Bid Tabs - AZ FTNP CAGR 10(2).pdf

PDF 143 KB Posted

Attached to
AZ FTNP CAGR 10(2) Entrance Road
Solicitation number
6982AF20B000035
Issued by

About this file

This is a tabulation of bids report for the AZ FTNP CAGR 10(2) Entrance Road project. The report provides bid pricing from seven contractors for base schedule A and option schedule X work. Schedule A involves rehabilitation of 0.65 miles of entrance roadway including full depth reclamation of the existing pavement, asphalt concrete paving of approximately 10,000 tons, roadway aggregate of 100 tons, and traffic control. Option X includes rehabilitation of 0.12 miles of an administration road with similar work. The bids were opened on November 3, 2020 in Lakewood, Colorado by the Federal Highway Administration. Contractor pricing ranged from $391,534.80 to $995,730 for schedule A work and $103,605 to $279,990 for option X. The low bidder for schedule A was Hauser Engineering Group and for option X was Hauser Engineering Group. The project is to be awarded by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Opening Summary AZ FTNP CAGR 10(2) Entrance Road.pdf PDF
QnA 10.29.20 CAGR.pdf PDF
Interested Vendor List 10 27 2020.pdf PDF
QnA 10.23.20 CAGR.pdf PDF
QnA 10.21.20 CAGR.pdf PDF
QnA 10.13.2020 CAGR.pdf PDF
A001 20B000035.pdf PDF
QnA 10.9.2020 CAGR.pdf PDF
FP-14_Eng.pdf PDF
AZ FTNP CAGR10(2)_Plans.pdf PDF
6982AF20B000035.pdf PDF
AZ FTNP CAGR 10(2) Plan Title sheet signed.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 11/05/20

1 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B000035

Division: Central Federal Lands

State: AZ County: Pima

Federal Land: Casa Grande National Monument Opened at: Lakewood, CO

Opened by: Jorey Deml

Date: 11/03/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Hauser Engineering Group, LLC $391,534.80 9029 N 65th Ave Glendale, AZ 85302

Crowley Holdings LLC $467,920.10 5041 Freret ST Unit A New Orleans, LA 70115

ARROW INDIAN CONTRACTORS, INC. $508,284.64

PO Box 2334 Scottsdale, AZ 85252

Meridian Engineering Company $589,829.00 3855 N. Business Center Drive Tucson, AZ 85705

Standard Construction Company, Inc. $602,324.00 810 E. Western Avenue Avondale, AZ 85323

Stormwater Plans, LLC dba SWP Contracting and Paving $608,540.00 5624 N. 54th Avenue Glendale, AZ 85301

Genesis Design and Development, LLC $995,730.00 7033 Kalgan Rd NE Rio Rancho, NM 87144

Engineer's Estimate $800,000.00

2 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Hauser Engineering Group, LLC Lump Sum $49,000.00 Crowley Holdings LLC Lump Sum $28,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $19,175.97 Meridian Engineering Company Lump Sum $63,600.00 Standard Construction Company, Inc. Lump Sum $73,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $90,000.00 Genesis Design and Development, LLC Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $103,225.00

A0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Hauser Engineering Group, LLC $17,000.00 $10,880.00 Crowley Holdings LLC $32,812.50 $21,000.00

ARROW INDIAN CONTRACTORS, INC. $21,879.96 $14,003.17

Meridian Engineering Company $20,000.00 $12,800.00 Standard Construction Company, Inc. $21,000.00 $13,440.00 Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $12,800.00 Genesis Design and Development, LLC $35,000.00 $22,400.00 Engineer's Estimate 0.640 MILE $5,000.00 $3,200.00

A0040 15301-0000 CONTRACTOR QUALITY CONTROL

Hauser Engineering Group, LLC Lump Sum $12,300.00 Crowley Holdings LLC Lump Sum $7,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $8,732.15 Meridian Engineering Company Lump Sum $15,000.00 Standard Construction Company, Inc. Lump Sum $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $50,000.00 Genesis Design and Development, LLC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

A0050 15401-0000 CONTRACTOR TESTING

Hauser Engineering Group, LLC Lump Sum $20,000.00 Crowley Holdings LLC Lump Sum $14,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $14,557.30 Meridian Engineering Company Lump Sum $5,000.00 Standard Construction Company, Inc. Lump Sum $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $78,000.00 Genesis Design and Development, LLC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

3 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0060 15501-0000 CONSTRUCTION SCHEDULE

Hauser Engineering Group, LLC Lump Sum $3,900.00 Crowley Holdings LLC Lump Sum $2,800.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $8,350.94 Meridian Engineering Company Lump Sum $1,000.00 Standard Construction Company, Inc. Lump Sum $3,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $5,000.00 Genesis Design and Development, LLC Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Hauser Engineering Group, LLC $6.00 $420.00 Crowley Holdings LLC $60.00 $4,200.00

ARROW INDIAN CONTRACTORS, INC. $46.84 $3,278.80

Meridian Engineering Company $15.00 $1,050.00 Standard Construction Company, Inc. $10.00 $700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $840.00 Genesis Design and Development, LLC $35.00 $2,450.00 Engineer's Estimate 70 LNFT $10.00 $700.00

A0080 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION

Hauser Engineering Group, LLC $200.00 $200.00 Crowley Holdings LLC $3,500.00 $3,500.00

ARROW INDIAN CONTRACTORS, INC. $3,052.38 $3,052.38

Meridian Engineering Company $1,500.00 $1,500.00 Standard Construction Company, Inc. $224.00 $224.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $500.00 Genesis Design and Development, LLC $500.00 $500.00 Engineer's Estimate 1 EACH $400.00 $400.00

A0090 15802-0000 WATERING FOR DUST CONTROL

Hauser Engineering Group, LLC Lump Sum $15,000.00 Crowley Holdings LLC Lump Sum $7,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $19,101.10 Meridian Engineering Company Lump Sum $6,000.00 Standard Construction Company, Inc. Lump Sum $25,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $10,000.00 Genesis Design and Development, LLC Lump Sum $12,500.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

4 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 20301-2400 REMOVAL OF SIGN

Hauser Engineering Group, LLC $50.00 $250.00 Crowley Holdings LLC $1,500.00 $7,500.00

ARROW INDIAN CONTRACTORS, INC. $153.62 $768.10

Meridian Engineering Company $500.00 $2,500.00 Standard Construction Company, Inc. $126.00 $630.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $750.00 Genesis Design and Development, LLC $150.00 $750.00 Engineer's Estimate 5 EACH $250.00 $1,250.00

A0110 30202-2000 ROADWAY AGGREGATE, METHOD 2

Hauser Engineering Group, LLC $40.00 $2,600.00 Crowley Holdings LLC $30.80 $2,002.00

ARROW INDIAN CONTRACTORS, INC. $15.00 $975.00

Meridian Engineering Company $70.00 $4,550.00 Standard Construction Company, Inc. $237.00 $15,405.00 Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $7,150.00 Genesis Design and Development, LLC $100.00 $6,500.00 Engineer's Estimate 65 TON $90.00 $5,850.00

A0120 30402-1300 FULL DEPTH RECLAMATION, METHOD 1, 6-INCH DEPTH

Hauser Engineering Group, LLC $3.00 $28,560.00 Crowley Holdings LLC $1.70 $16,184.00

ARROW INDIAN CONTRACTORS, INC. $4.61 $43,887.20

Meridian Engineering Company $6.00 $57,120.00 Standard Construction Company, Inc. $5.00 $47,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3.50 $33,320.00 Genesis Design and Development, LLC $25.00 $238,000.00 Engineer's Estimate 9,520 SQYD $7.00 $66,640.00

A0130 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Hauser Engineering Group, LLC $78.00 $120,900.00 Crowley Holdings LLC $114.66 $177,723.00

ARROW INDIAN CONTRACTORS, INC. $135.49 $210,009.50

Meridian Engineering Company $135.00 $209,250.00 Standard Construction Company, Inc. $125.00 $193,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $131,750.00 Genesis Design and Development, LLC $180.00 $279,000.00 Engineer's Estimate 1,550 TON $190.00 $294,500.00

5 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 40601-0000 FOG SEAL

Hauser Engineering Group, LLC $800.00 $4,000.00 Crowley Holdings LLC $4,200.00 $21,000.00

ARROW INDIAN CONTRACTORS, INC. $955.79 $4,778.95

Meridian Engineering Company $3,000.00 $15,000.00 Standard Construction Company, Inc. $1,500.00 $7,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $3,750.00 Genesis Design and Development, LLC $750.00 $3,750.00 Engineer's Estimate 5 TON $1,000.00 $5,000.00

A0150 40901-2000 MICRO SURFACING, TYPE 2

Hauser Engineering Group, LLC $10.00 $58,000.00 Crowley Holdings LLC $2.00 $11,600.00

ARROW INDIAN CONTRACTORS, INC. $8.35 $48,430.00

Meridian Engineering Company $8.00 $46,400.00 Standard Construction Company, Inc. $8.00 $46,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $7.00 $40,600.00 Genesis Design and Development, LLC $15.00 $87,000.00 Engineer's Estimate 5,800 SQYD $10.00 $58,000.00

A0160 41102-1000 PRIME COAT, METHOD 1

Hauser Engineering Group, LLC $0.38 $3,617.60 Crowley Holdings LLC $1.75 $16,660.00

ARROW INDIAN CONTRACTORS, INC. $0.64 $6,092.80

Meridian Engineering Company $3.00 $28,560.00 Standard Construction Company, Inc. $2.00 $19,040.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1.00 $9,520.00 Genesis Design and Development, LLC $2.00 $19,040.00 Engineer's Estimate 9,520 SQYD $1.50 $14,280.00

A0170 41105-0000 BLOTTER

Hauser Engineering Group, LLC $35.00 $875.00 Crowley Holdings LLC $50.00 $1,250.00

ARROW INDIAN CONTRACTORS, INC. $100.00 $2,500.00

Meridian Engineering Company $500.00 $12,500.00 Standard Construction Company, Inc. $50.00 $1,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15.00 $375.00 Genesis Design and Development, LLC $45.00 $1,125.00 Engineer's Estimate 25 TON $70.00 $1,750.00

6 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0180 41201-0000 TACK COAT

Hauser Engineering Group, LLC $700.00 $3,500.00 Crowley Holdings LLC $840.00 $4,200.00

ARROW INDIAN CONTRACTORS, INC. $915.39 $4,576.95

Meridian Engineering Company $5,000.00 $25,000.00 Standard Construction Company, Inc. $800.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $3,750.00 Genesis Design and Development, LLC $45.00 $225.00 Engineer's Estimate 5 TON $1,000.00 $5,000.00

A0190 41401-2000 CRACKS, CLEANING AND SEALING

Hauser Engineering Group, LLC $3.00 $1,500.00 Crowley Holdings LLC $15.40 $7,700.00

ARROW INDIAN CONTRACTORS, INC. $32.90 $16,450.00

Meridian Engineering Company $25.00 $12,500.00 Standard Construction Company, Inc. $18.00 $9,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $13.00 $6,500.00 Genesis Design and Development, LLC $5.00 $2,500.00 Engineer's Estimate 500 LNFT $3.00 $1,500.00

A0200 60901-0000 CURB, CONCRETE

Hauser Engineering Group, LLC $220.00 $2,200.00 Crowley Holdings LLC $840.00 $8,400.00

ARROW INDIAN CONTRACTORS, INC. $113.86 $1,138.60

Meridian Engineering Company $300.00 $3,000.00 Standard Construction Company, Inc. $90.00 $900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $325.00 $3,250.00 Genesis Design and Development, LLC $250.00 $2,500.00 Engineer's Estimate 10 LNFT $100.00 $1,000.00

A0210 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Hauser Engineering Group, LLC $110.00 $2,200.00 Crowley Holdings LLC $168.00 $3,360.00

ARROW INDIAN CONTRACTORS, INC. $125.00 $2,500.00

Meridian Engineering Company $90.00 $1,800.00 Standard Construction Company, Inc. $220.00 $4,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $2,200.00 Genesis Design and Development, LLC $190.00 $3,800.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00

7 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

Hauser Engineering Group, LLC $80.00 $1,600.00 Crowley Holdings LLC $350.00 $7,000.00

ARROW INDIAN CONTRACTORS, INC. $120.00 $2,400.00

Meridian Engineering Company $90.00 $1,800.00 Standard Construction Company, Inc. $175.00 $3,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $125.00 $2,500.00 Genesis Design and Development, LLC $175.00 $3,500.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00

A0230 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Hauser Engineering Group, LLC $130.00 $2,600.00 Crowley Holdings LLC $350.00 $7,000.00

ARROW INDIAN CONTRACTORS, INC. $185.00 $3,700.00

Meridian Engineering Company $120.00 $2,400.00 Standard Construction Company, Inc. $260.00 $5,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $2,800.00 Genesis Design and Development, LLC $175.00 $3,500.00 Engineer's Estimate 20 HOUR $250.00 $5,000.00

A0240 62301-0000 GENERAL LABOR

Hauser Engineering Group, LLC $38.00 $760.00 Crowley Holdings LLC $140.00 $2,800.00

ARROW INDIAN CONTRACTORS, INC. $43.00 $860.00

Meridian Engineering Company $30.00 $600.00 Standard Construction Company, Inc. $40.00 $800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $1,100.00 Genesis Design and Development, LLC $90.00 $1,800.00 Engineer's Estimate 20 HOUR $80.00 $1,600.00

A0250 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Hauser Engineering Group, LLC $95.00 $1,900.00 Crowley Holdings LLC $280.00 $5,600.00

ARROW INDIAN CONTRACTORS, INC. $90.00 $1,800.00

Meridian Engineering Company $150.00 $3,000.00 Standard Construction Company, Inc. $180.00 $3,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $4,000.00 Genesis Design and Development, LLC $175.00 $3,500.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00

8 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Hauser Engineering Group, LLC $170.00 $3,400.00 Crowley Holdings LLC $420.00 $8,400.00

ARROW INDIAN CONTRACTORS, INC. $135.00 $2,700.00

Meridian Engineering Company $150.00 $3,000.00 Standard Construction Company, Inc. $280.00 $5,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $3,300.00 Genesis Design and Development, LLC $175.00 $3,500.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00

A0270 63301-0000 SIGN SYSTEM

Hauser Engineering Group, LLC $600.00 $3,000.00 Crowley Holdings LLC $2,000.00 $10,000.00

ARROW INDIAN CONTRACTORS, INC. $759.74 $3,798.70

Meridian Engineering Company $1,000.00 $5,000.00 Standard Construction Company, Inc. $715.00 $3,575.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,000.00 $5,000.00 Genesis Design and Development, LLC $350.00 $1,750.00 Engineer's Estimate 5 EACH $750.00 $3,750.00

A0280 63308-3000 OBJECT MARKER, TYPE 3

Hauser Engineering Group, LLC $500.00 $1,000.00 Crowley Holdings LLC $10,000.00 $20,000.00

ARROW INDIAN CONTRACTORS, INC. $384.16 $768.32

Meridian Engineering Company $600.00 $1,200.00 Standard Construction Company, Inc. $513.00 $1,026.00 Stormwater Plans, LLC dba SWP Contracting and Paving $700.00 $1,400.00 Genesis Design and Development, LLC $250.00 $500.00 Engineer's Estimate 2 EACH $250.00 $500.00

A0290 63328-0000 SPEED BUMP

Hauser Engineering Group, LLC $2,100.00 $2,100.00 Crowley Holdings LLC $5,600.00 $5,600.00

ARROW INDIAN CONTRACTORS, INC. $1,307.20 $1,307.20

Meridian Engineering Company $2,000.00 $2,000.00 Standard Construction Company, Inc. $2,601.00 $2,601.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,000.00 $4,000.00 Genesis Design and Development, LLC $1,500.00 $1,500.00 Engineer's Estimate 1 EACH $2,000.00 $2,000.00

9 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0300 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Hauser Engineering Group, LLC $0.46 $16,362.20 Crowley Holdings LLC $0.23 $8,181.10

ARROW INDIAN CONTRACTORS, INC. $0.51 $18,140.70

Meridian Engineering Company $0.70 $24,899.00 Standard Construction Company, Inc. $0.50 $17,785.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.50 $17,785.00 Genesis Design and Development, LLC $2.00 $71,140.00 Engineer's Estimate 35,570 LNFT $1.50 $53,355.00

A0310 63405-0550 PAVEMENT MARKINGS, TYPE B, STRAIGHT ARROW

Hauser Engineering Group, LLC $255.00 $1,530.00 Crowley Holdings LLC $105.00 $630.00

ARROW INDIAN CONTRACTORS, INC. $637.19 $3,823.14

Meridian Engineering Company $150.00 $900.00 Standard Construction Company, Inc. $104.00 $624.00 Stormwater Plans, LLC dba SWP Contracting and Paving $300.00 $1,800.00 Genesis Design and Development, LLC $150.00 $900.00 Engineer's Estimate 6 EACH $250.00 $1,500.00

A0320 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL

Hauser Engineering Group, LLC $255.00 $1,530.00 Crowley Holdings LLC $105.00 $630.00

ARROW INDIAN CONTRACTORS, INC. $637.19 $3,823.14

Meridian Engineering Company $150.00 $900.00 Standard Construction Company, Inc. $104.00 $624.00 Stormwater Plans, LLC dba SWP Contracting and Paving $300.00 $1,800.00 Genesis Design and Development, LLC $350.00 $2,100.00 Engineer's Estimate 6 EACH $500.00 $3,000.00

A0330 63501-0000 TEMPORARY TRAFFIC CONTROL

Hauser Engineering Group, LLC Lump Sum $15,000.00 Crowley Holdings LLC Lump Sum $7,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $29,630.84 Meridian Engineering Company Lump Sum $15,000.00 Standard Construction Company, Inc. Lump Sum $9,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $70,000.00 Genesis Design and Development, LLC Lump Sum $45,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

10 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP

Hauser Engineering Group, LLC $850.00 $850.00 Crowley Holdings LLC $20,000.00 $20,000.00

ARROW INDIAN CONTRACTORS, INC. $3,173.69 $3,173.69

Meridian Engineering Company $5,000.00 $5,000.00 Standard Construction Company, Inc. $1,250.00 $1,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,000.00 $3,000.00 Genesis Design and Development, LLC $20,000.00 $20,000.00 Engineer's Estimate 1 EACH $3,000.00 $3,000.00

Total Schedule - All Items

Hauser Engineering Group, LLC $391,534.80 Crowley Holdings LLC $467,920.10

ARROW INDIAN CONTRACTORS, INC. $508,284.64

Meridian Engineering Company $589,829.00 Standard Construction Company, Inc. $602,324.00 Stormwater Plans, LLC dba SWP Contracting and Paving $608,540.00 Genesis Design and Development, LLC $995,730.00 Engineer's Estimate $800,000.00

11 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: X

Schedule Type: Options

Solcitation No: 6982AF20B000035

Division: Central Federal Lands

State: AZ County: Pima

Federal Land: Casa Grande National Monument Opened at: Lakewood, CO

Opened by: Jorey Deml

Date: 11/03/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Hauser Engineering Group, LLC $103,605.00 9029 N 65th Ave Glendale, AZ 85302

Meridian Engineering Company $135,050.00 3855 N. Business Center Drive Tucson, AZ 85705

Crowley Holdings LLC $141,594.35 5041 Freret ST Unit A New Orleans, LA 70115

ARROW INDIAN CONTRACTORS, INC. $170,705.31

PO Box 2334 Scottsdale, AZ 85252

Stormwater Plans, LLC dba SWP Contracting and Paving $181,200.00 5624 N. 54th Avenue Glendale, AZ 85301

Standard Construction Company, Inc. $218,156.00 810 E. Western Avenue Avondale, AZ 85323

Genesis Design and Development, LLC $279,990.00 7033 Kalgan Rd NE Rio Rancho, NM 87144

Engineer's Estimate $230,000.00

12 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0020 15101-0000 MOBILIZATION

Hauser Engineering Group, LLC Lump Sum $2,000.00 Meridian Engineering Company Lump Sum $1,000.00 Crowley Holdings LLC Lump Sum $10,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $12,616.41 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $24,000.00 Standard Construction Company, Inc. Lump Sum $37,600.00 Genesis Design and Development, LLC Lump Sum $28,000.00 Engineer's Estimate ALL LPSM Lump Sum $28,450.00

X0030 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Hauser Engineering Group, LLC $17,500.00 $3,850.00 Meridian Engineering Company $20,000.00 $4,400.00 Crowley Holdings LLC $32,812.50 $7,218.75

ARROW INDIAN CONTRACTORS, INC. $40,116.79 $8,825.69

Stormwater Plans, LLC dba SWP Contracting and Paving $20,000.00 $4,400.00 Standard Construction Company, Inc. $11,300.00 $2,486.00 Genesis Design and Development, LLC $35,000.00 $7,700.00 Engineer's Estimate 0.220 MILE $5,000.00 $1,100.00

X0040 15301-0000 CONTRACTOR QUALITY CONTROL

Hauser Engineering Group, LLC Lump Sum $4,000.00 Meridian Engineering Company Lump Sum $2,000.00 Crowley Holdings LLC Lump Sum $2,500.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $4,460.34 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $15,000.00 Standard Construction Company, Inc. Lump Sum $10,000.00 Genesis Design and Development, LLC Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

X0050 15401-0000 CONTRACTOR TESTING

Hauser Engineering Group, LLC Lump Sum $10,000.00 Meridian Engineering Company Lump Sum $2,000.00 Crowley Holdings LLC Lump Sum $7,500.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $5,097.54 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $25,000.00 Standard Construction Company, Inc. Lump Sum $10,000.00 Genesis Design and Development, LLC Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

13 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0060 15501-0000 CONSTRUCTION SCHEDULE

Hauser Engineering Group, LLC Lump Sum $650.00 Meridian Engineering Company Lump Sum $500.00 Crowley Holdings LLC Lump Sum $3,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $808.53 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,000.00 Standard Construction Company, Inc. Lump Sum $1,500.00 Genesis Design and Development, LLC Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

X0070 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Hauser Engineering Group, LLC $6.00 $300.00 Meridian Engineering Company $10.00 $500.00 Crowley Holdings LLC $60.00 $3,000.00

ARROW INDIAN CONTRACTORS, INC. $23.58 $1,179.00

Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $600.00 Standard Construction Company, Inc. $10.00 $500.00 Genesis Design and Development, LLC $35.00 $1,750.00 Engineer's Estimate 50 LNFT $20.00 $1,000.00

X0080 15802-0000 WATERING FOR DUST CONTROL

Hauser Engineering Group, LLC Lump Sum $2,500.00 Meridian Engineering Company Lump Sum $1,000.00 Crowley Holdings LLC Lump Sum $3,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $6,063.99 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $5,000.00 Standard Construction Company, Inc. Lump Sum $7,500.00 Genesis Design and Development, LLC Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

X0090 30202-2000 ROADWAY AGGREGATE, METHOD 2

Hauser Engineering Group, LLC $35.00 $6,300.00 Meridian Engineering Company $60.00 $10,800.00 Crowley Holdings LLC $30.80 $5,544.00

ARROW INDIAN CONTRACTORS, INC. $15.00 $2,700.00

Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $19,800.00 Standard Construction Company, Inc. $237.00 $42,660.00 Genesis Design and Development, LLC $100.00 $18,000.00 Engineer's Estimate 180 TON $90.00 $16,200.00

14 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0100 30402-1300 FULL DEPTH RECLAMATION, METHOD 1, 6-INCH DEPTH

Hauser Engineering Group, LLC $4.00 $12,400.00 Meridian Engineering Company $6.00 $18,600.00 Crowley Holdings LLC $1.70 $5,270.00

ARROW INDIAN CONTRACTORS, INC. $8.08 $25,048.00

Stormwater Plans, LLC dba SWP Contracting and Paving $3.50 $10,850.00 Standard Construction Company, Inc. $5.00 $15,500.00 Genesis Design and Development, LLC $25.00 $77,500.00 Engineer's Estimate 3,100 SQYD $7.00 $21,700.00

X0110 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Hauser Engineering Group, LLC $88.00 $44,880.00 Meridian Engineering Company $125.00 $63,750.00 Crowley Holdings LLC $114.66 $58,476.60

ARROW INDIAN CONTRACTORS, INC. $147.31 $75,128.10

Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $43,350.00 Standard Construction Company, Inc. $125.00 $63,750.00 Genesis Design and Development, LLC $180.00 $91,800.00 Engineer's Estimate 510 TON $190.00 $96,900.00

X0120 40601-0000 FOG SEAL

Hauser Engineering Group, LLC $700.00 $1,400.00 Meridian Engineering Company $3,000.00 $6,000.00 Crowley Holdings LLC $4,200.00 $8,400.00

ARROW INDIAN CONTRACTORS, INC. $1,019.51 $2,039.02

Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $1,500.00 Standard Construction Company, Inc. $1,500.00 $3,000.00 Genesis Design and Development, LLC $750.00 $1,500.00 Engineer's Estimate 2 TON $1,000.00 $2,000.00

X0130 41102-1000 PRIME COAT, METHOD 1

Hauser Engineering Group, LLC $0.45 $1,395.00 Meridian Engineering Company $2.00 $6,200.00 Crowley Holdings LLC $1.75 $5,425.00

ARROW INDIAN CONTRACTORS, INC. $0.69 $2,139.00

Stormwater Plans, LLC dba SWP Contracting and Paving $1.00 $3,100.00 Standard Construction Company, Inc. $2.00 $6,200.00 Genesis Design and Development, LLC $2.00 $6,200.00 Engineer's Estimate 3,100 SQYD $1.50 $4,650.00

15 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0140 41105-0000 BLOTTER

Hauser Engineering Group, LLC $50.00 $500.00 Meridian Engineering Company $500.00 $5,000.00 Crowley Holdings LLC $50.00 $500.00

ARROW INDIAN CONTRACTORS, INC. $100.00 $1,000.00

Stormwater Plans, LLC dba SWP Contracting and Paving $15.00 $150.00 Standard Construction Company, Inc. $321.00 $3,210.00 Genesis Design and Development, LLC $45.00 $450.00 Engineer's Estimate 10 TON $70.00 $700.00

X0150 41201-0000 TACK COAT

Hauser Engineering Group, LLC $1,100.00 $2,200.00 Meridian Engineering Company $3,000.00 $6,000.00 Crowley Holdings LLC $840.00 $1,680.00

ARROW INDIAN CONTRACTORS, INC. $915.39 $1,830.78

Stormwater Plans, LLC dba SWP Contracting and Paving $750.00 $1,500.00 Standard Construction Company, Inc. $800.00 $1,600.00 Genesis Design and Development, LLC $45.00 $90.00 Engineer's Estimate 2 TON $1,000.00 $2,000.00

X0160 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Hauser Engineering Group, LLC $110.00 $1,100.00 Meridian Engineering Company $90.00 $900.00 Crowley Holdings LLC $168.00 $1,680.00

ARROW INDIAN CONTRACTORS, INC. $155.00 $1,550.00

Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $1,100.00 Standard Construction Company, Inc. $220.00 $2,200.00 Genesis Design and Development, LLC $190.00 $1,900.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00

X0170 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

Hauser Engineering Group, LLC $80.00 $800.00 Meridian Engineering Company $90.00 $900.00 Crowley Holdings LLC $350.00 $3,500.00

ARROW INDIAN CONTRACTORS, INC. $120.00 $1,200.00

Stormwater Plans, LLC dba SWP Contracting and Paving $125.00 $1,250.00 Standard Construction Company, Inc. $175.00 $1,750.00 Genesis Design and Development, LLC $175.00 $1,750.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00

16 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0180 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Hauser Engineering Group, LLC $130.00 $1,300.00 Meridian Engineering Company $120.00 $1,200.00 Crowley Holdings LLC $350.00 $3,500.00

ARROW INDIAN CONTRACTORS, INC. $185.00 $1,850.00

Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $1,400.00 Standard Construction Company, Inc. $260.00 $2,600.00 Genesis Design and Development, LLC $175.00 $1,750.00 Engineer's Estimate 10 HOUR $250.00 $2,500.00

X0190 62301-0000 GENERAL LABOR

Hauser Engineering Group, LLC $38.00 $380.00 Meridian Engineering Company $30.00 $300.00 Crowley Holdings LLC $140.00 $1,400.00

ARROW INDIAN CONTRACTORS, INC. $43.00 $430.00

Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $550.00 Standard Construction Company, Inc. $40.00 $400.00 Genesis Design and Development, LLC $90.00 $900.00 Engineer's Estimate 10 HOUR $80.00 $800.00

X0200 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Hauser Engineering Group, LLC $95.00 $950.00 Meridian Engineering Company $150.00 $1,500.00 Crowley Holdings LLC $280.00 $2,800.00

ARROW INDIAN CONTRACTORS, INC. $90.00 $900.00

Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $2,000.00 Standard Construction Company, Inc. $180.00 $1,800.00 Genesis Design and Development, LLC $175.00 $1,750.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00

X0210 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Hauser Engineering Group, LLC $170.00 $1,700.00 Meridian Engineering Company $150.00 $1,500.00 Crowley Holdings LLC $420.00 $4,200.00

ARROW INDIAN CONTRACTORS, INC. $135.00 $1,350.00

Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $1,650.00 Standard Construction Company, Inc. $280.00 $2,800.00 Genesis Design and Development, LLC $175.00 $1,750.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00

17 out of 17 Project No: AZ FTNP CAGR 10(2)

Project Name: Entrance Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X0220 63501-0000 TEMPORARY TRAFFIC CONTROL

Hauser Engineering Group, LLC Lump Sum $5,000.00 Meridian Engineering Company Lump Sum $1,000.00 Crowley Holdings LLC Lump Sum $3,000.00 ARROW INDIAN CONTRACTORS, INC. Lump Sum $14,488.91 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $18,000.00 Standard Construction Company, Inc. Lump Sum $1,100.00 Genesis Design and Development, LLC Lump Sum $7,200.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

Total Schedule - All Items

Hauser Engineering Group, LLC $103,605.00 Meridian Engineering Company $135,050.00 Crowley Holdings LLC $141,594.35

ARROW INDIAN CONTRACTORS, INC. $170,705.31

Stormwater Plans, LLC dba SWP Contracting and Paving $181,200.00 Standard Construction Company, Inc. $218,156.00 Genesis Design and Development, LLC $279,990.00 Engineer's Estimate $230,000.00

2020-11-05T15:40:56-0700