Attch 9 - Pricing Worksheet - AFNWC VTC MX and Transition IDIQ FINAL.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
AFNWC VTC Maintenace IDIQ Federal contract opportunity
Solicitation number
FA940124R0001
Issued by
Department of the Air Force Materiel Command Nuclear Weapons Center

About this file

This document contains pricing worksheets and templates for a firm fixed price IDIQ contract and associated task orders to provide AV and VTC maintenance, design, and transition services to the Air Force Nuclear Weapons Center. The IDIQ is for a base period of five years with an optional six month extension. The first task order is for AV and VTC maintenance over five years including recurring maintenance, room relocations, and reactive equipment replacement. Pricing is provided through firm fixed price CLINs. The second task order is for a six month AV and VTC solutions engineering effort for mission critical and routine rooms. Labor categories and rates are to be proposed at the IDIQ level for use in developing task order proposals. Templates provide instructions for completing pricing worksheets utilizing proposed labor rates.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Completing the Pricing WorkSheet
***The vendor may modify worksheet or add sheets. All calculations must be UNLOCKED***
FOR IDIQ LABOR RATES
1) Contractor proposed fully burdened labor rates for all proposed labor categories shall be established at the IDIQ level. The vendor shall propose their labor categories (in accordance with vendor technical proposal) and associated labor hour rates for all task orders executed under the IDIQ. The vendor shall develop all subsequent task order proposals utilizing these labor categories and associated labor rates. The vendor shall propose labor rates on a yearly basis for the five (5) year ordering period totaling 60 months.
FOR TASK ORDER 1 - AFNWC VTC MAINTENANCE
1) The vendor shall provide proposed Firm Fixed Price for all CLINS. The vendor shall utilize the SCLS labor categories identified in their IDIQ technical proposal and Task Order 1 technical proposal, and the fully burdened labor rates proposed in their IDIQ labor rates tab to develop their Firm Fixed Price Estimate for Task Order 1.
2) CLINS 5001-5003 are set aside for FAR Clause 52.217-8 (Option to Extend Services). The vendor shall propose the same unit pricing as CLINS 4001-4003 for this optional 6 month extension.
FOR TASK ORDER 1 - REACTIVE EQUIPMENT CLIN
1) Please note, as identified in 52.212-1 Instructions to Offerors - Currently, the Government has identified a NTE CLIN and amount for reactive equipment replacement. This NTE amount is based on historical data related to failed equipment parts across the last 5 years. The contractor shall utilize this FFP NTE CLIN for all reactive equipment replacement or follow the procedures of DFARS 252.217-7.28 Over and Above actions as identified in the clause or the Performance Work Statement.
FOR TASK ORDER 2 - AV/VTC System Design
1) The vendor shall provide proposed Firm Fixed Price for all CLINS. The vendor shall utilize the SCLS labor categories identified in their IDIQ technical proposal and Task Order 2 technical proposal, and the fully burdened labor rates proposed in their IDIQ Labor Rates tab to develop their Firm Fixed Price Estimate for Task Order 2.

&D &A

IDIQ Labor Hours

IDIQ Project Title:AFNWC AV and VTC Maintenance, Design, and Transition IDIQ
IDIQ RFP Solicitation:FA940124R0001
Expected Contract Type:Firm Fixed Price
IDIQ Period of Performance:60 Months from DOA + 6 month option to extend services
Labor
Year 1 (Months 1-12 from DOA)Year 2 (Months 13-24 from DOA)Year 3 (Months 25-36 from DOA)Year 4 (Months 37-48 from DOA)Year 5 (Months 49-60 from DOA)
Proposed SCSLS Labor CategoriesFully Burdened Hourly RateFully Burdened Hourly RateFully Burdened Hourly RateFully Burdened Hourly RateFully Burdened Hourly Rate
00000
00000
00000
00000
00000
00000
00000
00000
00000
00000
00000

TO 1

IDIQ Project Title:AFNWC AV and VTC Maintenance, Design, and Transition IDIQ
Task Order Project Title:AFNWC AV and VTC Maintenance
IDIQ RFP Solicitation:FA940124R0001
Delivery Order/Task: Order/ Mod Number:TBD
Expected Contract Type:Firm Fixed Price
Task Order Period of Performance:Base Year + 4 Option Years + 6 month service extension
Firm Fixed PriceFirm Fixed Price
CLINDescriptionQuantityUnitUnit PriceTotal Price
CLIN 0001
(Base Year)Recurring Maintenance - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraphs 3.1 - 3.4.12Months$ - 0$ - 0
CLIN 0002
(Base Year)Room Relocations - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraph 3.6.2

tc={B3E150F5-612C-488D-A61F-A3DF4DDEF1DE}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

For sure 5 times?Each$ - 0$ - 0
CLIN 0003
(Base Year)Reactive Equipment/Spare Parts Replacement - Contractor shall provide all reactive equipment/spare parts replacement as needed IAW Task Order 1 Performance Work Statement 3.5 and IDIQ Attachment 2 - Equipment Inventory List.1Lot$ 1,500.00$ 1,500.00
CLIN 1001
(Option 1)Recurring Maintenance - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraphs 3.1 - 3.4.12Months$ - 0$ - 0
CLIN 1002
(Option 1)Room Relocations - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraph 3.6.2Each$ - 0$ - 0
CLIN 1003
(Option 1)Reactive Equipment/Spare Parts Replacement - Contractor shall provide all reactive equipment/spare parts replacement as needed IAW Task Order 1 Performance Work Statement 3.5 and IDIQ Attachment 2 - Equipment Inventory List.1Lot$ 1,500.00$ 1,500.00
CLIN 2001
(Option 2)Recurring Maintenance - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraphs 3.1 - 3.4.12Months$ - 0$ - 0
CLIN 2002
(Option 2)Room Relocations - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraph 3.6.2Each$ - 0$ - 0
CLIN 2003
(Option 2)Reactive Equipment/Spare Parts Replacement - Contractor shall provide all reactive equipment/spare parts replacement as needed IAW Task Order 1 Performance Work Statement 3.5 and IDIQ Attachment 2 - Equipment Inventory List.1Lot$ 1,000.00$ 1,000.00
CLIN 3001
(Option 3)Recurring Maintenance - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraphs 3.1 - 3.4.12Months$ - 0$ - 0
CLIN 3002
(Option 3)Room Relocations - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraph 3.6.2Each$ - 0$ - 0
CLIN 3003
(Option 3)Reactive Equipment/Spare Parts Replacement - Contractor shall provide all reactive equipment/spare parts replacement as needed IAW Task Order 1 Performance Work Statement 3.5 and IDIQ Attachment 2 - Equipment Inventory List.1Lot$ 1,000.00$ 1,000.00
CLIN 4001
(Option 4)Recurring Maintenance - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraphs 3.1 - 3.4.12Months$ - 0$ - 0
CLIN 4002
(Option 4)Room Relocations - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraph 3.6.2Each$ - 0$ - 0
CLIN 4003
(Option 4)Reactive Equipment/Spare Parts Replacement - Contractor shall provide all reactive equipment/spare parts replacement as needed IAW Task Order 1 Performance Work Statement 3.5 and IDIQ Attachment 2 - Equipment Inventory List.1Lot$ 500.00$ 500.00
CLIN 5001
(52.217-8)Recurring Maintenance - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraphs 3.1 - 3.4.6Months$ - 0$ - 0
CLIN 5002
(52.217-8)Room Relocations - Contractor shall furnish all labor, tools, parts, materials, facilities, and transportation necessary to provide services in accordance with Task Order 1 Performance Work Statement paragraph 3.6.1Each$ - 0$ - 0
CLIN 5003
(52.217-8)Reactive Equipment/Spare Parts Replacement - Contractor shall provide all reactive equipment/spare parts replacement as needed IAW Task Order 1 Performance Work Statement 3.5 and IDIQ Attachment 2 - Equipment Inventory List.1Lot$ 250.00$ 250.00
Total Task Order Price$ 5,750.00

TO 2

IDIQ Project Title:AFNWC AV and VTC Maintenance, Design, and Transition IDIQ
Task Order Project Title:AFNWC AV and VTC Solutions Engineering
IDIQ RFP Solicitation:FA940124R0001
Delivery Order/Task: Order/ Mod Number:TBD
Expected Contract Type:Firm Fixed Price
Task Order Period of Performance:6 Months
Firm Fixed PriceFirm Fixed Price
CLINDescriptionQuantityUnitUnit PriceTotal Price
CLIN 0001Solutions Engineering (MISSION CRITICAL ROOMS) - The Contractor shall furnish all labor, tools, parts, materials, facilities and transportation necessary to provide services IAW Task Order 2 Performance Work Statement.1Each

tc={A31C2CE0-75DA-413D-B36A-4D9373CB8A3A}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Do we want to do Each or 1 Lot?$ - 0$ - 0
CLIN 0002
Solutions Engineering (ROUTINE ROOMS) - The Contractor shall furnish all labor, tools, parts, materials, facilities and transportation necessary to provide services IAW Task Order 2 Performance Work Statement.1Each

tc={ACDB1A34-C6AC-4C69-AA09-4DF13C733414}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Do we want to do Each or 1 Lot $ - 0 $ - 0

File details come from the government source that posted it. Updated .