B-18089 Vendor Questions and Answers.docx

DOCX document 13 KB Posted

Attached to
DNR-New Salem-HVAC Controls Upgrade
Solicitation number
21-422DNR-DIREC-B-18089
Issued by
Madison County, Peoria City, Illinois

About this file

This document contains vendor questions and answers related to the HVAC controls upgrade project at the Lincoln New Salem site, which is being solicited by the Illinois Department of Natural Resources (IDNR). The project involves HVAC control upgrades, and the solicitation specifies that conduit is only required in mechanical areas, and valves are not planned to be replaced as part of the project, but will be addressed on a case-by-case basis if found to be non-functioning. The state and local contract opportunity is limited to Illinois and Menard County jurisdictions.

The pricing terms, set asides, incumbents, funding requirements and sources, and other salient financial information are not provided in this document. The solicitation requires electronic submission only, and does not mention any site visits, bidder's meetings, award dates, or contract term details.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Questions for B-18089 Lincoln New Salem HVAC Controls Upgrade

1. Per 23 09 23 3.02 – D. – Conduit is to be provided in accordance with Section 26 05 83. Could you confirm the conduit is only needed in mechanical areas.

A: Conduit is only required in mechanical areas.

2. Per 23 09 13 2.03 – Please confirm if valves are needed to be replaced as part of the project.

A: Valves are not planned to be replaced. If a valve is found to be non-functioning it will be brought up to the engineer’s attention and addressed on a case by case basis.

3. Per 23 09 13 2.03 A. – Please confirm if valves are to be replaced, are pressure independent valves required.

A: Valves are not planned to be replaced. If a valve is found to be non-functioning it will be brought up to the engineer’s attention and addressed on a case by case basis.