2+
.7
ST
A.
=1 2+
.6
ST
A.
=1 2+
.7
ST
A.
=1 2+
.8
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
EX
PA
N
SI
O N
J O
IN
T
EL
EC
TR
IC
AL
L
IN
E
DISCHARGE LINE
12+50
19 VDG
SIDEWALK LIMIT
PRIVATE PLANTER LIMIT
PILE CAP LIMIT
RIGHT OF WAY
PROPERTY LINE
PROPERTY LINE
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
PROFILE - 19 VISTA DEL GOLFO
0 1.51.5
SCALE: 1" = 3'
HORIZONTAL SCALE: 1" = 3'
VERTICAL SCALE: 1" = 1.5'
V
IS
TA
D
EL
G O
LF
O
P
IL
E C
A P
R
EP
A
IR
P
LA
N A
N D
P R
O
FI
LE
PLAN - 19 VISTA DEL GOLFO
SCALE: 1" = 3'
CONSTRUCTION NOTES
PILE CAP SPALL REPAIR, PER DETAIL 5 AND 6 ON SHT. C-13
POST POCKET (PP) FULL REPAIR PER, DETAIL 1 AND 2 ON SHT.
C-13
PILE CAP CRACK REPAIR, PER DETAIL 4 ON SHT. C-13
GRIND AND PATCH HORIZONTAL CONCRETE JOINT, PER
DETAIL 8 AND 9 ON SHT. C-136
RESEAL EXPANSION JOINT, PER DETAIL 7 ON SHT. C-139
PROFILE LEGEND
POST POCKET DAMAGE
SPALL DAMAGE
NOTE: CONTRACTOR SHALL VERIFY ALL QUANTITIES SHOWN
ON PLAN AND SHALL NOTIFY ENGINEER OF RECORD OF ANY
DISCREPANCIES PRIOR TO BEGINNING WORK
PLAN LEGEND
WALL
CONCRETE EDGE
HANDRAIL AND HANDRAIL POST
MAJOR CONTOUR
MINOR CONTOUR
13+33.9712+89.27
HANDRAIL
TOP OF PILE CAP
BOTTOM OF PILE CAP
6TYP
4 4
13+00
SHEET PILE
ENDS 24' BELOW BOTTOM OF PILE CAP ± EL -18.0'
MLLW ± EL 0.0'
PCC SHEET PILES
2'-4" ± TYP
-18 -18
13+00
ST
A.
=1 2+
.8
ST
A.
=1 2+
.2
ST
A.
=1 2+
.8
ST
A.
=1 3+
.0
ST
A.
=1 3+
.0
ST
A.
=1 3+
.0
ST
A.
=1 3+
.8
ST
A.
=1 3+
.9
PP
F
U
LL PP
F U
LL
PP
F
U
LL
PP
F
U
LL
PP
F
U
LL
W
AT
ER
L
IN
E
EL
EC
TR
IC
AL
L
IN
E
23 VDG
SIDEWALK LIMIT
PRIVATE PLANTER LIMIT
PILE CAP LIMIT
RIGHT OF WAY
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
N A
PL
ES
V D
G T
IE
B
A C
K C
A P
R
EP
A
IR
VI
ST
A D
EL
G
O
LF
O , L
O N
G B
EA
C
H C
A
TETRA TECH, INC.
ENGINEERS, PLANNERS, & ARCHITECTS
17885 VON KARMAN AVE STE. 500
IRVINE, CA 92614
PHONE:(949) 809-5000
FAX: (949) 809-5010
www.tetratech.com
Know what's below.
before you dig.Call
R
PROFILE - 23 VISTA DEL GOLFO
0 1.51.5
SCALE: 1" = 3'
HORIZONTAL SCALE: 1" = 3'
VERTICAL SCALE: 1" = 1.5'
V
IS
TA
D
EL
G O
LF
O
P
IL
E C
A P
R
EP
A
IR
P
LA
N A
N D
P R
O
FI
LE
PLAN - 23 VISTA DEL GOLFO
S…
This is the start of the file's text. The full file is on GovTribe.