Attch 8 Final Report Guidance.pdf

PDF 173 KB Posted

Attached to
Manufacturing Technology (ManTech) Composites Manufacturing Technology Center 6 (CMTC 6)
Solicitation number
N0001425R7004
Issued by

About this file

This document is a Final Report Guidance document for the Navy ManTech Program, providing comprehensive instructions for preparing and submitting final technical reports for Navy Manufacturing Technology projects. The guidance specifies detailed requirements including a mandatory 12-section document structure covering project details from cover page to conclusions, with an emphasis on documenting technical results, benefits analysis, and implementation plans. Key submission requirements include uploading the report to the Navy ManTech Projects Database (NMPD) within 30 days of project completion, using approved submission methods like DoD SAFE or encrypted email, and following a specific file naming convention that includes the Center of Excellence acronym, "FINAL", project number, project title, and date.

The document mandates a rigorous benefits analysis section that prioritizes project accomplishments across areas such as cost avoidance, capability acceleration, warfighter readiness, and performance improvement, with a current emphasis on ship and aircraft affordability. The implementation section requires detailed tracking of technology transition, including targeted weapons systems, implementing organizations, remaining implementation tasks, funding requirements, certification timelines, and updates to any existing Technology Transition Plan. Each final report must be prepared in Microsoft Word, include graphics and video clips as appropriate, and cannot be a PowerPoint presentation.

View the file

Other files

File Type Posted
Solicitation - N0001425R7004.pdf PDF
Attch 21 Technology Transition Plan Guidance.pdf PDF
Attch 23 CDRL Instructions for Distribution.pdf PDF
Attch 22 Trip Report Guidance.pdf PDF
Attch 7 COE Transition Implementation Guidance.pdf PDF
Attch 15 Project Quad Chart Guidance.pdf PDF
Attch 24 Cost Proposal Cost Plus Fixed Fee.xlsx XLSX spreadsheet
Attch 17 Public Release Request Tool Guidance.pdf PDF
Attch 14 Project Briefing Guidance.pdf PDF
Attch 20 Success Story Guidance.pdf PDF
RFP Exhibit B Project CDRLS.pdf PDF
Attch 12 Navy ManTech Code 33 Monthly Report Guidance.pdf PDF
Attch 6 Benefits and ROI Guidance.pdf PDF
Attch 26 Q and A Template.xlsx XLSX spreadsheet
Attch 3 Navy ManTech Program Annual Data Call.pdf PDF
Attch 25 Cost Information.pdf PDF
Attch 1 Statement of Work.pdf PDF
Attch 13 Project Book Guidance.pdf PDF
Attch 2 Affordability Assessment Guidance.pdf PDF
Attch 19 Rapid Response and Special Projects Guidance.pdf PDF
Attch 9 Funding Allocation Spreadsheet Guidance.pdf PDF
Attch 18 Quarterly Report Guidance.pdf PDF
RFP Exhibit A COE CDRLS.pdf PDF
Attch 11 Key Personnel.pdf PDF
Attch 16 Proposal Pipeline and ONR Contracts Actions Spreadsheet Guidance.pdf PDF
Attch 4 Annual Review Project Briefing Template.pdf PDF
Attch 5 Annual Portfolio Review Form.xlsx XLSX spreadsheet
Attch 10 Implementation Risk Assessment Guidance.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navy ManTech Program

REV L OCT24

Final Report Guidance Attachments:

None

A. PURPOSE

The project Final Report describes the technical results of a Navy ManTech project and is submitted after project completion.

B. REQUIRED TIMELINE

Final Reports for Navy ManTech projects are due by the date specified in the Center of Excellence (COE) contract or 30 days after the project end date. The status and anticipated submittal date of Final Reports for any recently completed project or any project to be completed within the next quarter should be included in the Quarterly Report (refer to the Quarterly Report Guidance). A final Quad Chart for the project, with Supplemental Supporting Data, should also be submitted when the Final Report is submitted (see Project Quad Chart Guidance).

C. PROCESS / APPROVAL CYCLE

COEs are expected to upload the Final Report to the respective project folder of the Projects tab of the Navy ManTech Projects Database (NMPD) by the date specified in their contracts or within 30 days of completion of the project. COE contracts also specify the required recipients of project Final Reports.

Because all recipients may not have access to the NMPD Projects page, the Final Report may need to be submitted using another secure method, such as encrypted email, DoD SAFE (https://safe.apps.mil/), a COE SharePoint site, or the Defense Technical Information Center (DTIC).

If the NMPD is unavailable, COEs will use one of the acceptable submission methods shown below to submit the Final Report, as well as notify the PO / COR and Navy ManTech Support Team of the method used to submit the report:

• DoD Safe – https://safe.apps.mil/

• COE File-Sharing Site

• E-mail with encryption

The Navy ManTech Support Team will upload a copy of the Final Report to the database.

Note: The Navy Authorizing Official of the U.S. Fleet Cyber Command has approved the NMPD for Controlled Unclassified Information (CUI), including export controlled.

D. FORMAT

Final Reports are mandated as deliverables under COE contracts, and the specified formats may vary.

However, Final Reports are documents prepared in Word, and the topics shown below are considered to be the minimum required. If there is a topic listed below that is not included in the Final Report format specified in a COE contract, the COE’s Final Report format must be amended to include the required topic. However, this guidance does not mandate that each COE change its format to exactly match the structure outlined below. This is a list of the minimum requirements. Each COE may continue to use its established format as long as the PO / COR has approved the format, and all information shown below is included. For those COEs that have no established Final Report format, the format below should be used. COEs are encouraged to include graphics and video clips, as appropriate, in the Final Report. A PowerPoint presentation is not acceptable as a Final Report.

https://safe.apps.mil/ https://safe.apps.mil/

Navy ManTech Program

REV L OCT24

Minimum Requirements

1. Cover Page (Complete Official Title of Project, Date, Project Number, Performing

Activity, Project Team Members, and Contact Information)

2. Executive Summary / Abstract

3. Table of Contents

4. Background / Problem Statement

5. Objective(s)

6. Technical Approach (by task)

7. Technical Activities Performed

8. Results and Discussions

9. Benefits Analysis

a. Categorize and prioritize the project’s accomplishments in one or more of the following areas and include quantifiable data to support benefit analysis:

• Cost avoidance / savings

• Capability acceleration

• Warfighter readiness

• Improved performance

• New product / process development to meet critical performance requirements

• Environmental compliance

With current Navy ManTech Program emphasis on ship and aircraft affordability, it is expected that the emphasis will be on cost-reduction benefits.

10. Implementation (Progress / Status)

a. Primary and secondary weapons systems targeted for implementation of technology developed.

b. Implementing organization.

c. Remaining tasks required to implement improved manufacturing technologies in a production environment.

d. Identification of organizations / personnel responsible for major milestones leading to full implementation.

e. Estimated funding / source of funding required for implementation.

f. Timeline for implementation of resultant technology to production floor.

g. Timeline with major milestones for Government and/or Design Agent certification / qualification of improved process.

h. Associated designs and materials, as applicable.

For every project that has a Technology Transition Plan (TTP), this section of the Final Report should address the status of the planned implementation and highlight any changes from the TTP. Updated recommendations to track the actual implementation(s) should be included.

11. Conclusions and Recommendations

12. References, as applicable

E. REVISION REQUIREMENTS AND FILE NAME

1. Revision Requirements:

As noted in the COE contract or by the ONR Contracting Officer.

2. File name convention:

File names for Final Reports should use the following format: {COE acronym} FINAL {official project number} {complete official title of project} {MMMYY}.

• i.e., CMTC FINAL A2587 Automated Material Mixing for F-35 MAY15.docx