Attch 5 B3 - Construction Specifications.pdf
PDF 25 MB Posted
- Attached to
- Install Boilers, Building 2 and Building 3 Federal contract opportunity
- Solicitation number
- FA875125B0002
About this file
This file contains detailed technical specifications for installing steam boilers in Buildings 2 and 3 at the Air Force Research Laboratory Rome Research Site in Rome, NY. The specifications cover multiple disciplines including general construction, fire protection, plumbing, mechanical, and electrical work.
The work includes installing new steam boilers, modifying/upgrading fire protection systems, plumbing, mechanical and electrical systems to accommodate the boiler installation. The contractor must ensure complete installation of all heating systems before the heating season, with systems active by October 15, 2025 if the campus steam plant is disconnected prior to the 2025 heating season. Training must be provided prior to system startup. The specifications include comprehensive sections on piping systems, controls, insulation, testing requirements, and other technical details. The work involves asbestos and hazardous materials considerations, with included survey results showing trace amounts of asbestos in some existing materials. The specifications reference specific industry standards from ASME, ASTM, NFPA and other organizations that must be followed. Detailed safety, environmental protection, and quality control requirements are included.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch 2 B2 - Contract Drawings.pdf | ||
| Attch 7 Hazmat AFRL Bldg 3 022924.pdf | ||
| Attch 6 B3 - Construction Drawing.pdf | ||
| Attch 3 B2 Addendum.pdf | ||
| Attch 1 B2- Construction Specifications.pdf | ||
| Attch 4 B2 Haz Mat Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL STEAM BOILERS, BUILDING 3
TECHNICAL SPECIFICATIONS
For
AIR FORCE RESEARCH LABORATORY
ROME RESEARCH SITE
ROME, NEW YORK 13441
PROJECT NUMBER: ULDF 220303AE
Prepared By
TOWNE ENGINEERING, P.C.
CONSULTING ENGINEERS
18 South Street Utica, New York 315.733.9000
Dec 17, 2024
PROJECT MANUAL
TABLE OF CONTENTS
PROJECT MANUAL TOC -1
SPECIFICATIONS
Division 1 ------ General Requirements Division 2-14 ---- General Construction Division 21 ----- Fire Protection Division 22 ----- Plumbing Division 23 ------ Mechanical Division 26 ------ Electrical
APPENDIX
A --------------- 2021 Hazardous Materials Survey B --------------- 2024 Hazardous Materials Survey
DIVISIONS 1 – GENERAL REQUIREMENTS
TABLE OF CONTENTS
SECTION TITLE PAGES
GENERAL CONSTRUCTION TOC - 1
01 00 01 General Requirements
01 00 02 Summary of Work
01 11 01 Abbreviations and Symbols
01 30 00 Administrative Requirements
01 32 16 Project Schedule – Small Projects
01 33 00 Submittal Procedures
01 35 29 Safety Fire Protection and Health Specifications
01 45 00 Quality Control
01 50 01 Environmental Protection
01 56 13 Temporary Barriers and Enclosures
01 74 19 Construction Waste Management
01 78 00 Close Out Submittals
01 78 23 Operation and Maintenance Data
02 41 00 Demolition
SECTION 01 00 01
GENERAL REQUIREMENTS
1.0 GENERAL INFORMATION:
1.1 Title: Install Steam Boilers, Buildings 3.
1.2 Project No.: ULDF 220303AE
1.3 Scope: These standards apply the work covered under this contract consists of furnishing all labor, equipment, devices, and materials and performing all work required to install steam boilers in accordance with these technical specifications and applicable drawings.
1.4 Project Description:
1.4.1 Location: Location: Building 3 at 525 Brooks Road, Rome, NY 13441 at 26 Electronics Parkway, Rome, NY 13441.
1.4.2 Performance of services: The work to be performed involves, but is not limited to the following principal features. Install steam boilers, Modify/upgrade fire protection, plumbing mechanical and electrical systems to accommodate boilers installation. The above description of work is for the purpose of general information only and is not intended to include and describe every feature of work or to define the scope of the work.
• Contractor shall insure complete installation of all heating systems and supporting systems head of heating season. i.e. if the campus steam plant service entrance is disconnected prior to heating season of 2025 then the proposed heating system(s) shall be active by October 15 of 2025, complete. Contractor shall provide all training prior to start of heating systems. If for some reason installation of all work is not 100% complete by the start of the heating season then the contractor shall provide routine maintenance and daily operation including but not limited to boiler blowdown, until the construction is 100% complete.
1.4.3 Green Procurement Requirements: The Contractor shall comply with the United States Environmental Protection Agency Comprehensive Procurement Guidelines (CPG).
1.4.3.1 The EPA's list of designated products grouped into 8 categories and the accompanying recycled-content recommendations listed below:
http://www.epa.gov/cpg/products.htm
1. Construction Products
2. Landscaping Products
3. Non-paper Office Products
4. Paper and Paper Products
5. Park and Recreation Products
6. Transportation Products
7. Vehicular Products
8. Miscellaneous Products
1.4.4 The contractor is required to complete a Green Procurement Program (GPP) Statement or the Recovered Material Determination Form (RMDF) prior to beginning construction. The contractor submits the completed form to Contracting, who will then forward the completed form to Civil Engineering for concurrence and filing.
1.4.5 As required on an order by order basis, the contractor shall estimate the amount of recycled material that was used in the project and provide the estimate as an official submittal to Contracting. The contractor shall also provide certification. The certification must be in the form of a label on the product or a statement verified by the vendor and attached to the proposal documents. Measurement of recovered material content should be made in accordance with standard industry practice. The certification on multi-component or multi-material products must verify the percentage of post-consumer waste and recycled material contained in the major constituents of the product.
2.0 WORKING HOURS: The regular hours of work on the Rome Research Site are from 0700 to 1600 hours, Monday through Friday, excluding Federal holidays. The government may restrict access to work sites to these hours and days. The contractor shall consider all other hours non- regular time and use the appropriate unit prices for tasks performed during those hours. In the technical/cost proposal submitted for each delivery order, the contractor shall clearly identify those items of work scheduled for accomplishment during non-standard time and include justification for the request. The contractor shall notify the CO at least 48 hours in advance of any work performed during non-regular hours that requires inspection during accomplishment or that prevents inspection of previous work after accomplishment.
2.1. Legal Holidays:
The Rome Research Site recognizes the following legal holidays:
New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th.
Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December
3.0 SECURITY REQUIREMENTS
3.1 The work to be done on this project is located in and around area’s that are under the scrutiny of the Department of Defense Police assigned to the AFRL Information Directorate. To gain access to the area(s) to examine the work to be done for job estimation purposes; arrangements must be made through the Contracting Office. Contractor personnel will be escorted into the area(s) for the purpose of project estimation.
3.2 When it has been determined which Contractor will accomplish the project a Visit Request from the company, preferably on Company letterhead, will be necessary prior to initial work commencement. The Visit Request form needs to be signed by the Company President or Director of Human Resources. The Visit Request form will also be used as the Entry Authority List. The Contractor will supply the Visit Request to Security (AFRL/RIOF) through the Contracting Office. The Visit Request can be done via RRS Form 31 Request for Visit Authorization Form, AFMC Form 97 (found on the AFRL web page, (https://rlweb.area52.afnoapps.usaf.mil/#) or a simple Company Letterhead letter identifying all personnel who will be employed during the work. The request will contain a full name to include a middle initial (Frank A. Dude), date of birth (14 Dec 1953), state of driver’s license issuance and place of birth (Austin, Texas). This information will be used to do a Local Files Check. This check will provide Driver’s License Info, Wants & Warrants and Protection Orders and will also provide information on Illegal Immigration and suspected terrorist affiliations. The Local Files Check will also be accomplished prior to work commencing. If the individual is not a US Citizen they will not be allowed within the complex or facilities. If, the individual is not a US Citizen but has a Green Card, Form I-551 or has the I-551 stamp on their passport, Security will need to see either one. There will be no foreign national workers allowed on the Rome Research
Site. For work at DFAS, and additional Form SF 85 must be submitted for each contractor working in the facility.
3.3 Provide the Company’s phone number and a Project Leaders or Supervisor/Foremen cell-phone number is necessary for the Law Enforcement Desk Sergeant.
3.4 All facilities are entered using a magnetic media entry badge. Any personnel such as Supervisor/Foremen or Project Leaders who may need building access for meetings etc.., during contract period, can acquire a Local Contractor Entry Badge through the Division/Branch with oversight of the work. This will be accomplished with the AFRL/RI Form 110 (Unescorted Visitor Badge). The Security Visitation Office is located in the lobby of Bldg 3, West Wing. This badge will be worn at all times within the facility. These badges will be returned to the Contracting Officer’s Technical Representative upon completion of the final inspection and Acceptance of Work. Any badges lost during the period of work will be reported to Security as soon as possible.
3.5 Access to the AFRL/RI Complex is controlled by a Main Gate on Brooks Rd, located just west of the Otis & Brooks intersection. Identification for the contractor to enter with a vehicle will be an access list supported by the electronic badge issued. All commercial vehicles entering the gate will be searched. One-time deliveries can be escorted from the gate to delivery point by project personnel.
3.6 All commercial vehicles are searched prior to entry into the AFRL/RI Complex. Vehicle operators will be aware of the vehicle search pull-off area prior to approaching the Main Gate. A search of the vehicle will be conducted prior to its entry. All vehicles not needed for delivery of equipment or tools will be parked in the visitor parking area unless cleared through Security. There are No vehicles allowed within 25 meters (80 ft.) of the AFRL/RI facilities.
3.7 All personnel should be aware that AFRL/RI is Property of the United States Air Force. All personnel will follow all posted signage.
3.8 Contractor personnel will be notified by AFRL/RI Police of any emergencies which would require an evacuation or work stoppage, such as an increase in the Force Protection Condition.
3.9 Building/Room Keys: If the contractor needs access to area(s) that are locked (i.e. mechanical rooms, janitor’s closet, etc.), a request for entry of at least 2 working days prior to the need for access will be submitted to AFRL/RIOC construction representative. The area(s) will be provided on a daily basis. The area(s) will be locked down at the end of the day’s work.
3.10 Dumpsters: Per UFC 04-010-02, All construction dumpsters shall be located no less than 25 meters from any facility, unless otherwise approved by AFRL/RI Security. All dumpster locations will be reviewed and evaluated on a case by case basis.
3.11 The 24 hour Desk Sgt. can be reached at 330-2961.
4.0 SAFETY: The Contractor is responsible for compliance with all Federal, Air Force, and State safety and health regulations and is subject to Air Force safety, OSHA inspections, and conformance to Section 01 35 29 of this SOW, Safety, Fire Protection and Health while working at the Rome Research Site
5.0 EXCAVATION PERMITS: The contractor shall obtain excavation permits (Air Force form 103) prior to any excavation. The Contracting Officer or his designated representative shall assist the contractor in obtaining the excavation permits. The contractor shall provide drawings and details showing exact location and description of the type of excavation to be accomplished. Should any one of the coordination points indicate an additional underground utility or structure over and above those shown on the contract drawing either by sketch on the contractor's drawing by field pointing or by flagging, the contractor shall be responsible for protection of each of the items indicated. Should damage occur to any of the items indicated by the contractor, contract drawings or coordinating agency to the permit, the contractor shall be responsible for prompt repair of the damage to return the item to its original workable condition.
6.0 UTILITIES AND INTERRUPTION OF UTILITIES OR BUILDING SYSTEMS:
6.1 Any required utility interruption that affects AFRL RRS building operations shall be scheduled for off-hour switch-over unless otherwise directed in the contract documents. See the paragraph WORKING HOURS for AFRL normal operating hours and Federal Holidays.
6.2 Submit written request to AFRL and Contracting Officer’s Representative (COR) fourteen (14) days prior to all utility cutovers and interruptions to include but not necessarily be limited to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and natural gas. The request shall give the following information:
6.2.2. Location of shut-off.
6.2.3. Services and areas affected.
6.2.4. Hour, date and duration of shut-off.
6.3 Submit a written method of procedure to COR for approval.
6.4 Do not proceed: Services shall not be interrupted until receipt of approval of the proposed hours and date from the COR. If the utility services are damaged by the contractor, the contractor shall restore them within 24 hours.
6.5 Execute all work in a thoughtful, organized, expeditious fashion to minimize downtime.
6.6 Provide piping connections with public and/or site utilities providers (water supply, sanitary drainage, storm drainage, steam, steam condensate, heating hot water, chilled water, condenser water, heat pump loop water, natural gas, propane gas, fuel oil and air distribution connections) in accordance with the sizes and locations shown on the drawings in strict compliance with the rules and regulations set forth by the local Authority Having Jurisdiction (AHJ) and the utility provider complete with test and final connections, with provisions for shut-off, isolation, and adapters as required.
6.7 Connections causing interruption of service shall be performed off-hours employing “premium time” labor as applicable. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
6.8 Disruptions to life safety systems (fire alarm/fire suppression systems) shall be restored to functional status at the end of each workday. For an exemption to the requirements of this paragraph, submit a written request to the COR for approval.
6.9 AFRL will pay all public utility charges related to permanent service.
7.0 SUBMITTALS: Submittals will be required on materials used under each proposal. Each submittal shall include information as described in the technical specifications or as shown on the drawings. Submittals will accompany the contractor’s proposal on each project. All submittals shall include a Material Approval Submittal AF3000 cover sheet. Once an item of material or equipment has been approved, the contractor will not be required to resubmit with the following exception: If, at any time during the duration of this contract, the contractor desires to change materials from those originally approved, his new materials shall be resubmitted to and approved by the Contracting Officer prior to incorporation into the project.
8.0 SCHEDULING WORK:
8.1 Before any of the work is initiated under an individual delivery order, the Contractor shall confer with the Contracting Officer or his representative(s) and agree on a sequence of procedures; means of access to premises and buildings; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; the location of partitions.
8.2 Delivery of materials and equipment shall be made with a minimum interference to Government operations and personnel.
8.3 The work shall, so far as practicable, be done in definite sections or divisions and confined to limited areas which shall be completed before work in other sections or divisions is begun.
9.0 CONTRACTOR STORAGE: A suitable outside storage area for each delivery order shall be provided to the contractor by the Contracting Officer. Security shall be the responsibility of the contractor. The contractor shall keep the storage area neat, orderly and clear of all debris. The contractor shall not allow trash or other debris to scattered from his area by wind or other means.
10.0 INSPECTION: Inspection of work by the Government will normally be accomplished along with the work as it progresses. At the discretion of the Contracting Officer, inspection may be directed at the completion of various phases of the work prior to initiation of any further work. The Contractor shall notify the Contracting Officer's Technical Representative that a phase will be complete at least 3 days in advance of the completion of each phase to be inspected.
END OF SECTION
SECTION 01 00 02
SUMMARY OF WORK
1.0 GENERAL:
1.1 Location: Location: Building 3 at 525 Brooks Road, Rome, NY 13441; and Building 106 at 26 Electronics Parkway, Rome, NY 13441.
1.2 Description: These standards apply the work covered under this contract consists of furnishing all labor, equipment, devices, and materials and performing all work required to install steam boilers in accordance with these technical specifications and applicable drawings.
2.0 PRODUCTS:
2.1 Submittal Requirements: Reproducible Shop drawings, manufacturer’s data, dated certifications and test reports, and samples constitute the project submittals. All submittals shall have an AF Form 3000 attached.
3.0 EXECUTION:
3.1 Safety Requirements: It shall be the responsibility of the contractor to initiate and maintain such programs as to comply with the provisions of the Air Force Occupational Safety and Health Standards. These programs shall include the education and training of employees and subcontractors' personnel in the recognition, avoidance and prevention of unsafe conditions. See Section 01 35 29 for further instructions.
3.2 Disposal of Materials: AFRL/RI shall have right of first refusal over all scrap metal generated; the Environmental Office shall provide appropriately sized containers to collect the material. Unless designated as salvageable, all waste materials generated by any work under this contract shall be handled, transported, stored and disposed of off Government property by the contractor at the end of each day’s work. Such materials shall be disposed of in accordance with applicable federal, state or local laws, ordinance or regulations. Spoils from excavation for marker bases may be spread evenly around the work area, but at no time will piles of soil be allowed in the work area. Coordination with the Environmental and Occupational Health office (EOH) is required before the generation and disposal of any Resource Conservation and Recovery Act (RCRA) ( http://www.access.gpo.gov/uscode/title42/chapter82_.html ) hazardous wastes.
3.2.1 Lead: The Contractor is responsible for ensuring surfaces coated with lead paint are properly remediated and disposed of IAW EPA protocols. Lead contaminated waste exceeding RCRA toxicity thresholds must be disposed IAW with Air Force, EPA, and NYSDEC regulations, and disposal must be coordinated with the Environmental office. Under no circumstances shall a contractor sign a hazardous waste manifest on behalf of
AFRL/RI.
3.2.2 Universal Wastes: The contractor is responsible for ensuring that Universal Wastes (batteries, light bulbs, mercury-containing equipment/thermostats) is collected and disposed of IAW with EPA and NYSDEC regulations. The Environmental Office will provide appropriate containers to collect Universal Waste. The Contractor is responsible for disposing of Universal Wastes generated during projects. Disposal must be coordinated with the Environmental Office; under no circumstances shall a contactor sign a Universal Waste manifest on behalf of AFRL/RI.
3.3 Fire Protection: The contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work. USACE Engineering Manual (EM), EM-385- 1-1 and NFPA 241 shall be adhered to throughout the duration of the construction contract.
http://www.access.gpo.gov/uscode/title42/chapter82_.html
3.4 Reference Standards and Publications: The standards and publications listed in each section of these specifications form part of these specifications to the extent referenced. The contractor shall conform with the provision of the dated issue of the listed standard or publication.
3.5 Clean-up: The contractor shall at all times, keep the construction area, including storage areas used by him, free from accumulation of waste materials or rubbish. Prior to completion of the work each day, remove from the construction site all waste materials or rubbish. Upon completion of the construction, the contractor shall leave the work premises in a clean, neat condition.
3.6 Pollution Control/Hazardous Substances: The contractor shall report any spill of oil or hazardous material to the EOH Office and to take every reasonable precaution to prevent the spillage of oil or other hazardous substances. The Contractor will perform all work consistent with the requirements of all Federal, State and Local laws, rules and regulations pertaining to pollution control. Additionally, Contractors using HAZMAT on this installation must comply with the procedures outlined in the Hazardous Materials Management Plan (HMMP), section 2.4.4 (see below). Any clarification of these procedures can be provided by the EOH Office.
4.0 HAZARDOUS MATERIALS MANAGEMENT
Pertaining to Contractor Usage For the purposes of this contract, the “HMMP Team” and the “HAZMART” are the Environmental Office.
HAZMAT Determination and Authorization Procedures for Contractors
AFI 32-7086 Hazardous Materials Management:
4.1 If a contract is reasonably expected to require a contractor to bring or to use HAZMAT on an installation, the requiring activity working with the Contracting Office shall include the following contract requirements to ensure that contractor materials can be evaluated for authorization and tracking under the
HMMP.
4.2 Federal Acquisition Regulation (FAR) Clause 52.223-3, Hazardous Material Identification and Material Safety Data.
4.3 FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information.
4.4 FAR Clause 52.223-19, Compliance with Environmental Management Systems.
4.5 AFFARS Clause 5352.223-9001, Health and Safety on Government Installations.
4.6 FAR Clause 52.223-7, Notice of Radioactive Materials.
4.7 The locally developed HAZMAT tracking and reporting tasks necessary to ensure contractor compliance with this AFI. All HAZMAT brought onto an installation for use shall be authorized via the process described in this section. The Environmental office has developed these local procedures to ensure that the HAZMAT monitoring process does not impede time-critical mission-essential materiel requests.
4.8 IAW FAR Clause 52.223-3, each Contractor must provide the Contracting Office (CO) with a list of proposed Hazardous Materials (HAZMAT) that it plans to use on the installation during the performance of the contract (includes any sub-contractor HAZMAT). IAW AFI 32-7086, contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to the Environmental Office (RIOCV). This includes fuels used to run generators and other construction/maintenance equipment.
4.8.1 Contractors shall submit through the CO to RIOCV, Safety Data Sheets (formerly known as Material Safety Data Sheets or MSDS’s), for all potentially hazardous materials/products that will be brought on to the installation.
4.8.2 RIOCV will review all potentially hazardous materials and identify the materials deemed as HAZMAT that require tracking. RIOCV may remove any materials from consideration for use by the Contractor that contain ingredients prohibited buy the AF or other regulatory agency.
4.8.3 RIOCV will communicate to the Contracting Officer Representative the list of HAZMAT that will require AF- EESOH-MIS tracking. Those materials will require the completion of one Contractor HAZMAT Product Request Form (PRF) per HAZMAT by the Contractor. RIOCV will provide the Hazardous Material Form to the Contractor and can assist the Contractor with this documentation if requested.
4.8.4 RIOCV will complete their portion on the Contractor PRF and load all information from the forms into the AF-EESOH-MIS data system. The Contractor will also retain a copy of their Contractor HAZMAT PRF for the duration of the specified project.
4.8.5 If the contractor needs to bring a material on the installation that was not included in the original HAZMAT listing, the contractor must first notify the CO and then obtain prior authorization, if RIOCV determines the material to be a HAZMAT.
4.8.6 The Contractor will submit a Contractor Material Usage Data Sheet provided by RIOCV to the CO once a month for contracts over 60 days. For contracts less than 60 days, a Material Usage Data Sheet will be submitted by the Contractor to CO at the completion of the contract.
4.8.7 The CO will provide a copy of the Usage Data Sheet to RIOCV.
4.8.8 Any HAZMAT brought on site for the contract and not used in its entirety will be removed from the installation by the Contractor. If HAZMAT can be used in another contract at this installation, please contact RIOCV for assistance.
4.8.9 RIOCV is ready to assist the CO and Contractor in any way to simplify and expedite this reporting and tracking procedure. Please contact RIOCV (330-2098) with any questions.
SECTION 01 11 01
ABBREVIATIONS AND SYMBOLS
1.0
MEASURE
DISTANCE
DESCRIPTION
MM
IN
CM
FT
M
LF
VLF
YD
CLF
MLF
MI
Millimeter Inch Centimeter Foot Meter Linear Foot Vertical Linear Feet Yard 100 Linear Feet 1000 Linear Feet Mile (Statute)
2.0 AREA
CM2
Square Centimeter
SI
M2
SF
HEC
SY
KM2
CSF
CSY
ACR
MI2
Square Inch Square Meter Square Foot Hectare Square Yard Square Kilometer 100 Square Feet 100 Square Yards Acre Square Mile
3.0 VOLUME
CC
Cubic Centimeter
CI
M3
CF
CY
BF
MBF
Cubic Inch Cubic Meters Cubic Feet Cubic Yard Board Feet 1000 Board Feet
4.0 FLOW
CCS
Cubic Centimeter/Sec
CFM
CMM
MCF
Cubic Ft/Minute Cubic Meter/Minute 1000 Cubic Ft/Minute
5.0 Liquid
MEASURE
DESCRIPTION
LIT
GAL
Liter Gallon (US)
6.0 Weight
G
Gram
OZ
KG
LB
MT
TON
Ounce Kilogram Pound Metric Ton Ton (Short)
7.0 Miscellaneous
BBL Barrel EA Each FLR Floor LAN Lane LS Lump Sum OPN Opening PCT Percent PR Pair RSR Riser SEA Seat SET Set SQ Square (Roofing) LD Load
SECTION 01 35 29
SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements.
The contractor shall develop and implement a comprehensive written Safety and Occupational Health Program. The contractor will submit a safety plan within ten (10) calendar days after award of the contract that will implement a safety program that ensures protection of Government personnel and property. The contractor shall comply with U.S.
Occupational Safety and Health Administration (OSHA) standards, program elements, explosive standards, and other safety and health requirements necessary for the protection of personnel, facilities, and equipment. Acceptance of the contractor’s Safety and Occupational Health Plan only signifies that the plan generally conforms to the requirements of the contract. It does not relieve the contractor of the responsibility for providing employees with a safe and healthful work environment. The program will consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B below.
2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II -Safety Plan Elements, and will be used during the performance of the work described in THE CONTRACT. The Safety Plan will be approved by the procuring safety office prior to commencement of any work described in this contract.
3. Routine and recurring surveillance of the procedures listed in the Safety Plan.
4. Competent personnel to provide surveillance of the Safety Plan.
5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for Contracting Officer approval of operations and changes at these specific sites.
6. Process for ensuring subcontractors comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify the contracting Safety Office and the Contracting Officer within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract.
This notification requirement shall also include physiological mishaps/incidents. A written or email copy of this mishap/incident notification shall be sent within three calendar days to the Contracting Officer, who will forward it to the Procuring Safety Office. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Contracting Officer.
Mishap notifications shall contain, as a minimum, the following information:
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. If requested by Contracting Officer, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
C. Changes to the Safety Plan
If the safety plan requires modification, the contractor shall submit the proposed modification, in writing, to the Contracting Officer.
SECTION II - SAFETY PLAN ELEMENTS
The contractor prepared Safety Plan shall clearly define procedures, personnel qualifications, facilities, required equipment, and other attributes necessary to fulfill the following elements. Each attribute shall meet or exceed the referenced benchmarks.
ELEMENT REQUIRED REFERENCED BENCHMARK
THE US AIR FORCE MISHAP PREVENTION
PROGRAM
AFI91-202 w/ AFMC Sup1
AIR FORCE OCCUPATIONAL AND
ENVIRONMENTAL SAFETY, FIRE
PROTECTION,AND HEALTH (AFOSH)
PROGRAM
AFI91-301 w/AFMC Sup1
AIR FORCE CONSOLIDATED OCCUPATIONAL
SAFETY STANDARD
AFOSHSTD91-501 w/AFMC Sup1
CIVIL ENGINEERING AFOSHSTD91-10
WELDING, CUTTING, AND BRAZING AFOSHSTD91-5, NFPA 410, NFPA 51B
INTERIOR SPRAY FINISHING AFOSHSTD91-17
CONFINED SPACES AFOSHSTD91-25
HYDROCARBON FUELS-- GENERAL AFOSHSTD91-38
COMMUNICATIONS CABLE, ANTENNA AND
COMMUNICATIONS-ELECTRONIC(C-E)
SYSTEMS
AFOSHSTD91-50
DATA PROCESSING FACILITIES AFOSHSTD91-64
GENERAL INDUSTRIAL OPERATIONS AFOSHSTD91-66
MATERIALS HANDLING AND STORAGE
EQUIPMENT
AFOSHSTD91-46
AGRICULTURAL TRACTORS AND
IMPLEMENT ATTACHMENTS
AFOSHSTD91-54
THE US AIR FORCE TRAFFIC SAFETY
PROGRAM
AFI91-207
CHEMICAL SAFETY AFOSHSTD91-68
Electronic/Electrostatic Discharge MIL HDBK 263, T.O. 00-25-234 Sensitive (ESD) Components http://www.e-publishing.af.mil/pubfiles/af/91/afi91-202/afi91-202.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afi91-301/afi91-301.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-501/afoshstd91-501.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-10/afoshstd91-10.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-5/afoshstd91-5.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-17/afoshstd91-17.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-25/afoshstd91-25.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-38/afoshstd91-38.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-50/afoshstd91-50.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-64/afoshstd91-64.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-66/afoshstd91-66.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-46/afoshstd91-46.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-54/afoshstd91-54.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afi91-207/afi91-207.pdf http://www.e-publishing.af.mil/pubfiles/af/91/afoshstd91-68/afoshstd91-68.pdf
Facility Fire Protection NAS 3306, AFI 32-2001, NFPA 13, 70, 72, NFPA 409, 410
Grounding and Bonding T.O. 00-25-172
NOTE: Anyone working on SAFETY should be familiar with Operational Risk Management (ORM) processes. Further information on ORM is contained in AFI 90-901, Operational Risk Management (ORM) Program, AFPAM 90-902, Operational Risk Management (ORM) Guidelines and Tools, AFMCPAM 63-101(Acquisition) Risk Management and AFMCI 90-902, Operational Risk Management (ORM) Program.
SECTION 01 50 01
ENVIRONMENTAL PROTECTION
PART I - GENERAL
1.1 SCOPE: The work covered by this section consists of furnishing all labor, materials and equipment and performing all work required for the prevention of environmental pollution during, and as the result of, construction operations under this contract except for those measures set forth in other Technical Provisions of these specifications.
For the purpose of this specification, environmental pollution is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human life; affect other species of importance to man or degrade the ability of the environment for aesthetic and recreational purposes. The control of environmental pollution requires consideration of air, water and land, and involves noise, solid waste-management and management of radiant energy and radioactive materials, as well as other pollutants.
1.2 APPLICABLE REGULATIONS: In order to prevent, and to provide for abatement and control of, any environmental pollution arising from the construction activities of the contractor in the performance of this contract, the contractor shall comply with all applicable Federal, State and local laws, and regulations concerning environmental pollution control and abatement.
1.3 NOTIFICATION: The Contracting Officer will notify the contractor in writing of any noncompliance with the foregoing provisions and the action to be taken. The contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the contractor, shall be deemed sufficient for the purpose.
1.4 IMPLEMENTATION: Prior to commencement of the work, the contractor will meet with representatives of the Contracting Officer to develop mutual understandings relative to compliance with this provision and administration of the environmental pollution control program.
1.5 REPORTING OF HAZARDOUS MATERIALS BY CIVILIAN CONTRACTORS: IAW FAR Clause 52.223-3, each Contractor must provide the Contracting Office (CO) with a list of proposed Hazardous Materials (HAZMAT) that it plans to use on the installation during the performance of the contract. IAW AFI 32-7086, contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to the Environmental Office (RIOCV). This includes fuels used to run generators and other construction/maintenance equipment.
1.5.1 Contractors shall submit through the CO to RIOCV, Safety Data Sheets (formerly known as Material Safety
Data Sheets or MSDS’s), for all potentially hazardous materials/products that will be brought on to the installation.
1.5.2 RIOCV will review all potentially hazardous materials and identify the materials deemed as HAZMAT that require tracking. RIOCV may remove any materials from consideration for use by the Contractor that contain ingredients prohibited buy the AF or other regulatory agency.
1.5.3 RIOCV will communicate to the Contracting Officer Representative the list of HAZMAT that will require AF-
EESOH-MIS tracking. Those materials will require the completion of one Contractor HAZMAT Product Request Form (PRF) per HAZMAT by the Contractor. RIOCV will provide the Hazardous Material Form to the Contractor and can assist the Contractor with this documentation if requested.
1.5.4 RIOCV will complete their portion on the Contractor PRF and load all information from the forms into the AF-
EESOH-MIS data system. The Contractor will also retain a copy of their Contractor HAZMAT PRF for the duration of the specified project.
1.5.5 If the contractor needs to bring a material on the installation that was not included in the original HAZMAT listing, the contractor must first notify the CO and then obtain prior authorization, if RIOCV determines the material to be a HAZMAT.
1.5.6 The Contractor will submit a Contractor Material Usage Data Sheet provided by RIOCV to the CO once a month for contracts over 60 days. For contracts less than 60 days, a Material Usage Data Sheet will be submitted by the Contractor to CO at the completion of the contract.
1.5.7 The CO will provide a copy of the Usage Data Sheet to RIOCV.
1.5.8 Any HAZMAT brought on site for the contract and not used in its entirety will be removed from the installation by the Contractor. If HAZMAT can be used in another contract at this installation, please contact RIOCV for assistance.
1.5.9 RIOCV is ready to assist the CO and Contractor in any way to simplify and expedite this reporting and tracking procedure. Please contact RIOCV (330-2098) with any questions.
1.6. Asbestos free materials certification and testing.
1.6.1 In performing this contract, the Contractor shall not use asbestos or asbestos-containing building materials during construction, renovation, and for modernization of this facility and shall provide to the Contracting
Officer (CO) a signed statement, prior to final acceptance, indicating that to the best of its knowledge, no asbestos-containing building materials were used during construction, renovation, and for modernization of this facility. The Contractor’s certification under this paragraph is considered to be a material requirement of the contract and AFRL/RI may withhold payment pending submittal and receipt of an acceptable certification.
1.6.2 The AFRL/RI CO may authorize sample testing of contractor building materials used during construction, renovation, and for modernization of this facility to very that they are asbestos-free. AFRL/RI will bear the facility to verify that they are asbestos-free. AFRL/ RI will bear the expense of this testing unless the testing reveals that the contractor used asbestos-containing building material in performing this contract. If asbestos-containing material is found, the Contractor shall remove and replace the asbestos-containing material and decontaminate the site of asbestos contamination caused by the Contractor at no additional cost to the Government. In addition, the Contractor shall bear the expense of the original testing and retesting to determine that the asbestos removal and site decontamination are satisfactorily completed.
SECTION 01 56 13
TEMPORARY BARRIERS AND ENCLOSURES
(DUST PROTECTION)
1.0 DESCRIPTION OF WORK: This specification covers the protection of work areas by the furnishing and installation of a temporary framework covered by polyethylene sheeting around the area where work is being performed or around the area that requires protection.
2.1 Framework shall be of sturdy wood or metal composition.
2.2 Polyethylene Film shall comply with ASTM D 2103, shall have a minimum density of 0.910, and an impact strength greater than 70.
2.3 Adhesive Tape for sealing seams and edges shall meet the polyethylene manufacturer's recommendations.
2.4 Sealing Compound shall comply with recommended practices for use of latex compounds as prescribed by ASTM C 790.
3.1 Installation: Dust protection enclosures shall be installed according to the manufacturer's recommendations.
3.2 Repairs: Any accidental penetrations of the enclosures shall be repaired swiftly and adequately to prevent dust intrusion.
SECTION 02 41 00
DEMOLITION
1.0 DESCRIPTION OF WORK: This specification covers the dismantling, salvage, demolition, and disposal of designated structures, utilities, and/or materials as directed by the Contracting Officer.
2.0 PRODUCTS: (This section not Used).
3.1 Submittals: Procedures proposed for the accomplishment of a1l demolition and salvage work, including a detailed description of the methods and equipment to be used for each operation and the scheduled sequence of operations, shall be submitted to the Contracting Officer for approval. Operations which involve interruption of utility services or the handling of toxic or hazardous materials shall be scheduled and approved by the Contracting Officer or designated representative at least 48 hours prior to the start of such operations. Weight tickets for all waste disposal generated during a project must be provided to the Environmental Office.
3.2 Clearances and Permits: Obtain as required from local authorities.
3.3 Salvage: Title to all materials and equipment to be demolished is vested in the Government. All recyclable metals shall be considered salvageable. The Environmental Office shall provide appropriately sized containers to collect salvageable scrap metal. Unsalvageable materials shall be disposed of as directed by the Contracting Officer. Materials and equipment for Government salvage or reuse shall be carefully removed and delivered to a storage site designated by the Contracting Officer or designated representative.
3.4 Protection of Existing Work: All necessary precautions shall be taken to ensure against damage to existing work that is to remain in place or is to remain the property of the Government. Damaged areas shall be repaired or replaced with new products to match existing surrounding surfaces. Shoring, bracing, and supports shall be provided as required and structural elements shall not be overloaded Care shall be taken to prevent unscheduled interruptions to any utility service.
3.5 Protection from Weather: The interior of buildings and all materials and equipment shall be protected from the weather at all times.
3.6 Dust and Dirt Control: Dust and dirt resulting from demolition operations shall be controlled with temporary barriers and enclosures to prevent spread into occupied portions of buildings and to avoid creation of a nuisance to the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding, and pollution.
3.7 Burning: Burning at the project site for the disposal of refuse and debris will not be permitted.
3.8 Explosives: The use of explosives will not be permitted.
3.9 Hazardous Materials: Extreme care and caution shall be exercised at all times when handling toxic or hazardous materials in order to prevent harm to personnel and property and to prevent environmental contamination. Federal, state, and local regulations governing handling, transportation, and disposal of such materials shall be rigidly adhered to. Potentially hazardous wastes must be sampled to determine if EPA or NYSDEC hazardous waste thresholds are met. The Environmental Office must be notified when hazardous waste is generated; hazardous waste shall be disposed of IAW with Air Force, EPA, and NYSDEC regulations. Disposal must be coordinated with the Environmental office. Under no circumstances shall a contractor sign a hazardous waste manifest on behalf of AFRL/RI.
3.10 Utilities: Temporary interruptions, disconnections, and relocation of existing utilities and removal of abandoned utility services shall be as directed by the Contracting Officer.
3.11 Cleanup: Debris and rubbish shall not be allowed to accumulate in buildings or on site. Local regulations regarding hauling and disposal shall be followed.
SECTION 01 00 02
SUMMARY OF WORK
1.0 GENERAL:
1.1 Location: Building 3 at 325 Brooks Road, Rome, NY 13441.
1.2 Description: The work to be performed involves, but is not limited to the following principal features. Erect boiler room addition install steam boilers, modify/upgrade fire protection, plumbing, mechanical and electrical systems to accommodate steam boilers installation. The above description of work is for the purpose of general information only and is not intended to include and describe every feature of work or to define the scope of the work.
2.1 Submittal Requirements: Reproducible Shop drawings, manufacturer’s data, dated certifications and test reports, and samples constitute the project submittals. All submittals shall have an AF Form 3000 attached.
3.1 Safety Requirements: It shall be the responsibility of the contractor to initiate and maintain such programs as to comply with the provisions of the Air Force Occupational Safety and Health Standards. These programs shall include the education and training of employees and subcontractors' personnel in the recognition, avoidance and prevention of unsafe conditions. See Section 01 35 29 for further instructions.
3.2 Disposal of Materials: AFRL/RI shall have right of first refusal over all scrap metal generated; the Environmental Office shall provide appropriately sized containers to collect the material. Unless designated as salvageable, all waste materials generated by any work under this contract shall be handled, transported, stored and disposed of off Government property by the contractor at the end of each day’s work. Such materials shall be disposed of in accordance with applicable federal, state or local laws, ordinance or regulations. Spoils from excavation for marker bases may be spread evenly around the work area, but at no time will piles of soil be allowed in the work area.
Coordination with the Environmental and Occupational Health office (EOH) is required before the generation and disposal of any Resource Conservation and Recovery Act (RCRA) ( http://www.access.gpo.gov/uscode/title42/chapter82_.html ) hazardous wastes.
3.2.1 Lead: The Contractor is responsible for ensuring surfaces coated with lead paint are properly remediated and disposed of IAW EPA protocols. Lead contaminated waste exceeding RCRA toxicity thresholds must be disposed IAW with Air Force, EPA, and NYSDEC regulations, and disposal must be coordinated with the Environmental office. Under no circumstances shall a contractor sign a hazardous waste manifest on behalf of
AFRL/RI.
3.2.2 Universal Wastes: The contractor is responsible for ensuring that Universal Wastes (batteries, light bulbs, mercury-containing equipment/thermostats) is collected and disposed of IAW with EPA and NYSDEC regulations. The Environmental Office will provide appropriate containers to collect Universal Waste. The Contractor is responsible for disposing of Universal Wastes generated during projects. Disposal must be coordinated with the Environmental Office; under no circumstances shall a contactor sign a Universal Waste manifest on behalf of AFRL/RI.
3.3 Fire Protection: The contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work. USACE Engineering Manual (EM), EM-385- 1-1 and NFPA 241 shall be adhered to throughout the duration of the construction contract.
3.4 Reference Standards and Publications: The standards and publications listed in each section of these specifications form part of these specifications to the extent referenced. The contractor shall conform with the provision of the dated issue of the listed standard or publication.
3.5 Clean-up: The contractor shall at all times, keep the construction area, including storage areas used by him, free from accumulation of waste materials or rubbish. Prior to completion of the work each day, remove from the construction site all waste materials or rubbish. Upon completion of the construction, the contractor shall leave the work premises in a clean, neat condition.
3.6 Pollution Control/Hazardous Substances: The contractor shall report any spill of oil or hazardous material to the EOH Office and to take every reasonable precaution to prevent the spillage of oil or other hazardous substances.
The Contractor will perform all work consistent with the requirements of all Federal, State and Local laws, rules and regulations pertaining to pollution control. Additionally, Contractors using HAZMAT on this installation must comply with the procedures outlined in the Hazardous Materials Management Plan (HMMP), section 2.4.4 (see below). Any clarification of these procedures can be provided by the EOH Office.
4.0 HAZARDOUS MATERIALS MANAGEMENT:
4.1 Pertaining to Contractor Usage: For the purposes of this contract, the “HMMP Team” and the “HAZMAT” are the Environmental Office. HAZMAT Determination and Authorization Procedures for Contractors. AFI 32-7086 Hazardous Materials Management.
4.2 If a contract is reasonably expected to require a contractor to bring or to use HAZMAT on an installation, the requiring activity working with the Contracting Office shall include the following contract requirements to ensure that contractor materials can be evaluated for authorization and tracking under the
HMMP.
4.3 Federal Acquisition Regulation (FAR) Clause 52.223-3, Hazardous Material Identification and Material Safety Data.
4.4 FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information.
4.5 FAR Clause 52.223-19, Compliance with Environmental Management Systems.
4.6 AFFARS Clause 5352.223-9001, Health and Safety on Government Installations.
4.7 FAR Clause 52.223-7, Notice of Radioactive Materials.
4.8 The locally developed HAZMAT tracking and reporting tasks necessary to ensure contractor compliance with this AFI. All HAZMAT brought onto an installation for use shall be authorized via the process described in this section. The Environmental office has developed these local procedures to ensure that the HAZMAT monitoring process does not impede time-critical mission-essential materiel requests.
4.9 IAW FAR Clause 52.223-3, each Contractor must provide the Contracting Office (CO) with a list of proposed Hazardous Materials (HAZMAT) that it plans to use on the installation during the performance of the contract (includes any sub-contractor HAZMAT). IAW AFI 32-7086, contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to the
Environmental Office (RIOCV). This includes fuels used to run generators and other construction/maintenance equipment.
4.9.1…