This document is a Conceptual Design attachment for the City of Thousand Oaks' CI 5702 Power Backup project at the Lang Ranch Pump Station. The project involves upgrading the electrical infrastructure with new power backup systems, including a 200kW/250kVA standby diesel generator, a 500kWh Battery Energy Storage System (BESS), and a new 600A switchboard. The design aims to ensure continuous electrical power for the pump station by implementing redundant power sources and improving the existing electrical distribution system.

The conceptual design includes removing existing electrical cables and infrastructure, installing a new switchboard with remote close/open capabilities, and integrating a standby generator and battery storage system. The project will require coordination with Southern California Edison (SCE) for closed-transition and islanding requirements. The design-builder will be responsible for determining the precise kilowatt ratings to ensure proper pump operation and developing a functional design based on the conceptual drawings. The single-line diagrams provide technical details of the existing and proposed electrical system, highlighting the integration of new power backup equipment at the Lang Ranch Pump Station.

View the file

Other files

File Type Posted
Power_Backup_at_Lang_Ranch_Pump_Station_(Addendum_#2_Revision).pdf PDF
Power_Backup_at_Lang_Ranch_Pump_Station.pdf PDF
RFPQ_CI_5702_Power_Backup_at_Lang_Ranch_Pump_Station_Notice.pdf PDF
RFPQ_CI_5702_Power_Backup_at_Lang_Ranch_Pump_Station_Notice.pdf PDF
AttachmentI_FEMA_Requirements.pdf PDF
AttachmentI_FEMA_Requirements.pdf PDF
AttachmentG_ConstructionGeneralSpecifications.pdf PDF
AttachmentG_ConstructionGeneralSpecifications.pdf PDF
AttachmentN_Photos.pdf PDF
AttachmentN_Photos.pdf PDF
AttachmentB_CI5702_ScopeOfWork_.pdf PDF
AttachmentK_TechnicalSpecs.pdf PDF
AttachmentB_CI5702_ScopeOfWork_.pdf PDF
AttachmentK_TechnicalSpecs.pdf PDF
AttachmentE_GeneralConditions_.pdf PDF
AttachmentF_DesignGuidelines_.pdf PDF
AttachmentF_DesignGuidelines_.pdf PDF
AttachmentC_AsBuiltDrawings.pdf PDF
AttachmentE_GeneralConditions_.pdf PDF
AttachmentC_AsBuiltDrawings.pdf PDF
AttachmentH_SampleAgreement.pdf PDF
AttachmentH_SampleAgreement.pdf PDF
AttachmentA_CI_5702_VicinityLocationMaps.pdf PDF
AttachmentM_CI5702_ConceptualDesign_251024.pdf PDF
AttachmentA_CI_5702_VicinityLocationMaps.pdf PDF
AttachmentD_ElectricityBills.pdf PDF
AttachmentL_PowerIntervals.csv CSV file
AttachmentJ_Performance_PaymentBonds.pdf PDF
AttachmentL_PowerIntervals.csv CSV file
AttachmentJ_Performance_PaymentBonds.pdf PDF
AttachmentD_ElectricityBills.pdf PDF
General_Services_Agreement_Template_Revision_9.18.23.docx DOCX document
General_Services_Agreement_Template_Revision_9.18.23.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT M – CONCEPTUAL DESIGN

CI 5702 – POWER BACKUP AT LANG RANCH PUMP STATION

rr======:--, \ I r- -- , \ / Q __ ---- 1r-----lJ I

\ I \ I \ I \ I \ - 1- \ I\ I \ I \ I

I \

Know what's below.

Call before you dig.

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

I

I

I

I

I

I

I

I

I

I

I

I

I

I

' ' RESEJ..,.VOIR '

' \-<: I

', I ', I

', I ' ,_ i I

' , I-------------------------------------------------------------------------➔f------------------------------------------------------------------------- ----

,/ I

I

I

/ I

/ I

/ I

/ I

/ I

/ I

(E) MET E

) cc

DATE_-_ _ PREPARED BY

DESIGNED

DATE_-__ KEWO

l----+---+------------------------1-------+-----1-------+------1 DRAFTED BY -IK:C ENGINEERING

CORPORATION

0 CONCEPTUAL DESIGN NOT FOR CONSTRUCTION

REV. SYMBO DESCRIPTION OF CHANGE

DATE_-__

10110/25

R.C.E. DATE C.T.O. DATE CHECKED

CITY OF THOUSAND OAKS

REVIEWED BY:

PROJECT ENGINEER

REVIEWED BY:

ENGINEERING DIVISION MANAGER

APPROVED BY:

TED GERBER, CITY ENGINEER

DATE

DATE

DATE

(E) SCE TRANSFORMER

(N) SWITCHBOARD

(N) BESS

(N) DIESEL GENERATOR

� 1�

''°----210

____....,_ SCALE: 1" = 10'

CITY OF THOUSAND OAKS

Cl 5702 POWER BACKUP AT LANG RANCH PUMP STATION

EQUIPMENT LAYOUT

CITY OF THOUSAND OAKS DWG. __ _ SHEET 2 OF 4

I

Know what's below.

Call before you dig.

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

'- ' ------- - - ------- - --- - ------- - --------- - - ----- ----- ------➔f--

DESIGNED

DATE_-__

L_J_ __ L---------------------+------11----t---l---- DRAFTED BY

0 CONCEPTUAL DESIGN NOT FOR CONSTRUCTION

REV. SYMBO DESCRIPTION OF CHANGE

DATE_-__

10110/25

R.C.E. DATE C.T.O. DATE CHECKED

-IK:C

KEWO

ENGINEERING

CORPORATION

REVIEWED BY:

PROJECT ENGINEER

REVIEWED BY:

ENGINEERING DIVISION MANAGER

APPROVED BY:

TED GERBER, CITY ENGINEER

DATE

DATE

DATE

) S:22.[[C BOARD

Cl 5702 POWER BACKUP AT LANG RANCH PUMP STATION

EQUIPMENT LAYOUT

CITY OF THOUSAND OAKS DWG. SHEET 3 OF 4

Know what's below.

Call before you dig.

CALL 811

AT LEAST TWO DAYS

BEFORE YOU DIG

UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA

SCE UTILITY SERVICE

16.34 KV

SCE XFMR -----1

150KVA , I

16.34KV-480/277V I

Z=3.1%

#5574025

'------� --- G)

SCE UTILITY SERVICE

16.34 KV

0 (N) SWBD, 600A, 480/277V, 3PH-4W, 65KAIC

SCE XFMR -----· ----1

150KVA ,

16.34KV-480/277V

Z=3.1% #5574025

- I

'------- ____ _j r·-·-·-·7·------------T·---------------------------------------·-·r·-·-·---uGPs , MTR & MAIN , DISTRIBUTION , I

300A

3P , I I I

300A

3P

I

1·-· - ■-

. I ! MPG j ! 1201208V j I , 1:.11:::i: ! ·-- _ _I

(E) MCC, 600A, 480/277V, 3PH-4W, 65KAIC

- , r --------------------------------

I I

MOBILE r·-··;·---.

GENERATOR i ) i

277/480V, 3PH 4W �©-!

! G !

I I

(E) MCC, 600A, 277/480V, 3PH-4W, 65KAIC

AIR

COMP.

PUMP

P-1

PUMP

P-2

------,----------r-----------------------------------------------

I I r-·-·-·:, l���K )

L)1: ! j KEY JOOA r-· ·-

I , INTLK 3P 3KVA �r,�.� • I

• I XFMR ' v v ' ! PNL A j ! j '------

480V-120/240V ! 1201240V j I • 1 PHASE · I I j I.-· __ _,: I

15A 3P

'125A ) 3P

125A

3P

@ EQUIPMENT

1. (E) MCC, 600A, 480/277V, 3PH-4W, 65KAIC

2.

- REMOVE NEUTRAL-GROUND BONDING JUMPER.

- SCE TO REMOVE EXISTING METER.

(E) GENERATOR PLUG

ARKTITE #AP40458, 400A, 4W, 4P

- UTILIZE PORTABLE GENERATOR TO MAINTAIN

ELECTRICAL POWER TO FACILITY DURING

CONSTRUCTION.

@ CONDUITS & CABLES

1. REMOVE EXISTING CABLES BETWEEN SCE

TRANSFORMER AND MCC. INTERCEPT CONDUITS

FOR NEW SWITCHBOARD.

DEMOLITION SINGLE LINE DIAGRAM 1

@ EQUIPMENT

1. (N) SWITCHBOARD

600A, 480/277V, 3PH-4W, 65KAIC

- REMOTE CLOSE/OPEN MAIN CIRCUIT BREAKER

- COORDINATE WITH SCE FOR

CLOSED-TRANSITION AND ISLANDING

REQUIREMENTS.

2. (N) STANDBY DIESEL GENERATOR

200KW/250KVA, 0.8PF, 480/277V, 3PH-4W

- DESIGN-BUILDER SHALL DETERMINE KW RATING

AND ENSURE PUMPS CAN BE STARTED ON WITH

GENERATOR

- WEATHER PROTECTED ENCLOSURE

SEISMIC BRACING.. ____ ·-·- -·-·-·- j.i_B_·-·-·-··""·-·-·-·-·-·-·-·-·-·-·-·-·-·-•-·-·-·-·- -·-

----__ : _____ -b ---- -------------------------------------------

,. 1 60 60

PARALLELING CONTROLS

- MOTORIZED CIRCUIT BREAKER

SYNCHRONIZING

.• 'r-----------J ----------, 7 r-'-··-i @ , , , ,. . ,-{ 1' I '

: I , • • ,6. �©-: (N)STANDBY GENERATOR

I i I . . DIESEL : • ----,-----' ! G ! 200KW/250KVA ·-·---1-·, ·-·-·-· ,., ___ ,_ I I 277/480V 3PH 4W I • I • • '

I j PROT. & , j , MICROGRID i- - - � ! CONT. j L _______ .

(N) BESS

500KWH

DATE_· _ _

DESIGNED

DATE_-__

l----+---+------------------------1-------+-----1-------+------1 DRAFTED BY

0 CONCEPTUAL DESIGN NOT FOR CONSTRUCTION

RE V. SYMBOL DESCRIPTION OF CHANGE R.C.E. DATE C.T.O.

DATE_-__

10110/25

DATE CHECKED

PREPARED BY

-IK:C

MOBILE r·-·-0 ----.

GENERATOR i ) !

277/480V, 3PH 4W

•@I

KEWO

ENGINEERING

CORPORATION

! G !

I I

CITY OF THOUSAND OAKS

REVIEWED BY:

PROJECT ENGINEER

REVIEWED BY:

ENGINEERING DIVISION MANAGER

APPROVED BY:

TED GERBER, CITY ENGINEER

HP HP HP

AIR PUMP PUMP

COMP. P-1 P-2

DATE

LOAD SHARING

3. (N) BATTERY ENERGY STORAGE SYSTEM

S00KWH, 480/277V

- DESIGN-BUILDER SHALL DETERMINE KW RATING

AND ENSURE PUMPS CAN BE STARTED WITH BESS.

NOTES:

1. SINGLE LINE DIAGRAM IS CONCEPTUAL AND SHALL

BE USED ONLY FOR REFERENCE. DESIGN-BUILDER

IS RESPONSIBLE FOR DEVELOPING FUNCTIONAL

DESIGN.

NEW SINGLE LINE DIAGRAM 2

CITY OF THOUSAND OAKS

DATE

Cl 5702 POWER BACKUP AT LANG RANCH PUMP STATION

SINGLE LINE DIAGRAM

DATE CITY OF THOUSAND OAKS DWG. __ _ SHEET 4 OF 4

File details come from the government source that posted it. Updated .