Award Information

19 KB Posted

Attached to
Acad
Solicitation number
22-021
Issued by
Dooly County, Georgia

About this file

This Award Information file documents the contract award for RFP 22-021, issued by the Brunswick-Glynn County Joint Water and Sewer Commission (JWSC) in Georgia for ultraviolet disinfection equipment at the Academy Creek Water Pollution Control Facility in Brunswick. The JWSC solicited sealed proposals for open-channel, low-pressure, high-intensity ultraviolet treatment equipment with a proposal deadline of 3:00 P.M. EST on Tuesday, May 17, 2022. The equipment scope includes a UV treatment system data package, local control panels for each UV system, spare parts, special tools, and appurtenances, all to be furnished by a single manufacturer with proven performance in similar applications. The UV system must be capable of treating a maximum flow of 27 million gallons per day with a design flow rate of 13.5 MGD, provide full treatment redundancy, and be mounted in existing channels of the Chlorine Contact Basin at 2909 Newcastle Street, Brunswick. The JWSC awarded the contract to Trojan Technologies on June 16, 2022, with an effective date of July 1, 2022.

The contract award to Trojan Technologies represents the JWSC's selection based on meeting or exceeding the technical specifications and requirements outlined in the solicitation documents, including technical specifications and layout drawings referenced in Appendices A and B. All pricing was to include manufacturer services at the minimum specified level and performance testing costs as part of the unit responsibility. No information regarding contract pricing, renewal options, or contract term duration is provided in this award information document.

Text of this file

Sheet1

22-021 ACCIDENTAL DAMAGE WARDED TO LEXICON TECHNOLOGIES

LEXICON TECHNOLOGIESSHI INTERNATIONALVIRTUCOM INCTRAFERA
ModelQuantityNotesCost Per Year 1 Per unitCost Per Year 2 Per unitCost Per Year 3 Per unitCost Per Year 1 Per unitCost Per Year 2 Per unitCost Per Year 3 Per unitCost Per Year 1 Per unitCost Per Year 2 Per unitCost Per Year 3 Per unitCost Per Year 1 Per unitCost Per Year 2 Per unitCost Per Year 3 Per unit
HP G916000$19.00$19.00$19.00$35.40$35.40$35.40$21.50$23.50$26.00$23.00$23.00$23.00
HP G810900$19.00$19.00$19.00$35.40$35.40$35.40$21.50$23.50$26.00$23.00$23.00$23.00
Lenovo 300e 2nd Gen600$20.50$20.50$20.50$35.40$35.40$35.40$21.50$23.50$26.00$23.00$23.00$23.00
Lenovo 300e/N23800$20.50$20.50$20.50$0.00$0.00$0.00$21.50$23.50$26.00$23.00$23.00$23.00
HP G6 14”250Used for spares only (optional)$12.50$12.50$12.50$0.00$0.00$0.00$21.50$23.50$26.00$23.00$23.00$23.00
HP G5 14”4693Used for spares only (optional)$12.50$12.50$12.50$0.00$0.00$0.00$21.50$23.50$26.00$23.00$23.00$23.00
Dell Latitude 74202300$40.00$40.00$40.00$61.93$61.93$61.93$44.00$52.00$62.00
Dell Latitude 5520/552130$40.00$40.00$40.00$58.54$58.54$58.54$54.00$62.00$72.00
Dell Latitude 5420 Rugged45$40.00$40.00$40.00$67.98$67.98$67.98$65.00$74.00$84.00
TOTALS$696,587.50$696,587.50$696,587.50$1,665,914.30$1,665,914.30$1,665,914.30$820,469.50$906,000.50$1,012,858.00$764,589.00$764,589.00$764,589.00

Other files

File Type Posted
Award Information —
Award Information —
Specifications and Documents —
22-021 Award —
22-021 NOIA —
21-021 Questionnaire —
22-021 Bid Packet —
Award Information —
22-021 Bid Submissions —
AMENDMENT 1 —
Q & A 22-021 —
REQUEST FOR PROPOSALS For Acci —
Award Information —
130 Easement Exhibit —
120 Easement Exhibit —
Special Provisions —
Award Information —
140 Easement Exhibit —
Plans —
ITB —
Award Information —
RFQ Documents and Instructions —
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .