Attachments Drawings 26QA095.pdf
PDF 833 KB Posted
- Solicitation number
- W912WJ26QA095
About this file
This document contains mechanical drawings and design specifications for HVAC repair work at Buffumville Dam, prepared by the US Army Corps of Engineers, New England District, dated October 2025.
The project involves comprehensive HVAC system replacement and upgrades including demolition of existing radiant floor heating systems, removal of fan coil units and associated ductwork, and installation of new equipment. New equipment specifications include two air-source heat pumps (HP-1 with 44 MBH cooling/30 MBH heating capacity at specified conditions, and HP-2 with 24 MBH cooling/24 MBH heating capacity), two fan coil units (FCU-1 with 1250 CFM and 29.6 MBH heating capacity; FCU-2 with 640 CFM and 15.3 MBH heating capacity), one energy recovery ventilator (ERV-1 rated at 400 CFM minimum with MERV 13 filtration), and two ceiling-mounted electric fan forced heaters (CH-1 and CH-2, each 1.5 kW/5120 BTU). The system includes new ductwork with specified dimensions, refrigerant piping (R32 or R454B), condensate drainage systems, and complete hydronic piping with 1-inch flexible elastomeric insulation (minimum R-3). Electrical connections require new dedicated circuits at panels PP-1 and MDP with specified amperage and wire sizing. Work includes removal of existing acoustic ceiling tiles with salvage and reinstallation, patching of gypsum wallboard penetrations, and coordination with existing structural elements. Installation must comply with ASHRAE Standard 15 refrigerant safety requirements and manufacturer specifications, with comprehensive testing and documentation of all system functions required upon completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA095-0002.pdf | ||
| Amendment W912WJ26QA095-0001.pdf | ||
| Attachments Photos 26QA095.pdf | ||
| Solicitation W912WJ26QA095.pdf | ||
| Solicitation Survey 26QA095.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 2026
DRAWINGS
CHANGE IN DUCT CONSTRUCTION BY
PRESSURE CLASS.
(PRESSURES IN INCHES W.G)
SS
G
HWS
HWR
CD
F
RS
RL
RD
WH
WCO
PRV
TPRV
HB
AV
ZZ ZZ
NN NN
CHS
CHR
GENERAL ABBREVIATIONSPIPING SYSTEMS
PIPING SYMBOLS
GENERAL NOTES
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER
RETURN
SANITARY SEWER
VENT
NATURAL GAS
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
CONDENSATE DRAIN
REFRIGERANT SUCTION
REFRIGERANT LIQUID
ROOF DRAIN
CONTINUATION
DROP IN PIPE
VALVE IN RISER
ELBOW, 90 DEG.
ELBOW UP, 90 DEG.
ELBOW DOWN, 90 DEG.
TEE
UNION
UNION, FLANGED
FLOOR DRAIN WITH TRAP
PIPE PITCH
DIRECTION OF FLOW
FLOOR PENETRATION
WALL HYDRANT
WALL CLEANOUT
TEE, OUTLET TURNED
DOWNWARD
TEE, OUTLET TURNED
UPWARD
PRESSURE REDUCING
VALVE
PRESSURE RELIEF VALVE
TEMP & PRESS RELIEF
THERMOMETER
BALL JOINT
ANCHOR
HOSE BIB
AFF - ABOVE FINISHED FLOOR
BOD - BOTTOM OF DUCT ELEV.
BOP - BOTTOM OF PIPE ELEV.
CFM - CUBIC FEET PER MINUTE
CL - CENTERLINE
CLG - CEILING
COND- CONDENSATE/CONDENSER
CONN- CONNECTION/CONNECT
DB - DRY BULB TEMPERATURE
DDC - DIRECT DIGITAL CONTROL
DX - DIRECT EXPANSION
EA - EXHAUST AIR
EAT - ENTERING AIR TEMP.
ELEV - ELEVATION
EMCS- ENERGY MONITORING
AND CONTROL SYSTEM
ESP - EXTERNAL STATIC PRESSURE
ETR - EXISTING TO REMAIN
EWT - ENTERING WATER TEMP.
FC - FAIL CLOSED
FD - FLOOR DRAIN
FLA - FULL LOAD AMPS
FO - FAIL OPEN
GA - GAUGE
HD - HUB DRAIN
IE - INVERT ELEVATION
LAT - LEAVING AIR TEMP.
LWT - LEAVING WATER TEMP.
NC - NORMALLY CLOSED
NO - NORMALLY OPEN
NPS - NOMINAL PIPE SIZE
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTSIDE AIR
OBD - OPPOSED BLADE DAMPER
OS&Y - OUTSIDE STEM AND YORK
Pa - PASCAL
PD - PRESSURE DROP
RA - RETURN AIR
RPM - REVOLUTIONS PER MINUTE
SA - SUPPLY AIR
SOG - SLAB ON GRADE
SP - STATIC PRESSURE
TOD - TOP OF DUCT ELEVATION
TOP - TOP OF PIPE ELEVATION
TOS - TOP OF SLAB/
TOP OF STEEL
TSP - TOTAL STATIC PRESSURE
VAV - VARIABLE AIR VOLUME
VP - VELOCITY PRESSURE
VTR - VENT THRU ROOF
W - WATTS
WB - WET BULB
WC - WATER COLUMN
WG - WATER GAUGE
EXPANSION LOOP
AIR VENT, AUTOMATIC
AIR VENT, MANUAL
GUIDE
EXPANSION JOINT
FLEXIBLE CONNECTOR
PRESSURE/TEMPERATURE
TEST PORT
DETAIL NO.
REF: DET.NN/MZZ
DETAIL LOCATION
REFERENCE SYMBOLOGY
DETAIL LOCATION
FIRE PROTECTION
A. MECHANICAL LAYOUTS ARE SCHEMATIC. PROVIDE ANY ADDITIONAL DROPS,
RISES, OR OFFSETS REQUIRED FOR A COMPLETE INSTALLATION.
COORDINATE EXACT ROUTING OF WORK WITH ALL OTHER TRADES AND
OBSTRUCTIONS. COORDINATE EXACT LOCATIONS OF CEILING MOUNTED
WORK WITH LIGHTS, CEILING GRID, AND OTHER OBSTRUCTIONS.
B. UNLESS OTHERWISE INDICATED ROUTED, ROUTE ALL DUCTWORK AND
PIPING ABOVE CEILINGS. ROUTE ALL DUCTWORK AND PIPING AS HIGH AS
POSSIBLE IN AREAS WITHOUT CEILINGS. ROUTE ALL DUCTWORK AND PIPING
TIGHT TO STRUCTURE.
C. DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS. INCREASE SHEET
METAL DIMENSIONS ON LINED DUCTWORK TO MAINTAIN THE INSIDE
CLEAR DIMENSIONS INDICATED.
D. UNLESS OTHERWISE INDICATED, PROVIDE DUCT RUNOUTS TO TERMINAL
UNITS SAME SIZE AS TERMINAL UNIT INLET.
E. FLEXIBLE DUCT RUNOUTS TO TERMINAL AIR DEVICES SHALL BE SAME
SIZE AS DIFFUSER CONNECTION. LIMIT FLEX TO 5 FEET.
F. INSTALL CALIBRATED BALANCING VALVES AND VENTURIS WITH A MINIMUM
UNRESTRICTED STRAIGHT RUN OF 5 PIPE DIAMETERS UPSTREAM AND
3 PIPE DIAMETERS DOWNSTREAM.
H. ALL WORK INDICATED IS NEW.
I. SOME SYMBOLS INDICATED ON THIS LEGEND SHEET MAY NOT APPEAR OF
THE DRAWINGS.
K. MOUNT CO2 SENSORS AND TEMPERATURE SENSORS 48 INCHES AFF.
L. ALL PIPING LOW POINTS SHALL HAVE DRAIN VALVES WITH HOSE
CONNECTION AND CAP.
M. ALL PIPING HIGH POINTS SHALL HAVE VALVED AIR VENTS.
N. PROVIDE 1-INCH DUCT LINER ON ALL TRANSFER DUCT.
T
S
HS
H
PS
SD
GENERAL CONTROL SYMBOLOGY
THERMOSTAT
TEMPERATURE SENSOR
HUMIDITY SENSOR
HUMIDISTAT
DUCT PRESSURE SENSOR
SMOKE DETECTOR
A
S1 900
36x24
DIFFUSER, REGISTER AND GRILLE NOTATION
SUPPLY DIFFUSER RETURN
REGISTER OR GRILLE
BALL VALVE
GATE VALVE
PLUG VALVE
GLOBE VALVE
CHECK VALVE
BUTTERFLY VALVE
MODULATING TWO-WAY
MODULATING THREE-WAY
SUPPLY REGISTER OR
GRILLE, SIDEWALL
RETURN/EXHAUST
REGISTER OR
GRILLE, SIDEWALL
DEVICE
IDENTIFICATION
AIR
QUANTITY
(CFM)
CALIBRATED BALANCING
VALVE
AUTOMATIC FLOW CONTROL
VALVE
DUCT SIZE IN INCHES
(NET INSIDE DIMENSIONS)
(RECTANGULAR DUCT SHOWN)
DIA INDICATES ROUND DUCT.
DIAO. INDICATES OVAL DUCT.
FOR RECTANGULAR DUCT:
FIRST FIGURE: SIDE SHOWN
SECOND FIGURE: SIDE NOT SHOWN
CD CARBON MONOXIDE DETECTOR
W
E
ESS
N
WATER METER
ELECTRIC METER
NIGHT THERMOSTAT
EMERGENCY STOP BUTTON
NPW NON-POTABLE WATER
FD
PA
EL
PG
PT
FLOOR SINK WITH TRAP
FS
ELBOW, 45 DEG.
WATER FLOW DETECTOR
WFD
DOUBLE CHECK VALVE
BACKFLOW PREVENTER
REDUCED PRESSURE
BACKFLOW PREVENTER
FIRE DEPARTMENT
CONNECTION
OS&Y VALVE
T
THERMOMETER GAGE
PRESSURE GAGE WITH SHUT
OFF COCK AND SIPHON OR
PULSATION DAMPENER
CAP BLIND FLANGE
MU MAKE-UP WATERHRR HEAT RECOVERY RETURN
HRS HEAT RECOVERY SUPPLY (E) EXISTING PIPING TO REMAIN
EXISTING PIPING TO BE
REMOVED
ROOM NUMBER000
ROUND DUCTØ
EXISTING WORK TO BE REMOVED
EXISTING WORK TO REMAIN-
POINT OF CONNECTION BETWEEN
NEW AND EXISTING WORK
POINT BETWEEN WORK TO REMAIN
AND WORK TO BE REMOVED
EXHAUST
REGISTER OR GRILLE
ARCHITECTURAL & FINISH NOTES
1. REMOVE EXISTING ACOUSTIC CEILING TILES, PROTECT AND STORE
FOR THE DURATION OF CONSTRUCTION. RE-INSTALL SALVAGED AND
PROTECTED ACOUSTIC CEILING TILES IN EXISTING CEILING GRID AT
THE COMPLETION OF WORK.
2. PROTECT EXISTING T-BAR CEILING GRID ASSEMBLY FOR THE
DURATION OF CONSTRUCTION. LIMIT REMOVAL OF CEILING GRID TO
AREAS WHERE REQUIRED TO PERFORM WORK, SALVAGE AND
PROTECT GRID COMPONENTS FOR RE-INSTALLATION.
3. AT REMOVED GRILLS, RETURNS OR OTHER COMPONENTS IN
GYPSUM WALLBOARD, HARD CEILINGS, PATCH CEILING TO NEAREST
JOIST OR STRUCTURAL MEMBER. PROVIDE JOINT COMPOUND, PREP
AND PAINT TO MATCH EXISTING ADJACENT FINISHES.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M H
O L M
Q U
IS
T
M
H
M-001
M E
C H
A N
IC
A
L L
E G
E N
D
B U
F F
U M
V
IL
L E
H V
A C
R E
P A
IR
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A
-2
M B
O L D
T
M B
O L D
T
C C
H A
R L E
S
O C
T O
B E
R
B U
F F
U M
V
IL
L E
D A
M
O
L D
O X
F O
R D
R D
C H
A R
L T
O N
M
A
REMOVE RADIANT FLOOR HEATING
HOT WATER PIPING AND
ASSOCIATED PUMPS (2) BACK TO
BOILER MAINS AND CAP FOR
FUTURE CONNECTION.
DEMOLISH RADIANT FLOOR HEATING
HOT WATER PIPING TO THIS POINT.
CAP FOR FUTURE CONNECTION.
DEMOLISH RADIANT
FLOOR HEATING HOT
WATER PIPING TO THIS
POINT. CAP FOR
FUTURE CONNECTION.
1"ø HWR ETR
1"ø HWS ETR
"ø
H W
S E
T R
"ø
H W
R E
T R
1"ø HWR ETR
1"ø HWS ETR 1"ø HWS ETR
1"ø HWR
"ø
H W
R E
T R
1"ø HWS ETR
1"ø HWR ETR
"ø
H W
R E
T R
"ø
H W
S E
T R
PANEL HP
XM
BOILER,
ETR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M H
O L M
Q U
MD-101
B U
F F
U M
V
IL
L E
H V
A C
R E
P A
IR
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A
-2
M B
O L D
T
M B
O L D
T
C C
H A
R L E
S
O C
T O
B E
R
B U
F F
U M
V
IL
L E
D A
M
O
L D
O X
F O
R D
R D
C H
A R
L T
O N
M
A
B A
S E
M E
N T
M E
C H
A N
IC
A
L D
E M
O L
IT
IO
N
P L A
N
3/8" = 1'-0" A6
BASEMENT DEMOLITION PLAN
RADIANT FLOOR HEATING HOT
WATER PIPING TO FIRST FLOOR
SHALL BE ABANDONED IN PLACE.
CAP PIPE ENDS.
T
T
T
DEAD STORAGE WORK SHOP
STORAGE
FIRE PROOF
ROOM HEATER ROOM
HALL
BATHROOM
OFFICE
VISITOR AREA
RAMP UP
OFFICE
KITCHEN/CONFERENCE
CU
CU
B
ETR
FOT
ETR
UH
ETR
UH
ETR
FCU
FCU
ROOM 2
ROOM 3
BATHROOM
ROOM 4
ROOM 6
Kitchen
A
A
B
C
C
C
C
C
C
C C
C
D
D
E
E
E
C
C
F F
F
F
ETR ETR
ETR
ETR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M H
O L M
Q U
MD-102
B U
F F
U M
V
IL
L E
H V
A C
R E
P A
IR
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A
-2
M B
O L D
T
M B
O L D
T
C C
H A
R L E
S
O C
T O
B E
R
B U
F F
U M
V
IL
L E
D A
M
O
L D
O X
F O
R D
R D
C H
A R
L T
O N
M
A
F
IR
S T
F L O
O R
M E
C H
A N
IC
A
L D
E M
O L
IT
IO
N
P L A
N
3/16" = 1'-0" A1
FIRST FLOOR DEMOLITION PLAN
KEYNOTES
A. REMOVE FAN COIL UNIT AND ALL ASSOCIATED DUCTWORK AND PIPING.
B. ELECTRIC HEATER TO REMAIN.
C. DEMOLISH SUPPLY DIFFUSER AND ALL ASSOCIATED DUCTWORK BACK TO THE UNIT. ALL DUCTWORK ROUTING AND SIZING IS
APPROXIMATE.
D. DEMOLISH RETURN GRILLE AND ALL ASSOCIATED DUCTWORK BACK TO THE UNIT. ALL DUCTWORK ROUTING AND SIZING IS
APPROXIMATE.
E. REMOVE EXISTING THERMOSTAT.
F. ELECTRICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ALL CONDUIT AND WIRES IN THEIR ENTIRETY FROM EQUIPMENT AND ASSOCIATED CONTROL DEVICES BACK TO THEIR SOURCE. TURN OFF AND MARK EXISTING CIRCUIT BREAKER AS SPARE.
B
ETR
1"ø HWS ETR
1"ø HWR ETR
"ø
H W
S E
T R
"ø
H W
R E
T R
"ø
H W
R E
T R
"ø
H W
S E
T R
1"ø HWS ETR
1"ø HWR ETR
1"ø HWS ETR
"ø
H W
R E
T R
1"ø HWS ETR
1"ø HWR ETR
1"ø HWS ETR
PROVIDE PIPE INSULATION ON ALL EXPOSED HEATING HOT
WATER SUPPLY AND RETURN PIPES. (TYPICAL ENTIRE
BASEMENT). PIPE INSULATION SHALL BE 1" FLEXIBLE
ELASTOMERIC CELLULAR AND SHALL BE MINIMUM R-3.
XM
PANEL HP
CAP.
CAP.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M H
O L M
Q U
M-101
B U
F F
U M
V
IL
L E
H V
A C
R E
P A
IR
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A
-2
M B
O L D
T
M B
O L D
T
C C
H A
R L E
S
O C
T O
B E
R
B U
F F
U M
V
IL
L E
D A
M
O
L D
O X
F O
R D
R D
C H
A R
L T
O N
M
A
B A
S E
M E
N T
M E
C H
A N
IC
A
L P
L A
N
3/8" = 1'-0" A9
BASEMENT PLAN
T
T
T
T
DEAD STORAGE WORK SHOP
STORAGE
FIRE PROOF
ROOM
HEATER ROOM
HALL
BATHROOM
OFFICE
VISITOR AREA
RAMP UP
OFFICE
KITCHEN/CONFERENCE
B
ETR
FOT
ETR
UH
ETR
UH
ETR
ROOM 2
ROOM 3
BATHROOM
ROOM 4
ROOM 6
Kitchen
1 1
7 7
FCU
FCU
L
L
HP
HP
ERV
S1
S1
100 S1
S1
S1
R1
S1
S1
S1
S2
S2
S2
R2
S2
S2
S2
14"x10"1 "x
18"x10"
10"x10"
10"x10"
"x
8"x8"
8"x8"
R1
10"x10"
PANEL PP-1
XM
PANEL MDP
XM
A B
C
E3
D
S1
S1
S1
"x
6"x6"
6"x6"
8"x8" 10"x10"
"x
"x
"x
14"x10"
"x
"x
"x
"x
"x
"x
8"x8"
"x
BATH
EXHAUST, ETR
BATH
EXHAUST, ETR
SEAL WALL
PENETRATION
WEATHERTIGHT
SEAL WALL
PENETRATION
WEATHERTIGHT
S
CH
CH
E
F
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M H
O L M
Q U
M-102
B U
F F
U M
V
IL
L E
H V
A C
R E
P A
IR
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A
-2
M B
O L D
T
M B
O L D
T
C C
H A
R L E
S
O C
T O
B E
R
B U
F F
U M
V
IL
L E
D A
M
O
L D
O X
F O
R D
R D
C H
A R
L T
O N
M
A
F
IR
S T
F L O
O R
D U
C T
W O
R K
P L A
N
3/16" = 1'-0" A1
FIRST FLOOR DUCTWORK PLAN
KEYNOTES
1. CLEAN EXISTING FINNED TUBE.
2. PROVIDE NEW CEILING MOUNTED FAN FORCED HEATER. PROVIDE T-BAR FRAME KIT TO MOUNT IN LAY-IN CEILING. PROVIDE
ASSOCIATED SINGLE-POLE THERMOSTAT WITH MANUAL CONTROLS.
3. INSTALL VOLUME DAMPER FOR EACH ASSOCIATED SUPPLY AIR DIFFUSER. AFTER SYSTEM IS INSTALLED, VERIFY AIR FLOWS
AT EACH DIFFUSER MEET DESIGN CFM VALUES.
4. PROVIDE NEW ENERGY RECOVERY VENTILATOR AND ASSOCIATED DUCTWORK. INSTALL PER MANUFACTURERS DRAWINGS AND ERV MOUNTING DETAIL. INSTALL WITH EASILY ACCESSIBLE FILTERS. AFTER INSTALLATION PERFORM A THOROUGH TESTING OF ALL COMPONENTS, INCLUDING FAN SPEED CONTROL, ENERGY RECOVERY FUNCTION, AND CONDENSATE
DRAINAGE. DOCUMENT ALL TEST RESULTS.
5. PROVIDE NEW THERMOSTAT AT 4' ABOVE FINISHED FLOOR ASSOCIATED WITH CORRESPONDING FAN COIL UNIT.
CONNECT TO ASSOCIATED IN-DUCT TEMPERATURE SENSOR
6. PROVIDE NEW FAN COIL UNIT. INSTALL PER MANUFACTURERS DRAWINGS AND FAN COIL UNIT MOUNTING DETAIL. ENSURE COMPLIANCE WITH ASSOCIATED REFRIGERANT SAFETY REGULATIONS. AFTER INSTALLATION, PERFORM A THOROUGH TESTING OF THE HEAT PUMP SYSTEM. VERIFY PROPER OPERATION OF ALL COMPONENTS, INCLUDING FAN SPEED CONTROL, AIR FLOW HEATING/COOLING MODES, AND CONDENSATE DRAINAGE. DOCUMENT ALL TEST RESULTS.
7. PROVIDE NEW AIR SOURCE HEAT PUMP. INSTALL PER MANUFACTURERS RECOMMENDATIONS AND HEAT PUMP DETAIL ON EXISTING CONCRETE PAD. ENSURE COMPLIANCE WITH ASSOCIATED REFRIGERANT SAFETY REGULATIONS. AFTER INSTALLATION, PERFORM A THOROUGH TESTING OF THE HEAT PUMP SYSTEM. VERIFY PROPER OPERATION OF ALL COMPONENTS, INCLUDING FAN SPEED CONTROL, HEATING/COOLING MODES, AND CONDENSATE DRAINAGE. DOCUMENT ALL
TEST RESULTS.
AIR TERMINAL SCHEDULE
TYPE
DIMENSIO
NS (IN)
MATERIAL
DEFLECTION TYPE
MAXIMUM PRESSURE
DROP (IN WG)
MAXIMUM
N.C. NOTES
L 12" x 16"
EXTRUDED ALUMINUM
STATIONARY LOUVER,
DRAINABLE BLAD
.1 25
1,2
R 24" x 24" EXTRUDED ALUMINUM EGGCRATE .1 25 1,2
S1 12" x 12" EXTRUDED ALUMINUM PLAQUE .1 25 1,2,3
S2 12" x 12" EXTRUDED ALUMINUM PLAQUE .1 25 1,2,4
CONDENSING UNIT SCHEDULE
EQUIPMENT
TAG
EQUIPMENT
NUMBER
COMPRESSOR
REFRIGERANT
TYPE
COIL DUTY
ELECTRICAL DATA
(VOLT/PHASE/HERTZ)
WEIGHT NOTES
COOLING HEATING
MIN. TOTAL
CAPACITY (MBH)
EAT DB
(°F)
EAT WB
(°F)
MIN.
TOTAL
CAPACITY
(MBH)
EAT DB
(°F)
HP 1 INVERTER-DRIVEN R32 OR R454B 44 96 74 30 3 208 V, 1 PHASE, 60 Hz 85 lb 1
HP 2 INVERTER-DRIVEN R32 OR R454B 24 96 74 24 3 208 V, 1 PHASE, 60 Hz 70 lb 1
ENERGY RECOVERY VENTILATOR UNIT SCHEDULE
Equipment Tags
Equipment Number
MINIMUM
AIRFLOW
(CFM)
OUTSIDE
AIRFLOW
(CFM)
ARRANGEMENT
MAX ESP
(IN H20)
FILTER
ELECTRICAL DATA
(VOLT/PHASE/HERTZ)
WEIGHT
(LB)
NOTES
ERV 1 400 400 HORIZONTAL 2.5 MERV 13 120 V, 1 PHASE, 60 Hz 145.5 1
FAN COIL UNIT SCHEDULE1
EQUIPMENT
TAG
EQUIPMENT
NUMBER
ARRANGEMENT
REFRIGERANT
TYPE
DESIGN SUPPLY
AIR FLOW CFM
(MEDIUM FAN
SPEED)
COIL DUTY
FILTER
ELECTRICAL DATA
(VOLT/PHASE/HERTZ)
NOTES
COOLING HEATING @ 17 °F
MIN. TOTAL
CAPACITY (MBH)
LAT DB
(°F)
MIN. TOTAL
CAPACITY (MBH)
LAT DB
(°F)
FCU 1 HORIZONTAL R454B 1250 44 55 29.6 95 MERV 8 208 V, 1 PHASE, 60 Hz 1,2
FCU 2 HORIZONTAL R454B 640 24 55 15.3 95 MERV 8 208 V, 1 PHASE, 60 Hz 1,2
1. DIFFUSER NECK DIAMETER SHALL MATCH DUCTWORK SIZE SHOWN ON DRAWINGS.
2. MAXIMUM NOISE CRITERIA SHALL BE DRIVING FACTOR IN AIR TERMINAL SELECTION.
3. TYPE S1 AND R1 TO BE INSTALLED IN 24" x 24" LAY IN T-BAR CEILING.
4. TYPE S2 AND R2 TO BE INSTALLED IN HARD CEILING.
1. ERV SHALL BE MOUNTED PER ERV DETAIL AND MANUFACTURERS REQUIREMENTS.
1. FAN COIL UNITS TO COME WITH INTEGRAL CONDENSATE LIFTS. IF INTEGRAL CONDENSATE LIFTS ARE NOT AVAILABLE, CONDENSATE PUMPS SHALL BE PROVIDED.
2. FAN COIL UNITS SHALL BE MOUNTED AS PER MANUFACTURER REQUIREMENTS.
3. FAN COIL UNITS SHALL MEET THE HEATING AND COOLING REQUIREMENTS WHILE RUNNING IN THE MEDIUM FAN SPEED SETTING WITH THE ABILITY TO RUN AT A
HIGHER FAN SPEED AS THE OUTDOOR TEMPERATURE DROPS AND THE SYSTEMS BECOME LESS EFFICIENT.
1. HEAT PUMPS SHALL COME WITH LOW AMBIENT KITS.
ELECTRICAL KEYNOTES
A. ELECTRICAL CONTRACTOR TO INSTALL NEW ELECTRICAL CONNECTION TO SUPPORT CONDENSING UNIT 'HP-1'. ROUTE NEW 2#10 AWG & 1#10 AWG GND, 3/4"C. FROM NEW 30A-2P CIRCUIT BREAKER IN PANEL PP-1 (CIRCUIT 25,27) TO CONDENSING UNIT VIA NEW LOCAL DISCONNECTING MEANSADJACENT TO THE UNIT.
REFER TO THE ELECTRICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION. NEW CIRCUIT BREAKER
SHALL MATCH EXISTING PANELBOARD RATINGS AND CHARACTERISTICS.
B. ELECTRICAL CONTRACTOR TO INSTALL NEW ELECTRICAL CONNECTION TO SUPPORT CONDENSING UNIT 'HP-2'. ROUTE NEW 2#8 AWG & 1#10 AWG GND, 3/4"C. FROM NEW 35A-2P CIRCUIT BREAKER IN PANEL PP-1 (CIRCUIT 29,31) TO CONDENSING UNIT VIA NEW LOCAL DISCONNECTING MEANS ADJACENT TO THE UNIT.
REFER TO THE ELECTRICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION. NEW CIRCUIT BREAKER
SHALL MATCH EXISTING PANELBOARD RATINGS AND CHARACTERISTICS.
C. PROVIDE FEED FROM CORRESPONDING CONDENSING UNIT (HP-1 OR HP-2) PER MANUFACTURER'S RECOMMENDATION. REFER TO THE ELECTRICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION.
D. ELECTRICAL CONTRACTOR TO INSTALL NEW ELECTRICAL CONNECTION TO SUPPORT ENERGY RECOVERY VENTILATOR UNIT 'ERV-1'. ROUTE NEW 2#12 AWG & 1#12 AWG GND, 3/4"C. FROM NEW 15A-1P CIRCUIT BREAKER IN PANEL PP-1 (CIRCUIT 37) TO UNIT VIA NEW LOCAL DISCONNECTING MEANS LOCATED ADJACENT TO EQUIPMENT. REFER TO THE ELECTRICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION.
NEW CIRCUIT BREAKER SHALL MATCH EXISTING PANELBOARD RATINGS AND CHARACTERISTICS.
E. ELECTRICAL CONTRACTOR TO INSTALL NEW ELECTRICAL CONNECTION TO SUPPORT CEILING MOUNTED FAN FORCED HEATER 'CH-1'. ROUTE NEW 2#12 AWG & 1#12 AWG GND, 3/4"C. FROM NEW 20A-1P CIRCUIT BREAKER IN PANEL MDP (CIRCUIT 32) TO CH-1. REFER TO THE ELECTRICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION. NEW CIRCUIT BREAKER SHALL MATCH EXISTING PANELBOARD RATINGS AND
CHARACTERISTICS.
F. ELECTRICAL CONTRACTOR TO INSTALL NEW ELECTRICAL CONNECTION TO SUPPORT CEILING MOUNTED FAN FORCED HEATER 'CH-2'. ROUTE NEW 2#12 AWG & 1#12 AWG GND, 3/4"C. FROM NEW 20A-1P CIRCUIT BREAKER IN PANEL MDP (CIRCUIT 34) TO CH-2. REFER TO THE ELECTRICAL SPECIFICATIONS FOR ADDITIONAL INFORMATION. NEW CIRCUIT BREAKER SHALL MATCH EXISTING PANELBOARD RATINGS AND
CHARACTERISTICS.
CEILING MOUNTED FAN FORCED HEATER SCHEDULE
EQUIPMENT
TAG
EQUIPMENT
NUMBER
kW MOUNTING
ELECTRICAL DATA
(VOLT/PHASE/HERTZ) BTU/HR
NOTES
CH 1 1.5 CEILING 120 V, 1 PHASE, 60 Hz 5120 1,2
CH 2 1.5 CEILING 120 V, 1 PHASE, 60 Hz 5120 1,2
1. CEILING MOUNTED FAN FORCED HEATERS ENCLOSURES SHALL BE MINIMUM 14 GAUGE STEEL.
2. UNITS TO BE CONTROLLED WITH 120 V THERMOSTAT.
DEAD STORAGE WORK SHOP
STORAGE
FIRE PROOF
ROOM
HEATER ROOM
HALL
BATHROOM
OFFICE
VISITOR AREA
RAMP UP
OFFICE
KITCHEN/CONFERENCE
B
ETR
FOT
ETR
UH
ETR
UH
ETR
HB
ROOM 1
ROOM 2
ROOM 3
BATHROOM
ROOM 4
ROOM 6
Kitchen
"ø
R L /R
S
/4
"ø C
D
"ø
R L /R
S
/4
"ø C
D
1 4
HP
FCU
HP
FCU
3/4"ø CD
/4
"ø C
D
ERV
5 5
CH
CH
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M H
O L M
Q U
M-103
B U
F F
U M
V
IL
L E
H V
A C
R E
P A
IR
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A
-2
M B
O L D
T
M B
O L D
T
C C
H A
R L E
S
O C
T O
B E
R
B U
F F
U M
V
IL
L E
D A
M
O
L D
O X
F O
R D
R D
C H
A R
L T
O N
M
A
F
IR
S T
F L O
O R
H Y
D R
O N
IC
P
L A
N
3/16" = 1'-0"
FIRST FLOOR HYDRONIC PLAN
KEYNOTES
1. PROVIDE NEW INSULATION ON EXISTING HEATING HOT WATER PIPING. PIPE INSULATION SHALL BE 1" FLEXIBLE ELASTOMERIC
CELLULAR AND SHALL BE MINIMUM R-3.
2. PROVIDE CONDENSATE DRAIN PIPING FROM EQUIPMENT TO EXTERIOR WALL AND DOWN TO 1' ABOVE GRADE. CONDENSATE DRAIN PIPING SHALL BE PVC. CONDENSATE DRAIN PIPING SHALL BE SIZED IN ACCORDANCE WITH THE EQUIPMENT
MANUFACTURER'S RECOMMENDATIONS AND/OR ASHRAE STANDARD 15.
3. PROVIDE REFRIGERANT LIQUID AND REFRIGERANT SUCTION PIPING. REFRIGERANT PIPING SHALL BE SIZED, INSTALLED AND LEAK-TESTED IN ACCORDANCE WITH ASHRAE STANDARD 15, LOCAL CODES, AND MANUFACTURER’S RECOMMENDATIONS.
REFRIGERANT PIPING SHALL BE COPPER AND THE LENGTH SHALL BE MINIMIZED FOR EFFICIENCY.
4. EXTERIOR CONDENSATE AND REFRIGERANT LINESET TO BE INSTALLED IN A UV RESISTANT ARCHITECTURAL SLEEVE.
FINNED TUBE SCHEDULE
EQUIPME
NT TAG
EQUIPME
NT
NUMBER PIPE SIZE
PIPE
MATERIAL FIN MATERIAL
ENTERING
WATER
TEMPERATURE
LEAVING WATER
TEMPERATURE
BTU/LINEAR
FOOT
ELEMENT
LENGTH NOTES
1. ENCLOSURE SHOULD COVER WALL IN ENTIRETY AS SHOWN ON DRAWINGS.
2. ENCLOSURE SHALL BE RESIDENTIAL STYLE WITH A SLOPED TOP, WHITE IN COLOR.
PIPE SUPPORT
ATTACHED TO
EQUIPMENT LEGS
AIR COOLED
HEAT PUMP
REFRIGERANT PIPING
AIR
FLOW
MIN. 1-13/16"
M10 ANCHOR BOLT
VIBRATION ISOLATOR
NOTE:
1. REFER TO MANUFACTURER'S INSTALLATION GUIDELINES FOR ADDITIONAL MOUNTING INSTRUCTIONS.
AIR
FLOW
AIR
FLOW
AIR
FLOW
CONCRETE PAD
GRADE
24" MIN
VIBRATION ISOLATOR (TYP 4)
1/2" THREADED ROD
DUCT SUPPORT STRAP (TYP)
AIR FLOW
SUSPENDED
ERV / FAN COIL UNIT AIR FLOW
DUCT INSULATION (TYP)
COIL CONDENSATE
REFER TO PLANS
FOR CONTINUATION
INSTALL AUXILIARY DRAIN PAN
2" BELOW UNIT. EXTEND PAN 3"
WIDER THAN FCU
DIMENSIONS.DUCT FLANGE (TYP)
FLEXIBLE DUCT CONNECTION (TYP)
CONDENSATE P-TRAP
STEEL SUPPORT (TYP)
PROVIDE NEOPRENE MOUNTS
BETWEEN SUPPORT AND FAN
COIL UNIT (TYP 4)
NOTES:
1. PROVIDE FLEXIBLE DUCT CONNECTIONS BEFORE TRANSITIONS.
2. CONTRACTOR SHALL VERIFY MAXIMUM LOADING ON UNIT AND DUCTWORK SUPPORT ASSEMBLIES.
ATTACH VIA GALVANIZED STEEL
SADDLE PLATES AND HEX NUTS
(TYP)
FACTORY INSULATED FLEXIBLE DUCT
FULL NECK SIZE OF DIFFUSER
5'-0" MAXIMUM LENGTH
VOLUME DAMPER
SEALANT AND
CLAMPS
CEILINGINSULATION
RIGID DUCT
DUCT HANGER ROD
DIFFUSER
1. USE OF FLEXIBLE DUCT FOR CHANGE OF DIRECTION IS PROHIBITED
NOTES:
GALVANIZED
ANCHOR SCREW
(TYP)
GALVANIZED,
ADJUSTABLE
DUCT STRAP
SUPPORT
BRACKET
WOOD JOIST
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
M H
O L M
Q U
M-501
M E
C H
A N
IC
A
L D
E T
A
IL
S
B U
F F
U M
V
IL
L E
H V
A C
R E
P A
IR
N E
W E
N G
L A
N D
D
IS
T R
IC
T
V
IR
G
IN
IA
R O
A D
C O
N C
O R
D M
A
-2
M B
O L D
T
M B
O L D
T
C C
H A
R L E
S
O C
T O
B E
R
B U
F F
U M
V
IL
L E
D A
M
O
L D
O X
F O
R D
R D
C H
A R
L T
O N
M
A
NTS
A4
HEAT PUMP AT GRADE
NTS
J10
ERV AND FAN COIL UNIT MOUNTING
NTS
E13
FLEX DUCT CONNECTION DETAIL
NOT TO SCALE
A13
DUCT HANGER
| Sheets |
| M-001 - MECHANICAL GENERAL NOTES, ABBREVIATIONS |
| MD-101 - BASEMENT DEMOLITION PLAN |
| MD-102 - FIRST FLOOR DEMOLITION PLAN |
| M-101 - BASEMENT PLAN |
| M-102 - FIRST FLOOR DUCTWORK PLAN |
| M-103 - FIRST FLOOR HYDRONIC PLAN |
| M-501 - HVAC DETAILS |
File details come from the government source that posted it. Updated .