Attachment3PricingMatrix FINAL Protected.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Diminishing Manufacturing Sources and Material Shortages (DMSMS) Predictive Tool Federal contract opportunity
- Solicitation number
- FA810920R0002
About this file
This solicitation seeks proposals for a Diminishing Manufacturing Sources and Material Shortages (DMSMS) Predictive Tool. The Air Force Materiel Command Air Force Sustainment Center is requesting a DMSMS Predictive Tool capability to assist the Air Force community in determining the present and future status of program-managed systems' bills of material, identified items, and life cycle procurement efforts. The requirement includes loading and updating bill of material data to evaluate potential supportability risks. The contractor shall also provide engineering and technical services to enhance the DMSMS process. The period of performance is one year basic with four one-year options and a six-month extension option. Offerors must complete export control certification to receive and view requirement data. The solicitation includes a pricing matrix template for offerors to input unit prices by contract line item number for evaluation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Predictive Tool Sec L Addendum 6.30.20.docx | DOCX document | |
| Predictive Tool Sec M Addendum 6.30.20.docx | DOCX document | |
| FA810920R0002_______0003.pdf | ||
| RevisedSectionLAddendum.pdf | ||
| RevisedSectionMAddendum.pdf | ||
| FA810920R0002_______0002.pdf | ||
| FA810920R0002.pdf | ||
| Attachment1PWS.pdf | ||
| Attachment6SectionM.pdf | ||
| EXHIBITA-CDRLs-DIDs.pdf | ||
| Attachment5SectionLAddendum.pdf | ||
| Attachment2WageDeterminations.pdf | ||
| Attachment4Access.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Calculation Methodolgy
| CALCULATION METHODOLOGY | ||
| CLIN | CLIN Description | Calculation Methodology |
| X001 | Bill of Material - Loading | Proposed unit price multiplied by Evaluation Quantity for each year as applicable. |
| X002 | Bill of Material - Updating | Proposed unit price multiplied by Evaluation Quantity for each year as applicable. |
| X003 | Travel | Proposed travel G&A rate multiplied by estimated travel dollars for each year as applicable. |
| X004 | Data - CDRL | Not Seperately Priced |
| X005 | Data - Appendix B | Not Seperately Priced |
| X006 | Bill of Material - Data Transfer | Proposed unit price multiplied by Evaluation Quantity for each year as applicable. |
FA8109-20-R-0002
DMSMS Pricing Matrix &"-,Bold"SOURCE SELECTION INFORMATION
SEE FAR 2.101 & 3.104
FOR OFFICIAL USE ONLY &P
DMSMS - Pricing Matrix
| Instructions: Please input Offeror Name in cell B6 and Input Unit Prices in the yellow cells below in Columns C - G. | ||||||||||||||||||||
| Diminishing Manufacturing Sources and Material Shortages (DMSMS) | ||||||||||||||||||||
| Unit Pricing Proposed | Evaluation Quantity Estimates | Extended Evaluated Pricing | ||||||||||||||||||
| Offeror: | Basic | Opt I | Opt II | Opt III | Opt IV | 6 Mo. Extension ** | Basic | Opt I | Opt II | Opt III | Opt IV | 6 Mo Ext | Basic | Opt I | Opt II | Opt III | Opt IV | 6 Mo. Extension | Total Evaluated Price (TEP) | |
| CLIN | CLIN DESCRIPTION | |||||||||||||||||||
| X001 | Bill of Material - Loading | $0.00 | 600,000 | 600,000 | 600,000 | 600,000 | 600,000 | 300,000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
X002 Bill of Material - Updating $0.00 600,000 600,000 600,000 600,000 600,000 300,000 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
X003 * Over & Above Travel (G&A) 0.0000 $ 30,000 $ 30,600 $ 31,212 $ 31,836 $ 32,473 $ 15,000 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
X004 Data - CDRL Not Separately Priced
X005 Data - Appendix B Not Separately Priced
X006 Bill of Material - Data Transfer N/A N/A N/A N/A N/A 1 $0.00 N/A N/A $0.00
Total $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
* CLINs x003 should be entered as 1 plus the percentage amount. For example 8.25% should be entered as 1.0825 $0.00 Check
** 6 month Extension price is the Proposed Opt IV price.
FA8109-20-R-0002 Appendix C
DMSMS Pricing Matrix &"-,Bold"SOURCE SELECTION INFORMATION
SEE FAR 2.101 & 3.104
FOR OFFICIAL USE ONLY &P
File details come from the government source that posted it. Updated .