This document is an addendum issued by the Farnsworth Group, Inc. on behalf of the Illinois Department of Natural Resources for the Lincoln's New Salem Historic Site Visitors Center project. The addendum amends the specifications for the project, specifically adding a new paragraph to Section 23 09 23 - DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC requiring the use of products from The Trane Company. The related state and local contract opportunity is for HVAC control upgrades at the Lincoln New Salem site, and bidders must submit their responses electronically per the agency's notice regarding electronic submissions only.

The contract opportunity does not provide any additional details on pricing terms, set-asides, incumbents, funding requirements, or other salient information. Bidders must acknowledge receipt of this addendum in the space provided on the bid form, and failure to do so may result in disqualification.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum

20 Allen Avenue, Suite 200 | St. Louis, MO 63119 | p 314.962.7900 | www.f-w.com

ENGINEERS | ARCHITECTS | SURVEYORS | SCIENTISTS

Addendum Number: 001

Addendum Issue Date: October 28, 2020 Owner: Illinois Department of Natural Resources

Project Name: Lincoln’s New Salem Historic Site Visitors Center

Project Number: 0181761.04 (4-20-015)

Containing: # Pages; 0 Drawings; # Specifications

This addendum amends the drawings and/or specifications of the above reference project and is hereby incorporated into the contract documents as part thereof. Bidders must acknowledge receipt of this Addendum in the space provided on the Bid Form. FAILURE TO DO SO MAY SUBJECT BIDDER TO DISQUALIFICATION.

General:

1. N/A

Drawings:

1. N/A

Specifications:

1. Add paragraph 2.01.E in specification section 23 09 23 – DIRECT DIGITAL CONTROL SUSTEMS FOR HVAC as follows:

a. The Trane Company; www.trane.com

END OF ADDENDUM

Issued By:

FARNSWORTH GROUP, INC.

Joseph Gaied Engineering Manager

Attachments:

Drawings: None Specifications: None

File details come from the government source that posted it. Updated .