Attch1_Drawings_442-18-003 Replace Buffalo Basement Switchgear - Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- 36c25920r0065
About this file
This solicitation is for replacing two basement switchgears at the Cheyenne VA Medical Center in Cheyenne, Wyoming. The scope of work includes demolishing existing electrical equipment including two oil-filled pad-mounted transformers, two 1600-amp switchboards, associated concrete containment curbs and housekeeping pads. It also includes installing new exterior pad-mounted transformers, underground ductbanks, interior feeders and two new 1600-amp switchboards. Construction phasing will involve completing exterior work first before replacing one interior switchgear at a time to minimize outage durations. The contractor must coordinate outages between 10pm and 6am on weekends over four planned outage periods. The solicitation number is 36c25920r0065 and was issued by the Department of Veterans Affairs Veterans Health Administration. The anticipated award date is April 2020.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING LIST
GENERAL
G-001 COVER 1 1
STRUCTURAL
S-001 ABBREVIATION, SYMBOL LEGEND, AND GENERAL STRUCTURAL NOTES 1 3
S-101 FOUNDATION PLAN, ROOF FRAMING PLAN, DEATILS 2 3
S-501 DETAILS 3 3
ARCHITECTURAL
AE101 FIRST FLOOR PLAN, ELEVATIONS, SECTION AND DETAIL 1 2
AE301 BUILDING SECTIONS AND DETAILS 2 2
ELECTRICAL
E-001 ELECTRICAL GENERL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 5
E-101 ELECTRICAL SITE PLAN - DEMOLITION 2 5
E-102 ELECTRICAL SITE PLAN - NEW WORK 3 5
E-501 ELECTRICAL DETAIL 4 5
E-601 SINGLE LINE DIAGRAM 5 5
CHEYENNE VA MEDICAL CENTER
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/6
/2
:4
:0
P M
G-001
COVER
1 1JJG
REPLACE BUFFALO
BUILDING BASEMENT
SWITCHGEAR
CHEYENNE VA MEDICAL CENTER
2360 EAST PERSHING BLVD
CHEYENNE, WY 82001 March 6, 2020
100% CONSTRUCTION DOCUMENT
442-18-00318-357
Buffalo
REPLACE BUFFALO BUILDING
BASEMENT SWITCHGEAR
CHEYENNE VA MEDICAL CENTER
2360 EAST PERSHING BLVD
CHEYENNE, WY 82001
VA PROJECT #: 442-18-003 APOGEE PROJECT #: 18-357
KC
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
AREA OF WORK
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H, N
C
N
11664
I K
G HC OY
RE
G
IS
TERED ARCHITECT
N O
R
T H C A R O L
I N A
DocuSign Envelope ID: 807AFC17-21D7-401E-A49B-5F1C7E3E4E8F
3/6/2020
American Welding Society
American National Standards Institute
American Society for Testing and Materials
American Iron and Steel Institute
American Institute of Steel Construction
American Institute of Architects
American Concrete Institute
CC Carried Column
CIP Cast In Place
Addition
Alternate
Air Condition
Aggregate
Anchor BoltAB
ALT
A/C
AGGR
ADD
Angle
And
Asphalt
Approximate
AIA
ACI
AISI
ANSI
ASTM
AISC
L
ASPH
ARCH
APPROX
AWS
Average
Bottom
Bearing
Bending Moment
Base Plate
Building
Center
Ceiling
Center to Center
Center of Gravity
Bottom of Deck
M
BOT
BRG
B PL
AVG
CG
CEN
CLG
BLDG
B/D
AssemblyASSY
Architect or Architectural
Column
Clear
Channel
Concrete
Control Joint
Connection
Cubic Yard
Cubic Foot
Continuous
Construction
C
CJ
CONN
CONC
COL
CLR
CY
CF
CMU
CMP
CONT
CONST
Diagonal
Detail
Ditto
Diameter
Double Angle
Dimensions
Drawing
Douglas Fir
2L
DO
DIM
DIA
DIAG
DET
DF
DWG
DoubleDBL
Concrete Masonry Units
Corrugated Metal Pipe
C/C
AluminumAL
MB Machine Bolt
Glu lam BeamGLB
Quarter
Radius
Reference
Reinforce, Reinforced, QTR
REF
RAD
REINF
Round
Required
Section
Schedule
Revise or Revision
South
Similar
Steel
Standard
Square
Specifications
Sheet
Stock
Tangent
Symmetrical
Structural
Strut Force
Through
Top of Concrete
Top and Bottom
Tongue & Groove
Tolerance
Thick
Top of Footing or Top of Foundation
RD
REV
SECT
SCHED
REQD
S
SIM
STL
STD
SQ
SPECS
SHT
SYM
STK
TAN
SF
STRUCT
TOL
T/F
T/C
T & B
T & G
THRU
THK
Typical
Total
Transverse
Top of Steel
Top of Masonry
Vertical
Verify in the Field
Unless Noted
Unless Noted Otherwise
Top of Concrete Wall
West
Without
With
Work Point
Wide Flange
Welded Wire Fabric
Yard
T/S
T/M
TYP
TOT
TRANS
UNO
UN
VIF
VERT
W
W
WWF
WP
W/O
W/
YD
T/W
Reinforcement, or Reinforcing
Long
Light
Length
Laminated
Longitudinal
LAM
LGTH
LG
LT
LONGIT
Each
East
EF
EA
E
EW
ELECT Electric or Electrical
Each way
Each face
Mark
Metal
Maximum
Material
Maximum
Mechanical
Manufacturer
LLH
LLBB
LLV
MK
MAX
MECH
MATL
MAX
MET
MFR
Medium
Mezzanine
Minimum
Minute
Miscellaneous
Mixture
North
Nominal
Near Side
Near Face
Multiple
MED
MIN
MEZZ
MIX
MISC
MIN
NF
N
NOM
NS
MULT
EQ
ENGR
ETC
EST
EXCAV
EQUIP
EXT
EJ
EXIST
X-STR
X-HVY
Etcetera
Extra Strong
Extra Heavy
Exterior
Expansion Joint
Existing
Excavate
Estimate
Equipment
Equal
Engineer
FS
FF
FT or '
FIN
FIG
FBM
FTG
FD
FRMG
FND
FLR
Framing
Foundation
Footing
Floor Drain
Floor
Finish
Figure
Feet Board Measure
Feet or Foot
Far Side
Far Face
FabricationFAB
Opposite
Opening
On Center
Number
Perpendicular
Permanent
Original
OPP
OPNG
OC
OD
PERP
PERM
d
ORIG
Point
Plate
Pound
Plywood
Project
PT
PL
PLYWD
PSF
PCF
LB
PROJ
PSI
Piece, Pile CapPC
GEN
GI
GALV
GRND
GR
HEX
HGT
HORIZ
S
IN or " Inches
I Beam
Horizontal
Hexagon
Height
Ground
Grade
General (Notes)
Galvanized Iron
Galvanize
Joint
Joist
ID
JT
JST
KO
K
Knockout
Kip (1,000 lbs)
Inside Diameter
Include or IncludedINCL
Not to ScaleGage or Gauge NTSGA
Elevation LHEELEV
Pounds Per Square Inch
Pounds Per Square Foot
Pounds Per Cubic Foot
Penny (Nails, etc)
Outside Diameter
Long Leg Vertical
Long Leg Horizontal
Long Leg Back To Back
Low Hydrogen Electrode
General Structural NotesGSN
LEGEND:
GSN = GENERAL STRUCTURAL NOTES
UNO = UNLESS NOTED OTHERWISE
INDICATES TUBE COLUMN
INDICATES WIDE FLANGE COLUMN
INDICATES BEAM SPLICE
INDICATES FOOTING SIZE. SEE SCHEDULE.
F1
SYMBOLS AND ABBREVIATIONS FOR CONCRETE (as per ACI)
SLOPE DIRECTION DOWN
MISCELLANEOUS ELEVATION
FLOOR OR STEEL ELEVATION
REQUIRED NUMBER OF HEADED SHEAR STUDS
RIGID CONNECTION
CAMBER UP
00'-0"
00'-0"
(00'-0")
C=0"
[00]
STEEL ELEVATION
SPAN DIRECTION
To Indicate Size of Deformed Bar.#
Clear
Bottom
Bent
Each Face
Column Tie
Each Way
Limits of Area Covered By Bars
Direction in Which Bars Extend
Spacing Center to Center
Spiral
Stirrup
Plain Bar
Outside Face
Near Face
Inside Face
Top
Straight
Far Face
AT
EF
CT
CL
BOT
BT
EW
T
STR
SP
STIR
PL
OF
NF
IF
FF
Plain Rounds, as Spirals/
INDICATES STD PIPE COLUMN
Construction Management Civil Engineering Surveying
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Calibre Engineering, Inc.
Calib er
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
18-357
Buffalo (CA)
/5
/2
:0
:2
A M
S-001
ABBREVIATIONS, SYMBOL LEGEND,
AND GENERAL STRUCTURAL NOTES
MBT
REPLACE BASEMENT
SWITCHGEAR
Cheyenne VA Medical Center 2360 East Pershing Blvd.
Cheyenne, WY 82001 March 06, 2020
100% CONSTRUCTION DOCUMENTS
442-18-003
GMG
SYMBOL LEGEND
ABBREVIATIONSGENERAL STRUCTURAL NOTES
1 3
GENERAL
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO STARTING CONSTRUCTION.
2. DO NOT SCALE THE DRAWINGS.
3. GENERAL STRUCTURAL NOTES AND TYPICAL DETAILS APPLY UNLESS NOTED OTHERWISE ON
PLANS, ELEVATIONS, DETAILS AND SPECIFICATIONS. IN CASE OF CONFLICT THE GREATER
REQUIREMENT GOVERNS.
4. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED
STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION.
5. THE STRUCTURAL ENGINEER SHALL NOT HAVE CONTROL OF CHARGE OF, AND SHALL NOT BE
RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK,
FOR THE ACTS OF OMISSIONS OF THE CONTRACTOR, SUB-CONTRACTORS OR ANY OTHER
PERSONS PERFORMING AN OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM TO CARRY
OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
6. THE CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE
DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING
AND SHORING FOR LOADS DUE TO HYDROSTATIC, EARTH, WIND OR SEISMIC FORCES,
CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE STRUCTURAL
ENGINEER SHALL NOT INCLUDE INSPECTION OF THE ABOVE ITEMS.
7. NOTIFY THE STRUCTURAL ENGINEER THROUGH THE ARCHITECT WHEN DRAWINGS BY OTHERS
SHOW OPENINGS, POCKETS, ETC., NOT SHOWN ON THE STRUCTURAL DRAWINGS, BUT WHICH
ARE LOCATED IN THE STRUCTURAL MEMBER.
8. ALL SPECIFICATIONS AND CODES NOTED SHALL BE THE LATEST APPROVED EDITIONS AND
REVISIONS BY THE GOVERNMENTAL AGENCY HAVING JURISDICTION OVER THIS PROJECT.
9. COST OF ADDITIONAL FIELD AND OFFICE WORK NECESSITATED BY REQUESTS BY THE
CONTRACTOR FOR AN OPTION OF DUE TO ERRORS OR COMMISSIONS IN CONSTRUCTION SHALL
BE BORNE BY THE CONTRACTOR. OPTIONS ARE FOR CONTRACTOR'S CONVENIENCE. HE SHALL
BE RESPONSIBLE FOR ALL CHANGES NECESSARY IF HE CHOOSES AN OPTION AND HE SHALL
COORDINATE ALL DETAILS.
10. ANY ENGINEERING DESIGN PROVIDED BY OTHERS AND SUBMITTED FOR REVIEW SHALL BEAR
THE SEAL OF AN ENGINEER REGISTERED IN WYOMING.
11. UNLESS NOTED OTHERWISE, DETAILS ON STRUCTURAL DRAWINGS ARE TYPICAL AS INDICATED
BY CUTS, REFERENCES OR TITLE.
12. CONTRACTOR SHALL VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
13. FIELD VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS PRIOR TO THE START OF SHOP
DRAWINGS OR CONSTRUCTION.
14. EXISTING CONDITIONS REQUIRING MODIFICATIONS TO DOCUMENTS FOR PROPOSED
CONSTRUCTION SHALL BE IMMEDIATELY SUBMITTED TO ARCHITECT.
CODE AND DESIGN CRITERIA
1. BUILDING CODE: LATEST EDITION OF U.S. DEPARTMENT OF VETERANS AFFAIRS DESIGN GUIDES, STANDARDS, AND MANUALS.
2015 INTERNATIONAL BUILDING CODE (IBC)
2. DESIGN LIVE LOADS:
a. SWITCHGEAR MECHANICAL PAD----------------- 250 PSF OR EQUIPMENT WEIGHT, THE HEAVIER
3 WIND DESIGN DATA:
a. BASIC WIND SPEED ----------------------------------- 140 MPH (ULTIMATE)
b. EXPOSURE ----------------------------------------------- C
c. INTERNAL PRESSURE COEFFICIENT----------- +/- 0.18
3. SEISMIC DESIGN DATA:
a. BUILDING RISK CATEGORY------------------------- IV
b. IMPORTANCE FACTOR (IE) -------------------------- 1.50
c. SS ------------------------------------------------------------ 0.156g
d. S1 ------------------------------------------------------------ 0.054g
e. SITE CLASS ---------------------------------------------- D
f. SDS ---------------------------------------------------------- 0.166g
g. SD1---------------------------------------------------------- 0.086g
h. SEISMIC DESIGN CATEGORY--------------------- C
5. GROUND SNOW LOAD---------------------------------- 30 PSF
FROST PENETRATION---------------------------------- 48 INCHES
IMPORTANCE FACTOR (IE)---------------------------- 1.20
CONCRETE AND MASONRY ADHESIVE ANCHORS
1. ADHESIVE ANCHORS SHALL NOT BE USED UNLESS SPECIFICALLY DETAILED ON DRAWINGS OR
APPROVED BY THE STRUCTURAL ENGINEER.
2. ADHESIVE ANCHORS IN NORMAL-WEIGHT HARDROCK CONCRETE SHALL BE BY HILTI, INC. (ICC NO.
ESR-3187; HIT-HY 200 ADHESIVE) OR ICC APPROVED EQUIVALENT.
3. ADHESIVE ANCHORS IN GROUT FILLED CMU SHALL BE BY HILTI, INC. (ICC NO. ESR-3963; HIT-HY 200
ADHESIVE) OR ICC APPROVED EQUIVALENT.
4. MINIMUM EMBEDMENT IN NORMAL-WEIGHT HARDROCK CONCRETE SHALL BE THE TABULATED
VALUE IN THE ICC REPORT THAT EXCEEDS SIX BOLT DIAMETERS OF THE ANCHOR SPECIFIED BUT
NOT LESS THAN AS INDICATED ON PLANS OR IN DETAILS.
REINFORCING STEEL
1. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN CONFORMANCE WITH THE `BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE' (ACI 318) AND THE `MANUAL OF STANDARD PRACTICE FOR REINFORCED CONCRETE CONSTRUCTION' BY CRSI AND WCRSI, AS MODIFIED BY THE PROJECT DRAWINGS
AND SPECIFICATIONS.
2. DEFORMED REINFORCING BARS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A615 GRADE 60, EXCEPT TIES, STIRRUPS AND REINFORCING BARS IN NON-STRUCTURAL CONCRETE SUCH AS SLABS ON GRADE, WHICH MAY BE GRADE 40, UNLESS NOTED OTHERWISE.
3. WELDING OF REINFORCING SHALL BE WITH LOW HYDROGEN ELECTRODES IN CONFORMANCE WITH 'RECOMMENDED PRACTICES FOR WELDING REINFORCING STEEL, ETC.', AMERICAN WELDING SOCIETY, AWS
D1.4. WELDING OF REINFORCING STEEL IS LIMITED TO A706 REBAR.
4. ALL REINFORCING BAR BENDS SHALL BE MADE COLD.
5. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185.
6. MINIMUM LAP OF WELDED WIRE FABRIC SHALL BE 6 INCHES OR ONE FULL MESH AND ONE HALF, WHICH EVER
IS GREATER.
7. SPLICES SHALL BE MADE ONLY AS AND WHERE INDICATED ON THE STRUCTURAL DRAWINGS.
8. DOWELS BETWEEN FOOTINGS AND WALLS OR COLUMNS SHALL BE THE SAME GRADE, SIZE, SPACING AND
NUMBER AS THE SPECIFIED VERTICAL REINFORCING, U.N.O.
9. ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN THE FINAL IN-PLACE
INSPECTION OCCURS.
10. PROVIDE SHOP DRAWINGS AND FABRICATE AFTER THE ARCHITECT'S REVIEW. ALL SPLICE LOCATIONS ARE
SUBJECT TO APPROVAL. PLACE REBAR PER CRSI STANDARDS.
CONCRETE
1. ALL PHASES OF WORK PERTAINING TO THE CONCRETE CONSTRUCTION SHALL CONFORM TO THE 'BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE', ACI 318, AND THE `SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS', ACI 301, LATEST EDITIONS, WITH MODIFICATIONS AS NOTED ON THE DESIGN DRAWINGS OR SPECIFICATIONS.
2. REINFORCED CONCRETE DESIGN IS BY THE ULTIMATE STRENGTH DESIGN METHOD.
3. CONCRETE MIXES SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND SHALL BEAR THE WET SEAL OF A CIVIL
ENGINEER LICENSED IN THE STATE OF WYOMING.
4. THE CONCRETE MIXTURES SHALL BE BASED ON THE FOLLOWING EXPOSURE CATEGORIES AND CLASSES.
a. MINIMUM SULFATE EXPOSURE CLASS ----------------------- S1
b. CORROSION PROTECTION OF REINF. CLASS ------------- C1
c. PERMEABILITY EXPOSURE CLASS ----------------------------- P0
d. FREEZING AND THAWING EXPOSURE CLASS ------------- F1
e. WATER CEMENT RATIO MAXIMUM W/CM ------------------- 0.45
5. SCHEDULE OF STRUCTURAL CONCRETE 28-DAY STRENGTHS AND TYPES:
LOCATION IN STRUCTURE STRENGTH (PSI) TYPE
CONCRETE SLAB 4500 HARD ROCK
ALL CONCRETE UNO 4500 HARD ROCK
6. PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE II.
7. AGGREGATE FOR HARD ROCK CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF ASTM C33 AND PROJECT SPECIFICATIONS. EXCEPTIONS MAY BE USED ONLY WITH PERMISSION OF THE STRUCTURAL ENGINEER. USE 1" MAX
AGGREGATE SIZE.
8. CONCRETE MIXING OPERATIONS, ETC., SHALL CONFORM TO ASTM C94.
9. PLACEMENT OF CONCRETE SHALL CONFORM TO ACI STANDARD 304 AND PROJECT SPECIFICATIONS. SANDBLAST ALL
CONCRETE SURFACES AGAINST WHICH CONCRETE IS TO BE PLACED.
10. PLACING OF CONCRETE SHALL CONFORM TO ACI 305 ``HOT WEATHER CONCRETING" WHEN APPLICABLE.
11. CLEAR COVERAGE OF CONCRETE OVER REINFORCING BARS BE AS FOLLOWS:
a. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH ------------ 3”
b. CONCRETE EXPOSED TO EARTH OR WEATHER:
i. NO. 6 THROUGH NO. 18 BAR ---------------------------------------------------------------------2”
ii. NO. 5 BAR AND SMALLER ------------------------------------------------------------------------ 1 1/2”
c. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND
i. SLABS, WALLS, JOISTS:
1. NO. 14 AND NO. 18 BAR ------------------------------------------------------------------------ 1 1/2”
2. NO. 11 BAR AND SMALLER --------------------------------------------------------------------3/4”
ii. BEAMS, COLUMNS:
1. PRIMARY REINFORCEMENT, TIES, STIRRUPS, SPIRALS --------------------------1 1/2”
d. SLABS ON GRADE (FROM TOP)---------------------------------------------------------------------- 1 1/2”
11. ALL REINFORCING BARS, ANCHOR BOLTS AND OTHER CONCRETE INSERTS SHALL BE WELL SECURED IN POSITION PRIOR TO
PLACING CONCRETE.
12. MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH SLAB ON GRADE, CONCRETE ON STEEL DECK, FRAMED CONCRETE FLOORS AND WALLS DO NOT REQUIRE SLEEVES, UNLESS OTHERWISE INDICATED IN THE PROJECT SPECIFICATIONS, MECHANICAL OR ELECTRICAL DRAWINGS. IF SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE PLACING CONCRETE. DO NOT CUT ANY REINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORING OPENINGS IN CONCRETE IS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER THROUGH THE ARCHITECT IN ADVANCE OF CONDITIONS NOT SHOWN ON THE STRUCTURAL DRAWINGS. NO PIPES OR ELECTRICAL CONDUIT SHALL PASS THROUGH CONCRETE BEAMS
OR COLUMNS UNLESS SPECIFICALLY DETAILED.
13. PROJECTING CORNERS OF BEAMS, WALLS, COLUMNS, ETC., SHALL BE FORMED WITH A 3/4 IN. CHAMFER, UNLESS OTHERWISE
NOTED ON ARCHITECTURAL DRAWINGS.
14. CURING COMPOUNDS USED ON CONCRETE THAT IS TO RECEIVE A RESILIENT TILE FINISH SHALL BE APPROVED BY THE FINISH
APPLICATOR BEFORE USE.
15. MODULUS OF ELASTICITY OF CONCRETE, WHEN TESTED IN ACCORDANCE WITH ASTM C469, SHALL BE AT LEAST THE VALUE GIVEN BY THE EQUATIONS IN SECTION 8.5.1 OF ACI 318 FOR THE SPECIFIED CONCRETE 28-DAY STRENGTH.
16. MINIMUM STRENGTH FOR REMOVAL OF FORMS AND SHORING SHALL BE 75% OF SPECIFIED STRENGTH AT 28 DAYS.
17. ALL CONCRETE NOT SPECIFICALLY SHOWN WITH REINFORCEMENT SHALL BE REINFORCED IN THE SAME MANNER AS SIMILAR
CONDITIONS OR WITH REINFORCEMENT MEETING THE MINIMUM REQUIREMENTS OF ACI-318.
18. CONCRETE SLAB SHALL BE WET MAT, MOIST CURED FOR A MINIMUM OF 7 DAYS.
19. CONCRETE MIXES MAY CONTAIN FLY ASH AS NOTED PER SPECIFICATIONS.
MASONRY
1. THE MASONRY UNITS SHALL CONFORM TO ASTM C90 GRADE N-1 AND SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 28-DAYS ON THE NET AREA OF 2000 PSI FOR A DESIGN STRENGTH OF f'm = 1500 PSI.
2. CEMENT SHALL BE AS SPECIFIED FOR CONCRETE.
3. REINFORCING BARS - SEE NOTES UNDER `REINFORCING STEEL' FOR REQUIREMENTS. ASTM A615, GRADE 60, UNLESS NOTED OTHERWISE.
4. MORTAR MIX SHALL CONFORM TO REQUIREMENTS FOR IBC TABLE 2103.8(1), TYPE S, AND PROJECT SPECIFICATIONS. MORTAR SHALL ATTAIN A MINIMUM COMPRESSIVE STRENGTH OF 1800 PSI AT 28 DAYS.
5. GROUT SHALL CONFORM TO REQUIREMENTS OF SECTION 2103 OF IBC FOR COARSE GROUT. USE SUFFICIENT WATER FOR GROUT TO FLOW INTO ALL JOINTS OF THE MASONRY WITHOUT SEGREGATION. GROUT SHALL ATTAIN A MINIMUM COMPRESSIVE STRENGTH OF 2000 PSI AT 28 DAYS. FLY ASH WILL NOT BE PERMITTED IN
GROUT.
6. GROUT AND MORTAR MIXES SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND SHALL BEAR THE WET SEAL OF A CIVIL ENGINEER LICENSED IN THE STATE OF WYOMING AND SHALL BE SUBMITTED FOR REVIEW.
GROUT, MORTAR AND BLOCK STRENGTHS MAY HAVE TO BE INCREASED IN ORDER TO OBTAIN AN f'm = 1500 PSI.
7. PROVIDE A MINIMUM OF 1/2 INCH GROUT BETWEEN VERTICAL REINFORCING AND MASONRY UNITS.
8. FOR GROUT LIFT CONSTRUCTION REFER TO THE ACI 530-02 SECTION 1.15.1 AND ACI 530.1 SECTION 3.5.
9. ALL CELLS IN CONCRETE BLOCKS SHALL BE FILLED SOLID WITH GROUT, UNLESS NOTED OTHERWISE IN THE
DRAWINGS OR SPECIFICATIONS.
10. MECHANICALLY VIBRATE GROUT IN VERTICAL SPACES IMMEDIATELY AFTER POURING.
11. CELLS SHALL BE IN VERTICAL ALIGNMENT. DOWELS IN FOOTINGS SHALL BE SET TO ALIGN WITH CORES
CONTAINING REINFORCING STEEL.
12. REFER TO ARCHITECTURAL DRAWINGS FOR SURFACE AND HEIGHT OF UNITS, LAYING PATTERN AND JOINT TYPE.
13. ALL REINFORCING SHALL HAVE A MINIMUM LAP SPLICE LENGTH AS FOLLOWS:
LAP SPLICE LENGTH (INCHES)
6" CMU 8" CMU
a. (1) #4 IN CELL 20” 20"
b. (2) #4 IN CELL 24” 24"
c. (1) #5 IN CELL 32” 25"
d. (2) #5 IN CELL 38” 38"
e. (1) #6 IN CELL 61” 44"
STAGGER ALL HORIZONTAL REBAR SPLICES
14. MECHANICAL PIPES AND ELECTRICAL CONDUITS WHICH PASS THROUGH MASONRY WALLS DO NOT REQUIRE SLEEVES, UNLESS OTHERWISE INDICATED IN THE PROJECT SPECIFICATIONS, MECHANICAL OR ELECTRICAL DRAWINGS. IF SLEEVES ARE REQUIRED, INSTALL SLEEVES BEFORE GROUTING. DO NOT CUT ANY REINFORCING WHICH MAY INTERFERE WITH SLEEVE PLACEMENT. CORING OPENINGS IN GROUTED MASONRY IS NOT PERMITTED. NOTIFY THE STRUCTURAL ENGINEER THROUGH THE ARCHITECT IN ADVANCE OF CONDITIONS NOT SHOWN ON THE STRUCTURAL DRAWINGS. NO PIPES OR ELECTRICAL CONDUIT SHALL PASS THROUGH MASONRY
LINTELS UNLESS SPECIFICALLY DETAILED.
15. SEE ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR EXPANSION AND CONTROL JOINTS. CONTRACTOR SHALL VERIFY AND PROVIDE ADDITIONAL CONTROL JOINTS WHERE SPACING SHOWN ON PLANS EXCEEDS 32 FEET UNLESS NOTED OTHERWISE ON PLANS AND ELEVATIONS. IF ADDITIONAL CONTROL JOINTS ARE REQUIRED OR LOCATIONS REQUIRE ADJUSTMENTS, CONTRACTOR SHALL COORDINATE AND OBTAIN ARCHITECT'S AND
STRUCTURAL ENGINEER'S APPROVAL PRIOR TO PLACING REBAR DOWELS FOR WALL.
16. REINFORCE WALLS PER PLANS AND DETAILS. PROVIDE CONTINUOUS HORIZONTAL BOND BEAMS AND
REINFORCING AS FOLLOWS:
a. AT BOTTOM OF WALLS, IN FIRST COURSE OF MASONRY, PROVIDE (1) #4 IN 8" DEEP GROUTED BOND BEAM.
b. AT TOP OF WALLS, STOP BELOW AND ARE ANCHORED TO ROOFS OR FLOORS, PROVIDE (2) #5 IN 8" DEEP
GROUTED BOND BEAM. AT TOP OF PARAPETS, PROVIDE (2) #4 IN 8" DEEP GROUTED BOND BEAM.
c. PROVIDE ADDITIONAL HORIZONTAL REINFORCING WHERE SHOWN ON PLANS AND DETAILS.
FOUNDATION
1. FOUNDATION:
a. DESIGN PER IBC SECTION 1806.
b. FOOTING SHALL BEAR ON FIRM UNDISTURBED OR COMPACTED SOIL AT 1'-6" MIN BELOW FINISH GRADE OF NATURAL
GRADE, WHICHEVER IS LOWER. ALLOWABLE BEARING = 1500 PSF.
2. SEE PLAN FOR DEPTH. CONTRACTOR SHALL VERIFY AND LOWER FOOTINGS AS REQUIRED TO MAINTAIN 44” MINIMUM BELOW FINISH GRADE TO BEAR BELOW THE FROST LINE. THE COST ASSOCIATED WITH LOWERING THE FOOTINGS (IF
REQUIRED) SHALL BE BORNE BY THE CONTRACTOR.
3. CONTRACTOR SHALL PROVIDE FOR PROPER DEWATERING OF EXCAVATIONS FROM SURFACE WATER, GROUND WATER, SEEPAGE, ETC.
4. CONTRACTOR SHALL PROVIDE FOR THE DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING AND SHORING REQUIRED TO SAFELY AND ADEQUATELY RETAIN THE EARTH BANKS AND ANY EXISTING STRUCTURE.
5. ALL EARTHWORK, FOOTING DEPTHS, AND EXCAVATIONS FOR FOUNDATIONS SHALL BE INSPECTED BY THE SOILS ENGINEER TO VERIFY ASSUMED ALLOWABLE SOIL BEARING PRESSURE AND TO MAKE ANY ADDITIONAL
RECOMMENDATIONS.
6. EXCAVATIONS FOR FOOTINGS SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACING THE CONCRETE AND REINFORCING. THE CONTRACTOR SHALL NOTIFY THE GEOTECHNICAL ENGINEER WHEN THE EXCAVATIONS ARE READY FOR INSPECTION. THE GEOTECHNICAL ENGINEER SHALL SUBMIT A LETTER OF COMPLIANCE TO THE OWNER.
7. ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING WALLS BEFORE CONCRETE OR MASONRY HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL BRACE OR PROTECT ALL BUILDING AND PIT WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORS ARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL PROVIDE FOR DESIGN, PERMITS AND INSTALLATION
OF SUCH BRACING AND PROTECTION.
8. FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN THE BUILDING PERIMETER SHALL BE MECHANICALLY COMPACTED IN LAYERS, TO THE APPROVAL OF THE GEOTECHNICAL ENGINEER. FLOODING WILL NOT BE PERMITTED.
9. ALL ABANDONED FOOTINGS, UTILITIES, ETC., THAT INTERFERE WITH THE NEW CONSTRUCTION SHALL BE REMOVED.
QUALITY ASSURANCE PLAN AND STATEMENT OF SPECIAL INSPECTION
1. SPECIAL INSPECTION, PER THE INTERNATIONAL BUILDING CODE CHAPTER 17, SECTION 1704 AND 1705. SEE PROJECT SPECIFICATIONS AND
STATEMENT OF SPECIAL INSPECTIONS BELOW FOR SPECIFIED REQUIREMENTS.
2. STATEMENT OF SPECIAL INSPECTIONS
A. THIS STATEMENT OF SPECIAL INSPECTIONS IS ACCORDANCE WITH SECTIONS 1704.3 OF THE IBC 2015 CODE. THE INTENT OF THIS SECTION IS
THAT ALL SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE PROVISIONS OF CHAPTER 17 OF THE 2015 IBC UNLESS
SPECIFICALLY NOTED OTHERWISE. SEE SPECIFICATION SECTION 01 45 35.
B. THE FOLLOWING ITEMS REQUIRE SPECIAL INSPECTION IN ACCORDANCE WITH THE BUILDING CODE AND SPECIFICATION SECTION 01 45 35.
1. CONCRETE CONSTRUCTION
2. MASONRY CONSTRUCTION
3. TEST OF SOILS
C. MATERIAL OR WORKMANSHIP NOT IN REASONABLE CONFORMANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS OR SPECIFICATIONS
MAY BE REJECTED AT ANY TIME DURING THE PROGRESS OF THE WORK.
D. THE CONTRACTOR SHALL REQUEST SPECIAL INSPECTION OF THE ITEMS LISTED ABOVE PRIOR TO THOSE ITEMS BECOMING INACCESSIBLE
AND UNOBSERVABLE DUE TO PROGRESSION OF THE WORK.
E. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
09/30/20
03/06/2020
A
25' - 4"
2' - 8" 8' - 0" 4' - 0" 8' - 0" 2' - 8"
B
S-101
S-101
M C
J
MCJ
MCJ
S-101
OPEN
9 9
14,375#
S-101
S-101
S-501
7 7
EXISTING, VERIFY IN FIELD
25' - 10"
OPEN
2' - 0" 2' - 0"
M
IN
S-101
S-101
S-501
MIN
2' - 10"
MIN.
2' - 4"
MIN.
8' - 8"
F A
C E
O F
L
IG
H T
W E
L L W
A L L
F A
C E
O F
D O
O R
O P
E N
IN
G
ELEVATION 1' - 5" IS TO TOP OF
EXISTING FIRST FLOOR SLAB,
VERIFY W/ ARCH.
14,375#
C J
C J
C J
C J
CJ CJ CJ
S-501
TYP
15 15
T.O.SLAB 0' - 0"
T.O.PAD 0' - 9"
VERIFY WITH ARCH.
SLOPE AS REQ'D
NOTE:
1. CMU LINTEL, SEE DETAIL
2.
3.
2"
4" FACE BRICK TO MATCH
EXISTING
STEEL ANGLE LOOSE LINTEL:
AT 8'-0" OPENING USE L8x6x7/16" LLV - 8" MIN. BEARING
8/S-501
FINISH SURFACE CONCRETE SLAB, SEE PLAN1.
2.
3.
4. #5 AT 12" O.C. TRANSVERSE
5.
6.
7.
DOWEL TO MATCH AND LAP WALL REINF.
8.
#4 CONT.
9.
16" WIDE CONCRETE STEM WALL WITH #5 VERTICAL AT 12"
O.C. EACH FACE AND #4 HORIZONTAL AT 12" O.C. EACH FACE
2"
6" 8"
10. 8" CMU WALL, SEE PLAN FOR REINFORCEMENT
11. 4" FACE BRICK TO MATCH EXISTING
PROVIDE STANDARD HOOK PER DETAIL 1/S-501
M
IN
GRID
12. (2)-#5 CONT. IN 8" DEEP BOND BEAM
TOP OF WALL ELEV.
VERIFY W/ ARCH.
10' - 0"
3' - 6"
1' - 2"
(4)-#5 CONTINUOUS
TRENCH DRAIN, SEE ARCHITECTURAL DRAWINGS
L A
P
L A
P
HORIZONTAL REINFORCEMENT @ 16" O.C. MAX
TOP OF WALL ELEV.
VERIFY W/ ARCH.
1' - 4"
13. 3/4" COMPRESSIBLE MATERIAL
14. TOP OF EXTERIOR GRADE
6" CONCRETE WALL, SEE PLAN FOR REINFORCEMENT
4" FACE BRICK
EXISTING CONCRETE WALL
2.
3.
1.
VENEER TIES, SEE ARCHITECTURAL4.
DRILL AND EPOXY DOWEL TO MATCH
AND LAP WALL REINFORCEMENT. USE
HILTI HIT-HY 200 (ESR-3187) OR
APPROVED EQUAL. 12" EMBEDMENT.
5.
1' - 0"
2"
6" 6"
GRID
TOP OF WALL ELEV.
VERIFY W/ ARCH.
10' - 0" A.F.F.
3 1/4"
EQUIPMENT PAD. REINFORCEMENT NOT
SHOWN FOR CLARITY. SEE DETAIL
FOR INFORMATION NOT CALLED OUT
5/S-501
MIN.
2' - 0"
1.
2 1
OPENING FOR CONDUIT, SEE PLAN2.
3/4" COMPRESSIBLE MATERIAL3.
CONCRETE SLAB, SEE PLAN4.
EQUIPMENT PAD, SEE DETAIL 5/S-501 FOR REINFORCEMENT1.
2.
3. MASONRY WALL BEYOND
4. FINISH GRADE, SEE CIVIL
5.
6.
7.
NEW CONDUIT BANK, SEE ELECTRICAL
CONCRETE STEM WALL, SEE 6/S-101 FOR REINFORCING
4" FACE BRICK TO MATCH EXISTING
(2)-#5 CONT. IN 8" DEEP BOND BEAM
2"
6" 8"
GRID
6 TOP OF WALL ELEV.
VERIFY W/ ARCH.
10' - 0" A.F.F.
S-101
V E
R
IF
Y W
E
L E
C T
R
IC
A L
8. CONT. FOOTING, SEE PLAN AND DETAIL 6/S-101
9. TOP OF FOOTING STEM WALL BEYOND
10. CONCRETE SLAB BEYOND, SEE PLAN
S-501
2' - 0"
11. #4 DOWELS, DRILL AND EPOXY 6" INTO CONCRETE
STEM WALL. SPACE DOWELS HORIZONTALLY AT 16"
O.C. AND 8" MAX. FROM EDGE OF EQUIPMENT PAD
(DO NOT DISTURB STEM WALL REINFORCEMENT)
12. TOP OF STEM WALL AT DOOR TO MATCH TOP OF
EQUIPMENT PAD ELEVATION
Construction Management Civil Engineering Surveying
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Calibre Engineering, Inc.
Calib er
## KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
18-357
Buffalo (CA)
/5
/2
:0
:2
A M
S-101
FOUNDATION PLAN, ROOF FRAMING
PLAN, DETAILS
MBT
REPLACE BASEMENT
SWITCHGEAR
Cheyenne VA Medical Center 2360 East Pershing Blvd.
Cheyenne, WY 82001 March 06, 2020
100% CONSTRUCTION DOCUMENTS
442-18-003
GMG
1. EXISTING CONCRETE BUILDING WALL
2. EXISTING CONCRETE LOW WALL
3. CONTINUOUS FOOTING 3' - 6" x 1' - 2" THICK, SEE
DETAIL 6/S-101 FOR REINFORCMENT
4. 6" CONCRETE WALL WITH #5 VERTS AT 12" O.C.
CENTERED IN WALL AND #4 AT 12" O.C. CENTERED IN
WALL
5. 8" SOLID GROUTED CMU WALL WITH #5 AT 24" O.C.
CENTERED IN CELL #4 AT 24" O.C. HORIZONTAL
6. 4" FACE BRICK TO MATCH EXISTING. BRICK TO BE
"CHEYENNE VA BLEND" WHICH CONSISTS OF 56%
MEDIUM RED SMOOTH, 34% REGENCY GOLD SMOOTH,
AND 10% MARKET STREET SMOOTH BY THE
LAKEWOOD BRICK COMPANY OR EQUAL.
COORDINATE WITH ARCHITECTURAL DRAWINGS.
7. JOINT MATERIAL, SEE ARCH.
8. CONDUIT OPENING PER MANUFACTURERS
REQUIREMENTS, COORDINATE PLAN DIMENSIONS
WITH MANUFACTURER.
9. NEW SWITCHGEAR
10. NEW MECHANICAL PAD, COORDINATE LOCATION WITH
ARCHITECTURAL AND MECHANICAL DRAWINGS.
11. NEW CONDUIT PASSING THROUGH EXISTING WALL.
EXISTING 16" CONCRETE WALL REINFORCEMENT
CONSIST OF THE FOLLOWING; #7 VERTICALS AT 12"
O.C. AT INTERIOR FACE, #5 VERTICALS AT 18" O.C. AT
OUTSIDE FACE, #4 HORIZONTAL EACH FACE AT 12"
O.C. SEE DETAIL 3(D)/E-501 FOR PROPOSED CONDUIT
CONFIGURATION. CONTRACTOR SHALL FIELD
LOCATE THE #7 VERTICAL BARS PRIOR TO CORE
DRILLING WALL. ADJUST CONDUIT CONFIGURATION
AS REQUIRED TO NOT DISTURB #7 VERTICAL BARS.
COORDINATE CONDUIT CONFIGURATION WITH COR
PRIOR TO CORE DRILLING WALL.
12. NEW CONDUIT BANK, SEE ELECTRICAL DRAWINGS
13. DRILL AND EPOXY (2)-#5 6" INTO EXISTING WALL,
EXTEND REBAR INTO NEW FOOTING 1' - 6" MIN. AND
PROVIDE STD HOOK.
14. EXISTING MRI FEEDER TO REMAIN AND TO PASS
THROUGH NEW CONCRETE STEM WALL. EXISTING
SIZES ARE (2) 2" & (1) 1-1/4". FIELD VERIFY SIZE,
DEPTH, AND LOCATION.
15. 6" THICK CONCRETE SLAB WITH #4 12" O.C. EACH
WAY. PROVIDE 3/4" COMPRESSIBLE MATERIAL
AROUND PERIMETER OF SLAB TO ALLOW
INDEPENDENT MOVEMENT BETWEEN WALLS,
EQUIPMENT PADS, AND EXISTING BUILDING.
16. CONCRETE FOOTING, SEE DETAIL 6/S-101
A. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
0 2 4 8
NORTH
PLAN
2 3
SCALE: 1/4" = 1'-0"
FOUNDATION PLAN
SCALE: 3/4" = 1'-0"
CMU & LOOSE LINTEL
SCALE: 3/4" = 1'-0"
CMU SITE WALL SECTION
SCALE: 3/4" = 1'-0"
CONCRETE SITE WALL ON EXISTING CONCRETE WALL
SCALE: 3/4" = 1'-0"
CONDUIT OPENING
SCALE: 3/4" = 1'-0"
CMU SITE WALL SECTION AT DOOR
BAR
SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
(IN INCHES)
f'c (PSI) dh
1.
2.
3.
4.
THIS TABLE FOR USE WITH NORMAL-
WEIGHT HARDROCK CONCRETE AND
GRADE 60 UNCOATED REINFORCING
BARS.
FOR LIGHT-WEIGHT AGGREGATE USE
1.3 dh
FOR GRADE 40 BARS, USE 0.67 dh dh SHALL BE A MINIMUM OF 8 BAR
DIAMETERS OR 6 INCHES, THE
GREATER
FACE OF SUPPORT
MIN CONC COVER PER
GSN OR DETAILS
90 DEG STD HOOK
FACE OF SUPPORT.dh f'c = 4500 PSI
BAR
SIZE
TOP BARS OTHER BARS
CASE 1 CASE 2 CASE 1 CASE 2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#14
#18
NOTES:
1. THIS TABLE FOR USE WITH NORMAL WEIGHT HARDROCK
CONCRETE AND GRADE 60 UNCOATED REINFORCING
BARS. FOR LIGHTWEIGHT AGGREGATE USE 1.3 d. d=
TENSION DEVELOPMENT LENGTH SHOWN AT THIS TABLE.
2. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF
CONCRETE CAST IN THE MEMBER BELOW THE BAR.
FOR BARS ENCLOSED IN STANDARD COLUMN SPIRALS, USE
0.75 d OR 12" MIN.
4. TENSION DEVELOPMENT LENGTH OF INDIVIDUAL BARS
WITHIN A BUNDLE SHALL BE 1.2 d FOR THAT BAR IN A 3-BAR BUNDLE AND 1.33 d FOR A 4-BAR BUNDLE.
3.
5. COMPRESSION DEVELOPMENT LENGTH (ONLY WHERE INDICATED
ON DRAWINGS) FOR GRADE 60 BARS USE 22 BAR DIAMETERS.
FACE OF SUPPORT
d
PROVIDE STANDARD HOOK PER DETAIL 1/S-501
WHERE d CANNOT BE ACHIEVED.
6. CASES 1 AND 2 ARE DEFINED AS FOLLOWS:
BEAMS OR COLUMNS
CASE 1: COVER AT LEAST 1.0 db AND CENTER TO CENTER SPACING AT LEAST 2.0 db
CASE 2: COVER LESS THAN 1.0 db OR CENTER TO CENTER SPACING LESS THAN 2.0 db
ALL OTHER MEMBERS
CASE 1: COVER AT LEAST 1.0 db AND CENTER TO CENTER SPACING AT LEAST 3.0 db
CASE 2: COVER LESS THAN 1.0 dB OR CENTER TO CENTER SPACING LESS THAN 3.0 db
#3
#4
#5
#6
#7
#9
#8
#10
#11
BAR
SIZE
LAP
CLASS
TOP BARS OTHER BARS
CASE 1 CASE 2 CASE 1 CASE 2
A
B
A
B
B
B
B
B
B
B
B
A
A
A
A
A
A
A f'c = 4500 PSI NOTES:
1. TABLE FOR USE WITH NORMAL WEIGHT HARDROCK
CONCRETE AND GRADE 60 UNCOATED REINF. BARS.
FOR LIGHTWEIGHT AGGREGATE USE 1.3
= BASIC LAP LENGHT SHOWN AT THIS TABLE.
2. CLASS A - HALF OR LESS OF THE BARS ARE
SPLICED WITHIN A REQUIRED LAP LENGTH.
CLASS B - MORE THAN HALF OF THE BARS ARE
SPLICED WITHIN A REQUIRED LAP LENGTH.
3. TOP BARS ARE HORIZONTAL BARS WITH MORE
THAN 12" OF CONCRETE CAST IN THE MEMBER
BELOW THE BAR.
4. FOR BARS ENCLOSED IN STANDARD COL. SPIRALS,
USE 0.75 OR 12" MIN.
5. LAP SPLICES OF INDIVIDUAL BARS WITHIN A
BUNDLE SHALL BE 1.2 FOR THAT BAR IN A 3-BAR
BUNDLE AND 1.3 FOR A 4-BAR BUNDLE. ENTIRE
BUNDLES SHALL NOT BE LAP SPLICED AT THE
SAME LOCATION. SPLICES FOR INDIVIDUAL BARS
WITHIN A BUNDLE SHALL BE STAGGERED SUCH
THAT THEY DO NT OVERLAP.
6. COMPRESSION LAP SPLICE (ONLY
WHERE INDICATED ON DRAWINGS) FOR
GRADE 60 BARS USE 30 BAR DIA.
7. CASES 1 AND 2 ARE DEFINED AS FOLLOWS:
BEAMS OR COLUMNS
CASE 1: COVER AT LEAST 1.0 db AND CENTER TO CENTER SPACING AT LEAST 2.0 db
CASE 2: COVER LESS THAN 1.0 db OR CENTER TO CENTER SPACING LESS THAN 2.0 dB
ALL OTHER MEMBERS
CASE 1: COVER AT LEAST 1.0 db AND CENTER TO CENTER SPACING AT LEAST 3.0 db
CASE 2: COVER LESS THAN 1.0 dB OR CENTER TO CENTER SPACING LESS THAN 3.0 db
.3"
PLAN
A
SECTION
A
2" C
LR
2' -0
2' -0
1.
2.
3.
4.
5.
(2) #4 TOP AND BOTTOM.
EDGE OF SLAB, OR PIT WALL ETC., SEE
PLAN.
FOR DIMENSIONS SEE PLAN, ARCH.,
MECH., ETC.
RECTANGULAR OR ROUND OPENING.
REINFORCING BARS.
#6 @ 12" O.C. EACH WAY TOP & BOTTOM.
M
IN
EDGE DIST, TYP
6" MIN
COORD. LOCATIONS, DIMENSIONS, ANCHORAGES &
SUPPORTS REQUIREMENTS FOR MECHANICAL UNITS
TO CONC BASES WITH EQUIP. MFR/ SUPPLIER,
ARCH'L, MECH'L & ELECT'L DWGS. EQUIP MFR/
SUPPLIER TO PROVIDE ALL SUPPORTS NOT SHOWN.
FINISH SURFACE1.
2.
3. ANCHOR BOLTS AS REQ'D.
M
IN
3/4" COMPRESSIBLE MATERIAL4.
1. CMU WALL.
2. LINTEL
3. VERTICAL BARS IN GROUTED
CELLS.
4. OPEN END BLOCKS AT LINTEL
HEIGHT "H". EXTEND OPEN END
BLOCK, GROUT AND REINFORCE
2'-0" MIN. CONT. PAST JAMB
EACH END.
5. TOP OF SOLID GROUT FULL
DEPTH.
6.
8.
LINTEL U-BLOCK.
9.
SHORE LINTEL UNTIL GROUT
REACHES DESIGN STRENGTH.
10.
180 DEGREE STANDARD HOOK.
TURN HOOK PARALLEL WITH
WALL AS REQ.
11. PROVIDE DOWEL BARS TO
MATCH JAMB BARS, TYP.
12. PROVIDE STANDARD HOOK PER DETAIL
ADDITIONAL BARS WHERE
CALLED OUT ON PLANS OR
ELEVATIONS.
LINTEL REINF PER LINTEL
SCHEDULE.
OPENING
WIDTH
JAMB BARS (FULL HEIGHT)
8" CMU PLAN
7'-0" OR GREATER
6-#6
B
TYPICAL JAMB REINFORCING, UNO
(SEE NOTE 13)
LINTEL SCHEDULE
OPENING WIDTH *LINTEL REINF VERT. REINF
4'-0" TO 8'-0"
*"H"
2'-0" (2)-#6 PER PLANS
A
LINTEL
"H
C L R
/2
/2
24" FOR #5 BARS, TYP .
P E
R G
S N
L A
P S
P L
IC
E
A
B
TOP OF SLAB
7.
* UNLESS NOTED OTHERWISE ON PLANS AND WALL ELEVATIONS
1/S-501
13. SEE DETAIL FOR LOOSE LINTEL
SUPPORTING FACE BRICK
3/S-101
LAP SPLICE
TENSION
CORNER
SINGLE MAT
END
1. PROVIDE ADDITIONAL FULL HEIGHT
VERTICAL WALL REINFORCING AS
SHOWN. SIZE TO MATCH TYPICAL WALL
REINFORCING. WHERE VERTICAL WALL
REINFORCING DIFFERS AT CORNERS &
INTERSECTIONS, MATCH LARGER SIZE.
SEE PLANS & ELEVATIONS FOR
ADDITIONAL REINFORCING AS
REQUIRED.
2. OPEN END BLOCK.
3. BREAK SHELL AT HORIZONTAL
REINFORCING.
4.
5.
PROVIDE 1" MIN GROUT ALL AROUND
REINFORCING THROUGH FACE SHELL.
6.
180 DEGREE HOOK.
TENSION LAP SPLICE PER GENERAL
STRUCTURAL NOTES.
2 1
A
PLAN AT CONTINUOUS WALL
B
PLAN AT INTERSECTION
1.
2.
3.
4.
5.
CMU WALL
REINFORCE PER DETAIL 19/- (WALL END)
CONT. VERTICAL CONTROL
MATERIAL PER ARCHITECTURAL
DRAWINGS AND SPECIFICATIONS.
STOP TYPICAL HORIZONTAL
REINFORCING AT 2" FROM JOINT
EXCEPT AS NOTED ON NOTE 4 ABOVE.
EXISTING CONCRETE WALL
CONTROL JOINT
1/4 x "T" = DEPTH OF CUT
"T
SAW-CUT CONCRETE AS SOON AS THE SURFACE IS
FIRM ENOUGH SO THAT IT WILL NOT BE TORN OR
DAMAGED BY THE BLADE, AND IN A TIMELY MANNER
TO PROHIBIT RANDOM CRACKING OF SLAB.
FOR SUBGRADE PREPARATION, SEE GEOTECH
REPORT.
1.
2.
3.
AT CONTROL JOINT PROVIDE 1/2" DIA x 16" LONG
SMOOTH BAR DOWEL AT 12" O.C. ALONG JOINT.
GREASE ONE END, CENTER DOWEL ON JOINT.
4.
3" 3"
OPEN
2' - 6"2' - 6"
TOP OF FOOTING1.
CONCRETE STEM WALL2.
ADDITIONAL (2)-#5 VERTICAL BARS EACH
SIDE OF OPENING
3.
ADDITIONAL (2)-#4 HORIZONTAL BARS
ABOVE OPENING
4.
Construction Management Civil Engineering Surveying
9090 South Ridgeline Boulevard, Suite 105
Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com
Calibre Engineering, Inc.
Calib er
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
18-357
Buffalo (CA)
/5
/2
:0
:2
A M
S-501
DETAILS
Author
REPLACE BASEMENT
SWITCHGEAR
Cheyenne VA Medical Center 2360 East Pershing Blvd.
Cheyenne, WY 82001 March 06, 2020
100% CONSTRUCTION DOCUMENTS
442-18-003
Checker
SCALE: 3/4" = 1'-0"
TENSION DEVELOPMENT FOR HOOKED BARS
SCALE: 3/4" = 1'-0"
TENSION DEVELOPMENT LENGTH d (INCHES)
SCALE: 3/4" = 1'-0"
TENSION LAP SPLICE LENGTH (INCHES)
SCALE: 3/4" = 1'-0"
OPENING IN SLAB ON GRADE
SCALE: 3/4" = 1'-0"
EQUIPMENT BASE AND PAD
SCALE: 3/4" = 1'-0"
TYPICAL CMU WALL OPENINGS
SCALE: 3/4" = 1'-0"
TYPICAL CMU WALL INTERSECTIONS & END OF WALL
SCALE: 3/4" = 1'-0"
TYPICAL CONTROL JOINTS IN CMU WALL
SCALE: 3/4" = 1'-0"
CONTROL JOINT (TYP)
SCALE: 3/4" = 1'-0"
OPENING IN CONCRETE STEM WALL
3 3
WV
STMH-A-11
(EX) MRI UG. FEEDER TO REMAIN
A
ELEC.
ROOM
8'-0" 4'-0" 8'-0" 2'-8"
BA _____
AE301
AE301
E X
IS
T
.V.I.F
2'-8"
25'-4"
1'-0"
E .J
AE301
AE301
AE101
AE301
07 07
1'-2"
1" E.J.
E.J. E.J.
AE301
MIN.
8'-8" 1" E.J.
1'-8"
NEW
TRANSFORMER
NEW
TRANSFORMER
NEW FIRE LANE
COORDINATE WITH
VA
4" DUCTILE
IRON
BUTTERFLY
VALVE
4" DUCTILE
IRON BUTTERFLY
VALVE
4" DUCTILE
IRON BUTTERFLY
VALVE
3'-4" 8'-8" 1'-10"
AE301
EDGE OF EXISTING CONCRETE
LANDING TO REMAIN. FIELD
VERIFY EXACT LOCATION.
R E
Q U
IR
E
D M
IN
IM
U M
R E
Q U
IR
E
D M
IN
IM
U M
'-0
R=4'-1 1 1/8" R
'-1
1/2
/8
/8
P A
R K
IN
G
S T
A L L
/8
14'-2 1/4"
NEW CURB CUT
YELLOW, LATEX STRIPED AREA
APPROXIMATE LOCATION OF
FUTURE NEW U.G. FIRELINE AND
HYDRANT BY OTHERS
TIE-IN NEW CURB CUT TO
MATCH EXISTING
TIE-IN NEW CURB CUT
TO MATCH EXISTING
DEMOLISH AND REMOVE
EXISTING CURB CUT. PREP
AND RESURFACE DEMO'D
AREA WITH NEW ASPHALT
UP TO NEW CURB CUT.
FIRST FLOOR
1' - 5"
TOP OF WALL
10' - 0"
AB E
X
IS
T
E.J.
1"
GRADE
0"
4" DUCTILE
IRON DRAIN
PIPE
4" DUCTILE
IRON DRAIN
PIPE
O .C
O .C
O .C
1'-7" 2'-0" 1'-7"
FIRST FLOOR
1' - 5"
A
TOP OF WALL
10' - 0"
1" CJ WITH SEALANT
AND BACKER ROD
GRADE
0"
EXISTING BUILDING
JOINT SEALANT
MINERAL FIBER
JOINT FILLER
DOWEL REINF. -
SEE STRUCTURAL
EXIST. RAMP
EXIST. HAND RAIL
1 1/2" DIA. GALV. STEEL
HANDRAIL - PAINTED TO
MATCH EXISTING
1 1/2" DIA. GALV.
STEEL POST -
PAINTED
12"
MIN.
M
IN
.11"
MIN.
CLR
1 1/2"
CLR
1 1/2"
C L R
/2
EMBEDMENT
6" DRILL AND EPOXY #4 DOWEL AT
18" O.C. USE HILTI HIT HY 200 (ESR 3187)
OR EQUAL
7' - 8"
TYPE A TYPE A
8' - 0"
2" 7' - 8" 2"
FIRST FLOOR
1' - 5"
TOP OF WALL
10' - 0"
/4
/4
EQUIPMENT CONCRETE PAD -
SEE STRUCTURAL DRAWINGS
GRAVEL FILL
V .I
.F
S E
E S
T R
U C
T D
W G
S
FLASHING & WEEPS
GROUT SOLID
CONCRETE
FOUNDATION
FOOTING - SEE
STRUCTURAL
DRAIWNGS
CMU - SEE
STRUCTURAL
DRAWINGS FOR
REINFORCEMENT
BRICK VENEER
6" CONCRETE WALL
BRICK VENEER
WOOD NAILER W/
SCREW-FASTENERS
MTL FLASHING
EXISTING CURB WALL
AT AREAWELL
PROVIDE SEALANT
2" NOMINAL AIR
SPACE (KEEP
CLEAN OF MORTAR)
WOOD NAILER W/
SCREW-FASTENERS
AE301
AE301
AE301
SEE STRU. DWG'S
3'-6"
A B
M
IN
SEAL ALL MOAT
JOINTS WITH OIL
RESISTANT SEALS
OIL MOAT
RESERVOIR GRADE
0"
O .C
4" DUCTILE
IRON BUTTERFLY
VALVE
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:4
:0
P M
AE101
FIRST FLOOR PLAN, ELEVATIONS,
SECTION AND DETAIL
1 2JJG/RER
REPLACE BUFFALO
BUILDING BASEMENT
SWITCHGEAR
CHEYENNE VA MEDICAL CENTER
2360 EAST PERSHING BLVD
CHEYENNE, WY 82001 March 6, 2020
100% CONSTRUCTION DOCUMENT
442-18-00318-357
Buffalo
KC
Scale: 1/4" = 1'-0"
FIRST FLOOR PLAN 0 4 8 16
NORTH
PLAN
Scale: 1/4" = 1'-0"
NORTH ELEVATION
Scale: 1/4" = 1'-0"
WEST ELEVATION
0 4 8 16
0 4 8 16
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1. THE CONTRACTOR IS RESPONSIBLE TO VERIFY ALL
EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
NOTIFY THE ARCHITECT AND VA COR OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH
DEMOLITION.
2. ALL ITEMS BEING REMOVED SHALL REMAIN THE
PROPERTY OF THE VA MEDICAL CENTER UNTIL
CONFIRMATION HAS BEEN MADE BY THE VA COR AS
TO WHETHER THE VA WILL RETAIN SUCH ITEMS. ALL
ITEMS NOT BEING RETAINED BY THE VA COR OR
DESIGNATED ON THE DRAWINGS TO BE REMOVED
FROM THE SITE BY CONTRACTOR.
3. REFER TO MECHANICAL, ELECTRICAL,
COMMUNICATION AND PLUMBING DOCUMENTS FOR
ADDITIONAL INFORMATION.
4. COORDINATE WORKING HOURS ALLOWED FOR
DEMOLITION WITH VA COR AS INSTRUCTED IN
GENERAL REQUIREMENTS.
5. REPAIR OR REPLACE ITEMS DAMAGED DURING
CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST
TO THE VA. IF DAMAGED, REPAIR, RE-PATCH, SAND
SMOOTH AND REFINISH TO MATCH EXISTING.
6. COORDINATE WITH VA COR FOR CONTRACTOR
ACCESS, AND STAGING AREAS. THE CONTRACTOR
SHALL NOT ENCROACH ON ADJACENT OCCUPIED
AREAS NOT WITHIN THE SCOPE OF WORK.
7. KEY NOTES AND DRAWINGS ARE INTENDED TO
GRAPHICALLY REPRESENT GENERAL WORK AND DO
NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
8. REFER TO SPECIFICATIONS SECTION 01 00 00 FOR
GENERAL REQUIREMENTS DURING DEMOLITION,
INCLUDING DISPOSAL OF ITEMS TO BE REMOVED OFF-
SITE, OR ITEMS TO BE RETURNED TO THE VA.
9. THE INFORMATION CONTAINED IN THESE DEMOLITION
DOCUMENTS DEFINES GENERAL SCOPE ONLY AND
DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION
REQUIRED FOR THE COMPLETION OF THE WORK.
10. THE CONTRACTOR SHALL, BEFORE THE START OF
WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND
THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE,
BELOW, INSIDE EXISTING WALLS BEING
DEMOLISHED, OR OUTSIDE PROJECT AREA. THE
CONTRACTOR SHALL PROVIDE DEMOLITION OF THESE
AREAS AND PATCH OF SAME AS A PART OF THE
SCOPE OF THE PROJECT. CONTRACTOR SHALL
NOTIFY AND COORDINATE THIS WORK WITH THE
CONTRACTING OFFICER'S REPRESENTATIVE.
11. ALL DEMOLITION WORK SHALL BE PERFORMED WITH
DUE CARE AND DILIGENCE IN ORDER TO PREVENT
ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE
OR CONCEALED UTILITIES INTENDED TO REMAIN IN
SERVICE.
12. REFER TO SPECIFICATION DIVISION 02 FOR
ADDITIONAL DEMOLITION WORK REQUIRED FOR
ASBESTOS ABATEMENT.
13. CONTRACTOR IS RESPONSIBLE TO REMOVE OR
REWORK PLUMBING, ELECTRICAL, OR MECHANICAL
ITEMS HIDDEN IN WALLS SHOWN TO BE DEMOLISHED.
REFER TO PLUMBING, ELECTRICAL, OR MECHANICAL
PLANS FOR ADDITIONAL INFORMATION.
14. WHEREVER EXISTING EQUIPMENT, PIPING, DUCTS,
ETC., ARE REQUIRED TO BE REMOVED, SUCH
REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS,
BRACING, FOUNDATION, ETC.
15. INTERIOR FINISHES, INCLUDING FLOORS, WALLS, AND
CEILINGS, DAMAGED DURING REMOVAL OR
ABANDONMENT OF PLUMBING, ELECTRICAL, OR
MECHANICAL ITEMS SHALL BE PATCHED AND
REPAIRED TO MATCH ADJACENT SURFACES AND FOR
PREPARATION FOR NEW CONSTRUCTION.
16. WALL MOUNTED STERILIZATION EQUIPMENT
MONITORS TO BE REMOVED AND REINSTALLED BY
CONTRACTOR. COORDINATE REINSTALLATION WITH
FINISHES AND NEW FURRING WALLS.
DEMOLITION KEYNOTES:#
SHEET KEY NOTES:#
1. THE DEMOLITION DRAWINGS FOR ARCHITECTURAL
AND ENGINEERING WORK HAVE BEEN PREPARED
USING "AS-DESIGNED" DOCUMENTS PROVIDED BY THE
OWNER. NEITHER THE OWNER NOR THE ARCHITECT
WARRANT THESE TO BE "AS-BUILT" DOCUMENTS, AND
ACTUAL CONDITIONS MAY VARY. THE DEMOLITION
WORK INDICATED IS INTENDED TO SHOW THE
GENERAL SCOPE OF THE DEMOLITION WORK AND IN
NO WAY RELIEVES THE CONTRACTOR FROM
PERFORMING ANY AND ALL DEMOLITION REQUIRED
TO COMPLETE THE NEW WORK.
2. ALL DEMOLITION WORK SHALL BE PERFORMED WITH
"DUE CARE AND DILIGENCE" SO AS TO PREVENT THE
ARBITRARY DESTRUCTION OR INTERRUPTION OF
CONCEALED UTILITIES WHICH COULD NOT BE
PREDETERMINED UNTIL DEMOLITION WAS STARTED.
ALL SUCH DISCOVERIES OF UTILITIES DURING THE
DEMOLITION PROCESS WHICH ARE IN A LOCATION
DIFFERENT FROM FLOOR TO FLOOR, ETC., OR ARE
UNIDENTIFIED, SHALL BE REPORTED TO THE
ARCHITECT BEFORE REMOVAL FOR FINAL
DISPOSITION.
3. REMOVE ALL CONSTRUCTION DESIGNATED TO BE
REMOVED AND CLEAR TO RECEIVE NEW WORK AS
HEREIN INDICATED.
4. REMOVE PORTIONS OF EXISTING CONSTRUCTION AS
DRAWN AND PATCH TO MATCH ADJACENT
CONSTRUCTION.
5. WHEREVER EXISTING EQUIPMENT, PIPING, DUCTS,
ETC., ARE REQUIRED TO BE REMOVED, SUCH
REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS,
BRACING, FOUNDATION, ETC. AFTER REMOVAL,
AFFECTED CONSTRUCTION AND SURFACES, SUCH AS
FLOORS ,WALLS, BASES, AND CEILINGS, SHALL BE
FINISHED TO MATCH ADJACENT SURFACES UNLESS
OTHERWISE NOTED.
6. NEW WORK SHALL ALIGN WITH AND MATCH EXISTING
WORK EXCEPT WHERE OTHERWISE DIMENSIONED OR
DETAILED.
7. ANY EXISTING CONDITIONS WHICH ARE INCONSISTENT
WITH CONTRACT DRAWINGS RELEVANT TO THIS
CONTRACT SHALL BE REPORTED TO THE COR.
8. WHERE DEMOLITION OR RELATED WORK LEAVES
FLOOR SURFACES WITH IMPERFECTIONS OR NOT
LEVEL TO TOLERANCES SPECIFIED FOR NEW WORK,
PROVIDE SELFLEVELING UNDERLAYMENT.
9. WHERE DEMOLITION WORK UNCOVERS OR LEAVES
OPENINGS IN PARTITIONS OR INCOMPLETE
PARTITIONS, EXTEND, RESTORE, AND/OR CLOSE
OPENING IN PARTITION AS INDICATED AND/OR AS
REQUIRED TO MAINTAIN FIRE RATINGS AND SMOKE
BARRIERS. MATCH EXISTING CONSTRUCTION, U.N.O.,
WITHIN THE LIMITS AND TOLERANCES FOR MATERIALS
AS SPECIFIED OR RECOMMENDED BY THE
MANUFACTURER. REFINISH SURFACES TO ALIGN
FLUSH WITH EXISTING.
10. WHERE DEMOLITION WORK OR RELOCATION OF
EXISTING ITEMS LEAVES UNFINISHED SURFACES
AND/OR SUBSTRATES, CUT AND PATCH AS REQUIRED
TO RESTORE SUBSTRATE AND/OR FINISH MATERIAL
EVEN AND FLUSH WITH ADJOINING SURFACES.
TEXTURE AND REFINISH TO MATCH EXISTING U.N.O.
11. CONTRACTOR SHALL DISPOSE OF ALL ITEMS AND
MATERIALS PER SPECIFICATIONS. OWNER RESERVES
THE RIGHT TO SELECT SPECIFIC ITEMS FOR
SALVAGE. THESE ITEMS SHALL BE IDENTIFIED DURING
A PRECONSTRUCTION WALKTHROUGH.
12. FOR FURTHER DEMOLITION INFORMATION REF THE
MECHANICAL, ELECTRICAL AND PLUMBING
DRAWINGS.
13. PROVIDE TEMPORARY DUST, SIGHT AND SOUND
BARRIERS AS REQUIRED BY OWNER, AND WHEREVER
NECESSARY, TO LIMIT THE AMOUNT OF NOISE, DUST,
VISUAL POLLUTION WITHIN AND AROUND THE
FACILITY, TO MAINTAIN OCCUPANCY AND USE OF
OCCUPIED AREAS IN THE EXISTING BUILDING. THE
EXACT LOCATION AND QUANTITY OF TEMPORARY
BARRIERS IS TO BE COORDINATED WITH OWNER AND
DETERMINED BY CONSTRUCTION SCHEDULE AND
WORK SCHEDULE.
14. ALL BUILDING SYSTEMS SERVING OCCUPIED AREAS
OF THE BUILDING SHALL REMAIN FULLY OPERATIONAL
AT ALL TIMES. CONTRACTOR SHALL PROTECT AND
MAINTAIN ALL EXISTING BUILDING SYSTEMS
INCLUDING SYSTEMS PASSING THROUGH AND
ADJACENT AREAS REQUIRING DEMOLITION. WHERE
NECESSARY RE-ROUTE OR CAP AS REQUIRED ALL
WIRING, CONDUITS, PIPING, DUCTWORK AND OTHER
UTILITIES TO SERVE OCCUPIED AREAS.
15. CONTRACTOR TO VERIFY ALL EXISTING
UNDERGROUND UTILITIES PRIOR TO DIGGING.
16. NO DEMOLITION SHALL OCCUR UNTIL TEMPORARY
LIFE SAFETY AND INFECTION CONTROL MEASURES
ARE IN PLACE.
17. COORDINATE CONCRETE DEMOLITION TIMES WITH
COR.
01 SAWCUT & REMOVED EXIST. STAIR TREAD
02 EXIST. RAMP TO REMAIN
03 EXIST. HANDRAIL TO REMAIN
01 PROVIDE NEW HANDRAIL - MATCH EXIST.
02 PROVIDE NEW STAIR TREAD.
03 NEW TRANSFORMER - SEE ELECTRICAL
DRAWINGS.
04 4" TRENCH DRAIN TIE TO NEARBY STORM DRAIN
SYSTEM.
05 GRAVEL FILL, VAPOR BARRIER, PAD
06 ELECTRICAL EQUIPMENT PAD, SEE STRUCTURAL
DRAWINGS.
07 TOP OF CONCRETE FOUNDATION WALL.
08 EXISTING HOSE BIBB TO REMAIN.
09 ROUTE EXISTING STORM DOWNSPOUT 11" FROM
EDGE OF AREA WELL ALONG TOP OF NEW
TRANSFORMER ENCLOSURE WALL AND DOWN THE
FRONT. TERMINATE AT GRADE.
10 TIE TRENCH DRAIN TO EXISTING STORM DRAIN
SYSTEM, REFER TO ELECTRICAL SITE PLAN ON
E-102
11 CENTER TRANSFORMER ON CONCRETE PAD
WITHIN THE DOOR OPENING TO ALLOW 3' - 0" FOR
TRANSFORMER DOORS TO OPEN TO 90 DEGREES.
12 EXISTING GUTTER TO BE RE-ROUTED ON TOP OF
THE NEW SCREEN WALL AND DOWN THE FRONT
AS SHOWN.
SCW= SOLID CORE WOOD
STN= STAIN
WD= WOOD
IHM= INSULATED HOLLOW METAL
OHD= OVERHEAD DOOR
PF= PREFINISHED
PNT= PAINT
AL= ALUMINUM
ALCW= ALUMINUM CLAD WOOD
EXIST= EXISTING
FRP= FIBER REINFORCED
PLASTIC
HM= HOLLOW METAL
Scale: 1 1/2" = 1'-0"
STAIR CONNECTION DETAIL
DOOR TYPE FRAME TYPE
0 4 8 16
Scale: 1/4" = 1'-0"
BUILDING SECTION
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H, N
C
N
11664
I K
G HC OY
RE
G
IS
TERED ARCHITECT
N O
R
T H C A R O L
I N A
A
A
DOOR SCHEDULE
DOOR DOOR FRAME HEAD
DETAIL NO.
JAMB
DETAIL NO.
THRESH
DETAIL NO.
FIRE
RATING
HDWR
SET REMARKSNO. WIDTH HEIGHT THICK MAT'L FINISH ELEV MAT'L FINISH ELEV
GRADE
A 7' - 8" 7' - 2" 1 3/4" HM PNT A HM PNT 2 - AE301 7 - AE301 1 - AE301 HW-11B
B 7' - 8" 7' - 2" 1 3/4" HM PNT A HM PNT 2 - AE301 7 - AE301 1 - AE301 HW-11B
GENERAL NOTES:
2" NOMINAL AIR SPACE (KEEP
CLEAN OF MORTAR)
45 MIL UNCURED EPDM
FLASHING W/ END DAMS
WEEPS @ 16" ON CENTER @
DOOR HEAD
STAINLESS STEEL DRIP EDGE
@ DOOR HEAD
LOOSE LINTEL, SEE
STRUCTURAL
SEALANT @ PERIMETER OF
FRAME
LINTEL, SEE
STRUCTURAL
SEALANT
BRICK VENEER
LINTEL, SEE STRUCTURAL
CONCRETE FOUNDATION,
SEE STRUCTURAL
DOUBLE 3" x 7' INSULATED HM
DOOR W/ ASTRAGAL & HD
LEVER HARDWARE &
STORAGE LOCKSET,
COORDINATE KEYING
AE301
AE301
2" NOMINAL AIR SPACE (KEEP
CLEAN OF MORTAR)
WOOD NAILER
W/ SCREW-
FASTENERS
V E
R
IF
Y W
E
L E
C T
R
IC
A L
GRAVEL FILL
GRADE
0' - 0"
NEW SIDEWALK
1'-6 1/8"
TOP OF WALL
10' - 0"
CONCRETE WALL, SEE
STRUCTURAL
DRAWINGS FOR
REINFORCEMENT
BRICK VENEEER
"HOOK & EYE" LADDER
REINFORCMENT @ 16'
ON CENTER
VERTICALLY
WOOD NAILER W/
SCREW-FASTENERS
PROVIDE SEALANT
/8
FIRST FLOOR
1' - 5"
GRAVEL FILL
CONRETE
FOUNDATION,
SEE STRUCTURAL
CONCRETE
FOUNDATION - SEE
STRUCTURAL DRAIWNGS
1/2" EXPANSION FILLER
45 MIL UNCURED EPDM
FLASHING W/ MFG.
WEEPS @ 16" ON
CENTER HORIZONTALLY
(TYP.)
BRICK VENEEER
SEE STRU. DWG'S
3'-6"
S E
E S
T R
U C
T U
R A
L D
R A
W
IN
G S
CONCRETE FOOTING -
SEE STRUCTURAL
DRAIWNGS
1" C.J WITH SEALANT
AND BACKER ROD
GRADE
0"
4" DUCTILE IRON
BUTTERFLY VALVE
NEW SIDEWALK,
COORDINATE WITH VA
M
IN
FIRST FLOOR
1' - 5"
ALL WALLS TO HAVE
2-HR RATED 8" CMU
EXISTING CURB WALL
EXISTING HOSE BIB
45 MIL UNCURED EPDM
FLASHING W/ MFG.
WEEPS @ 16" ON
CENTER HORIZONTALLY
(TYP.)
2" NOMINAL AIR SPACE (KEEP
CLEAN OF MORTAR)
"HOOK & EYE" LADDER
REINFORCMENT @ 16'
ON CENTER
VERTICALLY
GRAVEL FILL
CONCRETE WALL, SEE
STRUCTURAL DRAWINGS
FOR REINFORCEMENT
EXISTING LIGHTWELL WALL
EXTENDS DOWN TO BASEMENT
GRADE
0"
4" DUCTILE IRON BUTTERFLY
VALVE
OIL MOAT
RESERVIOR
M
IN
M
IN
MASONRY WALL, SEE STRUCTURAL
DRAWINGS FOR REINFORCEMENT
BRICK VENEER
2" NOMINAL AIR SPACE (KEEP
CLEAN OF MORTAR)
MASONRY WALL, SEE STRUCTURAL
DRAWINGS FOR REINFORCEMENT
SEALANT
8" HD HM FRAME &
INSULATED HD HM DOOR
EXT. SEALANT
'HOOK & EYE' HORIZONTAL
REINFORCEMENT @ 16" ON
CENTER (TIES @ 16" ON CENTER
EACH WAY)
BRICK VENEER
2" NOMINAL AIR SPACE (KEEP
CLEAN OF MORTAR)
S E
E S
T R
U C
T U
R A
L D
R A
W
IN
G S
1" CHAMFERED EDGE
1"
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:4
:0
P M
AE301
BUILDING SECTIONS AND DETAILS
2 2JJG
REPLACE BUFFALO
BUILDING BASEMENT
SWITCHGEAR
CHEYENNE VA MEDICAL CENTER
2360 EAST PERSHING BLVD
CHEYENNE, WY 82001 March 6, 2020
100% CONSTRUCTION DOCUMENT
442-18-00318-357
Buffalo
KC
Scale: 1 1/2" = 1'-0"
WALL SECTION AT DOOR HEAD
Scale: 3/4" = 1'-0"
WALL SECTION AT DOOR
Scale: 1 1/2" = 1'-0"
WALL CAP DETAIL
Scale: 1 1/2" = 1'-0"
FOOTING DETAIL
Scale: 1 1/2" = 1'-0"
DETAIL AT EXISTING CONCRETE WALL
Scale: 3" = 1'-0"
WALL CORNER DETAIL
Scale: 3" = 1'-0"
DOOR FRAME DETAIL
A
LA
R
E GI H,NC
S
G O 52644
P E
N
CO
LU IT
E
NG
RG
U O
A
P ,P
R E
G I
S T
E R
E D
A R
C H I T E C T U R
A L
C O
R P
O T
I O
N
N O
R T H C A R O L
I N A
A R
LA
R
E GI H, N
C
N
11664
I K
G HC OY
RE
G
IS
TERED ARCHITECT
N O
R
T H C A R O L
I N A
Scale: 3" = 1'-0"
CONCRETE PAD EDGE DETAIL
L L
ELECTRICAL ABBREVIATIONS LIST
SR SURFACE RACEWAY
SS STAINLESS STEEL
SSW SELECTOR SWITCH
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TC TIMECLOCK
TEL TELEPHONE
TEL/DATA TELEPHONE/DATA
TERM TERMINAL
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTB TELEPHONE TERMINAL BOARD
TTC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .