AZ FTNP CAGR 10(2) Plan Title sheet signed.pdf
PDF 442 KB Posted
- Attached to
- AZ FTNP CAGR 10(2) Entrance Road
- Solicitation number
- 6982AF20B000035
About this file
This document package includes plans for a proposed federal construction project and the associated solicitation. The plans outline rehabilitation work for approximately 0.65 miles of entrance road and 0.12 miles of an administrative road at Casa Grande National Monument in Pinal County, Arizona. Scope of work under Schedule A includes full-depth reclamation of the existing pavement, placement of approximately 10,000 tons of hot asphalt concrete for paving, and 100 tons of roadway aggregate. Option X adds similar rehabilitation of the administrative road with 3,100 tons of asphalt. The solicitation is a request for bid set aside for small businesses. The Department of Transportation Federal Highway Administration is the contracting agency. Responses are due by the date listed on the solicitation page.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
� I
:'l, 4l�t\ .. r;'.'f."Z•··· ... �•j'" �--�- -1\.,,,:,,,� ·1······· :...;[\ ·,_ : �
U.S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE SHEET
Al A2-A3
A4
AS
A6
PLANS FOR PROPOSED B1-B2
B4
BS
PROJECT Cl-C2
STATE
AZ
PROJECT
AZ FTNP CAGR 10(2)
ENTRANCE ROAD
NPS PMIS NO.: 230740
DRAWING NO.: 303/167840
INDEX TO SHEETS
DESCRIPTION
TITLE SHEET
COrt,JENTIONAL PLAN SYMBOLS & ABBREVIATIONS
SITE MAP
TYPICAL SECTION - SCHEDULE A
TYPICAL SECTION - OPTION X
SUMMARY OF QUANTITIES - SCHEDULE A
SUMMARY OF OUANTITIES - OPTION X
MISCELLANEOUS SUMMARIES - SCHEDULE A
MISCELLANEOUS SUMMARIES - SCHEDULE A AND OPTION X
ENTRANCE ROAD PLAN SHEETS - SCHEDULE A
SHEET
NUMBER!
Al
AZ FTNP CAGR 10(2)
AZ FTNP CAGR 10(2)
ENTRANCE ROAD
C3 ADMINISTRATIVE ROAD PLAN SHEET - OPTION X
El-E2 C157-51 TEMPORARY INLET PROTECTION
C � lr ij 1l
I
<'l o' 1l l
�"'1 eo
KEY MAP OF ARIZONA
TYPE OF CONSTRUCTION:
Road rehabilitation, micro-surfacing, and asphalt surfacing
DESIGN DESIGNATIONS:
ADT (2020) ----------- <200
ADT (2040) ----------- <200
DHV----- 30
D------ 50% T------ 1% V ------ 35 mph e(max) ----- 6%
U.S. CUSTOMARY DIMENSIONS:
Slopes are expressed as RISE:RUN
SPECIFICATIONS:
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"
C:ctarT•iMT TO liXCliLLUICli
Know what's below .
Call before you dig.
._.c .. Hl.-n
! PROJECT MANAGER LEAD DESIGNER
; JAMES KERRIGAN EBASTIAN GUZM
54 miles to Phoenix, AZ
CASA GRANDE NATIONAL MONUMENT
PIMA COUNTY
N
SCHEDULE A - LENGTH 0. 74 miles
OPTION X - LENGTH 0.22 miles f f f l f
Ruins� Mon 1
Coolidge
'WCOOlld9'A,,.
E�artir!Rd
0 1 --------;
Scale in Miles
¼
9""' _(Ji.•
E3 C157-55 FIBER ROLL
Kl C401-01 PAVEMENT TRANSITION
Tl-T2 SIGNING AND PAVEMENT MARJ<INGS- ENTRANCE ROAD
T3 SIGNING AND PAVEMENT MARJ<INGS- VISITOR CENTER PARKING AREA
T4-T6 SIGN STRUCTURES AND □ET AILS
T7 633-A SPEED BUMPS
TB C634-SO CENTERLINE STRIPING AND TOP LIFT PAVEMENT JOINT
T9 634-A PAVEMENT STRIPING DETAILS AND PAVEMENT MARIQNGS SYMBOLS
T10-T12 635 TEMPOPARY TPAFFIC CONTROL STANDARDS
Tl3 63S-A TEMPORARY TRAFFIC CONTROL SIGN INSTALlATION T 4 IF.1<;-P. T MPnRARY TllAfflr rnNTRnl PHA<;F P. II c;rw:n1" <= A
Begin Project AZ FTNP CAGR 10(2) Entrance Road Station 10+00.00 - 49+25.76 Schedule A
Begin Project AZ FTNP CAGR 10(2) Administrative Road Station 50+00.00 - 61+65.44 OptionX
PLANS PREPARED BY
·a•'� ! �-}
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
-:,.,s,.,n&'�f CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DENVER, COLORADO
RECOMMENDED:
CHIEF OF ENGINEERING
CENTRAL FEDERAL LANDS HIGHWAY DMSION
APPROVED:
Approval via letter signed by Benjamin Littlefield
SUPERINTENDENT, CASA GRANDE RUINS NATIONAL MONUMENT
DATE:
DATE:
August 5, 2020
09/11/2020
| 2020-09-11T10:33:17-0600 | |
| CURTIS R SCOTT |
File details come from the government source that posted it. Updated .