Attch B_Drawings 598-21-108.pdf
PDF 12 MB Posted
- Solicitation number
- 36C25625R0045
About this file
The provided document is a set of architectural and engineering drawings for a heating water system upgrade project at the John L. McClellan Memorial Veterans Hospital in Little Rock, Arkansas. The comprehensive drawing set includes 28 pages covering general information, mechanical plans, electrical plans, and detailed riser diagrams for a multi-phase replacement of the existing heating water infrastructure.
The project, identified as VA Project #598-21-108, involves replacing steam pressure reducing stations, steam-to-hot water converters, pumps, automatic valves, piping, and related boiler/hot water system equipment. The work will be completed in four phases to minimize service interruptions, with work spanning multiple floors including mechanical rooms, operating suites, and the 7E penthouse. The drawings provide detailed plans for demolition, new equipment installation, piping routes, electrical modifications, and control system updates, with a total project duration of 270 calendar days from the Notice to Proceed.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/8
/2
:2
:0
P M
C U s e rs \c th o m p s o n \D o c u m e n ts \A
M E
P F
-1
-J L
M U p g ra d e
H e a ti n g
W a te r
S y s te m s c th o m p s o n B
V
E
.r v t
G-001
COVER SHEET
1 3AD
REPLACE/UPGRADE
HEATING WATER SYSTEM
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
JULY 9, 2024
100% BID DOCUMENTS
598-21-10822-100
REPLACE/UPGRADE HEATING WATER SYSTEM
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
VA PROJECT #: 598-21-108
RHA
DRAWING LIST
GENERAL
G-001 COVER SHEET 1 3
G-002 GENERAL INFORMATION 2 3
G-003 ICRA INFORMATION AND DETAILS 3 3
ARCHITECTURAL
A-100 BUILDING 1. SECOND FLOOR, PHASE 3, ICRA PLAN 1 3
A-101 BUILDING 1, THIRD FLOOR, PHASE 1, FLOOR & DEMOLITION PLANS 2 3
A-102 BUILDING 1, THIRD FLOOR, PHASE 2, FLOOR & DEMOLITION PLANS 3 3
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 18
M-101 BUILDING 1, MEZZANINE, PHASE 1, MECHANICAL PLANS 2 18
M-102 BUILDING 1, THIRD FLOOR, PHASE 1, MECHANICAL PLANS 3 18
M-103 BUILDING 1, THIRD FLOOR, PHASE 2, MECHANICAL PLANS 4 18
M-104 BUILDING 1, THIRD FLOOR, PHASE 3, MECHANICAL PLANS 5 18
M-105 BUILDING 1, THIRD FLOOR POD B, PHASE 3, MECHANICAL PLAN 6 18
M-106 BUILDING 1, SECOND FLOOR POD F, PHASE 3, MECHANICAL PLAN 7 18
M-107 BUILDING 1, THIRD FLOOR, PHASE 4, MECHANICAL PLANS 8 18
M-108 BUILDING 1, 7E PENTHOUSE, PHASE 4, MECHANICAL PLANS 9 18
M-109 BUILDING 1, SIXTH AND SEVENTH FLOOR POD E, PHASE 4, MECHANICAL PLAN 10 18
M-501 MECHANICAL DETAILS 11 18
M-502 MECHANICAL DETAILS 12 18
M-601 MECHANICAL SCHEDULES 13 18
M-602 MECHANICAL CONTROLS 14 18
M-901 HEATING HOT WATER RISER DIAGRAM AREA A 15 18
M-902 HEATING HOT WATER RISER DIAGRAM AREA B 16 18
M-903 HEATING HOT WATER RISER DIAGRAM AREA C 17 18
M-904 HEATING HOT WATER RISER DIAGRAM AREA D 18 18
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 4
ED101 BUILDING 1, THIRD FLOOR POWER DEMOLITION PLAN 2 4
ED103 BUILDING 1, 7E PENTHOUSE POWER DEMOLITION PLAN 3 4
E-101 BUILDING 1, THIRD FLOOR POWER PLAN 4 4
Docusign Envelope ID: 611B32A1-85CA-441C-ACC1-AD6DC1E0670B
7/9/2024
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND
STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
1. VA Sustainable Design Manual, August 2017
2. VA VHA Directive 1061, February 2021
3. VA Fire Protection Design Manual, 2021
4. VA Plumbing Design Manual, June 2022
5. VA HVAC Design Manual, March 2022
6. VA Physical Security and Resiliency Design Manual, 2022
7. VA Lighting Design Manual, December 2022
8. VA Electrical Design Manual, December 2019
9. VA Office of Information & Technology Design Guide, February 2019
10. VA Infrastructure Standard for Telecommunications Spaces, v3.1, July 2021
11. PG 18-13 VA Barrier Free Design Standard, February 2022
12. PG 18-4 VA Standard Details and Specifications
13. NFPA 101, Life Safety Code, 2021
14. NFPA 99, Health Care Facilities Code, 2021
15. NFPA 90A, Installation of Air Conditioning and Ventilating Systems, 2021
16. NFPA 72, National Fire Alarm Code, 2022
17. NFPA 70, National Electrical Code, 2020
18. NFPA 13, Installation of Sprinkler Systems, 2022
19. International Standards for Hematopoietic Cellular Therapy Product Collection, Processing, and Administration, Eighth Edition
20. International Building Code, 2021
21. International Mechanical Code, 2021
22. International Plumbing Code, 2021
23. International Fuel Gas Code, 2021
24. Illuminating Engineering Society (IES) Lighting Handbook, 10th Edition
25. Facilities Guidelines Institute: Guidelines for the Design and Construction of Hospitals 2022
26. ASME B31.9, Building Services Piping
27. ASHRAE Standard 170, Ventilation for Health Care Facilities, 2021
28. ASHRAE Handbooks, 2017 Fundamentals, 2019 HVAC Applications, 2020 HVAC Systems and Equipment
29. ASHRAE 90.1 – 2019 Energy Standard for Buildings Except Low-Rise Residential Buildings
30. SMACNA, HVAC Duct Construction Standards, Metal and Flexible
31. SMACNA, HVAC Air Duct Leakage Test Manual
32. ANSI/TIA/EIA 568-2019 Commercial Building Cabling Standards
33. ANSI/TIA/EIA 569-C-2015 Commercial Building Standards for Telecommunications Pathways and Spaces
34. ANSI/TIA-1179-2017, Telecommunications Spaces for Healthcare Facilities
35. BICSI, Telecommunications Distribution Methods Manual, 2014
36. Federal Information Processing Standards-FIBS-201-1: Personal Identity Verification (PIV) of Federal Employees and Contractors
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT FOR ALL EXPOSED EDGES.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
14. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR
REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
15. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
16. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
17. CONTRACTOR TO MAINTAIN THE FIRE RATING OF STRUCTURAL MEMBERS OR REPAIR THE FIRE RATING WITH SIMILAR MATERIALS IF DAMAGED DURING CONSTRUCTION. INFILL ALL FLOOR/WALL PENETRATIONS WITH SIMILAR ADJACENT ASSEMBLY OR A UL APPROVED SLEEVE OR PLATE. MUST MAINTAIN THE INTEGRITY OF THE
FIRE-RATING.
18. CONTRACTOR TO COORDINATE SYSTEM SHUTDOWNS WITH COR. PROVIDE A MINIMUM OF 14 DAYS ADVANCE
NOTICE.
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1 #
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/8
/2
:2
:0
P M
C U s e rs \c th o m p s o n \D o c u m e n ts \A
M E
P F
-1
-J L
M U p g ra d e
H e a ti n g
W a te r
S y s te m s c th o m p s o n B
V
E
.r v t
G-002
GENERAL INFORMATION
2 3RHA
REPLACE/UPGRADE
HEATING WATER SYSTEM
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
JULY 9, 2024
100% BID DOCUMENTS
598-21-10822-100
AD
GENERAL SYMBOL LEGEND CODE STANDARDS AND EXECUTIVE ORDERSGENERAL NOTES
DEMOLITION NOTES
ARCHITECTURAL SYMBOL LEGEND
ABBREVIATIONS
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I
.F
E X
IS
T
IN
G
W A
L L
V .I
.F
E X
IS
T
IN
G
W A
L L
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE
THAN ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT IN
OPERATION DURING
PROJECT. COORDINATE
WITH COR.
COVER ALL RETURNS AT
THE GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
COORDINATE WITH
COR WITH MOST
READILY AVAILABLE
OUTLET FOR
NEGATIVE AIR UNIT.
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR JLM UPGRADE HEATING WATER SYSTEMS
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS NOT CONFIRMED THE
DESIGNATION FOR THIS PROJECT. COORDINATE FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES WITH THE VA.
HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED
ON THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL
AREA FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS
INTACT AND ACTIVE.
1A. IF THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING
CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR
THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM.
THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND
LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS
SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL
PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED
OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY
TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS; SERVICE
ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS
SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON
TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE
REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR
(HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE
OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED
AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION
AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL
BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION
PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR TO VERIFY AND TO ACKNOWLEDGE TO
THE CONTRACTOR WHETHER THE CONSTRUCTION AREA USES
FRESH/OUTSIDE AIR OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR
RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC.
AIR MUST FLOW FROM CLEAN TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
6B. COR TO APPROVE WORK AREA IS ACCEPTABLE BEFORE CONTRACTOR
CAN PROCEED TO THE NEXT PHASE.
7. ALL WORK IN HIGH RISK GROUP 4 AREAS TO BE AFTER HOURS.
COORDINATE WITH COR.
8. ALL ICRA MEASURES TO BE APPROVED BY THE COR PRIOR TO
INSTALLATION.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
I
I
II
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
II
II
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2: MEDIUMGroup 1: LOWEST
- Non-Invasive Areas of Clinics such as Cardiology / Echo, Nuclear Medicine, Physical Therapy, Radiology / MRI, and Respiratory Therapy
- Reasearch
- MHU DOMs and Inpatient Areas -Laundry Services
- Lodging Areas
- Maintence Medical Information
- Office Areas
- Outside Construction (unless adjacent to building intake vents) -Prosthetic Service -Warehouse
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4: HIGHESTGroup 3: HIGH
- Emergency Department
- Nuclear Medicince
- Canteen / N&Fs
- PT - Tank Areas
- Lab
- Inpatient Areas JLM and CLC
- Operating Room
- Sterile Processing
- Sterlie Supply
- SICU / MICU
- PACUs
- Cardiac Catheterization and Angiography Areas
IIII
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
- Administrative Areas
- Biomedical -Conference Rooms
- Engineering
- Environmental Maagement -Information Systems
- Library
- Interventional Radiology
- Dialysis
- Oncology
- All endoscopy Areas (scope store)
- Pharmacy Admixture
- Chemo Rooms
- Any Area Caring for Immunocompromised (e.g. 6C)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
/8
/2
:2
:0
P M
C U s e rs \c th o m p s o n \D o c u m e n ts \A
M E
P F
-1
-J L
M U p g ra d e
H e a ti n g
W a te r
S y s te m s c th o m p s o n B
V
E
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 3AD
REPLACE/UPGRADE
HEATING WATER SYSTEM
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
JULY 9, 2024
100% BID DOCUMENTS
598-21-10822-100
RHA
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
G A S
VALVE
15 16 17 18 19 20 21
W
X
Y
Z
AA
BB
CC
3" HWS
3" HWR
3" HWS
3" HWR
WOMEN'S
RESTROOM
2F-204
MEN'S
LOCKER
2F202A
GENERAL
OPERATING
ROOM
2F-208
NEUROSURGERY
OPERATING
ROOM
2F-210
2F-221
CLEAN CORE
CLEAN
CORE
CONTROL
ROOM
2F-226
NURSE
MANAGER
2F-227
MEDICATION
ROOM
2F-225
ORTHOPEDIC
STORAGE
2F-228
ORTHOPEDIC
OPERATING
ROOM #1
2F-224
CORRIDOR
2F-104
EQUIPMENT
STORAGE
2F-211 ELECT.
CLOSET
2F-209
Room
POD S
NEPTUNE
STORAGE
2F-207
ATRIUM
2F-205
ANESTHESIA
WORKROOM
2F-206
UNISEX
TOILET
2F-206A
WOMEN'S
LOCKER
2F-204A
ALCOVE
2F-203
MEN'S
RESTROOM
2F-202
PACU
2B-180
SOILED
UTILITY
2B-184
ISOLATION
ROOM
2B-182
NURISHMENT
2B-183
VESTIBULE
2B-182A
CUBLICLE
2C-125
CUBICLE
2C-126
CUBICLE
2C-123
ISOLATION
2C-122
STAIR
HEAD
NURSE
2B-189
ISOLATION
2B-188
SURGERY
SERVICE
2B-192
Room
2B-190
STAFF
ANESTHESLGST
2B-191
NURSE
ANESTHETIST
2B-162
STAFF
ANESTHESIOLGST
2B-194
RESDNT
ANSTHSLGST
2B-166
36"X60" ICRA
STICKY MATS
36"X60" ICRA
STICKY MATS
1 1
CONSTRUCTION
ANTEROOM
TEMP
C O
N S
T R
U C
T
IO
N A
N T
E R
O O
M
T E
M P
C L R
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/8
/2
:2
:0
P M
C U s e rs \c th o m p s o n \D o c u m e n ts \A
M E
P F
-1
-J L
M U p g ra d e
H e a ti n g
W a te r
S y s te m s c th o m p s o n B
V
E
.r v t
A-100
BUILDING 1. SECOND FLOOR, PHASE 3,
ICRA PLAN
1 3LMB
REPLACE/UPGRADE
HEATING WATER SYSTEM
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
JULY 9, 2024
100% BID DOCUMENTS
598-21-10822-100
CLA
Scale: 1/8" = 1'-0"
BUILDING 1, SECOND FLOOR POD F, PHASE 3, ICRA PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A
D E
C B
7 9
F
1 CONSTRUCTION ROUTE ACCESS.
2 CONSTRUCTION ROUTE ACCESS TO SERVICE
ELEVATOR. COORDINATE WITH COR.
3 TEMPORARY PREFABRICATED ICRA WALL
SYSTEM BASIS OF DESIGN, STARC WALL
SYSTEM OR EDGE GUARD SYSTEM.
4 TEMPORARY HARD ICRA BARRIER.
5 CLOSE, LOCK, AND SEAL EXISTING DOOR
DURING CONSTRUCTION. PROVIDE
TEMPORARY SIGNAGE AS NECESSARY.
6 PIPING TIE IN LOCATION. SEE PLUMBING.
7 SEAL ALL PENETRATIONS THROUGH RATED
WALLS WITH APPROVED SEALANT, TYPICAL.
PATCH AND REPAIR TO MATCH EXISTING,
TYPICAL.
8 ZIPPERED PLASTIC ICRA BARRIER.
9 PROVIDE ILSM CONSTRUCTION EGRESS
SIGNAGE, AS NECESSARY. SEE 4/G-003.
10 USE EXISTING DOOR FOR CONSTRUCTION
ACCESS.
11 CONTRACTOR TO PROVIDE SELF CONTAINED
HEPA FILTER AIR UNIT.
12 REMOVE AND REPLACE CEILING TILES AS
REQUIRED. CEILING IS TO BE SEALED AT THE
CLOSE OF EACH SHIFT.
13 WORK IN PACU TO BE COMPLETED ON
WEEKENDS/AFTER HOURS
A. SEE G-003 FOR ADDITIONAL ICRA INFORMATION.
B. COORDINATE WORK WITH ALL DISCIPLINES.
E
E
E
E
E
NEW WORK LEGEND
NEW CONCRETE SLAB
16 17 18 19 20 21
E
F
G
H
J
K
L
STAIR 4
S14-JLM
DN
MECHANICAL
ROOM
3E100
16 17 18 19 20 21
E
F
G
H
J
K
L
36"X60" ICRA
STICKY MATS
STAIR 4
S14-JLM
DN
MECHANICAL
ROOM
3E100
DEMOLITION LEGEND
ICRA STICKY MAT
DEMOLISH EXISTING CONCRETE
SLAB AND/OR EQUIPMENT
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/8
/2
:2
:0
P M
C U s e rs \c th o m p s o n \D o c u m e n ts \A
M E
P F
-1
-J L
M U p g ra d e
H e a ti n g
W a te r
S y s te m s c th o m p s o n B
V
E
.r v t
A-101
BUILDING 1, THIRD FLOOR, PHASE 1,
FLOOR & DEMOLITION PLANS
2 3LMB
REPLACE/UPGRADE
HEATING WATER SYSTEM
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
JULY 9, 2024
100% BID DOCUMENTS
598-21-10822-100
CLA
Scale: 1/8" = 1'-0"
BUILDING 1, THIRD FLOOR, PHASE 1, FLOOR PLAN
NORTH
0 4 8 16
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
BUILDING 1, THIRD FLOOR, PHASE 1, DEMOLITION PLAN
1 REMOVE EXISTING STEEL BRACKETS/BRACING
FOR EXISTING EQUIPMENT REMOVAL, TYP.
COORDINATE WITH ELECTRICAL AND
MECHANICAL DWGS.
PATCH AND REPAIR AFFECTED AREA TO ACHIEVE
SMOOTH, CONSISTENT FINISH.
A. ALL EXISTING EQUIPMENT AND EQUIPMENT PADS
ARE FOR REFERENCE ONLY AND TO BE
COORDINATED MECHANICAL AND FIELD VERIFIED.
B. SEE G-003 FOR ADDITIONAL ICRA INFORMATION.
C. COORDINATE WORK WITH ALL DISCIPLINES.
1 EXISTING EQUIPMENT PAD TO REMAIN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A
D E
C B
E
16 17 18 19 20 21
E
F
G
H
J
K
L
MECHANICAL
ROOM
3E100
STAIR 4
S14-JLM
DN
A-102
A-102
/4
C
LR
8"
M
IN
16 17 18 19 20 21
E
F
G
H
J
K
L
36"X60" ICRA STICKY MATS
STAIR 4
S14-JLM
DN
MECHANICAL
ROOM
3E100
NEW WORK LEGEND
NEW CONCRETE SLAB DEMOLISH EXISTING CONCRETE
SLAB AND/OR EQUIPMENT
DEMOLITION LEGEND
ICRA STICKY MAT
EDGE OF EQUIPMENT PAD
EDGE OF EQUIPMENT
M
IN
MIN.
6"
W
IT
H E
Q U
IP
M
E N
T S
IZ
E
C O
O R
D
IN
A T
E
COORDINATE WITH EQUIPMENT SIZE
M
IN
MIN.
6"
#3 ADHESIVE DOWEL AT 18" O.C.
W/ 2" EMBEDMENT INTO SLAB
NEW OR EXISTING CONC SLAB
#4 CONT
WWF
1/2" CHAMFER
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/8
/2
:2
:0
P M
C U s e rs \c th o m p s o n \D o c u m e n ts \A
M E
P F
-1
-J L
M U p g ra d e
H e a ti n g
W a te r
S y s te m s c th o m p s o n B
V
E
.r v t
A-102
BUILDING 1, THIRD FLOOR, PHASE 2,
FLOOR & DEMOLITION PLANS
3 3LMB
REPLACE/UPGRADE
HEATING WATER SYSTEM
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
JULY 9, 2024
100% BID DOCUMENTS
598-21-10822-100
CLA
1 NEW EQUIPMENT CONCRETE PAD.
COORDINATE WITH MECHANICAL AND
STRUCTURAL DWGS. SEE ALSO DETAIL
1/A-102.
2 EXPAND EXISTING EQUIPMENT PAD
PRIOR TO INSTALLING NEW EQUIPMENT
Scale: 1/8" = 1'-0"
BUILDING 1, THIRD FLOOR, PHASE 2, FLOOR PLAN
Scale: 1/8" = 1'-0"
BUILDING 1, THIRD FLOOR, PHASE 2, DEMOLITION PLAN
NORTH
0 4 8 16
NORTH
0 4 8 16
1 REMOVE EXISTING EQUIPMENT PADS AS
REQUIRED FOR THE REMOVAL OF THE EXISTING
EQUIPMENT. PATCH AND REPAIR AFFECTED
AREA TO ACHIEVE A SMOOTH FINISH.
COORDINATE WITH MECHANICAL DWGS.
2 EXISTING EQUIPMENT CONCRETE PAD TO
REMAIN. COORDINATE WITH MECHANICAL
DRAWINGS.
Scale: 1/2" = 1'-0"
CONCRETE PAD
Scale: 1 1/2" = 1'-0"
EQUIP PAD DETAIL
A. ALL EXISTING EQUIPMENT AND EQUIPMENT PADS
ARE FOR REFERENCE ONLY AND TO BE
COORDINATED MECHANICAL AND FIELD VERIFIED.
B. SEE G-003 FOR ADDITIONAL ICRA INFORMATION.
C. COORDINATE WORK WITH ALL DISCIPLINES.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A
D E
C B
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING TWO-WAY CONTROL
VALVE
STEAM TRAP
D CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMIT OF DEMOLITION
INLINE CENTRIFUGAL PUMP
STEAM PRESSURE REDUCING
VALVE
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS) MPS
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
MODULATING THREE-WAY
CONTROL VALVE
T
H
F
SD
FS
MECHANICAL LEGEND
MOTORIZED DAMPER
FLOW TRANSMITTER
MECHANICAL GENERAL NOTES
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
15. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.
22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24. INSTALL PIPING FREE OF SAGS AND BENDS.
25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
27. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
28. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST
29. CONTRACTOR TO FIELD-VERIFY EXISTING CONDTIONS PRIOR TO PERFORMING ANY DEMOLITION OR NEW WORK. CONTRACTOR TO PRESERVE ALL SURROUNDING PIPING, DUCTWORK, EQUIPMENT, AND FINISHES NOT INDICATED FOR DEMOLITION OR NEW WORK
30. CONTRACTOR TO COORDINATE ALL UTILITY SHUTDOWNS WITH THE COR (MIN. 14-DAY ADVANCE NOTICE).
31. ALL DEMOLISHED EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN ACCORDANCE WITH VAPHS REQUIREMENTS AND
ENVIRONMENTAL REGULATIONS.
32. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE GENERAL CONTRACTOR, OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION TO AREAS OUTSIDE OF THE
PROJECT LIMITS OF WORK.
33. CONTRACTOR SHALL INFORM THE COR OF ANY AREAS THAT MIGHT POTENTIALLY HOST ASBESTOS-CONTAINING MATERIAL.
34. CONTRACTOR SHALL COORDINATE WORK TO ENSURE THAT (1) PRIMARY HEATING HOT WATER HEAT EXCHANGER AND PUMP SET IS OPERATIONAL AND CONNECTED TO THE
END-USE EQUIPMENT THROUGHOUT THE CONSTRUCTION PERIOD.
35. STEAM SHUTDOWNS LIMITED TO OUTSIDE TEMPERATURES GREATER THAN 65 DEGREES F.
36. CONDENSATE FLASH TANK SHUTDOWN LIMITED TO 8 HOURS.
37. WORK IN THE PACU ONLY TO BE PERFORMED ON THE WEEKENDS.
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
DIFFUSER TAG
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
EQUIPMENT TAG
ANNOTATION SYMBOLS
##-VAV-#
SD-## ###
MECHANICAL ABBREVIATIONS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
°C CENTIGRADE (CELSIUS)
C COMMON
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .