Attch_4_-_LittleRobberDam_SchedofItems_Final.pdf
PDF 6 KB Posted
- Attached to
- LITTLE ROBBER DETENTION DAM RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L0625B0005
About this file
This document is a Bid Schedule for the Little Robber Dam Reconstruction project, detailing 22 line items for various construction activities. The schedule includes quantities and units for work such as mobilization, excavation, embankment, riprap replacement, outlet works, and drainage systems. Key quantitative details include 46,661 cubic yards of common excavation, 47,303 cubic yards of compacted embankment, 6,800 tons of new spillway riprap, and several lump sum (LS) items for structures and preparatory work. The schedule notes that quantities are not guaranteed, with measurement and payment defined in Section 01150, and provides spaces for unit pricing and total bid price calculation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_9_A0002_LittleRobberDam_Bids_Abstract_0002.pdf | ||
| Sol_140L0625B0005_Amd_0002.pdf | ||
| Sol_140L0625B0005_Amd_0001.pdf | ||
| Attch_8_A0001_LittleRobberDam_Questions___Answers_0001.pdf | ||
| Attch_7_A0001_LittleRobberDam_PRE-BID_Attendees__Conference_0001.pdf | ||
| Attch_6_A0001_LittleRobberDam_SF1442_Cont__Pages_0001.pdf | ||
| Attch_1_-_LittleRobberDam_TechSpecs_Final.pdf | ||
| Attch_2_-_LittleRobberDam_Drawings_Final.pdf | ||
| Sol_140L0625B0005.pdf | ||
| Attch_5_-_LittleRobberDam_Lim_on_Sub_Breakout.xlsx | XLSX spreadsheet | |
| Attch_3_-_LittleRobberDam_WD_Heavy_WY20250037.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item
No. Description Unit Price Total Price
1 Mobilization and Preparatory Work 1 LS
2 Clearing, Topsoil Stripping & Restoration 1 LS
3 Existing Structures Demolition 1 LS
4 Common Excavation 46,661 CY
5 Muck Excavation 2,500 CY
6 Compacted Embankment 47,303 CY
7 Lime Amended Embankment 3,870 CY
8 Spillway Excavation 9,780 CY
9 Spillway Fill 2,800 CY
10 Filter Sand 4,483 CY
11 Drain Gravel 400 CY
12 Road Gravel 370 TON
13 Outlet Works Tower and Inlet Structure 1 LS
14 Outlet Works Conduit 1 LS
15 Stilling Basin 1 LS
16 Salvage and Replace Embankment Riprap 2,030 CY
17 Salvage and Replace Spillway Riprap 2,972 CY
18 New Spillway Riprap 6,800 TON
19 New Embankment Riprap 3,079 TON
20 Water Control/Dewatering 1 LS
21 Toe Drain System 1 LS
22 Geotextile Fabric 500 SY
Total Bid (words):
*Quantities are not guaranteed. Measurement and payment for each Bid Item is defined in Section 01150, Measurement and
Payment.
LITTLE ROBBER DAM RECONSTRUCTION
SCHEDULE OF ITEMS
Quantity*
TOTAL BID PRICE
\\dowl.com\j\Projects\31\28008-01\81Specs\BidForm.xlsx
BID SCHEDULE