AttachmentE_Revised.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Earl Brown Park Signs
- Solicitation number
- RFP-25-03
- Issued by
- Volusia County, Florida
About this file
This document is a Price Form (Attachment E) for RFP-25-03 for the City of DeLand, Florida, detailing a comprehensive sign replacement and installation project at Earl Brown Park. The project involves nine specific sign locations, with scopes ranging from constructing entirely new signs with foundations and columns to modifying existing monument signs by retaining existing brick columns and updating sign panels and grills. The signs will be double-sided or single-sided, with dimensions varying between approximately 9-12 feet wide and 5-7 feet high, and will feature designs similar to reference Figure 2 and other specified design guidelines.
The pricing document indicates that bidders are expected to provide unit prices F.O.B. destination, inclusive of all discounts, transportation, labor, and equipment costs for delivering materials. Interestingly, the total price for Items 1-9, including Maintenance-of-Traffic (MOT) costs, is listed as $0.00, which might suggest a placeholder or separate pricing mechanism. The project involves detailed design and permitting requirements, with specific instructions for each sign location, including reusing existing message boards, adding directional arrows, and matching existing signage wording and design aesthetics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RCA.pdf | ||
| RFP2503SelectionCommitteeConsolidatedScoresheet.pdf | ||
| RFP2503EvaluationSheets.pdf | ||
| RFP2503SelectionCommitteeConsolidatedScoresheet.pdf | ||
| RFP2503EvaluationSheets.pdf | ||
| RFP2503PMN.pdf | ||
| RFP2503PMN.pdf | ||
| RFP2503NamesOnlyTab.pdf | ||
| RFP2503NamesOnlyTab.pdf | ||
| RFP2503ADD2.pdf | ||
| RFP2503ADD2.pdf | ||
| RFP2503ADD1.pdf | ||
| AttachmentE_Revised.xlsx | XLSX spreadsheet | |
| RFP2503ADD1.pdf | ||
| AttachmentC.pdf | ||
| AttachmentD.pdf | ||
| AttachmentE.xlsx | XLSX spreadsheet | |
| AttachmentA.pdf | ||
| AttachmentC.pdf | ||
| RFP2503Final.pdf | ||
| AttachmentB.pdf | ||
| AttachmentA.pdf | ||
| AttachmentB.pdf | ||
| AttachmentD.pdf | ||
| AttachmentF.pdf | ||
| RFP2503Final.pdf | ||
| AttachmentF.pdf | ||
| AttachmentE.xlsx | XLSX spreadsheet |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 RFP-25-03 / Earl Brown Park Signs Price Form
| Price Proposal Item | Location | Existing Sign Description | Scope of Work | Item Price |
| 1 | SW corner of Amelia Ave. and Hubbard Ave. | N/A - New foundation, columns and sign proposed | Provide detailed design and permitting. Construct new, double-sided sign to include foundation, columns, sign panel and grill. Overall dimensions shall be aproximately 12 ft. wide by 7 ft high. Wording and appearance (both sides) shall be similar to sign depicted in Figure 2. Sign Conceptual Design | |
| 2 | Alabama Ave. Median north of Beresford Ave | Monument Sign with Brick Columns - Double-sided | Retain existing brick columns. Remove and replace sign panel and metal grill with new, double sided panel and grill with wording and design similar to sign depicted in Figure 2 and Figure 3.2 | |
| 3 | SW corner of Amelia Ave. and Walts Ave. | Monument Sign with Brick Columns - Single-sided | Retain existing brick columns. Remove and replace sign panel and metal grill with new, double sided panel and grill with wording and design similar to sign depicted in Figure 2 and Figure 3.3 | |
| 4 | NW Corner of Amelia Ave. and Euclid Ave. | Monument Sign with Brick Columns - Double-sided | Retain existing brick columns. Remove and replace sign panel and metal grill with new, double sided panel and grill. New sign panel shall duplicate wording on existing sign for Chipper Jones Field (see photos, Figure 4.4). New Grill shall be similar to that depicted in Figure 2. | |
| 5 | SE corner of Woodland Blvd. and Euclid Ave. | Monument Sign with Brick Columns - Single-sided | Retain existing brick columns. Remove and replace sign panel and metal grill with new, single sided panel with wording to duplicate that on existing sign (see photos in Figure 4.5). New grill above sign shall be similar to that depicted in Figure 2. Provide additional signs with directional arrows below main panel to duplicate information on existing sign. | |
| 6 | NE corner of Woodland Blvd. and Hubbard Ave. | Monument Sign with Brick Columns - Single-sided | Retain existing brick columns. Remove and replace sign panel and metal grill with new, single sided panel with wording to duplicate that on existing sign (see photos in Figure 4.6). New grill above sign shall be similar to that depicted in Figure 2. Provide additional signs with directional arrows below main panel to duplicate information on existing sign. | |
| 7 | NW corner of Beresford Ave. and Amelia Ave. | N/A - New foundation, columns and sign proposed | Provide detailed design and permitting. Construct new, double sided sign to include foundation, columns, sign panel and grill. Overall dimensions shall be aproximately 9 ft. wide by 5 ft high. New grill above sign shall be similar to that depicted in Figure 2. Provide main sign panel and up to 4 additional signs with directional arrows below main panel (similar to directional signs currently at location No. 6). Wording on main sign panel and directional signs below shall be as directed by owner. | |
| 8 | SE corner of Woodland Blvd. and Hubbard Ave. | Monument Sign with Brick Columns - Double sided | Retain existing brick columns. Recondition and modify both sides of existing sign panel with wording and design similar to sign depicted in Figure 2. Remove and replace grill above existing sign with new grill similar to that depicted in Figure 2. Carefully remove and store existing message boards from both sides of existing sign and reinstall on reconditioned sign panel. | |
| 9 | Maintenance-of-Traffic (MOT) Costs | |||
| Total Price, Items 1-9 | $0.00 | |||
| Total Price, Items 1-9 in Words | ||||
| Bidders shall bid unit prices, F.O.B. destination, including all discounts in accordance with units and quantities indicated on the Price Sheet. The prices bid shall be used for payment and shall be deemed to include payment in full for all transportation, labor, and equipment used in delivering all supplies and materials to the point of delivery. |
File details come from the government source that posted it. Updated .