ATTCH 2 - CCTV Area of Coverage - Draft.pdf

PDF 580 KB Posted

Attached to
HANGAR 9 CAMERA UPGRADE
Solicitation number
FA521526Q0032
Issued by

About this file

This is a facility layout diagram showing the configuration of a CTK (Crash Test Kinetic) facility and associated gym space. The diagram depicts an interior hangar/vehicle parking area with two primary structures: a CTK unit containing a back section with snack bar, roll-up door, and main operational space (shown in red), and a separate gym facility (shown in red). A C Cage structure is positioned adjacent to the CTK on the right side. The legend indicates that red-colored areas represent facilities inside the CTK/Gym, while blue circles denote areas outside the building. The layout illustrates the spatial relationship between the CTK operational areas, support amenities, and associated training/fitness facilities within what appears to be a larger hangar or industrial building environment designed for vehicle testing and personnel support operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

File details come from the government source that posted it. Updated .