Attachment V - Special Provision GEND6AG23-900-Materials Generator Repairs.pdf
PDF 76 KB Posted
- Solicitation number
- BPM017952
- Issued by
- Allegany County, Garrett County, Washington County, Maryland
About this file
This document is a set of Special Provisions for a Maryland State Highway Administration (SHA) contract related to materials for generator repairs at SHA District 6 facilities in Allegany, Garrett, and Washington Counties. The contract includes an allowance for necessary materials not listed in the schedule of prices, with the contractor allowed a markup percentage up to a maximum of $0.10. The contractor must obtain all materials from approved sources and provide documentation of competitive pricing if purchasing from associated companies. The SHA reserves the right to furnish materials as deemed appropriate, with no claim for costs or profit from the contractor. The contract covers generator maintenance services within the three named Maryland counties.
The pricing terms allow for the contractor to be reimbursed for the actual cost of materials delivered, including tax and transportation, plus the allowed markup percentage. There is a $500 deduction per occurrence if the contractor refuses to order materials as requested by the SHA. The contract does not specify any set-asides, incumbents, or funding sources, but indicates the allowance amount may not be fully utilized over the term of the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS CONTRACT NO. GEND6AG23
900 –MATERIALS FOR GENERATOR REPAIRS 1 of 2
08-04-17
CATEGORY 900
MATERIALS
MATERIALS FOR GENERATOR REPAIRS
DESCRIPTION. This work is to provide for materials necessary to perform repairs.
Specific material bid items have not been included in this Contract. An item has been established in the Schedule of Prices for materials to be obtained under the item for “ALLOWANCE FOR
MATERIALS FOR GENERATOR REPAIRS (DO NOT ALTER).
MATERIALS. All materials used for repairs shall be from an approved source of supply or as approved by the Engineer prior to the incorporation of the material into any repair work.
CONSTRUCTION. Not applicable.
MEASUREMENT AND PAYMENT. The bid item prices shall include all costs for furnishing each specific material (including but not limited to ordering, actual cost, delivery, tax, etc.). The item “ALLOWANCE DOLLARS FOR PARTS AND MATERIALS FOR EMERGANCY
WORK”. “ALLOWANCE DOLLARS” has been established for the payment of any necessary materials not listed in the contract schedule of prices. The value of this item has been pre-established, and shall not be altered, but shall be included in the total bid. The value of this item is estimated and there is no guarantee that any or all of this item will be used during the term of the
Contract. Payment for materials will be for the actual cost of the materials delivered for the work including tax and transportation charges paid by the Contractor.
In addition to the actual materials, tax, and applicable transportation costs, the Contractor will be allowed the mark-up percentage established by the bid item for “MATERIALS MARKUP
PERCENTAGE”. The bid price for this item shall not exceed a maximum of $0.10. IF THE
CONTRACTOR’S BID FOR “MATERIALS MARKUP PERCENTAGE” EXCEEDS THIS
MAXIMUM, THE BID WILL BE CONSIDERED NON-RESPONSIVE AND THE
CONTRACTOR’S BID WILL BE REJECTED.
To substantiate materials and transportation cost, original receipted invoices shall be submitted.
Contractors who have subsidiary supply companies may not purchase material from those companies unless their prices are competitive with the prevailing rates being paid in the area where the work is being performed. Should the Contractor desire to purchase materials from his associated company, the Engineer may require the Contractor to provide documentation that the prices paid for materials are competitive with the supply industry. This documentation shall include at least two price quotations from other supply companies. All documentation shall be presented to the Engineer before the material is ordered.
When materials and supplies are requested to be ordered by the Engineer, the Contractor shall submit a copy of the order confirmation to the Engineer within 5 days, when requested. The
SPECIAL PROVISIONS CONTRACT NO. GEND6AG23
900 –MATERIALS FOR GENERATOR REPAIRS 2 of 2
08-04-17 confirmation shall include the estimated delivery time for the materials. If the Contractor refuses to order the items, the sum of $500.00 per occurrence will be deducted from money due to the
Contractor, not as a penalty but as liquidated damages.
THE ADMINISTRATION RESERVES THE RIGHT TO FURNISH MATERIALS AS IT
DEEMS APPROPRIATE, AND THE CONTRACTOR SHALL HAVE NO CLAIM FOR ANY
COSTS, OVERHEAD, OR PROFIT ON THESE MATERIALS.
The following is a list items that may or may not be in the Schedule of Prices. If there is no bid item in the Schedule of Prices, the item will be paid for under the item for MATERIALS ALLOWANCE
DOLLARS. The bid price on all material items shall include the delivery cost to the Administration provided storage yard.