Attch1 Performance Work Statement.docx
DOCX document 67 KB Posted
- Solicitation number
- 36C78625Q50134
About this file
This Performance Work Statement outlines facility maintenance and grounds maintenance requirements for the National Memorial Cemetery of the Pacific ("Punchbowl") in Honolulu, Hawaii. The contract covers a base year plus 4 option years, requiring services across 116 developed acres including a 2.5-acre administrative complex.
The contractor must provide all supervision, labor, equipment, and materials for facility maintenance tasks including: quarterly HVAC maintenance, monthly hydraulic elevator maintenance, biannual solar panel maintenance, monthly generator maintenance, biannual active vehicle barrier maintenance, biannual fuel tank inspections, annual backflow preventer inspections, biannual pressure washing, and biannual homeless camp removal. Additionally, weekly grounds maintenance services are required for the administrative complex, including mowing, edging, trimming, weed control, pruning, debris removal, and irrigation system maintenance. Work hours are Monday-Friday 8:00 AM to 4:30 PM for facility maintenance and weekends 8:00 AM to 4:30 PM for grounds maintenance. Key personnel requirements include a Site Manager and Assistant Site Manager, with the contractor responsible for providing all necessary equipment and supplies as no government-furnished property will be provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0003 Questions Answers Updates.docx | DOCX document | |
| 36C78625Q50134 0003 RFQ Amendment.docx | DOCX document | |
| 0003 Site Visit Sign Attendees.pdf | ||
| 0002 Questions and Answers.docx | DOCX document | |
| 36C78625Q50134 0002 RFQ Amendment.docx | DOCX document | |
| Attch5 52.237-1 Site Visit.docx | DOCX document | |
| 36C78625Q50134 0001 RFQ Amendment.docx | DOCX document | |
| Attch5 52.237-1 Site Visit.docx | DOCX document | |
| Attch2 Quality Assurance Surveillance Plan.docx | DOCX document | |
| Attch3 WD Honolulu 2015-5689 rev 24.docx | DOCX document | |
| Attch4 Past Performance Questionnaire.docx | DOCX document | |
| 36C78625Q50134 Combined Synopsis Solicitation.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Facility Maintenance and Administration Complex Grounds Maintenance National Memorial Cemetery of the Pacific
| 1.0 | General |
| 1.1 | Introduction |
The Department of Veterans Affairs, National Cemetery Administration, honors Veterans with a final resting place and lasting memorials that commemorate their service to our nation. There are approximately 150 National Cemeteries in 42 states that receive visitors, hold ceremonies, and conduct committal services on an ongoing basis. Because of the special significance and attention our National Cemeteries receive from the public, strict adherence to the following specifications is essential.
1.2 Objective
National Cemeteries are National Shrines. The standards of maintenance and appearance at these cemeteries must reflect this nation's concern for those interred there. For this reason, strict adherence to these specifications as well as the National Cemetery Administration, National Shrine Commitment Operational Standards and Measures (Version 9.1 December 2023) is essential. The contractor is encouraged to use an innovative and creative technical approach, in addition to standard commercial practices to manage the Facility Maintenance and Administration Complex Grounds Maintenance operations at the Cemetery in order to maintain the high standards of appearance as a National Shrine.
1.3 Scope of Work
The Contractor shall provide all supervision, labor, equipment, materials, uniforms, and supplies necessary to perform the following Facility Maintenance and Administration Complex Ground Maintenance at the National Memorial Cemetery of the Pacific.
The Facility Maintenance services shall include all corrective, preventive, and emergency maintenance:
1. HVAC maintenance and repair.
2. Hydraulic elevator maintenance, testing, and repairs.
3. Solar panel maintenance and repairs.
4. Generator check/set maintenance.
5. Active vehicle barrier maintenance and repair.
6. Above ground fuel tank inspection.
7. Backflow preventor inspection and repair.
8. Pressure washing of administration complex.
9. Homeless camp removal.
10. General Building Maintenance.
The Admin Complex Grounds Maintenance Services will include:
1. Lawn maintenance (mowing, trimming, edging, weeding, and waste removal).
2. Fertilizer and Herbicide applications.
3. Hedges & flower bed maintenance.
4. Irrigation maintenance.
Frequency
| Backflow Preventers Inspection |
| Yearly |
| Solar Panel Maintenance |
| Biannual |
| Active Vehicle Barrier Maintenance |
| Biannual |
| Above Ground Fuel Tank Inspection |
| Biannual |
| Pressure Washing of Administration Building Complex |
| Biannual |
| Homeless Camp Removal |
| Biannual |
| HVAC Maintenance |
| Quarterly |
| Hydraulic Elevator Maintenance/Testing |
| Monthly |
| Generator Set Maintenance |
| Monthly |
| Admin Complex Grounds Maintenance Svc |
| Weekly |
| Irrigation Maintenance |
| Weekly |
1.4 Background
The National Memorial Cemetery of the Pacific was established in 1949. Situated on 111.5 acres, it is known locally as “Punchbowl” because it is in the crater of an extinct volcano. Before Punchbowl became a cemetery, the site was used as a place of sacrifice during the ancient days of Hawaii. More than 1400 interments are conducted each year and currently there are approximately 62,000 decedents interred in this national shrine.
1.5 Type of Contract Contemplated
1.6 Period of Performance
This contract will be effective for a base year and 4 option years.
1.7 Place of Performance
The contractor shall provide services at the National Memorial Cemetery of the Pacific (NMCP), herby known as “Punchbowl Cemetery”. The hours of operation for the Facility Maintenance Services shall be during normal operations, Monday through Friday, from 8:00 a.m. to 4:30 p.m., except Federal Holidays. The hours of operation for the Admin Complex Grounds Maintenance Services shall be accomplished on weekends, Saturday, and Sunday, 8:00 a.m. to 4:30 p.m. Specific locations, sizes and services required for the cemetery are as follows:
| Cemetery |
| Address |
| Acreage |
| Required Services |
| National Memorial Cemetery of the Pacific |
| 2177 Puowaina Drive |
Honolulu HI, 96813 116 Developed Acres
Facility Maintenance & Grounds Maintenance Services
| Classification |
| Approximate Area/Quantity |
| Admin Building Complex Total Site Area |
| 2.5 Acres |
| Total Developed Area |
| 1.75 Acres |
1.8 Applicable Documents
The Contractor shall comply with all applicable Federal laws, regulations, requirements, and agency standards. All applicable instructions and directives are listed below:
NCA-Operational-Standards-and-Measures-Guidebook-Dec2023.pdf (va.gov)
| 2.0 | Specific Requirements/Tasks |
| 2.1 | Task One: HVAC maintenance. The contractor shall provide maintenance and inspections with certifications once every quarter (once every 3 months), four times a year. Services include but not limited to: |
1. Conduct an external inspection of the HVAC equipment.
2. Eliminate any obstructions in the way of air circulation.
3. Inspect the system to ensure there are no gas or fluid leaks.
4. Inspect blowers or fans to ensure they are working properly.
5. Inspect wiring and electrical components.
6. Inspect thermostat operation and readings.
7. Inspect refrigerant levels.
8. Inspect exhaust outlets.
9. Inspect carbon monoxide detectors.
10. Replace HVAC filters every 90 days.
2.2 Task Two: Hydraulic elevator maintenance and testing. The contractor shall ensure the hydraulic maintenance and testing are done by a licensed elevator personnel inspector once a month, twelve times a year to include an annual certification. Services include but not limited to:
1. Relief valve setting and system pressure
2. Flexible hose and fitting hydraulic cylinder leak test
3. Standby power operation
4. Fire fighter’s service
5. Power operation of doors
6. Normal and final terminal stopping devices
7. Emergency terminal speed-limiting device
8. Pressure switch
9. Oil buffer, safety, governor
10. Low oil test
11. All required elevator certification
2.3 Task Three: Photovoltaic System maintenance. The contractor shall conduct general maintenance on all components of cemetery solar modules once every six months, twice a year. Services include but not limited to:
1. Inspect modules for corrosion or general damage.
2. Inspect modules wirings and inverters.
3. Clean modules to ensure panels are free of debris of any type.
2.4 Task Four: Outdoor Standby Diesel Generator Set maintenance. The contractor shall do the following inspection and report of any issues once a month, twelve times a year. Services include but not limited to:
1. Complete a visual inspection.
2. Check fluid levels and pressure.
3. Check battery.
4. Visually inspect hoses, fittings, and connections.
5. Inspect wiring & electrical components.
6. Inspect the automatic transfer switch.
7. Address any unusual noises, vibrations or alerts that occur while the generator is running.
8. Turn the genset to "Auto" rather than "Off' after testing so it can start automatically during a power outage.
9. Inspect other external equipment including the fire extinguisher, first aid kit, manuals, and maintenance log.
2.5 Task Five: Active vehicle barrier maintenance. The contractor shall inspect and perform preventative maintenance to the Cemetery Main Gate, Administration Complex Entrance and Exit active vehicle barriers once a month, twelve times a year. Services include but not limited to:
1. Corrosion, rust, or weathering of barrier.
2. Inspect and grease barrier grease points.
3. Provide an inspection checklist detailing date of inspection and maintenance.
4. Inspect barriers paint for chipping and overall appearance.
5. Inspect gate actuators and control panels.
2.6 Task Six: Above ground fuel tank inspection. The contractor shall inspect and certify the above ground diesel and non-ethanol fuel tanks once every six months, twice a year. Services include but not limited to:
1. Inspect tank in its entirety for visible exterior leaks.
2. Perform moisture and tank sediment test.
3. Inspect nozzles for rust and leaks.
4. Provide a detailed written report and certificate to the Contracting Officer Representative (COR) on the results of the inspection and leak test of fuel tanks.
2.7 Task Seven: Backflow preventor inspection. The contractor shall provide backflow testing and certification by a certified backflow prevention assembly tester for each backflow prevention device serving the site once a year. Services include but not limited to:
1. Affix a service tag to each backflow serviced.
2. Flush and clean wye-strainers screens on backflow assemblies.
3. Check backflow insulators.
4. Provide certification of testing.
2.8 Task Eight: Pressure washing of administration complex. Contractor shall pressure wash the entirety of the administration building complex once every six months, twice a year. Services include:
1. Walkways
2. Sidewalks
3. Stairs
4. Lanais
5. Parking lot
6. Curbs & gutters
2.9 Task Nine: Homeless camp removal. Encampment Sites are considered to contain a variety of materials that may contain hazardous materials, including biohazardous materials, garbage, general debris, human waste, constructed temporary shelters, and other items associated with homeless occupancy. These sites may contain a variety of large items including furniture, appliances, motors, tires, construction debris, automobile parts, bicycles, mattresses, box springs, garbage, general debris, and other items as may be dumped illegally. The contractor shall provide services for the Homeless camp removal once every six months, twice a year.
1. Removal of Homeless camp and materials.
2. Disposal of Homeless camp and materials.
3. Dismantling temporary structures.
| 3.0 | Task Ten: Admin Complex Grounds Maintenance Services. The Contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance in accordance with the NCA-Operation-Standards-and-Measures Guidebook every week, fifty two weeks a year. |
| 3.0.1 | Mow. Mow all grounds to look well-manicured with a neat and professional appearance at all times. Maintain grass and vegetation in lawns between 3 to 3.5 inches in height, uniform in appearance, free of skips, gaps, rutting, or scalping. Pick up debris and litter prior to mowing any area. Remove or mulch grass clippings, when clumps or rows of clippings remain after mowing, before leaving work area. |
| 3.0.2 | Edge. Edge sidewalks, driveways, street edges, curbs, and other hard surfaced areas located within grounds during mowing or when vegetation extends onto hard surface by more than 2 inches. Grass and vegetation height shall match surrounding area vegetation height. Grass and/or other vegetation shall be cut back no more than half (1/2) inch from the surface being edged, maintaining an even contour with the edged surface, uniform in appearance and free of scalping, rutting, and uneven or rough cutting. |
| 3.0.3 | Trim. Trim grass and vegetation around trees, shrubs, buildings, planter beds, fences, poles, fire hydrants, parking lot bumper blocks, boulders, and other fixed obstacles and temporary obstacles/objects on improved grounds. Trimming height shall match surrounding area grass height. All areas shall be trimmed concurrent with mowing or when height exceeds four 3.5 inches. Remove grass clippings, when visible after trimming, before leaving work area. |
| 3.0.4 | Weed Control. Limit pest/weed control or invasive species control. Weed control is defined as the process of controlling or eliminating unwanted plant material. The Contractor shall control weeds in grounds areas. Any herbicides used shall be applied in strict compliance with the manufacturer’s label instructions. The contractor shall provide a Material Safety Data Sheet (MSDS) to the COR and approved by COR prior to applications. The Contractor shall repair/replace any grassed areas, trees, shrubs, flowers, or bushes that have been damaged by improper spraying procedures. |
| 3.0.5 | Prune Shrubs, Hedges and Other Plants. Prune shrubs, hedges, and other vegetation to prevent infrastructure damage and pest infestation. Prune/trim shrubs and other plants to maintain their natural growth characteristics and enhance the beauty and health of the plant. Maintain hedges to their natural, mature height and shape. Shrubs, plants, hedges, and ground cover/vines shall be pruned/trimmed three (3) inches away from buildings, fences, curbing, sidewalks, and other fixed obstacles. All ground cover and plants shall be kept within the bed borders. All plants around landscape and ground lights shall be pruned/trimmed to allow light usage for its intended purpose. Shrubs and hedges located on street corners and curb easements shall be pruned/trimmed to keep from obstructing view of oncoming traffic. Areas beneath shrubs and hedges shall be kept free (clean) of all grass, weeds, vegetation, and debris. |
| 3.0.6 | Remove Debris/Police Grounds. The contractor shall gather, remove, and dispose of debris and litter (tree limbs, dry brush, leaves, food wrappers, plastic bottles, cans, etc.). |
3.1 Task Eleven: Irrigation Maintenance Services. The contractor shall provide all supplies and services to include but not limited to:
1. Adjust, repair, and maintain sprinkler heads and irrigation valves.
2. Adjust heights of sprinkler heads to be flush with grade of lawn. Adjust arc and radius of sprinkler to minimize overspray.
3. Align heads perpendicular to grade of lawn, unclog nozzles, clean internal screens, relocate or add heads to ensure even distribution of water.
| 4.0 | Contractor Quality Assurance. |
| 4.1 | The Government will inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The COR will inspect by validating actual work performance, physically checking an attribute of the completed task, checking a management information report, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The COR will use the Contractor’s work schedule or modified version thereof, to record surveillance results. Results of the surveillance then become the official record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the CO or the COR will initiate either a Corrective Action Report (CAR), a Performance Assessment Report (PAR) or a Contract Discrepancy Report (CDR) at which time a Cure Notice will be issued by the CO. However, the Contracting Officer may issue a Cure Notice at any time he/she deems appropriate. Depending on the overall performance of the Contractor, an unsatisfactory reply to the Cure Notice should require a Show Cause letter to be issued, followed by consideration of termination of the contract. |
| 4.2 | Quality Control: The Contractor shall develop and maintain an effective quality control plan to ensure services are performed in accordance with this PWS. The Contractor’s quality control plan is the means by which he assures himself that his work complies with the requirement of the contract. At a minimum, the Contractor shall develop a quality control plan in accordance with the Performance Requirements identified in the Quality Assurance Surveillance Plan (QASP). After acceptance of the quality control plan, the Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system. |
| 4.3 | Quality Assurance: The Government will monitor the Contractor’s performance under this contract using the Quality Assurance Surveillance Plan (QASP). All work performed under this contract will be subject to inspection at all times by the Government. |
| 5.0 | Delivery or Deliverables |
The contractor shall provide the specific deliverables described below within the performance period stated in 1.6 of this PWS.
Facilities Maintenance:
| Line Item #/CLIN |
| PWS reference |
| Name |
| Place of Performance |
| Unit |
| QTY |
| Delivery Schedule |
| Inspection Schedule |
| Target |
| 0001 |
| Para 2.1 Task 1 |
| HVAC maintenance. |
| Administration Building. |
| 15 Blower Units/3 Split AC Units, 18 filters |
| 4 |
| Quarterly, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 95% |
| 0002 |
| Para 2.2 Task 2 |
| Hydraulic elevator maintenance. |
| Administration Building |
| 1 Elevator, 2 Floors |
| 12 |
| Monthly, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 100% |
| 0003 |
| Para 2.3 |
Task 3
| Photovoltaic System maintenance. |
| Administration Building |
| 120 modules, 84”x16” |
| 2 |
| Bi-Annually, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 95% |
| 0004 |
| Para 2.4 |
Task 4
| Generator check/set maintenance. |
| Administration Building |
| 2 Outdoor Standby Diesel Generator Sets. |
| 12 |
| Weekly, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 95% |
| 0005 |
| Para 2.5 Task 5 |
| Active vehicle barrier maintenance. |
| Administration Building |
| 3 Gates; Cemetery Main Gate, Admin Entry & Exit Gates. |
| 12 |
| Monthly, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
95%
| 0006 |
| Para 2.6 |
Task 6
| Fuel tank inspection. |
| Maintenance Shop |
| 2 tanks, Diesel & Non-Ethanol |
| 2 |
| Bi-Annually, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 100% |
| 0007 |
| Para 2.7 Task 7 |
| Backflow preventor inspection. |
| Pump House & Admin Building |
| 2 @ Pump House, 1 @ Admin Building |
| 1 |
| Annually, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 95% |
| 0008 |
| Para 2.8 Task 8 |
| Pressure washing |
| Administration Building Complex |
| All outside concrete surfaces & asphalt surfaces |
| 2 |
| Bi-Annually, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 95% |
| 0009 |
| Para 2.9 Task 9 |
| Homeless camp removal |
| NMCP Perimeter |
| 4 camps, approx. 20 feet x 20 feet each camp site. |
| 2 |
| Bi-Annually, Monday thru Friday, 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
Admin Complex Grounds Maintenance:
| Line Item #/CLIN |
| PWS reference |
| Name |
| Place of Performance |
| Unit |
| QTY |
| Delivery Schedule |
| Inspection Schedule |
| Target |
| 0010 |
| Para 3.0 Task 10 |
| Grounds Maintenance Services |
| Administration Building Complex |
| 1.75 acres |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
| Para 3.0.1 |
| Mowing |
| Administration Building Complex |
| Grass Ht. 3-3.5 inches |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
| Para 3.0.2 |
| Edging Curbs & Sidewalks |
| Administration Building Complex |
| ½ inch gap between turf & concrete |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
| Para 3.0.3 |
| Trees & Hedges trimming |
| Administration Building Complex |
| All trees, hedges, flower beds |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
| Para 3.0.4 |
| Weed Control |
| Administration Building Complex |
| 1.75 acres |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
| Para 3.0.5 |
| Pruning |
| Administration Building Complex |
| All shrubs, hedges & other plants |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
Para 3.0.6
| Debris Removal |
| Administration Building Complex |
| All grass clippings, cut tree & shrub branches, dirt, leaves, etc. |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 90% |
| 0011 |
| Para 3.2 |
Task 11
| Irrigation Maintenance |
| Administration Building Complex |
| All irrigation |
| 52 |
| Weekly, Saturday & Sunday. 08:00 a.m. to 04:30 p.m. |
| The COR will inspect when PM notifies of completion. |
| 95% |
5.1 Unscheduled emergency service/repair
Unscheduled emergency services/repairs are to be performed at the time of need for the Administration Building’s HVAC system, hydraulic elevator, photovoltaic system, outdoor standby diesel generator set, active vehicle barriers, above ground fuel tanks, and general building repairs. The contractor shall provide all supplies and services. Rates for unscheduled services/repairs are to be negotiated at time of need and funded by modification.
6.0 Meetings
Meetings will be conducted at either the NMCP Administration Office, location at 2177 Puowaina Dr., or through an alternative method of communication (such as teleconferencing), as approved by the Contracting Officer.
7.0 Key Personnel
The following personnel are considered key personnel by the Government: Site Manager and Assistant Site Manager. The Contractor shall submit the contact information for key personnel and replacements to the CO and COR.
7.1 Program/Site Manager: The Contractor shall provide a Program/Site Manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contract Officer. The Program/Site Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operations of this contract. The Program/Site Manager shall provide license and certifications for maintenance being performed for each task listed in this PWS. The Program/Site Manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday through Sunday except Federal Holidays.
| 7.2 | Contractor Identification: All contract personnel shall be identified as a Contractor, i.e., badge, company logo, or uniform. All contract personnel are required to identify themselves such that they avoid creating an impression in the minds of the public that they are Government officials. |
| 8.0 | Government Furnished Property/Equipment/Information |
The contractor is required to furnish all property necessary to perform the contract. There will be no Government Furnished Property provided by the Government. The Government will not be responsible for any loss, damage, or theft of contractor items. Contractor shall be responsible for acceptable standards of housekeeping and custodial maintenance of Department of Veterans Affairs' facilities used by contractor's employees that are acceptable to the COR and in accordance with National Cemetery Administration Operational Standards and Measures (Version 9.1, December 2023).
8.1 All contractor personnel operating vehicles on government property must possess a valid state driver's license. Contractor employees may park privately owned vehicles in the area designated for parking by the COR. It is the responsibility of the Contractor to ensure his employees park in the appropriate designated parking areas. The Government is not responsible for any damage, theft of vandalism to privately owned vehicles parked on cemetery property. All Contractor employees park on cemetery property at their own risk. The Contractor shall observe all traffic, parking, directional signs, and regulations when using the cemetery’s roadways. The Cemetery will not invalidate or make reimbursement for parking violations of the Contractor’s employees under any conditions.
8.2 Storage Facilities: The Government will not furnish a storage room at the Cemetery site for use by the Contractor to store supplies or equipment. Contractor shall bring all supplies and equipment on a daily basis. An area will be designated by the COR for smoking, lunch/breaks, employee parking, etc. as approved by the Contracting Officer (CO. All utilities to this area are the responsibility of the Contractor. The Government will not be responsible for any damage to, or loss of the Contractor's equipment and supplies stored on the Government's premises. The Contractor shall provide any storage buildings/lockers at their own expense.
8.3 Tools and Equipment: The Contractor shall comply with all Federal, State, City, County, regarding the use of Personal Protective Equipment for all contract personnel. All Personal Protective Equipment is provided by the Contractor.
8.4 Hazardous Materials: The Contractor shall be responsible for maintaining fire extinguishers and other safety equipment. SDS (Safety Data Sheets) are required for all chemicals and cleaning solutions. The Contractor shall provide a master file of SDS sheets to the COR. Contractor is responsible for safely storing any chemicals, pesticides, herbicides, cleaning solutions, flammable materials, etc. while on site in properly ventilated hazardous materials lockers in accordance with all federal, state and county laws and regulations and manufacturers recommendations.
9.0 Glossary of Abbreviations and Acronyms
| CAR | Corrective Action Report |
| CDR | Contract Discrepancy Report |
| CO | Contraction Officer |
| COR | Contracting Officer’s Representative |
| NMCP | National Memorial Cemetery of the Pacific |
MSDS Material Safety Data Sheet PAR Performance Assessment Report
File details come from the government source that posted it. Updated .