Sheet1 Independent Government Estimate Fort Frederica Visitor Center: Fabrication
FOR OFFICIAL USE ONLY (FOUO)
| PROJECT MANAGEMENT | | | | $ - 0 |
| FABRICATION DRAWINGS | | | | $ - 0 |
| SAMPLES | | | | $ - 0 |
| LIGHTING | | | | $ - 0 |
| EXHIBIT STRUCTURES | | | | $ - 0 |
| CUSTOM ELEMENTS | | | | $ - 0 |
| A/V ELECTRONIC | | | | $ - 0 |
| GRAPHICS | | | | $ - 0 |
| ARTIFACT MOUNTING | | | | $ - 0 |
| PROJECT CLOSEOUT | | | | $ - 0 |
| SHIPPING | | | | $ - 0 |
| INSTALLATION | | | | $ - 0 |
| TRAVEL | | | | $ - 0 |
| | Grand Total | | | $ - 0 |
| | | | | - 0 |
| PROJECT MANAGEMENT (excluding travel) | | | | | |
| LABOR | | Qty | Unit | rate | amount |
| Project Manager | | hours | | $ - 0 |
| TOTAL ALL LABOR | | | | $ - 0 |
| TOTAL Project Management | | | | | $ - 0 |
| Fabrication Drawings | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Miscellaneous | | Item | | $ - 0 |
| SUBTOTAL MATERIALS | | | | $ - 0 |
| MARK-UP on materials | | percent | | |
| TOTAL ALL MATERIALS | | | | $ - 0 |
| LABOR | | hours | x | rate | amount |
| Detailling | | hour | | $ - 0 |
| TOTAL ALL LABOR | | | | $ - 0 |
| TOTAL Fabrication Drawings | | | | | $ - 0 |
| Samples/Mock-ups/Prototypes | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| graphic samples-color proofs | job | $ - 0 |
| custom elements samples | job | $ - 0 |
| prototypes | job | $ - 0 |
| SUBTOTAL MATERIALS | | $ - 0 |
| MARK-UP on materials | percent | $ - 0 |
| TOTAL ALL MATERIALS | | $ - 0 |
| LABOR | | hours | x | rate | amount |
| exhibit spec-fabrication | | hours @ | | $ - 0 |
| scenic specialist | | hours @ | | $ - 0 |
| TOTAL ALL LABOR | $ - 0 |
| TOTAL Samples | | $ - 0 |
| Lighting | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| New fixtures: using existing tracks | | ea | | $ - 0 |
| MARK-UP on materials | | percent | | $ - 0 |
| TOTAL ALL MATERIALS | | | | $ - 0 |
| LABOR | | hours | x | rate | amount |
| TOTAL ALL LABOR | | job | | $ - 0 |
| TOTAL Lighting | | | | | $ - 0 |
| Exhibit Structures | | | | | |
| MATERIALS: | | qty. | | Material | amount |
| 03 | CA-03.03-150 Small case on Research today panel | 1 | unit | $ - 0 |
| CA-03.03-300 Artifact case | 1 | unit | $ - 0 |
| CA-03.03-300a Artifact case furniture | 1 | job | $ - 0 |
| CE-03.02-105 Flip book structure | 1 | unit | $ - 0 |
| CE-03.02-200 Stratigraphy wall structure | 1 | unit | $ - 0 |
04 GL-04.01-300 Reading Rail 1 unit $ - 0
| 05 | CE-05.01-100 Map table structure | 1 | unit | $ - 0 |
| CE.05.01-120 Tactile map for Map Table | 1 | per sf | $ - 0 |
| 06 | GL-06.03-400 reading rail | 1 | unit | $ - 0 |
| GL.06.01-200, 250 Banner hanging method | 2 | ea | $ - 0 |
| CA.06-01-200 Artifact case | 1 | unit | $ - 0 |
| GL.06-03-150 Diagonal wall | 1 | unit | $ - 0 |
| GL-06.03-250 Jenkin's ear tactlie shelf | 1 | unit | $ - 0 |
| GL-06.03-400 reading rail | 1 | unit | $ - 0 |
| 07 | GL-07.01-100 Tavern sign substrate and mounts | 1 | unit | $ - 0 |
| GL-07.02-100 hat panel | 1 | unit | $ - 0 |
| GL-07.02-125 hat panel | 1 | unit | $ - 0 |
| GL-07.02-150 hat panel | 1 | unit | $ - 0 |
| GL-07.06-200 Reading rail | 1 | unit | $ - 0 |
| GL-07.02-300 Dress up materials | 1 | job | $ - 0 |
| CA-07.02-400 Case for buckles and amounting | 1 | job | $ - 0 |
| 08 | GL.08-01-100 Reading rail | 1 | unit | $ - 0 |
| GL-08.02--100 Structure for spotting scope | 1 | unit | $ - 0 |
| GL-08.02--200 Structure for spotting scope | 1 | unit | $ - 0 |
| GL-08.02--300 Structure for spotting scope | 1 | unit | $ - 0 |
| 09 | CA-09.03-100 case for pipe stems including mounting | 1 | unit | $ - 0 |
| CA-09.01-100 Case for Shoe Buckles | 1 | unit | $ - 0 |
| CA-09.04-100 case for bottles and glassware | 1 | unit | $ - 0 |
| CA-09.02-100 Case for plates above fireplace including mounting | 1 | unit | $ - 0 |
| SUBTOTAL MATERIALS | | $ - 0 |
| MARK-UP on materials | $0.00 | $ - 0 |
| TOTAL MATERIALS | | $ - 0 |
| shop supervisor | hours @ | $ - 0 |
| Fabrication Specialist Milwork | hours @ | $ - 0 |
| fabricationSpecialsit Miillwork | hours@ | $ - 0 |
| Fabrication Specialist Millwork | hours@ | $ - 0 |
| Fabrication Specialist Metalwork | hours @ | $ - 0 |
| Fabrication Specialist Finisher | hours @ | $ - 0 |
TOTAL ALL LABOR $ - 0
TOTAL Exhibit Structures $0.00 $ - 0 $ - 0
| Custom Elements | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| 1 | CE-01.03-100 Reception desk | 1 | ea | | $ - 0 |
| GL-01.03-125 Raised line map (at desk) | 1 | ea | | $ - 0 |
| CE-01.03-150 Tactile Building Plan | 1 | ea | | $ - 0 |
| 2 | CE-02.01-100 Store Furnishings | 1 | job | | $ - 0 |
| | | | | $ - 0 |
| 3 | CE-03.02-105 Flipbook 14 pages with tabs | 136 | per sf | | $ - 0 |
| CE-03.02-200 Stratigraphy Wall | 1 | Element | | $ - 0 |
| CE-03.02-210 Props for wall-measuring scale and trowel | 2 | ea | | $ - 0 |
| CE-03.02-350 tactile Whelk shell (Est assumption these are found/park provided objects) | 1 | Element | | $ - 0 |
| CE-03.02-355 tactile oyster shells (Est assumption these are found/park provided objects) | 1 | Elements | | $ - 0 |
| CE-03.02.360 Pottery fragments (Native American) | 1 | Elements | | $ - 0 |
| CE-03.02.450 Reale, piece of eight (Est assumption these are found/park provided objects) | 1 | Element | | $ - 0 |
| CE-03.02-455 Pottery fragments (Spanish majolica) | 1 | Elements | | $ - 0 |
| CE-03.02.550 gun flint (Est assumption these are found/park provided objects) | 1 | Element | | $ - 0 |
| CE-03.02.555 Pipe stem (Est assumption these are found/park provided objects) | 1 | Element | | $ - 0 |
| CE-03.02.560 Clay marble (Est assumption these are found/park provided objects) | 1 | Element | | $ - 0 |
| CE-03.02.565 Brass button (Est assumption these are found/park provided objects) | 1 | Element | | $ - 0 |
| CE-03.02.570 Pottery fragments (English delft) (Est assumption these are found/park provided objects) | 0 | Elements | | $ - 0 |
| CE-03.02.650 Stragigraphy wall 4 embedded objects (Est assumption these are found/park provided objects) | 1 | Elements | | $ - 0 |
| CE-03.02.655 pearl ware (Est assumption these are found/park provided objects) | 1 | Element | | $ - 0 |
| CE-03.02.750 fish hooks and weights | 0 | Elements | | $ - 0 |
| CE-03.02.755 Slate tablet fragments (Est assumption these are found/park provided objects) | 0 | Elements | | $ - 0 |
| CE-03.02.760 1900's Coca Cola bottle | 1 | Elements | | $ - 0 |
| CE-03.02.850 Rusted trowel | 1 | Element | | $ - 0 |
| CE-03.02.855 Candy wrapper | 1 | Element | | $ - 0 |
| CE-03.02.860 Plastic water bottle cap | 1 | ea | | $ - 0 |
| CE-03.02.386 Replica Delftware plate | 1 | ea | | $ - 0 |
| 4 | CE-04.01-310 Tactile: Replica hammer head | 1 | Element | $ - 0 |
| CE-.04-.01-311: Replica blacksmith tongs | 1 | Element | $ - 0 |
| CE-04.01-312 replicated chunk of coal | 1 | Element | $ - 0 |
| CE-04.01-313 replicated chunk of slag | 1 | Element | $ - 0 |
| CE-04.02-270 Basket 1 | 1 | ea | $ - 0 |
| CE-04.02-280 Basket 2 | 1 | ea | $ - 0 |
| CE-04.02-290 basket 3 | 1 | ea | $ - 0 |
| GL-04.02-350 Tactile/braille button activation plate | 1 | ea | $ - 0 |
| CE.04.04-500 Tactile basket (partially finished) | 1 | ea | $ - 0 |
| CE-04.04-350 Map interactive flip book 10 pages , tabs | 88 | per sf | $ - 0 |
| CE-04.310 Flip book Brer Rabbit 10 pages, tabs | 75 | per sf | $ - 0 |
| CE-04.04-600 Case and mount for Abbott Bust | 1 | unit | $ - 0 |
| 5 | CE-05.01-100 Map Table | 1 | ea | $ - 0 |
| CE-05.01-120 Tactile insert map | 1.2 | sf | $ - 0 |
| CE-05.01-150 Insert elements for large Map table | 1 | job | $ - 0 |
| CE-05.02-200 Chunk of Oyster Tabby | 1 | unit | $ - 0 |
| CE-05.03-150 Spanish Moss Tactile | 1 | unit | $ - 0 |
| CE-05.04-150 Antler | 1 | unit | $ - 0 |
| CE.05.01-120 Tactile map for Map Table | 1 | sf | $ - 0 |
| GL-05.02-500 Oysters: Natural protection Custom Illustration line art | 1 | job | $ - 0 |
| 6 | CA-06.02-200 Wall-mounted artifact case | 1 | ea | $ - 0 |
| CA-06.03-250 Tactile: Jar containing ear | 1 | unit | $ - 0 |
| CE-06.01-100 Oglethorpe free-standing cut out | 1 | unit | $ - 0 |
| GL-06.02-150 Panel custom art | 1 | job | $ - 0 |
| GL-06.02-300 Panel custom art | 1 | job | $ - 0 |
| 7 | CE-07.01-200 Bench | 1 | unit | $ - 0 |
| CE-07.02-200 Benches With Storage | 2 | ea | $ - 0 |
| CE-07.02-250 Peg rail and mirror | 1 | job | $ - 0 |
| CE-07.02-350 Two smithed iron hooks to hold graphics | 1 | ea | $ - 0 |
| CE-07.03-100 Scenic reproduction Colonial hearth, plaster wall treatment and wainscoating | 1 | job | $ - 0 |
| CE-07.03-400 Reproduction Colonial chair | 1 | unit | $ - 0 |
| CE-07.03-500 Crane Arm with pot and kitchen utensils | 1 | unit | $ - 0 |
| CE-07.04-100 Table and Chairs-one table, 4 chairs | 1 | unit | $ - 0 |
| CE-07.04-150 Table and two chairs (child-sized but identical to CE-07.04-100) | 1 | unit | $ - 0 |
| CE-07.05-100 Reproduction Colonial bar | 1 | ea | $ - 0 |
| GL-07.05-150 Silhouette of female barkeep custom artwork | 1 | job | $ - 0 |
| CE-07.06-310 Interactive map puzzle five sets | 85 | sf | $ - 0 |
| CE-07.07-100-- Colonial writing desk & stool | 1 | ea | $ - 0 |
| CE-07.07-150 Writing implelemnts and supplies (allowance) multiples | 1 | | $ - 0 |
| CE-07.07.175 Post Box | 1 | ea | $ - 0 |
| GL-07.01-500 Tavern façade | 1 | ea | $ - 0 |
| GL-07.05-500 Bar customer cut out-form only | 1 | unit | $ - 0 |
| GL-07.01-600 Silhouette of Tabby workman-form only | 1 | ea | $ - 0 |
| GL-07.01-700 Townswoman-form only | 1 | ea | $ - 0 |
| 8 | CE-08.02-100 Spotting scope 1 with internal graphic | 1 | ea | $ - 0 |
| CE-08.02-200 Spotting scope 2 with internal graphic | 1 | ea | $ - 0 |
| CE-08.02-300 Spotting scope 3 wit internal graphic | 1 | ea | $ - 0 |
| Subtotal Custom Elelments | $ - 0 |
| Mark Up | $0.00 |
| Total Custom Elements | $ - 0 |
| Audio Video Programs | | | | |
| MATERIALS - AV EQUIPMENT: | qty. | unit | unit cost | amount |
| 04 | EE-04.02-450 32" monitor, Sound Shower, and CPU | | job | | $ - 0 |
| Associated cables, Triplite Plugs | | Job | | $ - 0 |
| | | | | $ - 0 |
| SUBTOTAL, AV EQUIPMENT | | | | |
| MARK-UP on materials | | percent | | $ - 0 |
| TOTAL ALL MATERIALS | | | | $ - 0 |
| LABOR (Production) | | | | | |
| | hours | x | rate | amount |
| EP-00.00-100 Audio Description | | Project | | $ - 0 |
| EP-04.02-400 Program: Ring Shout and Basket Maker Time:1-3 minutes | | Project | | $ - 0 |
| Licsensing Fees/Rights | job | $ - 0 |
| TOTAL ALL LABOR (see AV Estimate for Detail) | | $ - 0 |
| Total Audio Video | | | $ - 0 |
| Graphics | | | | |
| MATERIALS: | | | | |
| | qty. | unit | amount |
| 1 | GL-01.01-100 Welcome Mural 279 sf | 154 | sf | $ - 0 |
| GL-01.03-200 Hanging Sign: VC name and NPS arrowhead 9 sf | 9 | sf | $ - 0 |
| GL-01. 03-350 Donation Box panel | 11 | sf | $ - 0 |
| GL-01.04-100 Exhibit Title Panel | 29 | sf | $ - 0 |
2 GL-02.01-200 Store Hanging Sign 6 sf $ - 0
| 3 | GL-03.01-100 Intro panel & mural | 155 | sf | $ - 0 |
| GL-03.02-100 Stratigraphy panel- Who was here? | 3 | sf | $ - 0 |
| GL 03.02-250 Statigraphy Wall Title sign in "grass" | 1 | sf | $ - 0 |
| GL-03.03-100 Reasearch Today panel 1 | 7 | sf | $ - 0 |
| GL-03.03-200 Reaseach Today panel 2 | 4 | sf | $ - 0 |
| GL-03.03-250 Reasech Today panel 3 | 3 | sf | $ - 0 |
| GL-03.02-300 Statigraphy Wall labeling | 1 | sf | $ - 0 |
| GL-03.03-350 Artifact case title | 0.4 | sf | $ - 0 |
| GL-03.03-360 Case label: top layers | 0.4 | sf | $ - 0 |
| GL-03.03-370 Case label:Useful Everyday Objects | 0.4 | sf | $ - 0 |
| GL-03.03-380 Case label: Eating and Drinking | 0.4 | sf | $ - 0 |
| GL-03.03-390 Case label: Things To Wear | 0.4 | sf | $ - 0 |
| 4 | GL-04.01-100, 200, 300, 400 Mural for 04.01 | 114 | sf | $ - 0 |
| GL-04.01-200 Graphic panel level1: From fort to Plantation | 9 | sf | $ - 0 |
| GL-04.01-250, GL-04.02-250, GL-04.03-250, GL-04.04-250, GL-04.05-250 5 Circular panels | 39 | sf | $ - 0 |
| GL-04.02-100 panel | 9 | sf | $ - 0 |
| GL-04.02-200 Graphic panel level 1 Gullah Geechee Culture | 9 | sf | $ - 0 |
| GL-04.03-100 Mural for 04-03 | 9 | sf | $ - 0 |
| GL-04.04-200 Level 1 graphic panel: Reconstruction and Migration | 9 | sf | $ - 0 |
| GL-04.04-550 Abbott bust label | 1 | sf | $ - 0 |
| GL-04.04-570 Mural behing Abbott case | 30 | sf | $ - 0 |
| GL-04.05-100-- Banner 1 | 32 | sf | $ - 0 |
| GL-04.05-200 Banner 2 | 32 | sf | $ - 0 |
| GL-04.05-300 Banner 3 | 32 | sf | $ - 0 |
| GL-04.05-400 Banner 4 | 32 | sf | $ - 0 |
| 5 | GL-05.01-200 Hanging banner: Intro 2 required | 32 | sf | $ - 0 |
| GL-05.01-300,400,500, 500,600 4 panels | 128 | sf | $ - 0 |
| GL-05.02-100 Oysters intro panel | 1.5 | sf | $ - 0 |
| GL-05-02-200 Oysters: uses | 3 | sf | $ - 0 |
| GL-05.02-500 Oysters: Natural protection | 1 | sf | $ - 0 |
| GL-05.03.100 Fibers-Intro | 1.5 | sf | $ - 0 |
| GL-05.03-200 Fibers: Uses | 1.5 | sf | $ - 0 |
| GL-05.03-500 Fibers: Habitat health tracker | 1.5 | sf | $ - 0 |
| GL-05.04-100 Game animals: Intro | 1.5 | sf | $ - 0 |
| GL-05.04-200 Game animals: uses | 9 | sf | $ - 0 |
| GL-05.04-500 Game animals- combating Invasive species | 1 | sf | $ - 0 |
| GL-04.05-100 Timber Intro | 1.5 | sf | $ - 0 |
| GL.05-05-200 Timber-original maritime forest | 9 | sf | $ - 0 |
| GL-05.05-500 Conservation and restoration | 1 | sf | $ - 0 |
| 6 | GL-06.01-100 Standing panel front-Oglethorpe 2 sides | 69 | sf | $ - 0 |
| GL-06.001-200 Hanging British flag | 16 | sf | $ - 0 |
| GL-06.01-250 Hanging Spanish flag | 16 | sf | $ - 0 |
| GL-06.02-100 Wallpaper graphics:Tensions | | | |
| GL-06.02-150 Magenta Panel: Debatable land | 19 | sf | $ - 0 |
| GL-06.02-175 Circular panel | 3 | sf | $ - 0 |
| GL-06.02-02-210 Panel inside case CA-06-02-200 | 3 | sf | $ - 0 |
| GL-06.02-300 Britian vs Spain | 3 | sf | $ - 0 |
| Gl-06.03-100 Wallpaper graphic: War of Jenkin's Ear | 69 | sf | $ - 0 |
| GL-06.03-150 Magenta Panel: More Broken Promises | 19 | sf | $ - 0 |
| GL-06.03-200 Panel: Why Jenkin's Ear? | 5 | sf | $ - 0 |
| GL-06-03-300 Panel: War Comes to GA. | 4 | sf | $ - 0 |
| GL-06.03.500 Panel: War Ends… | 5 | sf | $ - 0 |
| GL-06.03-550 Circular Panel | 3 | sf | $ - 0 |
| 7 | GL-07.01-100 Tavern Sign 2 sides | 3 | sf | $ - 0 |
| GL-07.01-300 Panel : GA offers 2nd chance | 3 | sf | $ - 0 |
| GL-07.01-500 Panel: Tavern offers a place to meet | 3 | sf | $ - 0 |
| GL-07.05-500 bar customer cut out | 19 | sf | $ - 0 |
| GL-07.01-600 Silhoutete of Tabby workman | 15 | sf | $ - 0 |
| GL-07.01-650 Silhouette of Tabby workman reverse | 15 | sf | $ - 0 |
| GL-07.01-700, 750 Townswoman cut out two sides | 30 | sf | $ - 0 |
| GL-07.02-100 Cutout panel: functional yet elegant | 2 | sf | $ - 0 |
| GL-07.02-125 Cutout panel: hat panel | 2 | sf | $ - 0 |
| GL-07.02-150 Cutout panel to show status | 2 | sf | $ - 0 |
| GL.07-02-450 label for shoe buckle case | 0.25 | sf | $ - 0 |
| GL-07.03-200 Panel: hearth and food | 2 | sf | $ - 0 |
| GL-07.03-250 Cutout panel: food archeology | 2 | sf | $ - 0 |
| GL-07.03-275 Colonial hearths | 6 | sf | $ - 0 |
| GL-07.05-150 Silhouette of female barkeep | 16 | sf | $ - 0 |
| GL-07.03-200 Cutout panel: women ran taverns | 2 | sf | $ - 0 |
| GL-07.05-300 Bottles panel | 1 | sf | $ - 0 |
| GL-07.05-475 barrel cutout | 5 | sf | $ - 0 |
| GL-07.05-500 Public house panel | 1 | sf | $ - 0 |
| GL-07.06.100 Panel | 25 | sf | $ - 0 |
| GL-07.06-200 Panel: Hawkins-Davidson House Reading rail graphic | 5 | sf | $ - 0 |
| GL-07.06-200 Map reading rail graphic | 5 | sf | $ - 0 |
| GL-07.6-310 Map interactive prompt | 1 | sf | $ - 0 |
| GL-07.06-320 Base graphic for map interactive | 3 | sf | $ - 0 |
| GL-07.07-200 Panel: Keeping in touch | 2 | sf | $ - 0 |
| GL-07.07-250 Writing promp, applied to desk surface | 2 | sf | $ - 0 |
| GL.07-07-300 The Wesleys | 4 | sf | $ - 0 |
8 GL-08.01-100 Reading rail:t own plan 6 sf $ - 0
| 9 | GL-09.-3-100 Artifact label: Pipes | 0.25 | sf | $ - 0 |
| GL-09.01-150 Aftifact label for buckle case | 0.25 | sf | $ - 0 |
| GL-09.02-150 Artifact label for paltes above fireplace | 0.25 | sf | $ - 0 |
| GL09.03-150 Artifact label for glassware, lower right | 0.25 | sf | $ - 0 |
| GL-09.04-150 Artifact label: bottles | 0.25 | sf | $ - 0 |
| GL-09.04-155 Outline of short stemmed glass (make 18) | 0.25 | sf | $ - 0 |
| GL-09.04-160 Outline of long stemmed glass (make 18) | 0.25 | sf | $ - 0 |
| GL-09.04-165 Outline of tankard (make 24) | 0.25 | sf | $ - 0 |
| GL-09.04-170 Outline of bottle (make 10) | 0.25 | sf | $ - 0 |
| SUBTOTAL MATERIALS | | | | $ - 0 |
| MARK-UP on materials | | percent | | $ - 0 |
| TOTAL ALL Graphic MATERIALS | | | | $ - 0 |
| LABOR | | | | | |
| | hours | x | rate | amount |
| Graphics supervisor | | hours @ | $60.00 | $ - 0 |
| Graphics specialist | | hours @ | $53.00 | $ - 0 |
| TOTAL ALL LABOR | | | | $ - 0 |
| TOTAL Graphics | | | | | $ - 0 |
| Artifact mounting | | | | |
| MATERIALS: | | | | | |
| Note: Conservation to be done by NPS, NIC | qty. | unit | unit cost | amount |
| 3 | AO-03.03-365 Park artifacts for top layers | | Items | | $ - 0 |
| AO-03.03-375 Park artifacts for Everyday Objects | | Items | | $ - 0 |
| AO-03.03-385 Park artifacts for Eating and drinking | | Items | | $ - 0 |
| AO-03.03-395 Park artifacts for Things to Wear | | Items | | $ - 0 |
| 6 | AO-06.02-220 Axe head | 1 | Item | | $ - 0 |
| AO-06.02-221-225 beads | 3 | Items | | $ - 0 |
| AO-06.02-226 beads | 3 | Items | | $ - 0 |
| AO-06.02-227 Cufflink | 1 | Item | | $ - 0 |
| AO-06.02-228 Coin | 1 | Item | | $ - 0 |
| AO-06.02-229 Gun Part | 1 | Item | | $ - 0 |
| Qty Items | | | | |
| SUBTOTAL MATERIALS | | | | $ - 0 |
| MARK-UP on materials | | percent | | $ - 0 |
| TOTAL ALL MATERIALS | | | | $ - 0 |
| LABOR | | | | | |
| | hours | x | rate | amount |
| Mount maker - Fabricate and install 7 items | | hour | | $ - 0 |
| TOTAL ALL LABOR | | | | $ - 0 |
| TOTAL Conservation | Artifact mounting | | | | $ - 0 |
| PROJECT CLOSEOUT | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| Printing Supplies | | Item | | $ - 0 |
| Hard drives (4TB) | | Item | | $ - 0 |
| SUBTOTAL MATERIALS | | | | $ - 0 |
| MARK-UP on materials | | percent | | $ - 0 |
| TOTAL ALL MATERIALS | | | | $ - 0 |
| LABOR | | | | | |
| | hours | x | rate | amount |
| Project Specialist | | hours | | $ - 0 |
| Project Manager | | hours @ | | $ - 0 |
| TOTAL ALL LABOR | | | | $ - 0 |
| TOTAL Project Closeout | | | | | $ - 0 |
| SHIPPING | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| Packing | | Item | | $ - 0 |
| Shipping (2 Trucks) | | Truck | | $ - 0 |
| TOTAL MATERIALS | | | | $ - 0 |
| LABOR | | | | | |
| | hours | x | rate | amount |
| Warehouse and Shipping Specialists | | hours @ | | $ - 0 |
| TOTAL ALL LABOR | | | | $ - 0 |
| Total Shipping | | | | | $ - 0 |
| INSTALLATION | | | | | |
| Project manager | | | | |
| Travel | | qty. | unit | unit cost | amount |
| air fare | | Ticket | | $ - 0 |
| per diem | | day | | $ - 0 |
| Rental Van and Gas | | day | | $ - 0 |
| Lodging | | day | | $ - 0 |
| Total | | | | $ - 0 |
| LABOR | | | | | |
| | hours | x | rate | amount |
| Project Manager (1 Person) | | hour | | |
| Total Travel and Accomodation for: Project Manager | | | | $ - 0 |
| Fabrication Installers | | | | |
| Travel Costs: | | qty. | unit | unit cost | amount |
| air fare | | Tickets | | $ - 0 |
| per diem | | days @ | | $ - 0 |
| Lodging | | days @ | | $ - 0 |
| LABOR | Total | | | | $ - 0 |
| Exhibit Spec - Fabricator | hours @ | $ - 0 |
| Exhibit Spec - Fabricator | hours @ | $ - 0 |
| Exhibit Spec - Fabricator | hours @ | $ - 0 |
| Electrical Specialist | hours @ | $ - 0 |
| Total | | $ - 0 |
Total Travel and Accomodation for: Installation Team $ - 0
| 1 x Exhibit AV Specialist | | | | |
| Travel Costs: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $ - 0 |
| Rental Car and Gas | | days@ | | $ - 0 |
| per diem | | days @ | | $ - 0 |
| Lodging | | days @ | | $ - 0 |
| LABOR | Total | | | | $ - 0 |
| AV Integration Technician | hours @ | $ - 0 |
| Total | | $ - 0 |
Total Travel and Accomodation for: AV Specialist $ - 0
| Object Mount Maker/Installer | | | | |
| Travel Costs: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $ - 0 |
| Rental Car and gas | | days @ | | $ - 0 |
| per diem | | days @ | | $ - 0 |
| Lodging | | days @ | | $ - 0 |
| LABOR | | | | | $ - 0 |
| Object Installer/Mount Maker | hours @ | $ - 0 |
| | $ - 0 |
Total Travel and Accomodation for: AV Specialist $ - 0
TOTAL ALL Travel Costs: INSTALLATION - 0
TOTAL ALL LABOR: INSTALLATION - 0
Total Installation $ - 0
| TRAVEL | | | |
| Postaward meeting | | | |
| TRAVEL | | | |
| air fare (2 Round trips) | job @ | $ - 0 |
| per diem (2 x for 2 days) | days @ | $ - 0 |
| lodging 2 x for 2 days) | days @ | $ - 0 |
| Rental car and gas | days @ | $ - 0 |
| Misc. | job @ | $ - 0 |
| TOTAL MATERIALS | | | | $ - 0 |
| LABOR | | | | | |
| | hours | x | rate | amount |
| Project Manager (Trip report) | | hours @ | | $ - 0 |
| Object Installer | | hours @ | | $ - 0 |
| | | | | $ - 0 |
| TOTAL ALL LABOR | | | | $ - 0 |
| Total Travel | | | | | $ - 0 |