This is a Quality Assurance Surveillance Plan (QASP) for facilities maintenance and grounds maintenance services at the National Memorial Cemetery of the Pacific. The QASP outlines how the government will monitor contractor performance against the requirements in the Performance Work Statement (PWS).
The document details specific performance objectives including: HVAC system maintenance (95% compliance), hydraulic elevator maintenance and testing (100% compliance), photovoltaic system maintenance (95% compliance), standby diesel generator maintenance (95% compliance), vehicle barrier maintenance (95% compliance), fuel tank inspections (100% compliance), backflow preventer inspections (95% compliance), pressure washing of concrete surfaces (95% compliance), debris/waste removal (90% compliance), grounds maintenance (90% compliance), irrigation system maintenance (95% compliance), and emergency/unscheduled repairs. The QASP establishes that monitoring will be conducted through random sampling, periodic inspections, and customer feedback. Performance below standards requires correction within two workdays, with repeated deficiencies potentially resulting in meetings, quality control updates, and contractual corrections.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0003 Questions Answers Updates.docx | DOCX document | |
| 36C78625Q50134 0003 RFQ Amendment.docx | DOCX document | |
| 0003 Site Visit Sign Attendees.pdf | ||
| 0002 Questions and Answers.docx | DOCX document | |
| 36C78625Q50134 0002 RFQ Amendment.docx | DOCX document | |
| Attch5 52.237-1 Site Visit.docx | DOCX document | |
| 36C78625Q50134 0001 RFQ Amendment.docx | DOCX document | |
| Attch5 52.237-1 Site Visit.docx | DOCX document | |
| Attch3 WD Honolulu 2015-5689 rev 24.docx | DOCX document | |
| Attch4 Past Performance Questionnaire.docx | DOCX document | |
| 36C78625Q50134 Combined Synopsis Solicitation.docx | DOCX document | |
| Attch1 Performance Work Statement.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
FACILITIES MAINTENANCE & ADMIN COMPLEX GROUNDS MAINTENANCE
NATIONAL MEMORIAL CEMETERY OF THE PACIFIC
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Grounds Maintenance. This plan sets forth the procedures and guidelines the National Memorial Cemetery of the Pacific will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and identify required documentation and resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and ensure the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around what service or quality level is required, as opposed to how the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the COR to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract if the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will also set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer (CO/KO)
The CO is responsible for monitoring contract compliance, contract administration, and cost control, and resolving any differences between observations documented by the COR, PM, and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 The Contracting Officer Representative (COR)
The COR is designated in writing by the CO to act as their authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or authorize any contractual changes on the government’s behalf. Any changes the contractor deems may affect contract price, terms, or conditions must be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and Attachment 1, Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
To minimize the performance management burden, simplified surveillance methods will be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· Random monitoring, which shall be performed by the COR or designated inspector.
4.1
4.2 Cemetery Guests Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the CO or COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1 for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. Levels of performance are keyed to the relative importance of the task to the overall mission performance at the National Memorial Cemetery of the Pacific.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and assessed using the performance monitoring techniques shown in Attachment 1.
5.1
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR and PM, will be reported using the monitoring form in Attachment 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure the service or quality levels are being achieved.
5.2.1 The COR and PM will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.2 The government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment, using the deduction percentages shown in Attachment 1
6.3 Reporting
6.3.1 At the end of each month, the COR will prepare a written report for the PM summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.4 Reviews and Resolution
6.4.1 The COR may require the contractor’s project manager or designated alternate to meet with the COR and other government personnel as deemed necessary to discuss the performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor shall meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis.
· Recommendations for improved efficiency and/or effectiveness
The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR, PM, and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the procuring CO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective
Standard Performance Threshold
Methods of Surveillance
The contractor shall conduct an external inspection and maintenance of the Administration Building’s HVAC system.
PWS 2.1
| The inspection and maintenance shall be performed by a qualified technician in accordance with manufacturer’s service manuals provided by NMCP. PWS 2.1 |
| 95% Correction(s) required within two workdays to provide acceptable. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Inspection by COR or cemetery personnel. |
The contractor shall provide maintenance and testing on the Administration Building’s Hydraulic Elevator.
PWS 2.2
| The maintenance & testing shall be performed by a qualified technician. Provide all required elevator certification. In accordance with manufacturer’s service manuals provided by NMCP. PWS 2.2 |
| 100% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
Direct Observation by COR or cemetery personnel.
The contractor shall inspect and perform maintenance on the Administration Building’s Photovoltaic System.
PWS 2.3
| The inspection and preventative maintenance shall be performed by a qualified technician in accordance with manufacturer’s service manuals provided by NMCP. |
| 95% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Inspection by COR or cemetery personnel. |
The contractor shall perform maintenance on the Administration Building’s Outdoor Standby Diesel Generator Set
PWS 2.4
| Services shall be performed by a qualified technician in accordance with manufacturer’s service manuals provided by NMCP. PWS 2.4 |
| 95% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Direct Observation by COR or cemetery personnel. |
The contractor shall inspect and perform maintenance to the Cemetery Main Gate, Administration Complex Entrance and Exit active vehicle barriers.
PWS 2.5
| Services shall be performed by a qualified technician in accordance with manufacturer’s service manuals provided by NMCP. PWS 2.5 |
| 95% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
Inspection by COR or cemetery personnel.
The contractor shall inspect the above ground fuel tanks (non-ethanol & diesel) and provide written report on the results of the inspection and leak test.
PWS 2.6
| Services shall be performed by a qualified technician in accordance with manufacturer’s service manuals. PWS 2.6 |
| 100% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Direct Observation by COR or cemetery personnel. |
The contractor shall perform the Backflow Preventor inspection.
PWS 2.7
| The inspection shall be performed by a qualified technician In accordance with manufacturer’s service manuals. PWS 2.7 |
| 95% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Direct Observation by COR or cemetery personnel. |
The contractor shall pressure wash all outside concrete surfaces. Walkways, roads, stairs, and lanais.
PWS 2.8
| The pressure washing shall be performed at National Shrine Standards. PWS 2.8 |
| 95% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Inspection by COR or cemetery personnel. |
Contractor shall remove, transport, and dispose of all debris, biological waste, sharps, and other hazardous substances and materials to proper collection sites in accordance with all federal, state, and local laws. Cleanup duties shall include surveying sites, collecting debris, dismantling temporary structures, removal of trash, removal of human waste.
PWS 2.9
| To be performed in accordance with Federal, State, and Local laws. PWS 2.9 |
| 90% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Inspection by COR or cemetery personnel. |
The contractor shall perform Grounds Maintenance to the Admin Complex.
PWS 3.0
| All ground maintenance task shall be done to NCA ground maintenance standards and measure. PWS 3.0-3.06 |
| 90%. Contractor shall perform/ reperform to bring area into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Periodic inspection by COR or cemetery personnel. |
The contractor shall perform irrigation maintenance services for the Admin Complex Grounds.
PWS 3.1
The contractor shall; 1. Adjust, repair, and maintain sprinkler heads and irrigation valves.
2. Adjust heights of sprinkler heads to be flush with grade of lawn. Adjust arc and radius of sprinkler to minimize overspray.
3. Align heads perpendicular to grade of lawn, unclog nozzles, clean internal screens, relocate or add heads to ensure even distribution of water. PWS 3.1
| 95%. Contractor shall perform/ reperform to bring area into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Periodic inspection by COR or cemetery personnel. |
The contractor shall provide unscheduled emergency services/repairs for the Administration Building’s HVAC system, hydraulic elevator, photovoltaic system, outdoor standby diesel generator set, active vehicle barriers, above ground fuel tanks, and general building repairs.
General Building Maintenance– Exterior/Interior. The contractor is required to provide all supplies and services for maintenance, and repairs of structural components and surfaces, locks, doors, and windows. The work is to include any work on the building or it’s affixed components. Work includes but not limited to minor electrical, patching and touch up of all exterior and interior surfaces.
PWS 5.1
| The contractor shall perform services in accordance with manufacturer’s service manuals provided by NMCP. PWS 5.1 |
| 95% Contractor shall perform/ reperform to bring work into acceptance within two workdays. Repeated deficiencies may result in meetings, QC Updates, CDR, contractual correction. PWS 4.1 |
| Periodic Inspection by COR or cemetery personnel. |
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (check):
| Monthly | Quarterly | Bi-Annually Annually As needed | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (check): | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________